SKIKDA REFINERY REHABILITATION &

ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR
PARAXYLENE RECOVERY UNIT
(UNIT NO : 400)

CONTRACT NO. : DEV-K-23-09


SKIKDA REFINERY REHABILITATION &
PROJECT NAME :
ADAPTATION PROJECT
SONATRACH
OWNER :
ACTIVITE AVAL-DIVISION RAFFINAGE
LOCATION : SKIKDA, ALGERIA

F 30 NOV. 2014 AS-BUILT S.H.Park Y.C.Park P.S.Choi

5 30 NOV. 2011 Issue For Construction (Stage-2-3) Y.C.Park P.S.Choi K.Y.Nam

4 20 JAN. 2011 Issue For Construction (Stage-2-2) Y.C.Park P.S.Choi C.S.Koh

3 20 AUG. 2010 Issue For Construction (Stage-2-1) Y.C.Park P.S.Choi C.S.Koh

2 19 MAY. 2010 Issue For Approval (Stage-2) Y.C.Park P.S.Choi C.S.Koh

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED PM

DOC.NO : 6648-0400-5-PS-PI-0001-F TOTAL 97 SHEETS (INCL. COVER)

SAMSUNG ENGINEERING CO., LTD.


SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

UNIT 400 DRAWING LIST


Issue Issue
Acct. Drawing Number Drawing Title
Stage Date

1 6648-0400-5-PS-1-1111A FEED SURGE DRUM F 30 NOV. 2014

2 6648-0400-5-PS-1-1111B C8+ FEED PREHEATING SYSTEM F 30 NOV. 2014

3 6648-0400-5-PS-1-1112 XYLENE CLAY TOWER F 30 NOV. 2014

4 6648-0400-5-PS-1-1113 XYLENE SPLITTER F 30 NOV. 2014

XYLENE SPLITTER RECEIVER & SIDECUT


5 6648-0400-5-PS-1-1114 F 30 NOV. 2014
DRUM

6 6648-0400-5-PS-1-1115 XYLENE SPLITTER REBOILER HEATER F 30 NOV. 2014

7 6648-0400-5-PS-1-1116 FEED / FILTERATE EXCHANGER F 30 NOV. 2014

8 6648-0400-5-PS-1-1117 FEED / FILTERATE EXCHANGER F 30 NOV. 2014

9 6648-0400-5-PS-1-1118 FEED COOLER F 30 NOV. 2014

FIRST COLD STAGE CRYSTALLIZER -


10 6648-0400-5-PS-1-1119 F 30 NOV. 2014
LINE 1
SECOND COLD STAGE CRYSTALLIZER -
11 6648-0400-5-PS-1-1120 F 30 NOV. 2014
LINE 1
FIRST COLD STAGE CRYSTALLIZER -
12 6648-0400-5-PS-1-1121 F 30 NOV. 2014
LINE 2
SECOND COLD STAGE CRYSTALLIZER -
13 6648-0400-5-PS-1-1122 F 30 NOV. 2014
LINE 2
FIRST COLD STAGE CRYSTALLIZER -
14 6648-0400-5-PS-1-1123 F 30 NOV. 2014
LINE 4
SECOND COLD STAGE CRYSTALLIZER -
15 6648-0400-5-PS-1-1124 F 30 NOV. 2014
LINE 4

16 6648-0400-5-PS-1-1125 FIRST STAGE CENTRIFUGES F 30 NOV. 2014

17 6648-0400-5-PS-1-1125A FIRST STAGE CENTRIFUGES F 30 NOV. 2014

FIRST STAGE CENTRIFUGES


18 6648-0400-5-PS-1-1125B F 30 NOV. 2014
-NITROGEN SEAL SYSTEM
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Issue Issue
Acct. Drawing Number Drawing Title
Stage Date
FIRST STAGE CENTRIFUGES
19 6648-0400-5-PS-1-1125C F 30 NOV. 2014
-LUBE OIL SYSTEM

20 6648-0400-5-PS-1-1125D FIRST STAGE CENTRIFUGES F 30 NOV. 2014

FIRST STAGE CENTRIFUGES


21 6648-0400-5-PS-1-1125E F 30 NOV. 2014
-NITROGEN SEAL SYSTEM
FIRST STAGE CENTRIFUGES
22 6648-0400-5-PS-1-1125F F 30 NOV. 2014
-LUBE OIL SYSTEM
SLURRY DRUM & SLURRY DRUM
23 6648-0400-5-PS-1-1126 F 30 NOV. 2014
HEATER
SLURRY DRUM & SLURRY DRUM
24 6648-0400-5-PS-1-1127 F 30 NOV. 2014
HEATER
FIRST STAGE CENTRIFUGES AND FIRST
25 6648-0400-5-PS-1-1128 F 30 NOV. 2014
FILTRATE DRUM
26 6648-0400-5-PS-1-1128A FIRST STAGE CENTRIFUGES F 30 NOV. 2014
FIRST STAGE CENTRIFUGES
27 6648-0400-5-PS-1-1128B F 30 NOV. 2014
-NITROGEN SEAL SYSTEM
FIRST STAGE CENTRIFUGES
28 6648-0400-5-PS-1-1128C F 30 NOV. 2014
-LUBE OIL SYSTEM

29 6648-0400-5-PS-1-1129 INTERMEDIATE MELT DRUM F 30 NOV. 2014

30 6648-0400-5-PS-1-1130 SCREEN EFFLUENT DRUM F 30 NOV. 2014

31 6648-0400-5-PS-1-1131 SCREEN EFFLUENT DRUMS F 30 NOV. 2014

SECOND STAGE PRODUCT


32 6648-0400-5-PS-1-1132A F 30 NOV. 2014
CENTRIFUGES
SECOND STAGE PRODUCT
33 6648-0400-5-PS-1-1132B F 30 NOV. 2014
CENTRIFUGES
SECOND STAGE PRODUCT
34 6648-0400-5-PS-1-1132C F 30 NOV. 2014
CENTRIFUGES
SECOND STAGE PRODUCT
35 6648-0400-5-PS-1-1132D F 30 NOV. 2014
CENTRIFUGES

36 6648-0400-5-PS-1-1133 MELT DRUM F 30 NOV. 2014

37 6648-0400-5-PS-1-1134 SECOND FILTRATE DRUM F 30 NOV. 2014

38 6648-0400-5-PS-1-1135 WARM STAGE CRYSTALLIZER - LINE 1 F 30 NOV. 2014


SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Issue Issue
Acct. Drawing Number Drawing Title
Stage Date

39 6648-0400-5-PS-1-1136 WARM STAGE CRYSTALLIZER - LINE 2 F 30 NOV. 2014

SECOND STAGE RECOVERY


40 6648-0400-5-PS-1-1137A F 30 NOV. 2014
CENTRIFUGES
SECOND STAGE RECOVERY
41 6648-0400-5-PS-1-1137B F 30 NOV. 2014
CENTRIFUGES
SECOND STAGE RECOVERY
42 6648-0400-5-PS-1-1137C F 30 NOV. 2014
CENTRIFUGES
SECOND STAGE RECOVERY
43 6648-0400-5-PS-1-1137D F 30 NOV. 2014
CENTRIFUGES

44 6648-0400-5-PS-1-1138 THIRD FILTRATE DRUMS F 30 NOV. 2014

45 6648-0400-5-PS-1-1139 AROMATIC SUMP / VENT F 30 NOV. 2014

COLD AROMATIC SUMP / VENT &


46 6648-0400-5-PS-1-1140 F 30 NOV. 2014
DESUPERHEATING STATION
REFRIGERATION SYSTEM & LOW
47 6648-0400-5-PS-1-1141 F 30 NOV. 2014
PRESSURE NITROGEN HEADER
REFRIGERATION PACKAGE
48 6648-0400-5-PS-1-1141C F 30 NOV. 2014
-ETHYLENE REFRIGERATION UNIT (1/4)
REFRIGERATION PACKAGE
49 6648-0400-5-PS-1-1141D F 30 NOV. 2014
-PROPANE REFRIGERATION UNIT (1/4)
REFRIGERATION PACKAGE
50 6648-0400-5-PS-1-1141E F 30 NOV. 2014
-ETHYLENE REFRIGERATION UNIT (2/4)
REFRIGERATION PACKAGE
51 6648-0400-5-PS-1-1141F F 30 NOV. 2014
-PROPANE REFRIGERATION UNIT (2/4)
REFRIGERATION PACKAGE
52 6648-0400-5-PS-1-1141G F 30 NOV. 2014
-ETHYLENE REFRIGERATION UNIT (4/4)
REFRIGERATION PACKAGE
53 6648-0400-5-PS-1-1141H F 30 NOV. 2014
-PROPANE REFRIGERATION UNIT (4/4)
REFRIGERATION PACKAGE
54 6648-0400-5-PS-1-1141I F 30 NOV. 2014
-ETHYLENE REFRIGERATION UNIT (4/4)
REFRIGERATION PACKAGE
55 6648-0400-5-PS-1-1141J F 30 NOV. 2014
-PROPANE REFRIGERATION UNIT (4/4)
REFRIGERATION PACKAGE
56 6648-0400-5-PS-1-1141K F 30 NOV. 2014
-ETHYLENE REFRIGERATION UNIT
REFRIGERATION PACKAGE
57 6648-0400-5-PS-1-1141L F 30 NOV. 2014
-PROPANE REFRIGERATION UNIT
REFRIGERATION PACKAGE
58 6648-0400-5-PS-1-1141M F 30 NOV. 2014
-OIL SYSTEM (LO CONSOLE)
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Issue Issue
Acct. Drawing Number Drawing Title
Stage Date
REFRIGERATION PACKAGE
59 6648-0400-5-PS-1-1141N F 30 NOV. 2014
-LUBE OIL SYSTEM
REFRIGERATION PACKAGE
60 6648-0400-5-PS-1-1141O F 30 NOV. 2014
-LUBE OIL SYSTEM
REFRIGERATION PACKAGE
61 6648-0400-5-PS-1-1141P F 30 NOV. 2014
-GAS SEAL MODULE
REFRIGERATION PACKAGE
62 6648-0400-5-PS-1-1141Q F 30 NOV. 2014
-GAS SEAL MODULE
REFRIGERATION PACKAGE
63 6648-0400-5-PS-1-1141R F 30 NOV. 2014
-TRANSFER UNIT
REFRIGERATION PACKAGE
64 6648-0400-5-PS-1-1141S F 30 NOV. 2014
-TRANSFER UNIT

