You are on page 1of 28

    G O V E R N M E N T   O F   I N D I A (http://india.gov.

in/) 

Skip to main content (http://www.facebook.com/isro) (http://www.twitter.com/isro)


Home (/)

(https://india.gov.in/)

(/)

Department of Space
Indian Space Research Organisation
(/)

Search...

English (/update/26-mar-2019/young-scientist-programme-yuvika-online-registration)

िह ी (/hi/update/26-%E0%A4%AE%E0%A4%BE%E0%A4%B0%E0%A5%8D%E0%A4%9A-2019/%E0%A4%AF%E0%A5%81%E0%A4%B5%E0%A4%BE-
%E0%A4%B5%E0%A5%88%E0%A4%9C%E0%A5%8D%E0%A4%9E%E0%A4%BE%E0%A4%A8%E0%A4%BF%E0%A4%95-
%E0%A4%95%E0%A4%BE%E0%A4%B0%E0%A5%8D%E0%A4%AF%E0%A4%95%E0%A5%8D%E0%A4%B0%E0%A4%AE-
%E0%A4%AF%E0%A5%81%E0%A4%B5%E0%A4%BF%E0%A4%95%E0%A4%BE-%E0%A4%91%E0%A4%A8%E0%A4%B2%E0%A4%BE%E0%A4%87%E0%A4%A8-
%E0%A4%AA%E0%A4%82%E0%A4%9C%E0%A5%80%E0%A4%95%E0%A4%B0%E0%A4%A3)

Missions (https://www.isro.gov.in/missions-0) Spacecraft (https://www.isro.gov.in/spacecraft) Launchers (https://www.isro.gov.in/launchers)


Applications (https://www.isro.gov.in/applications) Media (https://www.isro.gov.in/media) About (https://www.isro.gov.in/about-isro)
Request transponder capacity (https://www.isro.gov.in/request-transponder-capacity)
Home (/)

Mar 26, 2019

Young Scientist Programme (Yuvika ) - Online Registration


Indian Space Research Organisation has launched a special programme for School Children called "Young Scientist Programme" "YUva VIgyani KAryakram" from
this year, in tune with the Government's vision "Jai Vigyan, Jai Anusandhan".

The Program is primarily aimed at imparting basic knowledge on Space Technology, Space Science and Space Applications to the younger ones with the intent of
arousing their interest in the emerging areas of Space activities. The program is thus aimed at creating awareness amongst the youngsters who are the future
building blocks of our Nation. ISRO has chalked out this programme to "Catch them young".

The programme will be of two weeks duration during summer holidays (second half of May 2019) and the schedule will include invited talks, experience sharing by
the eminent scientists, facility and lab visits, exclusive sessions for discussions with experts, practical and feedback sessions.

It is proposed to select 3 students each from each State/ Union Territory to participate in this programme covering CBSE, ICSE and State syllabus.

There are a few seats left for the programme and it is proposed to select through online registration. Those who have just completed 9th standard (in the
academic year 2018-19) and waiting to join 10th Std (or just joined 10th Std) will be eligible for the online registration.

The selection is based on the 8th Standard academic performance and extracurricular activities. The selection criteria is given below.

Sl.No Description Weightage

1 Performance in the 8th Std Examination 50%

2 Membership of Science Club/Space Club 5%

Prize in any school based individual extracurricular activity


(Elocution/Debate/Essay Writing, science quiz, computer modeling, scienti៛�c
3 2/4/6/10%
prototype model making, etc.,) at District/State/National/ International Level
(The higher level will be considered for weightage)

Winners of District/State/National/International Level sports activities (The


4 2/4/6/10%
higher level will be considered for weightage)

5 Scout and Guides/NCC/NSS Member 5%

Studying in Village/Rural School (Certi៛�cate of proof to this effect to be


6 produced from the head of the school . Criteria: The school, where the 20%
candidate is studying should be located in Panchayath Area)

Total 100%

 
Students belonging to the rural area have been given special weightage in the selection criteria. In case there is tie between the selected candidates, the younger
candidates will be given priority.

A few seats are left for the programme and the interested students can register online with the link given below from 25 March 2019 (1800 hrs) to 03 April 2019
(1800 hrs). The list of the provisionally selected candidates from each state will be announced on 06 April 2019. The provisionally selected candidates will be
requested to send the attested copies of the relevant certi៛�cates through E-mail. After verifying the relevant certi៛�cates the ៛�nal selection list will be published
on 13 April 2019.

The progamme is planned at 4 centres of ISRO during the second half of May 2019. The selected students will be accommodated in ISRO guest houses/hostels.
Expenditure towards the travel of student (II AC fare by train from nearest Rly Station to the reporting centre and back), course material, lodging and boarding
etc., during the entire course will be borne by ISRO. II AC fare will also be provided to one guardian/parent for drop and pick up of student from the reporting
centre.

Click here to register for YUVIKA (https://yuvika.isro.gov.in/yuvika/register.jsp)

Registered Students click here to Login (https://yuvika.isro.gov.in/yuvika/login.jsp)

Archive of Updates from ISRO

Apr PSLV-C45 Mission - Propellant ៛�lling of second stage completed (/update/01-apr-2019/pslv-c45-mission-propellant-៛�lling-of-second-stage-


01, completed)
2019

Mar PSLV-C45 Mission - Propellant ៛�lling of second stage of PSLV-C45 commenced (/update/31-mar-2019/pslv-c45-mission-propellant-៛�lling-of-second-
31, stage-of-pslv-c45-commenced)
2019

Mar PSLV-C45 Mission - Propellant ៛�lling of fourth stage of PSLV-C45 completed (/update/31-mar-2019/pslv-c45-mission-propellant-៛�lling-of-fourth-
31, stage-of-pslv-c45-completed)
2019

Mar PSLV-C45 Mission - Filling of propellant for the fourth stage (PS4) Commenced. (/update/31-mar-2019/pslv-c45-mission-៛�lling-of-propellant-fourth-
31, stage-ps4-commenced)
2019

Mar The countdown for the launch of PSLV-C45 mission commenced today at 06:27 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
31, The launch is scheduled at 09:27 Hrs IST on 1st April 2019 (/update/31-mar-2019/countdown-launch-of-pslv-c45-mission-commenced-today-0627-
2019 hrs-ist-satish-dhawan)

Mar Launch View Gallery (/update/28-mar-2019/launch-view-gallery)


28,
2019

Mar Upcoming NavIC (IRNSS) System Week Number (WN) Rollover Event (/update/28-mar-2019/upcoming-navic-irnss-system-week-number-wn-
28, rollover-event)
2019

