You are on page 1of 5

Curriculum Vitae

GAURAV KADAM
A/G1, Om Shree Ram C.H.S, Sector 7, Plot no.26, Shree nagar, Wagle estate, Thane (West)–
400604, Maharashtra,India
Contact No. : +91 – 8450902129, 9082531462
Email ID: gauravkadam8@gmail.com , gaurav_198129@rediffmail.com

Petrochemical/ Chemical / Oil & Gas Projects - Planning, , Site Construction Management
– Execution & close out, Quality Management

Career Objective:
Have an overall Experience of 18+ years in the field of Instrumentation & Control
Engineering. I am looking for a good position in the field of instrumentation and safety
integrated process automation system in a prestigious company where my skills and
capabilities can be put into efficient use. I possess effective organizational skills and the
ability to utilize a team and develop the final output.

Educational Qualification:
 DIPLOMA : Diploma In Instrumentation Engg. From M.S.B.T.E – Under
University of Mumbai, 2000

 TECHNICAL COURSE :
 Undergone Implant training in Nagman Instruments & Electronics Pvt. Ltd., 2005
 Attended seminar for Pepperl + Fuchs – Field Bus
 Attended seminars for various make DCS, PLC, Water Treatment Plant, Fire
Fighting System, In-Tools etc.
 All in-house vendors training for process instrumentation and plant safety training
 Completed the ISO 9001-2008 course & certified as an Internal Auditor
 Completed various level of Group ethics training programs

Professional Experience

1. Name of Company : Miraj Instrumentation Services Pvt.Ltd.


Project : BASF ED LINE2 EXPANSION PROJECT, Dahej
Position Held : Planning Engineer
Duration : From Feb 2021 to November 2022

2. Name of Company : Offshore Infrastructure Ltd,India


Project : IOCL BS VI PROJECT, Panipat
Position Held : Planning Engineer
Duration : From March 2018 to January 2021
3. Name of Company : HYUNDAI ENGG.CO.LTD. (Turkmenistan)
Project : Turkmenistan Ethane Cracker/PE/PP Plant PMC: TOYO ,
CLIENT : TURKMANGAZ
Position Held : Instrument Supervisor
Duration : From February 2014 to Feb.2018

4. Name of Company : M/S. SAMSUNG ENGG.LTD. (SAUDI ARABIA)


Project : Ma’aden Aluminum Rolling Mill (Ras Al khair )
Client : FLUOR (ARABIA)
Position Held : Instrument Supervisor
Duration : March 2013 to February 2014

5. Name of Company : M/S. Jasubhai Engg. Pvt. Ltd . MUMBAI


Project : DHT (OSBL)
CLIENT : HPCL (Mumbai Refinery)
Position Held : Sr. Project Engineer
Duration : September 2011 to March 2013

6. Name of Company : M/s. Perfect Instrumentation & Control KOCHI


Project : CEMP (Phase II)
Client : EIL, BPCL( Kochi )
Position Held : Instrument Engineer
Duration : January 2010 to December 2010

7. Name of Company : Somika Societe miniere Du Katanga, Based at Lubumbashi D. R.


Congo - Africa
Project : Agitated flash dryer
Client : EIL, BPCL( Kochi )
Position Held : Instrument Engineer.
Duration : May 2009 – Sept. 2009

8. Name of Company : Viraj Profiles Ltd. (Thane - Boisar) – Viraj Group


Project : VIRAJ PROFILES LTD. (Manufacturing steel wire)
Position Held : Instrument Engineer.
Duration : May 2005 – June 2008

8. Name of Company : Monotona Tyres Ltd. (Thane - Wada)


Project : MONOTONA TYRES LTD. (Manufacturing of Tyres and Tubes)
Position Held : Instrument Engineer.
Duration : May 2005 – June 2008

9. Name of Company : M/s. Perfect Instrumentation & Control


Project : NEW FCCU,
Client : HPCL ( Mumbai Refinery )
Position Held : Instrument Engineer.
Duration : June 2002 to March 2005

10. Name of Company: Hindustan Petroleum Corporation Ltd. (Mumbai)


Project : Diploma Apprentice
Position Held : Instrument Engineer.
Duration : May 2001 – May 2002