65 6648-0400-5-PS-1-1142 #1 HOT FLUSH - FEED F 30 NOV. 2014

66 6648-0400-5-PS-1-1143 #2 HOT FLUSH - FIRST FILTRATE F 30 NOV. 2014

67 6648-0400-5-PS-1-1144 #4 HOT FLUSH - THIRD FILTRATE F 30 NOV. 2014


SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

CHANGE LIST
Change List for all the drawing
Rev. Description Remarks
0 Corrected Symbols & Nomenclature according to Symbol and Legend
6648-0100-5-PS-1-1001 to 1005.
0 Changed Symbol & Legend numbering.
- Feed Package : LSD-001 to LSD-005
- IFD : 6648-0100-5-PS-1-1001 to 1005
0 Changed P&ID DWG numbers.
- Feed Package : PID-400-xxxx
- IFD : 6648-0400-5-PS-1-xxxx
* xxxx : Last 4 digit numbers on each sheet.
0 Changed existing line number to new line number as replacing all
existing line to new line.
0 Generally corrected line No. & continuity arrows for consistency.

0 Continuity arrows with to battery limit(B.L.) lines filled with PID-600-


1183H for continuity
0 Reflected spec break on the correct position.
0 Changed existing spec break to new one.
0 Reflected equipment short-spec data according to the equipment
datasheets
0 Reflected calculated PSV inlet & outlet line sizes according to PSV
calculation.
0 In PSV thermal relief to atm case provided isolation valves on the PSV
inlet line with CSO.
0 Deleted existing PSVs Notes of “Existing PSV shall be checked BY
DEC for adequancy (not in GTC scope). Number and location of tie-in
points are subjects to detail engineering Review." Existing PSVs to be
replaced to new ones.
0 Reflect PSV 2” bypass line with one gate valve, one globe valve and in
between one spectacle blind & 3/4” bleed connection with valve and end
flange arrangement as per GDD 6.6.2 (6648-02-41-GDD-01_Rev.8).
0 Applied 3/4" bleed valves on PSVs with inlet & outlet isolation valves
for depressurizing.
0 Applied drain/vent valve end according to the drain/vent valve
specification:
- Under 1.1/2" size corrected to cap end.
- Over 2” corrected to blind flange.
0 Added alarm points as per HAZOP study report (Doc. No. 6648-10-04-
41-012) HAZOP recommendations
0 Reflected manhole & handhole DWGs and sizes on column & vessel
according to the equipment datasheets.
0 Reflected steam out detail DWGs on equipments steam out nozzle
instead of ‘SO’ in feed package P&IDs as per client requirement.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


0 Reflected nitrogen seal detail DWGs on equipments nitrogen seal nozzle
instead of ‘NS’ in feed package P&IDs as per client requirement.
0 Cooling water return line arrangement changed as per General Design
Data for basic engineering 4.3.1 (Doc. No. 6648-02-41-GDD-01 Rev.8).
- Feed Package : TW with no sampling connection.
- IFD : Changed TW to TI and added sampling connection on cooling
water return line
0 Cooling water drainage destination for back flush changed SY to SS as
per General Design Data for basic engineering 4.3.1 (Doc.No. 6648-02-
41-GDD-01 Rev.8).
0 Reflected existing air cooler detail DWGs on each item as per existing
P&ID and mechanical drawings
0 Changed air cooler control loop as per Scope of Work and Supply 2.6.18
(Doc. No. 6648-00-02-41-SW-02 Rev.2) & General Design Data for
basic engineering 5.2.5 (Doc. No. 6648-02-41-GDD-01 Rev. 8).
- Feed Package : VSH, VAH.
- IFD : changed VSH, VAH to VSHH, VAHH and motor control
method to 50% motor control.
0 Generally added pressure indicators ‘PI’ with tag number on pump
suction as per Scope of Work and Supply 2.6.22(Doc. No. 6648-00-02-
41-SW-02 Rev.2 ).
0 Applied heat exchanger drain system detail DWGs in the process P&IDs
with additional note of "Locate at the lowest point." as per Symbol and
Legend-Flushing & Drain connection (DWG No. 6648-0100-5-ps-1-
1003).
0 Deleted tie-in points as replacing all existing line to new line.

0 Added limit switch for valve symbol & details in the Symbol and Legend
(DWG No. 6648-0100-5-PS-1-1005) and added limit position switch on
each on/off valves.
0 Closed aromatic drain (CAD) spec changed ‘BY DEC’ to ‘A1A’ and
cold Aromatic drain (CAD(COLD)) spec changed ‘BY DEC’ to ‘A24K’
for 400 unit according to the piping material specification (Doc. No.
6648-6-44-0005-r Rev.4).
0 Added "Two phase flow" note on the two phase flow lines according to
material balance.
0 Located pump suction drain position to down stream of y-type strainer as
per client requirement and existing plant pump suction drain position.
0 Column overhead line pressure switch changed as below.
- Feed Package : Three ‘PSHH’ from one common point of the pipe line.
- IFD : Three pressure transmitters ‘PT’ with pressure High High alarm
‘PAHH’ from three individual point of the pipe line
0 Applied tight shut off(TSO) on solenoid valves in steam & fuel gas lines
as per Scope of Work and Supply 2.3.31 (Doc. No. 6648-00-02-41-SW -
02 Rev.2 ).
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


0 Changed pressure & level switches to pressure & level transmitters as
below:
- ‘PSH’ to ‘PT’ with ‘PAH’ & ‘PSL’ to ‘PT’ with ‘PAL’.
- ‘PSHH’ to ‘PT’ with ‘PAHH’ & ‘PSLL’ to ‘PT’ with ‘PALL’.
- ‘LSH’ to ‘LT’ with ‘LAH’ & ‘LSL’ to ‘LT’ with ‘LAL’.
- ‘LSHH’ to ‘LT’ with ‘LAHH’ & ‘LSLL’ to ‘LT’ with ‘LALL’ .
0 Unit 400 feed tank number is corrected as S232 in place of S32 as per
Scope of Work and Supply (6648-00-02-41-SW-02 Rev.2) clause
8.13.1. .
0 Deleted battery limits valving on lines between unit 400 & unit 500 as
per Scope of Work and Supply (6648-00-02-41-SW-02 Rev.2) clause
8.8. .
0 Added low liquid level(LLL) of vessels and columns on P&ID.
0 Added insulation on the PSV inlet line for safety.
0 Deleted note “Existing line without line number shown on existing
P&ID.”
0 Added note “See solids analyzer deteil, Legend & Symbol diagram No.
6648-0100-5-PS-1-1004.” for solids analyzer.
2 Corrected Symbols & Nomenclature according to Symbol and Legend
(DWG No. 6648-0100-5-PS-1-1001 to 1005).
2 Corrected line Number & Continuity arrows for Consistency.
2 Corrected Spec breaks, Existing/New breaks at correct position.
2 Line Number changed as per Piping Engineering information.
2 Added new line numbers on untagged lines as per Piping Engineering
information.
2 Changed Equipment Short Spec data according to the Equipment
datasheets.
2 Changed Equipment tag numbers which changed from Existing to New.
2 Added (or deleted) Reducers & expanders on the proper position.
2 Reflected Pump, Air Cooler and Control valve Vent & Drain details on
each Process P&IDs as per MOM. No. E05/CL-SH/6648/M/0296.
2 Instrumentation Number changed as per Instrument Engineering
Information.
2 Revised New Air Cooler detail DWGs on each item as per Air Cooler
Vendor information.
2 Added Gas detector DWG. on the each items and changed Note for Gas
detector to inform the Gas detector Tag Number.
2 Process scheme and Instrumentation of the New Fired Heater is modified
as per information form Heater Vendor.
2 Reflected Control Valve type and Body Size as per Control Valve
Vendor print corrected as per control valve datasheet and Clarification
with licensor.
2 Reflected Pressure Regulating Valve (PCV) Body Size as per PCV
Vendor print corrected as per PCV datasheet and Clarification with
licensor.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