Mar The PSLV-C45 vehicle was moved from the Vehicle Assembly Building to the Umbilical Tower today at 06:00 Hrs (IST) in Satish Dhawan Space Centre
28, (SDSC) SHAR, Sriharikota. Presently, all the electrical checks are being performed. (/update/28-mar-2019/pslv-c45-vehicle-was-moved-vehicle-
2019 assembly-building-to-umbilical-tower-today)

Mar Young Scientist Programme (Yuvika ) - Online Registration (/update/26-mar-2019/young-scientist-programme-yuvika-online-registration)


26,
2019

Mar Appreciation from participants of UNNATI Program (/update/22-mar-2019/appreciation-participants-of-unnati-program)


22,
2019

Mar Astrosat Picture of the Month of Feb, 2019 (/update/08-mar-2019/astrosat-picture-of-month-of-feb-2019)


08,
2019

Mar Mr. Jean Yves Le Gall, President, French National Space Agency (CNES) visited ISRO Head Quarters on March 6, 2019 (/update/07-mar-2019/mr-jean-
07, yves-le-gall-president-french-national-space-agency-cnes-visited-isro)
2019

Mar Announcement of Opportunity (AO) soliciting proposals for Seventh AO cycle observations (/update/06-mar-2019/announcement-of-opportunity-ao-
06, soliciting-proposals-seventh-ao-cycle-observations)
2019

Mar Announcement of Opportunity for Space-National Academic Partner (S-NAP) (/update/06-mar-2019/announcement-of-opportunity-space-national-


06, academic-partner-s-nap)
2019

Feb Chairman, Ukrainian Space Agency’s visit to ISRO HQ (/update/22-feb-2019/chairman-ukrainian-space-agency%E2%80%99s-visit-to-isro-hq)


22,
2019

Feb Russian Ambassador to India visited ISRO HQ & HSFC (/update/22-feb-2019/russian-ambassador-to-india-visited-isro-hq-hsfc)


22,
2019

Feb British High Commissioner to India visited ISRO HQ (/update/22-feb-2019/british-high-commissioner-to-india-visited-isro-hq)


22,
2019
Feb JSC "Rosoboronexport" of៛�cials visited ISRO HQ (/update/22-feb-2019/jsc-rosoboronexport-of៛�cials-visited-isro-hq)
22,
2019

Feb Announcement of Opportunity (AO) for Establishing ISRO Chair at Institutes - Last date for submissions extended upto March 08, 2019
13, (/announcement-of-opportunity-ao-establishing-isro-chair-institutes-last-date-submissions-extended)
2019

Feb After the injection of GSAT-31 communication satellite into an elliptical Geosynchronous Transfer Orbit (GTO) on February 06, 2019, all the three orbit
09, raising manoeuvers have been completed successfully as planned using the satellite's propulsion system. (/update/09-feb-2019/after-injection-of-
2019 gsat-31-communication-satellite-elliptical-geosynchronous)

Feb The ៛�rst orbit raising manoeuver of GSAT-31 satellite has been successfully carried out today (February 7, 2019) at 0438 hrs (IST) by ៛�ring the Liquid
07, Apogee Motor (LAM) engine of the satellite for a duration of 4684 seconds. (/update/07-feb-2019/៛�rst-orbit-raising-manoeuver-of-gsat-31-satellite-
2019 has-been-successfully-carried)

Jan AstroSat Picture of the Month of Jan, 2019 (/update/31-jan-2019/astrosat-picture-of-month-of-jan-2019)


31,
2019

Jan Inauguration of Human Space Flight Centre (HSFC) (/update/30-jan-2019/inauguration-of-human-space-៟�ight-centre-hsfc)


30,
2019

Jan National Space Science Syposium (NSSS) – 2019 (/update/30-jan-2019/national-space-science-syposium-nsss-%E2%80%93-2019)


30,
2019

Jan Ref. Request for Quali៛�cation (RFQ) - Technology Transfer of Lithium-ion Cell by ISRO to Indian Industries (/update/29-jan-2019/ref-request-
29, quali៛�cation-rfq-technology-transfer-of-lithium-ion-cell-isro-to)
2019

Jan Samwad with Students at Sriharikota (/update/24-jan-2019/samwad-with-students-sriharikota)


24,
2019

Jan PSLV-C44 Mission - Filling of propellant UH25 for the second stage (PS2) of PSLV-C44 completed (/update/24-jan-2019/pslv-c44-mission-៛�lling-of-
24, propellant-uh25-second-stage-ps2-of-pslv-c44-0)
2019

Jan PSLV-C44 Mission - Filling of propellant UH25 for second stage (PS2) of PSLV-C44 commenced. (/update/24-jan-2019/pslv-c44-mission-៛�lling-of-
24, propellant-uh25-second-stage-ps2-of-pslv-c44)
2019

Jan PSLV-C44 Mission - Filling of oxidizer (N204) for the second stage (PS2) completed (/update/24-jan-2019/pslv-c44-mission-៛�lling-of-oxidizer-n204-
24, second-stage-ps2-completed)
2019

Jan PSLV-C44 Mission - Propellants ៛�lling of fourth stage (PS4) of PSLV-C44 completed (/update/24-jan-2019/pslv-c44-mission-propellants-៛�lling-of-
24, fourth-stage-ps4-of-pslv-c44-completed)
2019

Jan The countdown for the launch of PSLV-C44 mission started today at 19:37 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. The
23, launch is scheduled at 23:37 Hrs IST on 24th January 2019 (/update/23-jan-2019/countdown-launch-of-pslv-c44-mission-started-today-1937-hrs-ist-
2019 satish-dhawan)

Jan Inauguration of Space Technology Incubation Centre, National Institute of Technology, Jalandhar, Punjab (/update/17-jan-2019/inauguration-of-space-
17, technology-incubation-centre-national-institute-of)
2019

Jan Announcement of Opportunity (AO) for Establishing ISRO Chair at Institutes (/update/16-jan-2019/announcement-of-opportunity-ao-establishing-
16, isro-chair-institutes)
2019

Jan Video of Press Meet - Brie៛�ng by Dr. K Sivan, Chairman, ISRO (/update/11-jan-2019/video-of-press-meet-brie៛�ng-dr-k-sivan-chairman-isro)
11,
2019

Jan Press Meet - Brie៛�ng by Dr. K Sivan, Chairman, ISRO (/update/11-jan-2019/press-meet-brie៛�ng-dr-k-sivan-chairman-isro)


11,
2019

Jan PSLV Productionisation (/update/11-jan-2019/pslv-productionisation)


11,
2019

Jan Message from Chairman's desk (/update/01-jan-2019/message-chairmans-desk)


01,
2019

Dec Latest update on GSAT-7A (/update/24-dec-2018/latest-update-gsat-7a)