JOB PROFILE
 Design Review of EPC and Vendors Overall detailed Engineering and Standard
Specification with respect to Instrument system activities to ensure compliance with
the scope of work.
 Review for various I&C system like DCS Logics, SAT procedure, Commissioning
procedure, System Description, Control Philosophy, Data Sheets, Location & Installation
Drawings, Hook up, P&ID, PFD Drawings etc.
 Working as an INSTRUMENTATION & CONTROL ENGINEER in detailed erection,
construction, pre-commissioning and commissioning of instrumentation activities in
Power Plant, Oil & Gas, and petro chemicals.
 Familiar with standards ISA, IEEE, ASTM, NAMUR, ASMI, ANSI, NEMA, IEC, NFPA etc.
 Supervision for the laying of Control / Instrumentation / Fiber-optic / Other network
cables in the Cable trays, trenches, underground & along with proper termination
including with conduit sealing / proper Lugs
 Actively Conducting the Factory Acceptance Test & Site Acceptance Test for I&C Related
Packages as OE role
 Actively lead the Site construction supervision activities like erection, installation,
Testing, Quality Assurance, Loop Checking, Witnessing of FAT / SAT, Troubleshooting,
Pre-commissioning, and Post commissioning of I&C Components and Plant Main
Control system (DCS / PLC / SIS) in thermal / CCGT power plant and as well as oil & gas
projects
 Testing of DCS, PLC, UPS (Earth test, Cable Loop & Continuity Test, Megger Test, Logic
Test, Control Network Test, Redundancy Test etc.)
 Prepare and maintain commission records of site observations, testing processes and
checklists.
 Efficient troubleshooting and optimization of the Field instruments & Control Systems.
 Validation of Control System Logics like OCLS and CLCS in the DCS / PLC / SIS.
 Modification of CLCS / OLCS logics as per process condition / site condition based.
 Maintaining of all kinds of reports like ITR approved reports, Instrument calibration
Reports, FAT & SAT reports for PCS / SIS and PLC Panel, TG Panel, Pre-commissioning
test report, Final commissioning report
 Coach and train equipment engineers associated with instrument as well as control
deliverables.
 Responsible for completion activities related to commissioning package equipment and
handover to operation
 Following up punch works in the field and punch list documentation and clearance.
 Actively involved to close of all kinds of Checklist, Inspection Test Reports (ITR) and
Punch Lists
 Ensure that drawings/documents are marked up with changes identified during
Commissioning and that as-built documentation is updated according to Site
Instructions
 Preparation / Review of final Site As-Built Drawing
 Actively participated in the performance Test and warranty test
 Preparation of List for any left-out items after commissioning of plant
 Providing recommendations to the Owner for the Final Take of the Plant (TOP)
 Actively lead on kinds of meetings like Monthly progress meeting, Site Progress
meeting, technical issues meetings, contract variation meetings, Design Review
meetings, Commercial negotiation meetings etc.
 Adept at implementing quality measures / standards & applied quality management
tools & practices such as for effective with zero accidents
 Always maintain the QA/QC records of the inward material calibration report and
issuing the I&C instruments / Equipments after completion of calibration for further
Site erection works with safety precaution methods.
 Involves in the Schedule development, maintenance & Monitoring activities. Final sign
off for all QA / QC checklists.
 Insisting of QHSE Rules implementation at site
 An effective communicator with excellent relationship, management skills and strong
analytical, problem solving and organizational abilities.
 Test Reports handling for the various BOP Package, I&C Equipments and Control
system including with the Pre / Final Commissioning Activities at site
 Followed the Design change notes (DCN) & Field Change Notes (FCN) from the EPC
Consortium / contractors during site erection / installation / commissioning activities
from the EPC Consortium partners at site

Personal Profile:

Name : GAURAV KADAM


Nationality : Indian
Date of Birth : 22 Feb 1981
Nationality : Indian
Passport Number : P - 5981365
Marital Status : Married
Language known : English, Hindi, Marathi

Permanent Address for Communication:


A/G1,Om Shree ram C.H.S, Sector 7, Plot no.26, Shree nagar , Wagle estate, Thane
(West)– 400604, Maharashtra, India
Contact No. : +91 – 8450902129, 9082531462

Declaration
I promise that the details furnished above by me are the latest and true to the best of my
knowledge.

Place : India
Date : 16/12/2022
(GAURAV KADAM)

You might also like