2 Added Line Trap on Steam Lines as per Piping Engineering information.
2 Removed UN service line for slurry pumps, agitators and crystallizer
scrappers. Added information of line number and instrumentation to
Symbol and Legend-Pump Seal Plan (DWG No. 6648-0100-5-PS-1-
1001 to 1006).
2 All of the existing Pumps are changed to New ones as per clarification
with client (E05/CL-SH/6648/L/0478).
2 Pump Seal Plan is updated as per information from the Pump Vendor.
2 All instruments are expressed in detail as per client requirement.
2 Interlock description is added on the last page of the P&ID as per client
requirement.
2 Car Sealed Open/Close (CSO/CSC) are reflected on the manual valve
where is required for all unit as per HAZOP recommendation resolution
number BLK2G-1, 2 and 3.
2 Shelter and ejector for Sump Pit are installed as per MOM (E05/CL-
SH/6648/M/0112).
2 All Spectacle Blinds on PSV bypass line is deleted as per MOM
(E05/CL-SH/6648/M/0273).
2 Flow Totalizer (FQ) is configured on the FI on Blowdown header for all
units as per HAZOP recommendation resolution number BLK2G-21.
2 Interlock for Fired Heaters is separated to Fuel Gas and Pilot Gas scheme
respectively as per HAZOP recommendation resolution number BLK2G-
26.
2 Pressure control valve on the Fuel Gas line of New Fired Heater is
moved to before shutdown valve set as per HAZOP recommendation
resolution number BLK2G-27.
2 PAHH alarm is expressed for All of the Fired Heater as per HAZOP
recommendation resolution number BLK2G-31.
2 Variable Speed Motor of the Air Cooler is configured as per client
comment.
2 Liquid level of the Vessel/Column is changed to proper value for the
safety as per HAZOP recommendation.
2 Pump warm up bypass is expressed in detail for requested item as per
information from the Pump Vendor.
2 Heat Exchanger Vent / Drain nozzles are configured.
2 Eye showers are configured at the required place on the Drinking Water
Header in UDD.
2 Bridle Water Pump and Pit are deleted as per MOM (E05/CL-
SH/6648/M/0259).
2 Two Emergency shut down switches for Fired Heater are installed on
Local Field and Central Control Room respectively.
2 Isolation Valve on the Blow down header installed with stem horizontal
as per HAZOP recommendation resolution number BLK2G-20.
2 Piping Specialty No. (ex. STR-XXXX) added as per Piping Engineering
information.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


2 Reflected slurry pumps, crystallizer scrappers, agitators and air cooler
fan motor running status as per client P&ID comment.
2 Changed All pressure instrument elements for slurry service line to
diaphragm type as per HAZOP recommendation U400-53.
2 To distinguish from Hot Flush, changed fluid name for heat exchanger
flushing lines from HF to FLO as per HAZOP recommendation U400-97
and MOM no. E05/CL-SH/6648/M/0249.
2 Added lines for Refrigeration system shut down on the Cold Stage
Crystallization section.
2 Revised PSV inlet/outlet line size as per SECL calculation basis.
2 Changed type of Dip Pipe from removable type to fixed type as per
E05/CL-SH/6648/M/0297.
2 Added Hand Switches to stop the pump from DCS for the critical pumps,
applied seal, as per E05/CL-SH/6648/M/274.
2 Mark “NC”, “NO” to inform normal position of manual valves.
2 Changed the level instrument installation for the vessels which have LLL
below 450mm as per clarification no. E05/CL-GH/6648/L/0100.
2 Added note for double pipe heat exchanger to inform which side is tube
or annulus.
2 Added Hand switches for reset of on/off valves on the overflow line.
2 Added high high liquid level(HHLL) and low low liquid level(LLLL) to
required vessels.
2 Revised equipment elevation as per Plot Plan.
2 Revised crystallizers jacket vent and drain as per piping engineering
information.
2 Changed valve type of control valves on the slurry service line from ball
valve to globe valve (Eccentric Rotating Plug Valve, specified for slurry
service) as per instrument engineering information.
3 Corrected Symbols & Nomenclature according to Symbol and Legend
(DWG No. 6648-0100-5-PS-1-1001 to 1005).
3 Corrected line Number & Continuity arrows for Consistency.
3 Corrected Pipe Insulation & Pipe Class for Consistency.
3 Added new line numbers on untagged lines as per Piping Engineering
information.
3 Deleted existing line number on the new line.

3 Changed Equipment Short Spec data according to the Equipment


datasheets.
3 Added (or deleted) Reducers & expanders on the proper position.
3 Instrumentation Number changed as per Instrument Engineering
Information.
3 Air Fan Cooler Local Start/Stop Switches are shown for the Air Fan
Cooler Control System.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


3 Modified the symbol of On-Off Valve as per Legend and Symbol.

3 Added Analyzer Connection DWGs to Shelter for the each Analyzers on


its P&ID.
3 Reflected Equipment (Pumps, H/EX, etc.) DWGs and confirmed sizes
on each Equipments as per Vendor Information.
3 Process scheme and Instrumentation of the New Fired Heater is modified
as per information form Heater Vendor.
3 Revised and reflected Control Valve type and Body Size as per Control
Valve Vendor print corrected as per control valve datasheet and
Clarification with licensor.
3 Revised and reflected Pressure Regulating Valve (PCV) Body Size and
set pressure as per PCV Vendor print corrected as per PCV datasheet and
Clarification with licensor.
3 Added Fired Heater Pass Control Scheme DWGs in detail.
3 Added PSV size as per PSV Vendor information.
3 Pump Seal Plan are updated as per information from the Pump Vendor.
Interlock description is added on each page by page of the P&ID as per
3
client requirement.
3 Alarm for 2 out of 3 voting A/B/C is deleted because common represent
alarm will be installed.
3 Moved Vessel / Column Drain connection to upstream of ESD Valve as
per MOM, E05/CL-SH/6648/M/0334.
Equipment Elevation is confirmed by latest Plot Plan and implemented
3
on each equipments.
The detail type of level instrument is determined and implemented as per
3
level instrument vendor information.
3 Shelter and ejector for Sump Pit are installed as per MOM (E05/CL-
SH/6648/M/0112).
3 Piping Specialty No. (ex. STR-XXXX) is added as per Piping
Engineering information.
3 Mark “NC”, “NO” to inform normal position of manual valves.
Modified steam line trap scheme on Legend & Symbol No.6648-0100-5-
3
PS-1-1004.
Changed Sampling Connection as below.
- Added type numbers.
3
- Moved Spec. breaks and Block valves and Line number to detail
drawing Legend & Symbol 6648-0100-5-PS-1-1004A.
3 Reflected Flow meter element number for unification with CDU P&ID.
3 Y type Strainers on the over 6” line are changed to T type strainer as per
E05-CL-SH-6648-L-1096.
3 Removed PIs on the slurry pump suction and discharge line as per the
75% 3D model review with GTC and clarification with Sonatrach
( E05/CL-SH/6648/L/1164).
3 Relocated PI on the hot flush line to downstream of the check valve as
per the 75% 3D model review with GTC and clarification with Sonatrach
( E05/CL-SH/6648/L/1164).
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


3 Revised P&ID for centrifuges as per vendor information.
3 Attached vendor P&ID for centrifuges.
3 Added “RAD.” For rador type level transmitter.
4 Corrected Symbols & Nomenclature according to Symbol and Legend
(DWG No. 6648-0100-5-PS-1-1001 to 1005).
4 Corrected line Number & Continuity arrows for Consistency.
4 Corrected Pipe Insulation & Pipe Class for Consistency.
4 Added new line numbers on untagged lines as per Piping Engineering
information.
4 Revised Piping class from A1A to B1A to avoid overrating (ERI no.
6648-0400-5-PS-EI-1001-0).
4 Changed Equipment Short Spec data according to the Equipment
datasheets.
4 Added (or deleted) Reducers & expanders on the proper position.
4 Instrumentation Number changed as per Instrument Engineering
Information.
4 Process scheme, instrumentation and control philosophy of the Fired
Heater is modified for proper operation with vendor information
4 Revised and reflected Control Valve type and Body Size as per Control
Valve Vendor print corrected as per control valve datasheet and
Clarification with licensor.
4 Added PSV size as per PSV vendor information.

4 Added bleed valve for PSV to closed system as per Scope of Work and
Supply, 6648-00-02-41-SW-02 Rev. 2.
4 Updated Pump Seal Plan as per information from the Pump Vendor.

4 Restored alarm for 2 out of 3 voting A/B/C for easier identification.


Equipment Elevation is confirmed by latest Plot Plan and implemented
4
on each equipments.
4 Marked UDD number on the utility connection in process P&ID.
4 Reflected Vent/Drain for level instrument Level in detail on P&ID.
4 Changed the type of level instruments/switches on the crystallizers and
vessels in the crystallization section from radar type to RF admittance
type to avoid malfunction due to the low operating temperature and
scrapper as per E05/CL-GH/6648/L/0171 and E05/CL-GH/6648/L/0180.
4 Changed the type of level instruments on the 400-V-52A/B from radar
type to diaphragm type to avoid malfunction due to agitator as per
E05/CL-GH/6648/L/0171 and E05/CL-GH/6648/L/0180.
4 Added Extended diaphragm type level instrument on crystallizers to
measure full range of crystallizer level as per crystallizer vendor
recommendation.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Rev. Description Remarks