24,
2018
Dec The ៛�rst orbit raising manoeuver of GSAT-7A satellite has been successfully carried out today (20th December) by ៛�ring the Liquid Apogee Motor (LAM)
20, engine of the satellite at 0916 Hrs IST for a duration of 3895 seconds. (/update/20-dec-2018/៛�rst-orbit-raising-manoeuver-of-gsat-7a-satellite-has-
2018 been-successfully-carried)

Dec Filling of propellant for Cryo stage (C15) of GSLV-F11/GSAT-7A mission completed (/update/19-dec-2018/៛�lling-of-propellant-cryo-stage-c15-of-gslv-
19, f11-gsat-7a-mission-completed)
2018

Dec GSAT-7A Spacecraft powered on (/update/19-dec-2018/gsat-7a-spacecraft-powered)


19,
2018

Dec Filling of propellant for Cryo stage (C15) of GSLV-F11/GSAT-7A mission commenced (/update/19-dec-2018/៛�lling-of-propellant-cryo-stage-c15-of-
19, gslv-f11-gsat-7a-mission-commenced)
2018

Dec GSLV-F11/GSAT-7A Mission - Propellant ៛�lling of liquid strap-on (L40) completed (/update/19-dec-2018/gslv-f11-gsat-7a-mission-propellant-៛�lling-of-
19, liquid-strap-l40-completed)
2018

Dec GSLV-F11/GSAT-7A Mission - Propellant ៛�lling of liquid strap-on (L40) commenced (/update/18-dec-2018/gslv-f11-gsat-7a-mission-propellant-៛�lling-
18, of-liquid-strap-l40-commenced)
2018

Dec GSLV-F11/GSAT-7A Mission - Second stage (GS2) propellant loading completed (/update/18-dec-2018/gslv-f11-gsat-7a-mission-second-stage-gs2-
18, propellant-loading-completed)
2018

Dec GSLV-F11/GSAT-7A Mission - Second stage (GS2) propellant loading commenced (/update/18-dec-2018/gslv-f11-gsat-7a-mission-second-stage-gs2-
18, propellant-loading-commenced)
2018

Dec The countdown for the launch of GSLV-F11/GSAT-7A mission started today at 14:10 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
18, The launch is scheduled at 16:10 Hrs IST on 19th December 2018 (/update/18-dec-2018/countdown-launch-of-gslv-f11-gsat-7a-mission-started-today-
2018 1410-hrs-ist-satish)

Dec GSAT-11 positioned in Geostationary Orbit (/update/10-dec-2018/gsat-11-positioned-geostationary-orbit)


10,
2018

Dec Orbit raising manoeuvres have been performed on GSAT-11 (/update/08-dec-2018/orbit-raising-manoeuvres-have-been-performed-gsat-11)


08,
2018

Dec Glimpse of HyperSpectral Data Captured by HySIS (/update/07-dec-2018/glimpse-of-hyperspectral-data-captured-hysis)


07,
2018

Dec The countdown for the launch of GSAT-11 mission onboard Ariane-5 launch vehicle started today (December 04, 2018) at 13:14 Hrs IST from French
04, Guiana. The launch is scheduled at 02:07 Hrs IST on December 05, 2018 (/update/04-dec-2018/countdown-launch-of-gsat-11-mission-onboard-
2018 ariane-5-launch-vehicle-started-today)

Dec HYsIS First day Image (/update/02-dec-2018/hysis-៛�rst-day-image)


02,
2018

Nov AstroSat Picture of the Month Nov, 2018 (/update/30-nov-2018/astrosat-picture-of-month-nov-2018)


30,
2018

Nov PSLV-C43/HysIS Mission: Propellant ៛�lling for the second stage(PS2) of PSLV-C43 completed (/update/28-nov-2018/pslv-c43-hysis-mission-
28, propellant-៛�lling-second-stageps2-of-pslv-c43-completed)
2018

Nov PSLV-C43/HysIS Mission: Filling of oxidizer (N204) for the second stage (PS2) of PSLV-C43 completed (/update/28-nov-2018/pslv-c43-hysis-mission-
28, ៛�lling-of-oxidizer-n204-second-stage-ps2-of-pslv-c43)
2018

Nov PSLV-C43/HysIS Mission: Propellant ៛�lling for the second stage(PS2) of PSLV-C43 commenced (/update/28-nov-2018/pslv-c43-hysis-mission-
28, propellant-៛�lling-second-stageps2-of-pslv-c43-commenced)
2018

Nov Celebrations of 1000th Casting Completion by SPROB (/update/28-nov-2018/celebrations-of-1000th-casting-completion-sprob)


28,
2018

Nov PSLV-C43 / HysIS Mission: Fuel ៛�lling of PS4 stage (fourth stage) completed (/update/28-nov-2018/pslv-c43-hysis-mission-fuel-៛�lling-of-ps4-stage-
28, fourth-stage-completed)
2018

Nov The countdown for the launch of PSLV-C43/HysIS mission started today at 05:58 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
28, The launch is scheduled at 09:58 Hrs IST on 29th November 2018 (/update/28-nov-2018/countdown-launch-of-pslv-c43-hysis-mission-started-today-
2018 0558-hrs-ist-satish)
Nov PSLV-C43 lift off time is rescheduled to 09.58 Hrs IST on 29th November, 2018. Countdown will commence from 05.58 Hrs IST on 28th November, 2018
27, (/update/27-nov-2018/pslv-c43-lift-time-rescheduled-to-0958-hrs-ist-29th-november-2018-countdown-will)
2018

Nov The countdown for the launch of PSLV-C43 / HysIS Mission from Satish Dhawan Space Centre SHAR, Sriharikota is tentatively scheduled at 0557 Hrs
27, IST on November 28, 2018. The launch is tentatively scheduled at 0957 Hrs IST on November 29, 2018. (/update/27-nov-2018/countdown-launch-of-
2018 pslv-c43-hysis-mission-satish-dhawan-space-centre-shar)

Nov The third and ៛�nal orbit raising operation of GSAT-29 satellite has been successfully carried out today (November 17, 2018) by ៛�ring the Liquid Apogee
17, Motor (LAM) engine of the satellite at 0957 Hrs IST for a duration of 207 sec (/update/17-nov-2018/third-and-៛�nal-orbit-raising-operation-of-gsat-29-
2018 satellite-has-been)

Nov GSLV Mk III-D2/GSAT-29 Mission: The second orbit raising operation of GSAT-29 satellite has been successfully carried out today (November 16, 2018)
16, by ៛�ring the Liquid Apogee Motor (LAM) engine of the satellite at 1027 Hrs IST for a duration of 4988 sec (/update/16-nov-2018/gslv-mk-iii-d2-gsat-
2018 29-mission-second-orbit-raising-operation-of-gsat-29)

