Steel Structure Assesment

Date Conduct 10-May-18


Team Member Eswandi Muhamad, Aw Chih Long.

No Plant Area Before

1 Kiln 1 Skip rail support


structure left side

2 Kiln 1 Support skip rail no 2


from the top - bottom
view.

3 Kiln 1 Support rail no 2 from


the top - botom view
right side.

4 Kiln 1 Support railing no 2


from the top - top
view.
5 Kiln 1

6 Kiln 1 Rail support to


platform left side.

7 Kiln 1 Side platform for top


hopper right side.

8 Kiln 1 Side platform for top


hopper left side.

9 Kiln 1 Top hopper platform


entrance left side
10 Kiln 1 Top hopper platform
beam and rail support
feed side

11 Kiln 1 Top hopper platform


centre beam bottom
view.

12 Kiln 1 Top hopper platform


left beam bottom
view.

13 Kiln 1 Top hopper platform


right beam bottom
view.

14 Kiln 1 Rail plate support to


platform left side.
15 Kiln 1 Top pulley platform
bottom view.
Condition Hazard
After
Corroded Wear of Paint peel High Medium

√ √ √ √

√ √ √

√ √ √

√ √ √
√ √ √ √

√ √ √

√ √ √

√ √ √

√ √ √
√ √ √

√ √ √

√ √ √

√ √ √

√ √ √
√ √