Modified for all of Steam Line Trap to Typical drawing as per Symbol &
4 Legend 6648-0100-5-PS-1-1004. And added related note on each page
of P&ID.
Modified Sampling Connection configuration as below
4 - Moved spec breaks, block valve, check valve and added line number on
detail drawing as per Symbol & Legend 6648-0100-5-PS-1-1004A.
4 Revised P&ID for centrifuges as per vendor information.
4 Added on-off valve on nitrogen, cooling water and rinse lines of pusher
type centrifuges. (ERI no. 6648-0400-5-PS-EI-1002-0)
4 Revised line size for utility line of pusher type centrifuges as per
hydraulic calculation based on utility consumption list provided by
centrifuge vendor. (ERI no. 6648-0400-5-PS-EI-1004-0)
4 Attached revised vendor P&ID for centrifuges.
4 Added flow switch on crystallizer scraper seal line.
4 Revised type of pressure transmitter on the crystallizer head to
diaphragm type as per crystallizer vendor information.
4 Added pressure switch on the lube oil line of crystallizer scraper with
interlock and added related note.
4 Added strainers for steam traps which don’t have internal mesh.
4 Added line trap on the low point of steam line.
4 Revised inlet/outlet size of PSVs as per PSV size calculation.
4 Revised insulation break on the PSV bypass from before first block valve
to after first block valve for consistency.
4 Changed Control valve drain end point type for slurry line(A24A, A24K)
from cap to flange as per letter E05-CL-SH-6648-L-1386. (ERI no.
6648-0400-5-PS-EI-1003-0)
4 Shown oil pump motor for crystallizer scraper on P&ID with running
status and added related note.
4 Revised ethylene transfer line for shut down as per piping information
4 Removed drain on the PSV bypass line as per letter E05/CL-
GH/6648/L/1974.
4 Add drain for pump discharge line with check valve on P&ID as per
MOM E05/CL-SH/6648/M/0426.
4 Moved location of instruments for convenience of access.
4 The note about P&ID symbol & legend page No. of pump, crystallizer
scraper and agitator seal plan drawing is added near the pump scheme for
the client’s requirement.
5 Corrected Symbols & Nomenclature according to Symbol and Legend
(DWG No. 6648-0100-5-PS-1-1001 to 1005).
5 Corrected line Number & Continuity arrows for Consistency.
5 Corrected Pipe Insulation & Pipe Class for Consistency.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

5 Added new line numbers on untagged lines as per Piping Engineering


information.
5 Romoved ‘CSC(Car Seal Closed)’ from PSV bypass line (ERI no. 6648-
0400-5-PS-EI-2001-0).
5 Instrumentation Number changed as per Instrument Engineering
Information.
5 Added insulation break to spec break for steam-out connection to cold
vessels and crystallizer. (ERI no. 6648-0400-5-PS-EI-2001-0).
5 Process scheme, instrumentation and control philosophy of the Fired
Heater is modified for proper operation with vendor information
5 Added low point drain for pump discharge (between check valve and
gate valve) (ERI no. 6648-0400-5-PS-EI-2001-0).
5 Revised the tracing type from steam to electric as per clarification with
client.(E05-CL-SH-6648-L-2543)
5 Revised P&ID for centrifuges as per vendor information.

5 Moved location of instruments for convenience of access.

5 Revised some piping philosophy & instruments location to reflect the 3D


model review as per Piping Engineering information..
5 Reflected the Man Hole on crystallizer.
5 Updated Refrigeration system P&ID as per latest vendor’s P&ID
F Line tracing is changed from electric tracing to steam tracing due to the
vendor requirement. (ERI no. 6648-0400-5-PS-EI-3002-0)
F Line material changed from LTCS to CS. (ERI no. 6648-0400-5-PS-EI-
3003-0, 6648-0400-5-PS-EI-3004-0)
F The end of vent/drain valves are changed from cap to flange. (ERI no.
6648-0400-5-PS-EI-3006-0, 6648-0400-5-PS-EI-3007-0, 6648-0400-5-
PS-EI-3008-0, 6648-0400-5-PS-EI-3009-0)
F Solid analyzer details including tracing lines are developed.
AI-1901/2001/2101/2201/2301/2401/3001/3101/3102
AI-2601,2701,3501,3601.
(ERI no. 6648-0400-5-PS-EI-3008-0)
F Line arrangement is changed as per construction.
(ERI no. 6648-0400-5-PS-EI-3007-0, 6648-0400-5-PS-EI-3008-0)
F Crystallizer section modification by licensor is reflected as per (ERI no.
6648-0400-5-PS-EI-3011-0)
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

Change List
P&ID No. Rev. Description Remarks
6648-0400-5- 0 Added new pumps(400-MP-74 A/B) along with associated
PS-1-1111A Piping & Instrumentation on 10" feed line coming to unit
400 from OSBL feed tank S232 as per Scope of Work and
Supply(6648-00-02-41-SW-02 Rev.2) clause 8.13.2.
Deleted unit 400 feed line 6"-P-100-2111-A1A as per Scope
of Work and Supply(6648-00-02-41-SW-02 Rev.2) clause
8.13.3.
To avoid double PI, deleted PI-1105 as added PI-1110 on the
pump inlet line.
Line size is corrected from 2"-P-400-3903-A1A-it to 4"-P-
400-3903-A1A-IT as mismatching with line of PID-400-
1139.
Changed existing heat exchanger to new heat exchanger as
per Scope of Work and Supply(6648-00-02-41-SW-02
Rev.2) clause 8.13.12.
- 400-E-1 → 400-E-72
- 400-E-3 → 400-E-74
Deleted check valve on 3”-MC-400-1101-B1A-IH.

Added TI-1118 as per HAZOP study report No. 20


recommendation (Doc. No. 6648-10-04-41-012)
6648-0400-5- 0 Added PI-1211 as per HAZOP study report No. 34
PS-1-1112 recommendation (Doc. No. 6648-10-04-41-012)

Changed existing heat exchanger to new heat exchanger as


per Scope of Work and Supply(6648-00-02-41-SW-02
Rev.2) clause 8.13.12.
- 400-E-2 → 400-E-73
Added line 3”-P-400-1250-A1A as per Scope of Work and
Supply(6648-00-02-41-SW-02 Rev.2) clause 8.13.4.
Line of 2"-P-400-2806-A24K-IC dismantled as mismatching
with line of PID-400-1143.
Changed local pressure guage to sight glass as mismatching
with P&ID.
Added Note 12 for information about drain system of
aircooled exchanger.
Added PSV-1210 for protecting 400-V-64.

6648-0400-5- 0 Added minimum flow circulation with control valve for


PS-1-1113 400-MP-3 A/B as per HAZOP study report No. 2
recommendation (Doc. No. 6648-10-04-41-012)
Corrected 400-C-1 b tray number as per equipment data
sheet.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 0 Deleted 400-EA-52 as per Scope of Work and Supply(6648-
PS-1-1114 00-02-41-SW-02 Rev.2) clause 8.13.14.
Added pump minimum flow line(6”-P-400-1412-A1A-IH)
as per Scope of Work and Supply(6648-00-02-41-SW-02
Rev.2) clause 2.6.12.
6648-0400-5- 0 Added dedicated FT on each pass to shut down heater on
PS-1-1115 lowlow flow(FALL) as per HAZOP study report No. 24
recommendation (Doc. No. 6648-10-04-41-012)
Changed scheme of fuel line to the heaters.
- Feed Package : One on-off valve with one PSLL
- IFD :
1. Added additional on-off valve for double block.
2. One PSLL changed to three PALL with 2 out of 3
voting.
3. Added 3/4" vent lines between the on-off valves
Added interlock and HV on 400-F-51 stack damper for high
high pressure(PAHH) trip on stack damper as per HAZOP
study report (6648-10-04-41-012) clause 201.
Added heater emergency shut down switch with note
"Heater emergency shut down switch. Located at 15m away
from the heater".
Generally modified instrumentation scheme of new heaters
as per Scope of Work and Supply for fired heater (6648-00-
05-42-SP-21) Rev. 1
6648-0400-5- 0 Added new pumps(400-MP-75 A/B) along with associated
PS-1-1116 Piping & Instrumentation on 10" feed line coming to unit
400 from OSBL feed tank S124/125 as per Scope of Work
and Supply(6648-00-02-41-SW-02 Rev.2) clause 8.13.7.
To avoid double PI, deleted PI-1605 as added PI-1606 on the
pump inlet line.
6648-0400-5- 0 Line size changed from 8"-P-400-1738-A2K-IC to 10"-P-
PS-1-1117 400-1738-A2K-IC as SECL’s hydraulic calculation.
6648-0400-5- 0 Added PI-1803 as per Note 6 on P&ID.
PS-1-1118
6648-0400-5- 0 UA-2501,2(common trip alarm) for centrifuge added as per
PS-1-1125 HAZOP study report No. 117 recommendation (Doc. No.
6648-10-04-41-012)
6648-0400-5- 0 Line size changed from 1 1/2"-P-400-2611-A1A-IE to 2"-P-
PS-1-1126 400-2611-A1A-IE as SECL’s hydraulic calculation.
Line size corrected from 3"-P-400-2712-A1A-IE to 1 1/2"-
P-400-2712-A1A-IE as mismatching with line of PID-400-
1137.
400-MX-51A (slurry drum agitator) separated from 400-V-
52A(slurry drum)
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 0 400-MX-51B (slurry drum agitator) separated from 400-V-
PS-1-1127 52B(slurry drum)
Line size changed from 1 1/2"-P-400-2711-A1A-IE to 2"-P-
400-2711-P1P-IE as SECL’s hydraulic calculation.
Line size corrected from 3"-P-400-2712-A1A-IE to 1 1/2"-
P-400-2712-A1A-IE as mismatching with line of PID-400-
1137.
6648-0400-5- 0 Line size changed from 8"-P-400-2805-A24K-IC to 10"-P-
PS-1-1128 400-2805-A24K-IC as SECL’s hydraulic calculation.
Line size changed from 8"-P-400-2805-A24K-IC to 10"-P-
400-2805-A24K-IC as SECL’s hydraulic calculation.
Line of 2"-P-400-2806-A24K-IC dismantled as mismatching
with line of PID-400-1143.
UA-2801(common trip alarm) for centrifuge added as per
HAZOP study report No. 117 recommendation (Doc. No.
6648-10-04-41-012)
6648-0400-5- 0 Valve type of FV-2903 bypass valve changed from gate to
PS-1-1129 globe as per GDD (6648-02-41-GDD-01) Rev. 8 clause
6.5.1
Added PSV-2910 for protecting 400-V-66.