Nov GSLV Mk III-D2 / GSAT-29 Mission: The ៛�rst orbit raising operation of GSAT-29 satellite has been successfully carried out today (15th November) by
15, ៛�ring the Liquid Apogee Motor (LAM) engine of the satellite at 0834 Hrs IST for a duration of 4875 seconds (/update/15-nov-2018/gslv-mk-iii-d2-gsat-
2018 29-mission-៛�rst-orbit-raising-operation-of-gsat-29-satellite)

Nov GSLV Mk III-D2 / GSAT-29 Mission Launch: Filling of Liquid Oxygen in Cryogenic Stage completed and ៛�lling up of Liquid Hydrogen is in progress.
14, (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-launch-៛�lling-of-liquid-oxygen-cryogenic-stage-0)
2018

Nov GSLV Mk III-D2 / GSAT-29 Mission Launch - GSAT-29 satellite powered on. It is a multi-band multi-band high throughout communication satellite. It is
14, the 33rd communication satellite built by ISRO (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-launch-gsat-29-satellite-powered-it-multi-
2018 band)

Nov GSLV Mk III-D2 / GSAT-29 Mission Launch - Filling of liquid oxygen in Cryogenic Stage commenced. Cryogenic Stage of GSLV Mklll is one of the
14, powerful Cryogenic Upper Stages developed in the world and it generates nearly 2MW power (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-
2018 launch-៛�lling-of-liquid-oxygen-cryogenic-stage)

Nov GSLV Mk III-D2 / GSAT-29 Mission Launch - Launch Vehicle Avionics health checks completed (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-
14, mission-launch-launch-vehicle-avionics-health-checks)
2018

Nov Announcement of Opportunity (AO) for Utilization of Astrosat Archival Data (/update/13-nov-2018/announcement-of-opportunity-ao-utilization-of-
13, astrosat-archival-data)
2018

Nov Shri A. S. Kiran Kumar is presented with International Von Karman Wings Award (/update/13-nov-2018/shri-s-kiran-kumar-presented-with-
13, international-von-karman-wings-award)
2018

Nov The countdown for the launch of GSLV Mk III-D2 / GSAT-29 Mission from Satish Dhawan Space Centre SHAR, Sriharikota started today at 14:50 Hrs IST.
13, The launch is scheduled at 17:08 Hrs IST on 14th November 2018. (/update/13-nov-2018/countdown-launch-of-gslv-mk-iii-d2-gsat-29-mission-satish-
2018 dhawan-space-centre)

Nov GALCIT honour for Prof. Satish Dhawan (/update/07-nov-2018/galcit-honour-prof-satish-dhawan)


07,
2018

Nov Announcement of Opportunity (AO) for Low Earth Orbit based Microgravity Experiments (/announcement-of-opportunity-ao-low-earth-orbit-based-
07, microgravity-experiments)
2018

Nov Announcement of Opportunity (AO) to international science community for Space-Based Experiments to Study Venus (/update/06-nov-
06, 2018/announcement-of-opportunity-ao-to-international-science-community-space-based)
2018

Oct AstroSat Picture of the month - Oct 2018 (/update/31-oct-2018/astrosat-picture-of-month-oct-2018)


31,
2018

Oct CHANDRAYAAN-2 LANDER ACTUATOR PERFORMANCE TEST (LAPT PHASE-2) (/update/26-oct-2018/chandrayaan-2-lander-actuator-performance-


26, test-lapt-phase-2)
2018

Oct Release of three publications on Indian Space Programme (/update/23-oct-2018/release-of-three-publications-indian-space-programme)


23,
2018

Oct Megha-Tropiques Successfully Completes Seven Years in Orbit (/update/13-oct-2018/megha-tropiques-successfully-completes-seven-years-orbit)


13,
2018

Oct ISRO successfully tests Cryogenic Engine (CE-20) for GSLV Mk-III / Chandrayaan-2 Mission (/update/12-oct-2018/isro-successfully-tests-cryogenic-
12, engine-ce-20-gslv-mk-iii-chandrayaan-2-mission)
2018

Oct AstroSat Picture of the Month: Sept 2018 (/update/01-oct-2018/astrosat-picture-of-month-sept-2018)


01,
2018
Sep Dr. K Sivan at Bremen, Germany (/update/30-sep-2018/dr-k-sivan-bremen-germany)
30,
2018

Sep Three years of AstroSat (/update/28-sep-2018/three-years-of-astrosat)


28,
2018

Sep Lunar Science Meeting at ISRO HQ (/update/27-sep-2018/lunar-science-meeting-isro-hq)


27,
2018

Sep Archival Data of AstroSat released (/update/26-sep-2018/archival-data-of-astrosat-released)


26,
2018

Sep Third year data of MOM released (/update/26-sep-2018/third-year-data-of-mom-released)


26,
2018

Sep Mars Orbiter Mission (MOM) completes 4 years in its orbit (/update/24-sep-2018/mars-orbiter-mission-mom-completes-4-years-its-orbit)
24,
2018

Sep Visit of Chairman of Algerian Space Agency Governing Body & Director General of Algerian Space Agency (ASAL) to ISRO (/update/19-sep-2018/visit-
19, of-chairman-of-algerian-space-agency-governing-body-director-general-of)
2018

Sep ISRO Conferred with Rajbhasha Kirti Award 2018 (/update/18-sep-2018/isro-conferred-with-rajbhasha-kirti-award-2018)


18,
2018

Sep Inauguration of Space Technology Incubation Centre, National Institute of Technology, Agartala, Tripura (/update/18-sep-2018/inauguration-of-
18, space-technology-incubation-centre-national-institute-of)
2018

Sep Launch at a glance (/update/16-sep-2018/launch-glance)


16,
2018

Sep Inauguration of S-band Polarimetric Doppler Weather Radar at SDSC SHAR by Chairman ISRO (/update/16-sep-2018/inauguration-of-s-band-
16, polarimetric-doppler-weather-radar-sdsc-shar-chairman-isro)
2018

Sep The countdown begun today at 01:08 pm (IST) for the launch of PSLV C42 from Satish Dhawan Space Centre, Sriharikota. The scheduled launch is at
15, 10:08 pm (IST) tomorrow. (/update/15-sep-2018/countdown-begun-today-0108-pm-ist-launch-of-pslv-c42-satish-dhawan-space-centre)
2018

Sep The countdown begun today at 01:08 pm (IST) for the launch of PSLV C42 from Satish Dhawan Space Centre, Sriharikota. The scheduled launch is at
15, 10:08 pm (IST) tomorrow. (/update/15-sep-2018/countdown-begun-today-0108-pm-ist-launch-of-pslv-c42-satish-dhawan-space-centre)
2018

Sep PSLV-C42 Mission Launch is scheduled on September 16, 2018 (/pslv-c42-mission-launch-scheduled-september-16-2018)


13,
2018

Sep Creating Dynamism in Indian Space Ecosystem (/update/06-sep-2018/creating-dynamism-indian-space-ecosystem)


