ADAPTATION PROJECT
Issue Issue
Acct. Drawing Number Drawing Title
Stage Date
FIRST STAGE CENTRIFUGES
19 6648-0400-5-PS-1-1125C F 30 NOV. 2014
-LUBE OIL SYSTEM
Issue Issue
Acct. Drawing Number Drawing Title
Stage Date
Issue Issue
Acct. Drawing Number Drawing Title
Stage Date
REFRIGERATION PACKAGE
59 6648-0400-5-PS-1-1141N F 30 NOV. 2014
-LUBE OIL SYSTEM
REFRIGERATION PACKAGE
60 6648-0400-5-PS-1-1141O F 30 NOV. 2014
-LUBE OIL SYSTEM
REFRIGERATION PACKAGE
61 6648-0400-5-PS-1-1141P F 30 NOV. 2014
-GAS SEAL MODULE
REFRIGERATION PACKAGE
62 6648-0400-5-PS-1-1141Q F 30 NOV. 2014
-GAS SEAL MODULE
REFRIGERATION PACKAGE
63 6648-0400-5-PS-1-1141R F 30 NOV. 2014
-TRANSFER UNIT
REFRIGERATION PACKAGE
64 6648-0400-5-PS-1-1141S F 30 NOV. 2014
-TRANSFER UNIT
CHANGE LIST
Change List for all the drawing
Rev. Description Remarks
0 Corrected Symbols & Nomenclature according to Symbol and Legend
6648-0100-5-PS-1-1001 to 1005.
0 Changed Symbol & Legend numbering.
- Feed Package : LSD-001 to LSD-005
- IFD : 6648-0100-5-PS-1-1001 to 1005
0 Changed P&ID DWG numbers.
- Feed Package : PID-400-xxxx
- IFD : 6648-0400-5-PS-1-xxxx
* xxxx : Last 4 digit numbers on each sheet.
0 Changed existing line number to new line number as replacing all
existing line to new line.
0 Generally corrected line No. & continuity arrows for consistency.
0 Added limit switch for valve symbol & details in the Symbol and Legend
(DWG No. 6648-0100-5-PS-1-1005) and added limit position switch on
each on/off valves.
0 Closed aromatic drain (CAD) spec changed ‘BY DEC’ to ‘A1A’ and
cold Aromatic drain (CAD(COLD)) spec changed ‘BY DEC’ to ‘A24K’
for 400 unit according to the piping material specification (Doc. No.
6648-6-44-0005-r Rev.4).
0 Added "Two phase flow" note on the two phase flow lines according to
material balance.
0 Located pump suction drain position to down stream of y-type strainer as
per client requirement and existing plant pump suction drain position.
0 Column overhead line pressure switch changed as below.
- Feed Package : Three ‘PSHH’ from one common point of the pipe line.
- IFD : Three pressure transmitters ‘PT’ with pressure High High alarm
‘PAHH’ from three individual point of the pipe line
0 Applied tight shut off(TSO) on solenoid valves in steam & fuel gas lines
as per Scope of Work and Supply 2.3.31 (Doc. No. 6648-00-02-41-SW -
02 Rev.2 ).
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT
4 Added bleed valve for PSV to closed system as per Scope of Work and
Supply, 6648-00-02-41-SW-02 Rev. 2.
4 Updated Pump Seal Plan as per information from the Pump Vendor.
Change List
P&ID No. Rev. Description Remarks
6648-0400-5- 0 Added new pumps(400-MP-74 A/B) along with associated
PS-1-1111A Piping & Instrumentation on 10" feed line coming to unit
400 from OSBL feed tank S232 as per Scope of Work and
Supply(6648-00-02-41-SW-02 Rev.2) clause 8.13.2.
Deleted unit 400 feed line 6"-P-100-2111-A1A as per Scope
of Work and Supply(6648-00-02-41-SW-02 Rev.2) clause
8.13.3.
To avoid double PI, deleted PI-1105 as added PI-1110 on the
pump inlet line.
Line size is corrected from 2"-P-400-3903-A1A-it to 4"-P-
400-3903-A1A-IT as mismatching with line of PID-400-
1139.
Changed existing heat exchanger to new heat exchanger as
per Scope of Work and Supply(6648-00-02-41-SW-02
Rev.2) clause 8.13.12.
- 400-E-1 → 400-E-72
- 400-E-3 → 400-E-74
Deleted check valve on 3”-MC-400-1101-B1A-IH.
6648-0400-5- 0 LI-3002 with LAL added as per HAZOP study report No.
PS-1-1130 108 recommendation (Doc. No. 6648-10-04-41-012)
6648-0400-5- 0 LI-3105,3106 with LAL added as per HAZOP study report
PS-1-1131 No. 109 recommendation (Doc. No. 6648-10-04-41-012)
6648-0400-5- 0 UA-3201(common trip alarm) for centrifuge added as per
PS-1-1132 HAZOP study report No. 183 recommendation (Doc. No.
6648-10-04-41-012)
UA-3202(common trip alarm) for centrifuge added as per
HAZOP study report No. 184 recommendation (Doc. No.
6648-10-04-41-012)
6648-0400-5- 0 Valve type of FV-3301 bypass valve changed from gate to
PS-1-1133 globe as per GDD(6648-02-41-GDD-01) Rev. 8 clause 6.5.1
Added PSV-3310 for protecting 400-V-67.
6648-0400-5- 0 Line insulation corrected from 3"-P-400-3404-A24A-it to
PS-1-1135 3"-P-400-3404-A24A-IE/IC as mismatching with line of
PID-400-1134.