6648-0400-5- 0 LI-3002 with LAL added as per HAZOP study report No.
PS-1-1130 108 recommendation (Doc. No. 6648-10-04-41-012)
6648-0400-5- 0 LI-3105,3106 with LAL added as per HAZOP study report
PS-1-1131 No. 109 recommendation (Doc. No. 6648-10-04-41-012)
6648-0400-5- 0 UA-3201(common trip alarm) for centrifuge added as per
PS-1-1132 HAZOP study report No. 183 recommendation (Doc. No.
6648-10-04-41-012)
UA-3202(common trip alarm) for centrifuge added as per
HAZOP study report No. 184 recommendation (Doc. No.
6648-10-04-41-012)
6648-0400-5- 0 Valve type of FV-3301 bypass valve changed from gate to
PS-1-1133 globe as per GDD(6648-02-41-GDD-01) Rev. 8 clause 6.5.1
Added PSV-3310 for protecting 400-V-67.
6648-0400-5- 0 Line insulation corrected from 3"-P-400-3404-A24A-it to
PS-1-1135 3"-P-400-3404-A24A-IE/IC as mismatching with line of
PID-400-1134.
6648-0400-5- 0 Line insulation corrected from 3"-P-400-3405-A24A-IT to
PS-1-1136 3"-P-400-3405-A24A-IE/IC as mismatching with line of
PID-400-1134.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 0 UA-3701(common trip alarm) for centrifuge added as per
PS-1-1137 HAZOP study report No. 126 recommendation (Doc. No.
6648-10-04-41-012)
UA-3702(common trip alarm) for centrifuge added as per
HAZOP study report No. 127 recommendation (Doc. No.
6648-10-04-41-012)
6648-0400-5- 0 Line size changed from 1 1/2"-P-400-3811-A24A-IC to 2"-
PS-1-1138 P-400-3811-A24A-IC as SECL’s hydraulic calculation.
Line size changed from 1 1/2"-P-400-3813-A24A-IC to 2"-
P-400-3813-A24A-IC as SECL’s hydraulic calculation.
Line size changed from 1 1/2"-P-400-3815-A24A-IC to 2"-
P-400-3815-A24A-IC as SECL’s hydraulic calculation.
6648-0400-5- 0 Line size changed from 1 1/2"-P-400-3825-A24A-IC to 2"-
PS-1-1138 P-400-3825-A24A-IC as SECL’s hydraulic calculation.

6648-0400-5- 0 LI-3903 with LAHH, LAH, LAL added as per HAZOP


PS-1-1139 study report No. 157 recommendation (Doc. No. 6648-10-
04-41-012)
6648-0400-5- 0 LI-4003 with LAHH, LAH, LAL added as per HAZOP
PS-1-1140 study report No. 156 recommendation (Doc. No. 6648-10-
04-41-012)
CSO facility downstream of RO-4004 added as per HAZOP
study report No. 155 recommendation (Doc. No. 6648-10-
04-41-012)
6648-0400-5- 2 Added minimum flow line for 400-MP-76 A/B as per
PS-1-1111A HAZOP recommendation U400-1 and U400-6.
Added trip signal to 400-MP-74 A/B as per HAZOP
recommendation U400-3.
Changed destination of 400-LIC-1102 signal from 400-FIC-
1101 to 100-FIC-2903 as per HAZOP recommendation
U400-6 and MOM no. E05/CL-SH/6648/M/0273.
Changed nitrogen service for 400-V-62 from UN to UN-LP
and deleted 400-PCV-1106 as per HAZOP recommendation
U400-12.
Deleted “Free Draining” as per GTC clarification during
HAZOP period.
6648-0400-5- 2 Added a block valve on the line 4”-P-400-1130-A1A-IH as
PS-1-1111B per HAZOP recommendation U400-11.
Added 400-PSV-1109 and 400-PSV-1110 for protecting
400-E-52 and 400-E-54 from the fire as per HAZOP
recommendation U400-19.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 2 Configured FAL on 400-FI-1202 as per HAZOP
PS-1-1112 recommendation U400-26.

Deleted slip-stream line 3”-P-400-1250-A1A as per HAZOP


recommendation U400-29 and MOM no. E05/CL-
SH/6648/M/0273.
Configured PALL on 400-PI-1211 as per HAZOP
recommendation U400-30.
Added check valves as per HAZOP recommendation U400-
37.
Relocated the takeoffs for 400-SC-1205 as per HAZOP
recommendation U400-40.
Added Make-up Lean Oil line for the connectivity with other
units.

6648-0400-5- 2 Added 400-HS-1378AA/BA for 400-MP-78 A/B remote


PS-1-1113 manual start as per HAZOP recommendation U400-13.

Added Note 14 for configuring a soft stop on 400-FV-1302


as per HAZOP recommendation U400-20.

Configured TAH on 400-TI-1302 as per HAZOP


recommendation U400-23.

6648-0400-5- 2 Added an interface level transmitter on the boot of 400-V-74


PS-1-1114 as per HAZOP recommendation U400-9.
Changed nitrogen service for 400-V-74 from UN to UN-LP
and deleted 400-PCV-1412 as per HAZOP recommendation
U400-22.
Configured FAL on 400-FIC-1401 as per HAZOP
recommendation U400-24.
Configured FAL on 400-FIC-1402 as per HAZOP
recommendation U400-25.
Added 400-HS-1451AA/BA for 400-MP-51 A/B remote
manual start as per HAZOP recommendation U400-28.
Relocated HC gas detector from 400-MP-63 to 400-MP-51
A as per HAZOP recommendation U400-35.
Changed control valve type of 400-FV-1401 from globe
valve to butterfly valve as per instrument engineering
information.
6648-0400-5- 2 Added minimum flow line for 400-MP-75 A/B as per
PS-1-1116 HAZOP recommendation U400-29, 44 and MOM no.
E05/CL-SH/6648/M/0273.
6648-0400-5- 2 Revised the nozzle orientation of double pipe heat exchanger
PS-1-1117 400-E-66A~H.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 2 Marked Car Sealed Open on the manual valve of overflow
PS-1-1119 line as per HAZOP recommendation U400-31. Applied
same recommendation on P&ID no. 6648-0400-5-PS-1-
1120/1121/1122/1123/1124/1126/1127/1128/1130/1131/113
4/1135/1136/1138.
Removed limit switch for 400-FV-1901 as per HAZOP
recommendation U400-47. Applied same recommendation
on P&ID no. 6648-0400-5-PS-1-
1120/1121/1122/1123/1124.

6648-0400-5- 2 Configured FAH on 400-FIC-2501/2502 as per HAZOP


PS-1-1125 recommendation U400-59.
Changed fail action of 400-FV-2503/2504 to FO as per
HAZOP recommendation U400-67.

Configured FAL on 400-FIC-2503/2504 as per HAZOP


recommendation U400-68.
Added on/off valves on Xylene Slurry line as per SIL study
report no. 6648-SIL-400-04-42-002.
Deleted flexible connection tag number “SXH-XXXX” as
changing to be provided by centrifuge vendor.
6648-0400-5- 2 Marked CSO on the First Cake inlet and Third cake inlet to
PS-1-1126 400-V-52A as per HAZOP recommendation U400-66 and
113.
Configured FAL on 400-FIC-2601 as per HAZOP
recommendation U400-79.
Added additional LI, 400-LI-2602, on 400-V-52 B with
LAL as per HAZOP recommendation U400-87.
Configured TAL on 400-TI-2604 as per HAZOP
recommendation U400-94.
Added ball valve with CSO on wash effluent inlet as per
HAZOP recommendation U400-96.
6648-0400-5- 2 Marked CSO on the First Cake inlet and Third cake inlet to
PS-1-1127 400-V-52B as per HAZOP recommendation U400-66 and
113.
Configured FAL on 400-FIC-2701 as per HAZOP
recommendation U400-79.
Added additional LI, 400-LI-2702, on 400-V-52 B with
LAL as per HAZOP recommendation U400-87.
Configured TAL on 400-TI-2704 as per HAZOP
recommendation U400-94.
Added ball valve with CSO on wash effluent inlet as per
HAZOP recommendation U400-96.
6648-0400-5- 2 Configured FAH on 400-FIC-2801 as per HAZOP
PS-1-1128 recommendation U400-59.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


Changed fail action of 400-FV-2802 to FO as per HAZOP
recommendation U400-67.
Added 400-FI-2806 with FAL as per HAZOP
recommendation U400-76.
Added on/off valves on Xylene Slurry line as per SIL study
report no. 6648-SIL-400-04-42-002.
6648-0400-5- 2 Marked CSO on the First Cake inlet to 400-V-53 as per
PS-1-1129 HAZOP recommendation U400-66.
Added hot flush connection at the 400-V-53 outlet as per
HAZOP recommendation U400-130.
Configured TALL on 400-TI-2901 as per HAZOP
recommendation U400-131.
Configured TAH and TAL on 400-TI-2903 as per HAZOP
recommendation U400-135 and 136.
6648-0400-5- 2 Configured LAH on 400-LI-3002 as per HAZOP
PS-1-1130 recommendation U400-77.
6648-0400-5- 2 Configured LAH on 400-LI-3105/3106 as per HAZOP
PS-1-1131 recommendation U400-77.
6648-0400-5- 2 Configured FAL on 400-FIC-3205/3206 as per HAZOP
PS-1-1132 recommendation U400-81.
Changed fail action of 400-FV-3205/3206 to FO as per
HAZOP recommendation U400-82.
Configured FAH on 400-FIC-3201/3202 as per HAZOP
recommendation U400-86.
Deleted nitrogen service line as per centrifuge vendor
information.
Added on/off valves on Xylene Slurry line and PX Wash
line as per SIL study report no. 6648-SIL-400-04-42-002.
6648-0400-5- 2 Marked CSO on the Second Cake inlet to 400-V-56 as per
PS-1-1133 HAZOP recommendation U400-83.
Added hot flush connection at the 400-V-56 outlet as per
HAZOP recommendation U400-100.
Added a check valve on PX product rundown to storage
tanks as per HAZOP recommendation U400-104.
Configured TAH and TAL on 400-TI-3304 as per HAZOP
recommendation U400-105, 106.
6648-0400-5- 2 Added additional LI, 400-LI-2702, on 400-V-57 with LAL
PS-1-1134 as per HAZOP recommendation U400-107, 108.
Changed the LLL set point of 400-V-57 from 150mm to
900mm as per HAZOP recommendation U400-109.