06,
2018

Aug AstroSat Picture of the Month Aug, 2018 (/update/30-aug-2018/astrosat-picture-of-month-aug-2018)


30,
2018

Aug 72nd Independence Day Celebrations at ISRO HQ (/72nd-independence-day-celebrations-isro-hq)


16,
2018

Aug Dr.Vikram A Sarabhai Birth Anniversary (/update/12-aug-2018/drvikram-sarabhai-birth-anniversary)


12,
2018

Aug 6th Bangalore Space Expo 2018, 6-8 September 2018 (/update/10-aug-2018/6th-bangalore-space-expo-2018-6-8-september-2018)
10,
2018

Aug Transfer of VSSC developed Lithium Ion Cell Technology to Industries (/update/06-aug-2018/transfer-of-vssc-developed-lithium-ion-cell-
06, technology-to-industries)
2018

Jul ASTROSAT PICTURE OF THE MONTH (APOM) – JULY 2018 (/update/30-jul-2018/astrosat-picture-of-month-apom-%E2%80%93-july-2018)


30,
2018
Jul MOU between ISRO and EIL (/update/21-jul-2018/mou-between-isro-and-eil)
21,
2018

Jul Successful Quali៛�cation of High Thrust Vikas Engine (/update/15-jul-2018/successful-quali៛�cation-of-high-thrust-vikas-engine)


15,
2018

Jul AstroSat Picture of the Month (June 2018) (/update/02-jul-2018/astrosat-picture-of-month-june-2018)


02,
2018

Jun Li Ion Technology Transfer (/li-ion-technology-transfer)


12,
2018

May AstroSat Picture of the Month (May 2018) (/update/28-may-2018/astrosat-picture-of-month-may-2018)


28,
2018

Apr AstroSat Picture of the Month (April 2018) (/update/30-apr-2018/astrosat-picture-of-month-april-2018)


30,
2018

Apr Shri A S Kiran Kumar selected to receive "International von Karman Wings Award" for the year 2018 (/update/25-apr-2018/shri-s-kiran-kumar-
25, selected-to-receive-international-von-karman-wings-award-year)
2018

Apr The fourth and the ៛�nal orbit raising operation of IRNSS-1I is successfully carried out at 21:05 hr IST on April 15, 2018. The achieved perigee height is
15, 35,462.9 km and apogee height is 35,737.8 km (/update/15-apr-2018/fourth-and-៛�nal-orbit-raising-operation-of-irnss-1i-successfully-carried-out)
2018

Apr The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14, 2018. The achieved perigee height is 31,426 km and
15, apogee height is 35,739 km (/update/15-apr-2018/third-orbit-raising-operation-of-irnss-1i-successfully-carried-out-2250-hr-ist)
2018

Apr The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14, 2018 (/update/14-apr-2018/third-orbit-raising-
14, operation-of-irnss-1i-successfully-carried-out-2250-hr-ist)
2018

Apr The second orbit raising operation of IRNSS-1I Satellite has been successfully carried out at 20:04 hr IST on April 13, 2018. The achieved perigee height is
14, 8683 km and apogee height is 35733 km. (/update/14-apr-2018/second-orbit-raising-operation-of-irnss-1i-satellite-has-been-successfully)
2018

Apr The second orbit raising operation of IRNSS-1I is successfully carried out at 20:04 hr IST on April 13, 2018 (/update/13-apr-2018/second-orbit-raising-
13, operation-of-irnss-1i-successfully-carried-out-2004-hr-ist)
2018

Apr The ៛�rst orbit raising operation of IRNSS-1I is successfully carried out at 4:19 hr IST on April 13, 2018 (/update/13-apr-2018/៛�rst-orbit-raising-
13, operation-of-irnss-1i-successfully-carried-out-419-hr-ist)
2018

Apr The ៛�rst orbit raising operation of IRNSS-1I is planned to be carried out at 4:15 hr IST on April 13, 2018. The targeted perigee height is 322 km and
12, apogee height is 35887 km (/update/12-apr-2018/៛�rst-orbit-raising-operation-of-irnss-1i-planned-to-be-carried-out-415-hr-ist)
2018

Apr The 32 hr countdown activity has commenced at 20:04hr IST on Tuesday, April 10, 2018 for the launch of PSLV-C41/IRNSS-1I Mission scheduled at 04:04
10, hr IST on April 12, 2018 (/update/10-apr-2018/32-hr-countdown-activity-has-commenced-2004hr-ist-tuesday-april-10-2018-launch-of)
2018

Apr The second orbit raising operation of GSAT-6A satellite has been successfully carried out by LAM Engine ៛�ring for about 53 minutes on March 31, 2018
01, in the morning. (/update/01-apr-2018/second-orbit-raising-operation-of-gsat-6a-satellite-has-been-successfully-carried)
2018

Mar The ៛�rst orbit raising operation of GSAT-6A Satellite has been successfully carried out by LAM Engine ៛�ring for 2188 sec from 09:22hr IST on March 30,
30, 2018. (/update/30-mar-2018/៛�rst-orbit-raising-operation-of-gsat-6a-satellite-has-been-successfully-carried)
2018

Mar GSLV-F08 Successfully launches GSAT-6A (/update/29-mar-2018/gslv-f08-successfully-launches-gsat-6a-0)


29,
2018

Mar GSLV-F08 Successfully launches GSAT-6A (/update/29-mar-2018/gslv-f08-successfully-launches-gsat-6a)


29,
2018

Mar GSLV-F08/GSAT-6A - GSAT-6A satellite separated (/update/29-mar-2018/gslv-f08-gsat-6a-gsat-6a-satellite-separated)


29,
2018

Mar GSLV-F08/GSAT-6A - Cryogenic Engine Shutoff (/update/29-mar-2018/gslv-f08-gsat-6a-cryogenic-engine-shutoff)


29,
2018
Mar GSLV-F08/GSAT-6A - Cryogenic Upper Stage Performance is Normal (/update/29-mar-2018/gslv-f08-gsat-6a-cryogenic-upper-stage-performance-
29, normal)
2018

Mar GSLV-F08/GSAT-6A Cryogenic Upperstage Engine ignited. Third Stage performance is normal (/update/29-mar-2018/gslv-f08-gsat-6a-cryogenic-
29, upperstage-engine-ignited-third-stage-performance)
2018

Mar GSLV-F08/GSAT-6A Payload fairing Seperated (/update/29-mar-2018/gslv-f08-gsat-6a-payload-fairing-seperated)


29,
2018

Mar GSLV-F08/GSAT-6A Second Stage Performance is Normal (/update/29-mar-2018/gslv-f08-gsat-6a-second-stage-performance-normal)


