You are on page 1of 5

RESUME

Bharathidasan Natarajan

Name: Bharathidasan Natarajan

Title: Sr.Instrumentation Engineer

Education: B.E (Electronics & Communication Engineering), 2000 Pass out, Madras
University.

Specialist Courses:
 Completed Smart Plant Instrumentation in “TECHINDEED” Saidapet, Chennai.

 Completed Project Management Program (PMP) Preparatory Course in InfoCarrer Chennai

 Certified in SIX SIGMA Green Belt at MSME Development Institute Chennai.

 Certified in Lead Auditing Course in ISO 9001:2008 at INTERTECK, Chennai.


 Certified in ASNT NDT Level –II at VIBRANT, Chennai.

 Completed Certified Automation Engineer (CAE) In Prolific, Chennai.

 Done PLC and SCADA course in Central Polytechnic, Chennai.

 Done a Project on Digital Image Processing Using C language.

 Telephone Maintenance and Servicing.

 Repair and Maintenance of Power Supply, UPS, Invertors & Stabilizer at Central Training
Institute, Chennai.

 Fire and Safety Training at CPCL CHENNAI

 H2S Training & PTW Training in Qatar Gas.

Registrations/Affiliations

 Registered in Saudi Council of Engineers.

SUMMARY OF EXPERIENCE:

An experienced individual in Instrumentation Field with over Twenty years in the construction
industry which have encompassed projects in infrastructure, oil & gas, petrochemical, minerals
and chemical industries.

Has the ability to plan, manage, coordinate and control project teams from award to completion
and demonstrates strong leadership skills that ensure the highest levels of safety, quality,
design, specification and client requirements are obtained.

Possesses excellent communication skills at all levels and fully understands the necessities of
building a solid Client/Contractor relationship from the outset to achieve maximum project
success. Please find below a quick glance of the projects which was handled.

JACOBS ZATE
RESUME
Bharathidasan Natarajan

Projects Handled in Maaden:

 Project Name : Gypsum Conveyor Expansion Project (Electro Mechanical) in


Gypsum Unloading Area, MH Plant
Duration : Nov-2019 to Till Now

 Project Name : PAP Off Gas Scrubber Project in PAP Plant


Duration : Jan-2020 to Till Now

 Project Name : MACP Process Water Line connecting to PAU in PAU Plant
Duration : Dec-2019 to Nov-2020

 Project Name : 4” to 6” Line Modification (Instruments Inst. & Comm.) in PAP


Plant
Duration : Sep-2019 to Oct-2019

 Project Name : Additional Air Compressor Inst. and Commissioning in PAU Plant
Duration : Aug-2019 to Sep-2019

 Project Name : PAP Subgrade Project (Instruments Inst. & Comm.) in PAP Plant
Duration : Feb-2019 to Apr-2019

 Project Name : Weigh Scale Installation for the Ship Loader Conveyor Y85
Duration : Jul-2018 to Aug-2018

 Project Name : AMMONIA-1 SHUTDOWN & REPLACING TWO VESSELS


Duration : 15-Mar-2018 to 25-Apr-2018

 Project Name : DAP Interconnection MPC to MWSPC Project


Duration : 20-Sep-2017 to 4-Mar-2018

 Project Name : Gypsum Stacking Area


Duration : 1-Feb-2016 to 25-Oct-2016

 Project Name : Fire Detection and Protection for Ammonia & MH-1
Duration : 1-Feb-2016 to 10-Nov-16

 Project Name : Gas Chromatograph Project in Ammonia


Duration : 10-Nov-2015 to 29-Jan-2016

 Project Name : FSA/ Cooling Tower Bleed Off Project in PAP


Duration : 03-Jun-2015 to 31-Dec-2015

JACOBS ZATE
RESUME
Bharathidasan Natarajan

 Project Name : Additional DAP Warehouses and Associated Facilities Project


Duration : 27-Aug-2014 to 31-May-2016

 Project Name : Replacement of DG Sets in ARAMCO METERING Station


Duration : 05-April-2015 to 31-May-2015

Project Name : Installation and Commissioning of 19 No’s Nuclear Density


Transmitter in PAP
Duration : 25-Dec-2014 to 16-Feb-2015

Project Name : Installation and Commissioning of CCTV in MH-1


Duration : 05-Nov-2014 to 18-Dec-2014

EMPLOYMENT HISTORY

21-Aug- M/s MAADEN PHOSPHATE COMPANY (KSA)


2014 to Till
Date Duties and Responsibilities:

 Responsible for managing all site construction activities and supervising field
personnel as required to ensure adherence to international standards, agreed budget,
schedule and construction sequence.

 Responsible for supervising construction activities and Subcontractor trades personnel


related to a discipline. Maintains the highest quality standards while administering
good construction safety practices with all on-site activities.

 Ensure that all company employees and contractors are adhering to the company
Health, Safety, and Environmental excellence policy.

 Promote job site safety, encourages safe work practices and rectifies job site hazards
immediately. Regularly participate in HSE meetings, toolbox talks, and daily jobsite
walks.

 Direct all field personnel including those of construction contractors to achieve


completion of the project on schedule, with quality workmanship that conforms to
original plans and specifications.

 Ensure that each reporting supervisor is capable of performing their allotted scope of
work.

 Contribute to construction schedule and 6-weeks look-ahead, understand the project


plans and specifications, identify and solve problems, order materials and schedule s
inspections as necessary throughout the process.

 Maintain positive working relationship with customers, contractors, suppliers and other

JACOBS ZATE
RESUME
Bharathidasan Natarajan

employees.

 Serve as a coach and mentor for subordinates and identify construction Supervisors
with capacity to be promoted to Superintendent level.

 Implement standardized construction work processes, procedures, manuals and systems


and create a system of control in each specific area.

 Verifying the As Built Construction Drawings and Design Packages ,Drawings by the
Contractor and giving comments

03-Feb-2013
M/s QATAR GAS (QATAR)
to
Duties and Responsibilities:
30-Jun-2014
 Involving in the Cold SAT, Hot SAT & Energization of all the Instrument DCS &
Marshalling, MMS, F&G Panels and Operational Consoles.
 Witnessing Hot Loop Check, Function Check as per Cause & Effect Drawing and
Function Check Control Narratives.
 Giving Technical Support in Trouble Shooting ON/OFF Valves & Control Valves and
solving the problems
 Raising Punch List which is not as per Project Specification and Verifying and clearing
it after it is cleared in MC+.
 Attending System Mechanical Completion Certificate (SMCC) Walk down for each
completed system
 Activities of Instrumentation & E&I, Documentation
Maintenance, Attending Inspection with Contractor and reporting the same
 Perform surveillance, inspections & audits for Instrumentation & E&I activities to
verify compliance with Company Requirements
 Quality control inspections, monitoring and reporting, Verify
 Materials in accordance with specifications and installation and Pre-Commissioning &
Commissioning of nstrument activities

M/s MAADEN PHOSPHATE COMPANY


Duties and Responsibilities:
30-May-2011
to
31-Jan-2013 Developed with the Client an integrated site construction team for monitoring well head
construction, sweet gas pipeline construction, gas compression and receiving facilities.
 Conducted constructability reviews and provided input during detailed design stages.
 Developed a Construction Execution Plan and the Integrated Management Team
philosophy for the Project.
 Developed a Coordination Procedure for joint occupancy of construction areas by
Contractors.