Relocated HC gas detector from 400-MP-63 to 400-MP-51


A as per HAZOP recommendation U400-110.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 2 Configured FAL on 400-FIC-3501 as per HAZOP
PS-1-1135 recommendation U400-127.
6648-0400-5- 2 Configured FAL on 400-FIC-3601 as per HAZOP
PS-1-1136 recommendation U400-127.
6648-0400-5- 2 Configured FAL on 400-FIC-3703/3704 as per HAZOP
PS-1-1137 recommendation U400-111.
Changed fail action of 400-FV-3703/3704 to FO as per
HAZOP recommendation U400-112.
Added on/off valves on Xylene Slurry line as per SIL study
report no. 6648-SIL-400-04-42-002.
Deleted nitrogen service line as per centrifuge vendor
information.

6648-0400-5- 2 Changed the LLL set point of 400-V-58 A/B from 150mm to
PS-1-1138 750mm as per HAZOP recommendation U400-128.
6648-0400-5- 2 Marked CSO on the manual valve on the inlet to 400-V-70
PS-1-1139 as per HAZOP recommendation U400-138.
Revised short spec. of 400-V-70 and 400-MP-72 as per
HAZOP recommendation U400-139.
Configured TAHH on 400-TI-3903 as per HAZOP
recommendation U400-141.
Added FQ on 400-FI-3901 as per HAZOP recommendation
U400-142.
Removed unnecessary vent nozzle for 400-V-68.
Removed PI on 400-V-68 to avoid overlapping other PI on
aromatics vent line.
Rearranged vent lines as per piping engineering information.
6648-0400-5- 2 Configured TALL on 400-TI-4006 as per HAZOP
PS-1-1140 recommendation U400-143.
Added FQ on 400-FI-4002 as per HAZOP recommendation
U400-145.
Removed unnecessary vent nozzle for 400-V-72.
Removed PI on 400-V-72 to avoid overlapping other PI on
aromatics vent line.
Rearranged vent lines as per piping engineering information.
Added Note for minimum straight run distance of
Desuperheater, 400-X-54.
6648-0400-5- 2 Added Ethylene Receiver 400-V-94 on the process side for
PS-1-1141 the Refrigeration system shutdown.
6648-0400-5- 2 Added a manual bypass around 400-XV-4201 as per
PS-1-1142 HAZOP recommendation U400-146.
Changed 400-LSHH-4201A and 400-LSLL-4201B to 400-
LT-4201 as per HAZOP recommendation U400-147.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


Configured FAL on 400-FI-4201 as per HAZOP
recommendation U400-148.
6648-0400-5- 2 Added a manual bypass around 400-XV-4301 as per
PS-1-1143 HAZOP recommendation U400-146.
Changed 400-LSHH-4301A and 400-LSLL-4301B to 400-
LT-4301 as per HAZOP recommendation U400-147.
Configured FAL on 400-FI-4301 as per HAZOP
recommendation U400-148.
6648-0400-5- 2 Added a manual bypass around 400-XV-4401 as per
PS-1-1144 HAZOP recommendation U400-146.
Changed 400-LSHH-4401A and 400-LSLL-4401B to 400-
LT-4401 as per HAZOP recommendation U400-147.
Configured FAL on 400-FI-4401 as per HAZOP
recommendation U400-148.
6648-0400-5- 3 Changed line size of PSV-1101 inlet & outlet as per fire case
PS-1-1111A load calculation.
Relocated drain line of 400-V-62 as per 3D model review.
6648-0400-5- 3 Not installed spare PSVs (400-PSV-1202) for 400-V-51A/B
PS-1-1112 as per clarification with Sonatrach. (E05-CL-SH-6648-L-
1209) 400-PSV-1202B is provided as a common warehouse
spare for 400-PSV-1202, 3A
Added B.L valves on line 1 1/2”-P-400-1213-A1A
PI-1208 which was not expressed last issue is shown on
P&ID.
Added manhole(20”) for 400-V-64.
6648-0400-5- 3 Added restriction orifice(FO-1353A/B, FO-1354A/B) for
PS-1-1113 pump warm up bypass as per vendor information.
Relocated drain line of 400-C-51 A/B as per 3D model
review.
Line size changed from 20"-P-400-1304-A1A-IH to 16"-P-
400-1304-A1A-IH as per clarification with GTC(E05/CL-
GH/6648/L/0146).
Line size changed from 16"-P-400-1305-A1A-IH to 14"-P-
400-1305-A1A-IH as per clarification with GTC(E05/CL-
GH/6648/L/0146).
Line size changed from 16"-P-400-1317-A1A-IH to 12"-P-
400-1317-A1A-IH as per clarification with GTC(E05/CL-
GH/6648/L/0146).
6648-0400-5- 3 Relocated drain line of 400-V-73 and 400-V-74 as per 3D
PS-1-1114 model review.
6648-0400-5- 3 Heater inlet line changed symmetrically..
PS-1-1115
Added Stack Damper Position Indicator on Local Panel for
the Stack Damper operation by Heater Vendor.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


Modified Fired Heater Local Control Panel Scheme and
Burner Detail as per Heater Vendor information.
Separated local HIC controller to HI and HC as per Heater
Vendor information.
Added Permissive Alarm and Shut Down Alarm for the
Fired Heater as per Heater Vendor information.
Configured the PAH alarm for Heater Arch Section for pre-
alarm of Heater trip and related note is added.
6648-0400-5- 3 Revised 400-PSV-1603A/B/C outlet line as per piping
PS-1-1116 information.
6648-0400-5- 3 Deleted reducer of 400-E-67 inlet & outlet header as per 3D
PS-1-1117 model review.
6648-0400-5- 3 Revised ethylene transfer line(2”-GRE-400-2110/2310-
PS-1-1119 B2K-IC, for shutdown.
3 Scraper No.(400-UX-51A) is shown on P&ID
6648-0400-5- 3 Revised ethylene transfer line(2”-GRE-400-2210/2410-
PS-1-1120 B2K-IC, for shutdown.
Scraper No.(400-UX-52A) is shown on P&ID
3 Revised ethylene transfer line(2”-GRE-400-2110/2310-
6648-0400-5- B2K-IC, for shutdown.
PS-1-1121 Scraper No.(400-UX-51B) is shown on P&ID
6648-0400-5- 3 Revised ethylene transfer line(2”-GRE-400-2210/2410-
PS-1-1122 B2K-IC, for shutdown.
Scraper No.(400-UX-52B) is shown on P&ID

3 Revised ethylene transfer line(2”-GRE-400-2110/2310-


6648-0400-5- B2K-IC, for shutdown.
PS-1-1123 Scraper No.(400-UX-51C) is shown on P&ID