29,
2018

Mar GSLV-F08/GSAT-6A L40 Engine Shutoff. (/update/29-mar-2018/gslv-f08-gsat-6a-l40-engine-shutoff)


29,
2018

Mar GSLV-F08/GSAT-6A First Stage Performance is Normal (/update/29-mar-2018/gslv-f08-gsat-6a-៛�rst-stage-performance-normal)


29,
2018

Mar GSLV-F08/GSAT-6A Liftoff Normal (/update/29-mar-2018/gslv-f08-gsat-6a-liftoff-normal)


29,
2018

Mar Mission Director has authorised Vehicle Director for launch. Vehicle Director has authorised initiation of Automatic Launch Secquence (ALS) program at
29, 16:40 hr IST. (/update/29-mar-2018/mission-director-has-authorised-vehicle-director-launch-vehicle-director-has)
2018

Mar Propellant ៛�lling operations of cryo stage are completed (/update/29-mar-2018/propellant-៛�lling-operations-of-cryo-stage-are-completed)


29,
2018

Mar Propellant ៛�lling operations of cryo stage are under progress (/update/29-mar-2018/propellant-៛�lling-operations-of-cryo-stage-are-under-progress)
29,
2018

Mar Preparations for propellant ៛�lling of cryo stage are under progress (/update/29-mar-2018/preparations-propellant-៛�lling-of-cryo-stage-are-under-
29, progress)
2018

Mar Real Time System simulation checks Completed. Countdown is progressing normally. (/update/29-mar-2018/real-time-system-simulation-checks-
29, completed-countdown-progressing-normally)
2018

Mar Propellant ៛�lling operation of L40 Stages is completed by 02:20 hr IST. (/update/29-mar-2018/propellant-៛�lling-operation-of-l40-stages-completed-
29, 0220-hr-ist)
2018

Mar Propellant ៛�lling operation of L40 Stages is under progress. Countdown is progressing normally. (/update/28-mar-2018/propellant-៛�lling-operation-
28, of-l40-stages-under-progress-countdown-progressing)
2018

Mar Second Stage (GS2) UH25 ៛�lling is completed by 19:45 hr IST (/update/28-mar-2018/second-stage-gs2-uh25-៛�lling-completed-1945-hr-ist)
28,
2018

Mar Second Stage (GS2) UH25 ៛�lling is under progress. (/update/28-mar-2018/second-stage-gs2-uh25-៛�lling-under-progress)


28,
2018

Mar Preparation for Second Stage (GS2) UH25 ៛�lling is under progress (/update/28-mar-2018/preparation-second-stage-gs2-uh25-៛�lling-under-progress)
28,
2018

Mar Second Stage (GS2) N2O4 ៛�lling completed by 16:15 hr IST (/update/28-mar-2018/second-stage-gs2-n2o4-៛�lling-completed-1615-hr-ist)
28,
2018

Mar Second Stage (GS2) N2O4 ៛�lling under progress (/update/28-mar-2018/second-stage-gs2-n2o4-៛�lling-under-progress)


28,
2018

Mar Preparations for GSLV-F08 Second stage (GS2) propellant ៛�lling operation are under progress (/update/28-mar-2018/preparations-gslv-f08-second-
28, stage-gs2-propellant-៛�lling-operation-are-under)
2018

Mar The 27 Hrs Countdown activities for the launch of GSLV-F08 / GSAT-6A Mission have started at 13:56 Hrs IST on Wednesday, March 28, 2018.
28, (/update/28-mar-2018/27-hrs-countdown-activities-launch-of-gslv-f08-gsat-6a-mission-have-started-1356)
2018
Mar AstroSat Picture of the Month (March 2018) (/update/28-mar-2018/astrosat-picture-of-month-march-2018)
28,
2018

Mar Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 27 hr countdown activities starting at 13:56hr IST
27, on Wednesday, March 28, 2018 and the launch of GSLV-F08/GSAT-6A for Thursday, March 29, 2018 at 16:56hr IST (/update/27-mar-2018/mission-
2018 readiness-review-mrr-committee-and-launch-authorization-board-lab-have)

Mar Indian Space Research Organisation (ISRO) gears up for the ‘36 hour Smart India Hackathon 2018 Grand Finale’ (/update/24-mar-2018/indian-space-
24, research-organisation-isro-gears-%E2%80%9836-hour-smart-india-hackathon-2018)
2018

Mar On Information Security Incident of March 10, 2018 (/update/13-mar-2018/information-security-incident-of-march-10-2018)


13,
2018

Feb AstroSat Picture of the Month (Science Day-February 2018) (/update/28-feb-2018/astrosat-picture-of-month-science-day-february-2018)


28,
2018

Feb AstroSat Picture of the Month (January 2018) (/update/27-feb-2018/astrosat-picture-of-month-january-2018)


27,
2018

Feb NDTV Interview with Chairman ISRO (/update/13-feb-2018/ndtv-interview-with-chairman-isro)


13,
2018

Feb Announcement of Opportunity (AO) for future Astronomy payload/ mission (/update/03-feb-2018/announcement-of-opportunity-ao-future-
03, astronomy-payload-mission)
2018

Feb AstroSat: Announcement of Opportunity (AO) soliciting proposals for fourth AO cycle observations (/update/02-feb-2018/astrosat-announcement-of-
02, opportunity-ao-soliciting-proposals-fourth-ao-cycle)
2018

Jan Swachhta pakhwada(1st to 15th February 2018) (/update/29-jan-2018/swachhta-pakhwada1st-to-15th-february-2018)


29,
2018

Jan ISRO technology know-how for production of NavIC Messaging Receiver for Indian Industries (/update/27-jan-2018/isro-technology-know-how-
27, production-of-navic-messaging-receiver-indian-industries)
2018

Jan Images from INS-1C and Microsat (/update/23-jan-2018/images-ins-1c-and-microsat)


23,
2018

Jan First Day Image from Cartosat-2 Series Satellite (/update/16-jan-2018/៛�rst-day-image-cartosat-2-series-satellite)


16,
2018

Jan PSLV-C40 Successfully Launches Cartosat-2 Series Satellite along with 30 Co-passenger Satellites (/update/12-jan-2018/pslv-c40-successfully-
12, launches-cartosat-2-series-satellite-along-with-30-co)
2018

Jan PSLV-C40 Successfully Launches Cartosat-2 Series Satellite. (/update/12-jan-2018/pslv-c40-successfully-launches-cartosat-2-series-satellite)


12,
2018

Jan All Nano Satellites Seperated Successfully (/update/12-jan-2018/all-nano-satellites-seperated-successfully)


12,
2018

Jan LEO -P1, POC-P1 Satellites Seperated (/update/12-jan-2018/leo-p1-poc-p1-satellites-seperated)


12,
2018

Jan Cartosat Satellite seperated (/update/12-jan-2018/cartosat-satellite-seperated)