6648-0400-5- 0 Line insulation corrected from 3"-P-400-3405-A24A-IT to
PS-1-1136 3"-P-400-3405-A24A-IE/IC as mismatching with line of
PID-400-1134.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT
6648-0400-5- 2 Changed the LLL set point of 400-V-58 A/B from 150mm to
PS-1-1138 750mm as per HAZOP recommendation U400-128.
6648-0400-5- 2 Marked CSO on the manual valve on the inlet to 400-V-70
PS-1-1139 as per HAZOP recommendation U400-138.
Revised short spec. of 400-V-70 and 400-MP-72 as per
HAZOP recommendation U400-139.
Configured TAHH on 400-TI-3903 as per HAZOP
recommendation U400-141.
Added FQ on 400-FI-3901 as per HAZOP recommendation
U400-142.
Removed unnecessary vent nozzle for 400-V-68.
Removed PI on 400-V-68 to avoid overlapping other PI on
aromatics vent line.
Rearranged vent lines as per piping engineering information.
6648-0400-5- 2 Configured TALL on 400-TI-4006 as per HAZOP
PS-1-1140 recommendation U400-143.
Added FQ on 400-FI-4002 as per HAZOP recommendation
U400-145.
Removed unnecessary vent nozzle for 400-V-72.
Removed PI on 400-V-72 to avoid overlapping other PI on
aromatics vent line.
Rearranged vent lines as per piping engineering information.
Added Note for minimum straight run distance of
Desuperheater, 400-X-54.
6648-0400-5- 2 Added Ethylene Receiver 400-V-94 on the process side for
PS-1-1141 the Refrigeration system shutdown.
6648-0400-5- 2 Added a manual bypass around 400-XV-4201 as per
PS-1-1142 HAZOP recommendation U400-146.
Changed 400-LSHH-4201A and 400-LSLL-4201B to 400-
LT-4201 as per HAZOP recommendation U400-147.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT
400-V-62
400-MP-74A 400-MP-74B
400-E-54
400-E-74
400-E-64
400-E-52
400-E-51
400-E-72
400-E-56
400-MP-76 A 400-MP-76 B
400-E-58
400-V-51 B 400-V-51 A
400-V-64
400-E-57
DETAIL "A"
400-EA-51
400-E-53
400-E-55
400-E-73
400-C-51 A
400-C-51 B
400-MP-79 A 400-MP-79 B
DETAIL "A"
400-V-74 400-V-73
400-MP-77 A 400-MP-77 B
400-MP-51 A 400-MP-51 B
400-F-51
400-F-51
NOTES:
400-E-65 A
400-E-65 B
400-E-65 C
NOTES:
400-E-66 B
400-E-66 C
400-E-66 D
400-E-66 E
400-E-66 F
400-E-66 G
400-E-66 H
NOTES:
400-E-67
400-E-67
NOTES:
400-UX-51A
400-U-51 A
400-V-59 A
400-V-59 D
400-MP-52 A
400-MP-53 A
400-UX-52A
400-U-52 A
400-V-60 A
400-V-60 D
400-MP-54 A
400-MP-55 A
400-UX-51B
400-U-51 B
400-V-59 B
400-V-59 E
400-MP-52 B
400-MP-53 B
400-UX-52B
400-U-52 B
400-V-60 B
400-V-60 E
400-MP-54 B
400-MP-55 B
400-UX-51C
400-U-51 C
400-V-59 C
400-V-59 F
400-MP-52 C
400-MP-53 C
400-UX-52C
400-U-52 C
400-V-60 C
400-V-60 F
400-MP-54 C
400-MP-55 C
400-X-51 A 400-X-51 B
400-X-51 A/B
A23A
-A23A
A23A
A23A
A23A
A23A
A23A
$$
$$
$$
$$
$$
$$
400-V-52 A
400-E-59 A
400-E-68 A
400-MP-56 A
400-V-52 B
400-E-59 B
400-E-68 B
400-MP-56 B
400-V-54
400-X-51 C
A23A
A23A
A23A
A23A
A23A
A23A
400-E-60
400-V-53
400-V-66
400-MP-57 A 400-MP-57 B
400-V-55 A
400-MP-60 A
400-MP-61A
400-V-55 B 400-V-55 C
400-MP-60 B
400-MP-60 C
400-MP-61 B
400-MP-61 C
400-X-52 A 400-MP-87A
400-E-94A
400-X-52 A
NOTES
400-X-52 B 400-MP-87B
400-E-94B
400-X-52 B
FO
FO
N32 N31
FO
FO
N32 N31
DETAIL "A"
NOTES:
400-E-61
400-V-56
400-V-67
400-E-69
400-MP-62 A 400-MP-62 B
400-V-57
400-MP-64
400-MP-63
400-UX-53A
400-U-53 A
400-V-61 A
400-V-61 C
400-MP-65 A 400-MP-66 A
400-UX-53B
400-U-53 B
400-V-61 B
400-V-61 D
400-MP-66 B
400-MP-65 B
400-X-53 A 400-MP-88A
400-E-95A
400-X-53 A
NOTES
400-X-53 B 400-MP-88B
400-E-95B
400-X-53 B
FO
FO
FO
FO
NOTES:
400-V-58 A 400-V-58 B
400-MP-67 B
400-MP-67A
400-MP-68 A
400-MP-68 B
400-V-68
400-V-70
400-J-51
400-MP-72
400-X-54
400-V-72
400-E-71
400-J-52
400-V-71
400-MP-73
400-V-94
400-M-51
400-V-94 400-M-51
015-1/
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
033-1/
034-1/
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
SAMSUNG ENGINEERING
NOTES:
400-V-63
400-E-62
400-MP-69 A 400-MP-69 B
400-V-65
400-E-63
400-MP-70 A 400-MP-70 B
400-V-69
400-E-70
400-MP-71 A 400-MP-71 B
400-V-69 400-MP-71 A/B 400-E-70