6648-0400-5- 3 Revised ethylene transfer line(2”-GRE-400-2210/2410-


PS-1-1124 B2K-IC, for shutdown.
Scraper No.(400-UX-52C) is shown on P&ID
6648-0400-5- 3 Added PX return line(1”-P-400-3719-A24A-IE) from
PS-1-1126 centrifuge.
Deleted FAL on 400-FIC-2601. This line normally has very
low flowrate.
6648-0400-5- 3 Added PX return line(1”-P-400-3719-A24A-IE) from
PS-1-1127 centrifuge.
Deleted FAL on 400-FIC-2701. This line normally has very
low flowrate.
6648-0400-5- 3 Not installed spare PSVs (PSV-2801B) for 400-V-54 as per
PS-1-1128 clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
Line size is changed from 1 1/2"-P-400-2901-A1A-IE to 2"-
P-400-2901-A1A-IE.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 3 Not installed spare PSVs (PSV-2901B) for 400-V-53 as per
PS-1-1129 clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
Changed line size of PSV-2901A inlet & outlet as per fire
case load calculation.
Added handhole(8”) for 400-V-66.
Line size is changed from 1 1/2"-P-400-2901-A1A-IE to 2"-
P-400-2901-A1A-IE.
6648-0400-5- 3 Not installed spare PSVs (PSV-3001B) for 400-V-55A as
PS-1-1130 per clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
400-PSV-3001B is a common warehouse spare for 400-
PSV-3001A, 400-PSV-3101A and 400-PSV-3201A.
6648-0400-5- 3 Not installed spare PSVs for 400-V-55B/C as per
PS-1-1131 clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
400-PSV-3001B is a common warehouse spare for 400-
PSV-3001A, 400-PSV-3101A and 400-PSV-3201A
6648-0400-5- 3 Not installed spare PSVs (PSV-3301B) for 400-V-56 as per
PS-1-1133 clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
Changed line size of PSV-3301A inlet & outlet as per fire
case load calculation.
Added detail dwg for analyzer shelter.
Added handhole(8”) for 400-V-67.
Added PX seal line(1 1/2”-P-400-3339-A1A-IE) to
centrifuge.
6648-0400-5- 3 Not installed spare PSVs (PSV-3401B) for 400-V-57 as per
PS-1-1134 clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
6648-0400-5- 3 Scraper No.(400-UX-53A) is shown on P&ID
PS-1-1135
Revised propane transfer line(2”-GRP-400-3610-B4A-IC,
for shutdown.
6648-0400-5- 3 Scraper No.(400-UX-53B is shown on P&ID
PS-1-1136
6648-0400-5- 3 Not installed spare PSVs (PSV-3801B) for 400-V-58A/B as
PS-1-1138 per clarification with Sonatrach. (E05-CL-SH-6648-L-1209)
400-PSV-3801B is a common warehouse spare for 400-
PSV-3801A and 400-PSV-3802A.
6648-0400-5- 3 Reflected ejector(400-J-51) dwg on P&ID
PS-1-1139
PCV-3902 changed to FI-3902
6648-0400-5- 3 Reflected ejector(400-J-52) dwg on P&ID
PS-1-1140 PCV-4001 changed to FI-4003
6648-0400-5- 3 Utility lines for 400-M-51 developed as receiving vendor’s
PS-1-1141 document.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 3 Changed line size of PSV-4201A/B inlet & outlet as per
PS-1-1142 load calculation.
6648-0400-5- 3 Changed line size of PSV-4301A/B inlet & outlet as per
PS-1-1143 load calculation.
6648-0400-5- 3 Changed line size of PSV-4401A/B inlet & outlet as per
PS-1-1144 load calculation.
6648-0400-5- 1 Interlock Description is updated as per P&ID development.
PS-1-
1311A/B/C
6648-0400-5- 4 Revised line size of pump casing drain as per pump vendor
PS-1-1111B information.
Changed destination of 400-PSV-1109 and 400-PSV-1110
from CAD to flare with bypass because relieving status of
these PSVs is vapor. (ERI no. 6648-0400-5-PS-EI-1005-0)
6648-0400-5- 4 Revised set pressure of 400-PSV-1209 from 16.7kg/cm2g to
PS-1-1112 27.0kg/cm2g as per design pressure of 400-E-58 shell side.
Added tag number for each manual valve on the inlet/outlet
of 400-V-51A/B to reduce possibility of mis-operation as
per unit 400 HAZOP recommendation #38.
Relocated block valve and drain on 10”-P-400-1230-A1A
from before the branch 10”-P-400-1247-A1A to after the
branch 11/2”-P-400-1213-A1A as changing control scheme
of feed from xylene splitter to crystallization section as per
MOM E05-CL-SH-6648-M0249.
6648-0400-5- 4 Marked insulation break and vendor scope on the warm up
PS-1-1113 bypass of 400-MP-79A/B.
6648-0400-5- 4 Moved line trap on the snuffing steam line to UDD 6648-
PS-1-1115 0500-5-PS-1-1251B.
Put together outlet of 400-XV-1505 and 400-XV-1506 as
per piping information.
Added PAHH on 400-PI-1519 and 400-PI-1520 as per
Global HAZOP recommendation #29 and #31.
6648-0400-5- 4 Revised routing of 400-E-65A/B/C bypass line as per piping
PS-1-1116 information.
6648-0400-5- 4 Added drain on the each header as per 3D model review.
PS-1-1117
Revised 400-E-66A~H drain and PSV outlet line as per 3D
model review and letter E05/CL-GH/6648/L/0190.
6648-0400-5- 4 Revised piping class on the drain of crystallizer jacket to
PS-1-1119 A24K.
6648-0400-5- 4 Revised piping class on the drain of crystallizer jacket to
PS-1-1120 A24K.
6648-0400-5- 4 Revised bottom elevation of 400-V-52A to 5000mm as per
PS-1-1126 latest plot plan.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 4 Revised bottom elevation of 400-V-52B to 5000mm as per
PS-1-1127 latest plot plan.
6648-0400-5- 4 Deleted block valve on 2”-P-400-2901-A1A-IE as per letter
PS-1-1129 E05/CL-GH/6648/L/0189.
Revised bottom elevation of 400-V-53 to 9000mm as per
latest plot plan.
6648-0400-5- 4 Added interlock I-7-2501 to motor of 400-MP-61A to trip
PS-1-1130 the pump when centrifuge 400-X-51A shut down.
6648-0400-5- 4 Added interlock I-8-2502 and I-12-2801 to motors of 400-
PS-1-1131 MP-61B/C to trip the pumps when centrifuge 400-X-51B/C
shut down.
6648-0400-5- 4 Deleted block valve on 2”-P-400-2901-A1A-IE as per letter
PS-1-1133 E05/CL-GH/6648/L/0189.
Added DW line as per analyzer shelter vendor.
6648-0400-5- 4 Revised bottom elevation of 400-V-57 to 3500mm as per
PS-1-1134 latest plot plan.
6648-0400-5- 4 Rearranged vent line to header as per piping information.
PS-1-1139 Changed HLL and LLL of 400-V-70 from 1880mm and
380mm to 1885mm and 385mm to satisfy minimum
submergence level for aromatic sump pump as per pump
vendor information.
Moved CAD line from unit 500 to UDD 6648-0500-5-PS-1-
1257A.
Marked slop on LP vent header.
6648-0400-5- 4 Revised instrumentation for I-25-4001.
PS-1-1140 Changed HLL and LLL of 400-V-71 from 1880mm and
380mm to 1885mm and 385mm to satisfy minimum
submergence level for aromatic sump pump as per pump
vendor information.
Removed line trap on 400-X-54 outlet line.
Marked slop on LP vent header.
6648-0400-5- 4 Added ethylene make-up line for gas phase for effective
PS-1-1141 filling.
Rearranged IA supply connection as per piping engineering
team information.
6648-0400-5- 4 Removed block valve on PSV line to avoid overlapping the
PS-1-1142 function.
Rearranged hot flush lines to each user as per piping
information.
6648-0400-5- 4 Removed block valve on PSV line to avoid overlapping the
PS-1-1143 function.
Rearranged hot flush lines to each user as per piping
information.
6648-0400-5- 4 Removed block valve on PSV line to avoid overlapping the
PS-1-1144 function.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


Rearranged hot flush lines to each user as per piping
information.
6648-0400-5- 2 Interlock Description is updated as per P&ID development.
PS-1-
1311A/B/C
6648-0400-5- 5 Deleted the connection named "SC" on 400-F-51 and they
PS-1-1115 are blinded off with flange since these nozzles will be used
not sampling connection but additional instrument
connection as per MOM(E05-CL-SH-6648-M0098).
Revised end type of control valve drain from flange to cap
6648-0400-5- 5 Revised drain line size from 1” to 3/4”
PS-1-1117
6648-0400-5- 5 Revised globe valve on the bypass line of 400-FV-
PS-1-1120 2001/2201/2401 to ball valve. (ERI no. 6648-0400-5-PS-EI-
2001-0)
6648-0400-5- 5 Added interlock I-2507 and I-2508 as per centrifuge
PS-1-1125 vendor’s information.
Revised globe valve on the hot flush line(2”-HF-400-
2503,4-A1A-IE) to ball valve.
6648-0400-5- 5 Revised the type of block valve of 400-LI-2601, 2602 on the
PS-1-1126 top side of vessels from ball vavle to gate valve (ERI no.
6648-0400-5-PS-EI-2001-0).
6648-0400-5- 5 Revised the type of block valve of 400-LI-2701, 2702 on the
PS-1-1127 top side of vessels from ball vavle to gate valve (ERI no.
6648-0400-5-PS-EI-2001-0).
6648-0400-5- 5 Added interlock I-2807 as per centrifuge vendor’s
PS-1-1128 information.
Revised globe valve on the hot flush line (2”-HF-400-2805-
A1A-IE) to ball valve.
6648-0400-5- 5 Revised alarms of centrifuge instruments as per vendor's
PS-1-1132A/B information.
Revised valve fail position of centrifuge instruments as per
vendor's information.
6648-0400-5- 5 Revised the detail drawing of GC analyzer required fast loop
PS-1-1133 as per vendor’s information.
6648-0400-5- 5 Revised alarms of centrifuge instruments as per vendor's
PS-1-1137A/B information.
Revised valve fail position of centrifuge instruments as per
vendor's information.
6648-0400-5- 5 Added spectacle blind to vent line for 400-V-70 (ERI no.
PS-1-1139 6648-0400-5-PS-EI-2001-0).
6648-0400-5- 5 Added spectacle blind to vent line for 400-V-71 (ERI no.
PS-1-1140 6648-0400-5-PS-EI-2001-0).
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PIPING AND INSTRUMENTATION DIAGRAM