12,
2018

Jan Fourth Stage Engine Shutoff (/update/12-jan-2018/fourth-stage-engine-shutoff)


12,
2018

Jan Fourth Stage Performance is Normal (/update/12-jan-2018/fourth-stage-performance-normal-0)


12,
2018

Jan Fourth Stage Performance is Normal (/update/12-jan-2018/fourth-stage-performance-normal)


12,
2018
Jan Third Stage Seperated. Foruth Stage Ignited (/update/12-jan-2018/third-stage-seperated-foruth-stage-ignited)
12,
2018

Jan Vehicle Coasting Normal (/update/12-jan-2018/vehicle-coasting-normal)


12,
2018

Jan Second Stage is shutdown. Third Stage is ignited. Performanc is normal (/update/12-jan-2018/second-stage-shutdown-third-stage-ignited-
12, performanc-normal)
2018

Jan Heat Shield Seperated. Performance is Normal (/update/12-jan-2018/heat-shield-seperated-performance-normal)


12,
2018

Jan PSLV-C40 / Cartosat-2 Series Mission - Liftoff Normal (/update/12-jan-2018/pslv-c40-cartosat-2-series-mission-liftoff-normal)


12,
2018

Jan Mission Director has authorised Vehicle Director for launch. Automatic Launch Secquence (ALS) program initiation authorised by Vehicle Director and
12, ALS started for launch at 09:13 hr IST. (/update/12-jan-2018/mission-director-has-authorised-vehicle-director-launch-automatic-launch)
2018

Jan PSLV-C40/Cartosat-2 Series Mission - Propellant ៛�lling operations of Second Stage (PS2) are in progress (/update/11-jan-2018/pslv-c40-cartosat-2-
11, series-mission-propellant-៛�lling-operations-of-second-stage)
2018

Jan Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress.
11, (/update/11-jan-2018/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2018

Jan Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C40 is completed. Countdown is progressing normally. (/update/11-jan-2018/propellant-
11, ៛�lling-operation-of-fourth-stage-ps4-of-pslv-c40-completed-countdown)
2018

Jan Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C40 is under progress (/update/11-jan-2018/propellant-៛�lling-operation-of-fourth-stage-ps4-
11, of-pslv-c40-under-progress)
2018

Jan The 28hr countdown activity of PSLV-C40/Cartosat2 Series Satellite Mission has started at 05:29hr IST today, Thursday, January 11, 2018 (/update/11-
11, jan-2018/28hr-countdown-activity-of-pslv-c40-cartosat2-series-satellite-mission-has)
2018

Jan Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C40/ Cartosat2 Series
10, Satellite mission for Thursday, January 11, 2018 starting at 05:29hr IST (/update/10-jan-2018/mission-readiness-review-mrr-committee-and-launch-
2018 authorisation-board-lab-have)

Jan "Off The Cuff" with Chairman, ISRO (/update/09-jan-2018/cuff-with-chairman-isro)


09,
2018

Dec Liquid Propulsion Systems Centre Pearl Jubliee Celebration (/update/29-dec-2017/liquid-propulsion-systems-centre-pearl-jubliee-celebration)


29,
2017

Dec AstroSat Picture of the Month (December 2017) (/update/28-dec-2017/astrosat-picture-of-month-december-2017)


28,
2017

Nov AstroSat Picture of the Month (November 2017) (/update/28-nov-2017/astrosat-picture-of-month-november-2017)


28,
2017

Nov Seeking comments on Draft "Space Activities Bill, 2017" from the stake holders/public -regarding. (/update/21-nov-2017/seeking-comments-draft-
21, space-activities-bill-2017-stake-holders-public-regarding)
2017

Oct AstroSat Picture of the Month - Oct 2017 (/update/28-oct-2017/astrosat-picture-of-month-oct-2017)


28,
2017

Oct Selection of Three Posters from Indian Students for APRSAF-24 Poster Contest (/update/23-oct-2017/selection-of-three-posters-indian-students-
23, aprsaf-24-poster-contest)
2017

Oct AstroSat contributes to the saga of Gravitational Wave Astronomy (/update/17-oct-2017/astrosat-contributes-to-saga-of-gravitational-wave-


17, astronomy)
2017

Sep AstroSat Completes 2 years in Orbit (/update/28-sep-2017/astrosat-completes-2-years-orbit)


28,
2017
Sep AstroSat Picture of the Month - Sep 2017 (/update/26-sep-2017/astrosat-picture-of-month-sep-2017)
26,
2017

Sep ISRO released MOM Second year science data (/update/25-sep-2017/isro-released-mom-second-year-science-data)


25,
2017

Aug PSLV-C39/IRNSS-1H Mission Unsuccessful (/update/31-aug-2017/pslv-c39-irnss-1h-mission-unsuccessful)


31,
2017

Aug PSLV-C39/IRNSS-1H mission Lift-off Normal (/update/31-aug-2017/pslv-c39-irnss-1h-mission-lift-normal)


31,
2017

Aug Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and
31, ALS started for launch of PSLV-C39/IRNSS-1H Satellite mission at 18:47 hr IST (/update/31-aug-2017/mission-director-has-authorised-vehicle-
2017 director-launch-automatic-launch-sequence)

Aug The countdown operations of PSLV-C39/IRNSS-1H mission are progressing normally (/update/31-aug-2017/countdown-operations-of-pslv-c39-irnss-
31, 1h-mission-are-progressing-normally)
2017

Aug Propellant ៛�lling operations of second stage (PS2) of PSLV-C39 are completed (/update/31-aug-2017/propellant-៛�lling-operations-of-second-stage-
31, ps2-of-pslv-c39-are-completed)
2017

Aug Propellant ៛�lling operations of second stage (PS2) of PSLV-C39 are under progress (/update/31-aug-2017/propellant-៛�lling-operations-of-second-
31, stage-ps2-of-pslv-c39-are-under-progress)
2017

Aug Propellant ៛�lling operations of fourth stage (PS4) of PSLV-C39 are completed (/update/30-aug-2017/propellant-៛�lling-operations-of-fourth-stage-
30, ps4-of-pslv-c39-are-completed)
2017

Aug Propellant ៛�lling operations of fourth stage (PS4) of PSLV-C39 are under progress (/update/30-aug-2017/propellant-៛�lling-operations-of-fourth-
30, stage-ps4-of-pslv-c39-are-under-progress)
2017

Aug The 29 hrs countdown operations of PSLV-C39/IRNSS-1H mission have started on Wednesday, Aug 30, 2017 at 14:00hr IST (/update/30-aug-2017/29-
30, hrs-countdown-operations-of-pslv-c39-irnss-1h-mission-have-started-wednesday)
2017