FOR PARAXYLENE RECOVERY UNIT
Doc. No : 6648-0400-5-PS-PI-0001-F

P&ID No. Rev. Description Remarks


6648-0400-5- 5 Added the drain valve on Make up Ethylene line and IA line.
PS-1-1141
Revised IA distribution for Refrigeration system as per
Piping Engineering information.
6648-0400-5- 5 Revised HF distribution for Refrigeration system as per
PS-1-1142 Piping Engineering information.
6648-0400-5- 5 Revised HF distribution for Refrigeration system as per
PS-1-1143 Piping Engineering information.
Added block valve for 400-PI-4301 (ERI no. 6648-0400-5-
PS-EI-2001-0).
6648-0400-5- 5 Revised HF distribution for Refrigeration system as per
PS-1-1144 Piping Engineering information.
Added block valve for 400-PI-4401 (ERI no. 6648-0400-5-
PS-EI-2001-0).
Corrected set point of PSV-4402 from 12.4 kg/cm2G to 16.7
kg/cm2G
6648-0400-5- F Block valve on CW line (8”-CW-400-1228-A23A) is
PS-1-1112 relocated. (ERI no. 6648-0400-5-PS-EI-3001-0)
Sampling line is added for checking the inlet fluid of clay
tower (400-V-51A/B). (ERI no. 6648-0400-5-PS-EI-3005-0)
6648-0400-5- F Added low point drain for pump (400-MP-77A/B) discharge
PS-1-1114 between check valve and gate valve. (ERI no. 6648-0400-5-
PS-EI-3001-0)
6648-0400-5- F Limit switch number corrected. (2501->2502) (ERI no.
PS-1-1125 6648-0400-5-PS-EI-3001-0)
6648-0400-5- F Line number added. (ERI no. 6648-0400-5-PS-EI-3001-0)
PS-1-1132A, Nozzle number is revised as N31 to N32 and N32 to N31.
1132B (ERI no. 6648-0400-5-PS-EI-3010-0)
6648-0400-5- F Moved location of PT-3602,3 for convenience of access.
PS-1-1136 (ERI no. 6648-0400-5-PS-EI-3001-0)
6648-0400-5- F Location of 400-PT-3807 is revised. (ERI no. 6648-0400-5-
PS-1-1138 PS-EI-3009-0)
6648-0400-5- F Gas ethylene charge line to 400-V-81 is removed.
PS-1-1141, And it is connected to 400-V-82. (ERI no. 6648-0400-5-PS-
1141C, 1141E EI-3009-0)
NOTES:

400-V-62

400-MP-74A 400-MP-74B

400-MP-74 A/B 400-V-62


NOTES:

400-E-54

400-E-74

400-E-64

400-E-52

400-E-51

400-E-72

400-E-56

400-MP-76 A/B 400-E-72 400-E-54 400-E-51

400-MP-76 A 400-MP-76 B

400-E-56 400-E-52 400-E-74 400-E-64


NOTES:

400-E-58

400-V-51 B 400-V-51 A

400-V-64

400-E-57

DETAIL "A"

400-EA-51

400-E-53

400-E-55

SEE DETAIL "A"

400-E-73

400-E-55 400-EA-51 400-V-64 400-E-57 400-E-58 400-V-51 A/B 400-E-53 400-E-73


NOTES:

400-C-51 A

400-C-51 B

400-MP-79 A 400-MP-79 B

400-C-51 A 400-MP-78 A/B 400-MP-78 A 400-MP-78 B


NOTES:

SEE DETAIL "A"


400-EA-52

DETAIL "A"

400-V-74 400-V-73

400-MP-77 A 400-MP-77 B
400-MP-51 A 400-MP-51 B

400-EA-52 400-V-74 400-MP-77 A/B 400-MP-51 A/B 400-V-73


NOTES:

400-F-51

400-F-51
NOTES:

400-E-65 A

400-E-65 B

400-E-65 C

400-E-65 A/B/C 400-MP-75 A/B


400-MP-75A 400-MP-75B
400-E-66 A

NOTES:

400-E-66 B

400-E-66 C

400-E-66 D

400-E-66 E

400-E-66 F

400-E-66 G

400-E-66 H
NOTES:

400-E-67

400-E-67
NOTES:

400-UX-51A

400-U-51 A
400-V-59 A

400-V-59 D

400-MP-52 A

400-MP-53 A

400-MP-52 A 400-U-51 A 400-MP-53 A 400-V-59 A/D 400-UX-51A


NOTES:

400-UX-52A

400-U-52 A
400-V-60 A

400-V-60 D

400-MP-54 A

400-MP-55 A

400-MP-54 A 400-U-52 A 400-MP-55 A 400-V-60 A/D


400-UX-52A
NOTES:

400-UX-51B

400-U-51 B
400-V-59 B

400-V-59 E

400-MP-52 B

400-MP-53 B

400-MP-52 B 400-U-51 B 400-MP-53 B 400-V-59 B/E 400-UX-51B


NOTES:

400-UX-52B

400-U-52 B
400-V-60 B

400-V-60 E

400-MP-54 B

400-MP-55 B

400-MP-54 B 400-U-52 B 400-MP-55 B 400-V-60 B/E


400-UX-52B
NOTES:

400-UX-51C

400-U-51 C
400-V-59 C

400-V-59 F

400-MP-52 C

400-MP-53 C

400-MP-52 C 400-U-51 C 400-MP-53 C 400-V-59 C/F 400-UX-51C


NOTES:

400-UX-52C

400-U-52 C
400-V-60 C

400-V-60 F

400-MP-54 C

400-MP-55 C

400-MP-54 C 400-U-52 C 400-MP-55 C 400-V-60 C/F


400-UX-52C
NOTES:

400-X-51 A 400-X-51 B

400-X-51 A/B
A23A

-A23A

A23A

A23A

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1125A F
A23A

A23A

A23A

A23A

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1125B F
SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.
NONE 6648 0400 5 PS 1 1125C F
$$

$$

$$

$$

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1125D F
$$

$$

$$

$$

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1125E F
SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.
NONE 6648 0400 5 PS 1 1125F F
NOTES:
400-MX-51 A

400-V-52 A

400-E-59 A

400-E-68 A

400-MP-56 A

400-E-68 A 400-E-59 A 400-MX-51 A


400-V-52 A 400-MP-56 A
NOTES:
400-MX-51 B

400-V-52 B

400-E-59 B

400-E-68 B

400-MP-56 B

400-E-68 B 400-E-59 B 400-MX-51 B


400-V-52 B 400-MP-56 B
NOTES:

400-V-54

400-X-51 C

400-MP-59 A 400-MP-59 B 400-MP-59 A/B 400-V-54 400-X-51 C


A23A

A23A

A23A

A23A

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1128A F
A23A

A23A

A23A

A23A

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1128B F
SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.
NONE 6648 0400 5 PS 1 1128C F
NOTES:

400-E-60

400-V-53

400-V-66

400-MP-57 A 400-MP-57 B

400-V-53 400-MP-57 A/B 400-E-60 400-V-66


NOTES:

400-V-55 A

400-MP-60 A
400-MP-61A

400-MP-60 A 400-V-55 A 400-MP-61 A


NOTES:

400-V-55 B 400-V-55 C

400-MP-60 B
400-MP-60 C

400-MP-61 B

400-MP-61 C

400-MP-60 B 400-V-55 B 400-MP-61 B 400-MP-60 C 400-V-55 C 400-MP-61 C


NOTES

400-X-52 A 400-MP-87A

400-E-94A

400-X-52 A
NOTES

400-X-52 B 400-MP-87B

400-E-94B

400-X-52 B
FO

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1132C F

FO

N32 N31
FO

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1132D F

FO

N32 N31
DETAIL "A"
NOTES:

400-E-61

400-V-56

400-V-67

400-E-69

400-MP-62 A 400-MP-62 B

400-V-56 400-MP-62 A/B 400-E-61 400-E-69 400-V-67


NOTES:

400-V-57

400-MP-64

400-MP-63

400-MP-63 400-V-57 400-MP-64


NOTES:

400-UX-53A

400-U-53 A
400-V-61 A

400-V-61 C

400-MP-65 A 400-MP-66 A

400-MP-65 A 400-U-53 A 400-MP-66 A 400-V-61 A/C 400-UX-53A


NOTES:

400-UX-53B

400-U-53 B
400-V-61 B

400-V-61 D

400-MP-66 B

400-MP-65 B

400-MP-65 B 400-U-53 B 400-MP-66 B 400-V-61 B/D 400-UX-53B


NOTES

400-X-53 A 400-MP-88A

400-E-95A

400-X-53 A
NOTES

400-X-53 B 400-MP-88B

400-E-95B

400-X-53 B
FO

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1137C F

FO
FO

SCALE JOB NO. UNIT C DEPT. SIZE SERIAL NO. REV.


NONE 6648 0400 5 PS 1 1137D F

FO
NOTES:

400-V-58 A 400-V-58 B

400-MP-67 B

400-MP-67A

400-MP-68 A

400-MP-68 B

400-MP-67 A 400-V-58 A 400-MP-68 A 400-MP-67 B 400-V-58 B 400-MP-68 B


NOTES:

400-V-68

400-V-70

400-J-51

400-MP-72

400-J-51 400-V-70 400-MP-72 400-V-68


NOTES:

400-X-54

400-V-72

400-E-71

400-J-52

400-V-71

400-MP-73

400-J-52 400-E-71 400-V-71 400-MP-73 400-V-72 400-X-54


NOTES:

400-V-94

400-M-51

400-V-94 400-M-51
015-1/
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
033-1/
034-1/
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
NOTES:

400-V-63

400-E-62

400-MP-69 A 400-MP-69 B

400-V-63 400-MP-69 A/B 400-E-62


NOTES:

400-V-65

400-E-63

400-MP-70 A 400-MP-70 B

400-V-65 400-MP-70 A/B 400-E-63


NOTES:

400-V-69

400-E-70

400-MP-71 A 400-MP-71 B
400-V-69 400-MP-71 A/B 400-E-70