Aug Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 29hr countdown of PSLV-C39/ IRNSS-1H Satellite
29, mission for Wednesday, Aug 30, 2017 starting at 14:00 hr IST, (/update/29-aug-2017/mission-readiness-review-mrr-committee-and-launch-
2017 authorisation-board-lab-have)

Aug PSLV-C39/IRNSS-1H Mission is scheduled to be launched on Aug 31, 2017 at 19:00 Hrs from SDSC SHAR, Sriharikota. (/update/23-aug-2017/pslv-c39-
23, irnss-1h-mission-scheduled-to-be-launched-aug-31-2017-1900-hrs-sdsc-shar)
2017

Aug The IRNSS Signal-in-Space Interface Control Document ICD Ver 1.1 released (/update/18-aug-2017/irnss-signal-space-interface-control-document-
18, icd-ver-11-released)
2017

Aug AstroSat is completing 10,000th Orbit today (/update/03-aug-2017/astrosat-completing-10000th-orbit-today)


03,
2017

Jul A TRIBUTE TO PROF U R RAO (/update/28-jul-2017/tribute-to-prof-u-r-rao)


28,
2017

Jul Prof. U R Rao, Architect of Indian Satellite Programme passes away (/update/24-jul-2017/prof-u-r-rao-architect-of-indian-satellite-programme-
24, passes-away)
2017

Jul 3 axis stabilisation of GSAT-17 has been successfully completed by 07:40 hrs IST on July 03, 2017. Spacecraft systems are normal (/update/03-jul-
03, 2017/3-axis-stabilisation-of-gsat-17-has-been-successfully-completed-0740-hrs-ist-july)
2017

Jul Deployment of both the Solar arrays and two antenna re៟�ectors have been successfully completed by 16:15 hrs IST. (/update/02-jul-2017/deployment-
02, of-both-solar-arrays-and-two-antenna-re៟�ectors-have-been-successfully)
2017

Jul The third and ៛�nal orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine ៛�ring for 492 sec from 08:51 hr IST on
02, July 02, 2017 (/update/02-jul-2017/third-and-៛�nal-orbit-raising-operation-of-gsat-17-satellite-has-been)
2017

Jul The second orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine ៛�ring for 2896 sec from 11:03 hr IST on July 01,
01, 2017. (/update/01-jul-2017/second-orbit-raising-operation-of-gsat-17-satellite-has-been-successfully-carried)
2017
Jun The ៛�rst orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine ៛�ring for 5912 sec from 04:38 hrs IST on June 30,
30, 2017. (/update/30-jun-2017/៛�rst-orbit-raising-operation-of-gsat-17-satellite-has-been-successfully-carried)
2017

Jun GSAT-17 successfully launched by Ariane-5 VA-238 from Kourou, French Guiana (/update/29-jun-2017/gsat-17-successfully-launched-ariane-5-va-
29, 238-kourou-french-guiana)
2017

Jun NRSC Team gets Award for GeoMGNREGA by MORD (/nrsc-team-gets-award-geomgnrega-mord)


27,
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission - Message from President (/update/24-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
24, message-president)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: All 31 Satellites separated successfully (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-
23, mission-all-31-satellites-separated)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Cartosat Seperated, NIUSAT Seperated, (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-
23, mission-cartosat-seperated-niusat-seperated)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Fourth stage engine shut off (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
23, fourth-stage-engine-shut)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Fourth Stage performance is normal (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-
23, mission-fourth-stage-performance-normal)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Third stage separated.Fourth Stage Engine ignited (/update/23-jun-2017/pslv-c38-cartosat-2-series-
23, satellite-mission-third-stage-separatedfourth-stage)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Coasting operation normal (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
23, coasting-operation-normal)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Third stage action completed. Coasting phase initiated (/update/23-jun-2017/pslv-c38-cartosat-2-
23, series-satellite-mission-third-stage-action-completed)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Third stage performance normal (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
23, third-stage-performance-normal)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Second Stage Engine Shutoff, Third stage ignited (/update/23-jun-2017/pslv-c38-cartosat-2-series-
23, satellite-mission-second-stage-engine-shutoff-third)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Heat shield separated (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-heat-shield-
23, separated)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: First Stage Seperated, Second Stage performance normal (/update/23-jun-2017/pslv-c38-cartosat-2-
23, series-satellite-mission-៛�rst-stage-seperated-second-stage-0)
2017

Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: First Stage Seperated, Second Stage Ignited (/update/23-jun-2017/pslv-c38-cartosat-2-series-
23, satellite-mission-៛�rst-stage-seperated-second-stage)
2017

Jun PSLV-C38 Lift off Normal (/update/23-jun-2017/pslv-c38-lift-normal)


23,
2017

Jun Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and
23, ALS started for launch of PSLV-C38/Cartosat2 Series Satellite mission at 09:17 hr IST (/update/23-jun-2017/mission-director-has-authorised-vehicle-
2017 director-launch-automatic-launch-sequence)

Jun Propellant ៛�lling operations of Second Stage (PS2) are completed. Countdown is progressing normally. (/update/23-jun-2017/propellant-៛�lling-
23, operations-of-second-stage-ps2-are-completed-countdown)
2017

Jun Propellant ៛�lling operations of Second Stage (PS2) are in progress (/update/22-jun-2017/propellant-៛�lling-operations-of-second-stage-ps2-are-
22, progress)
2017

Jun Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress
22, (/update/22-jun-2017/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2017
Jun Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C38 is completed (/update/22-jun-2017/propellant-៛�lling-operation-of-fourth-stage-ps4-of-
22, pslv-c38-completed)
2017

Jun Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C38 is under progress (/update/22-jun-2017/propellant-៛�lling-operation-of-fourth-stage-
22, ps4-of-pslv-c38-under-progress)
2017

Jun The 28 hr countdown operation of PSLV-C38/Cartosat2 Series Satellite Mission has started on Thursday, June 22, 2017 at 05:29 hr IST (/update/22-jun-
22, 2017/28-hr-countdown-operation-of-pslv-c38-cartosat2-series-satellite-mission-has)
2017

Jun Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C38/Cartosat-2 Series
21, Satellite mission for Thursday, June 22,2017 starting at 05:29 hr IST (/update/21-jun-2017/mission-readiness-review-mrr-committee-and-launch-
2017 authorisation-board-lab-have)

Jun GSLV Mk III-D1/GSAT-19 Message from President (/update/13-jun-2017/gslv-mk-iii-d1-gsat-19-message-president)


13,
2017

Jun West and East re៟�ectors of GSAT-19 have been successfully deployed by 18:47 hr IST. Three axis stabilisation of GSAT-19 has been achieved by 19:42 hr
10, IST (/update/10-jun-2017/west-and-east-re៟�ectors-of-gsat-19-have-been-successfully-deployed-1847-hr-ist)
2017

Jun South and North solar arrays of GSAT-19 have been successfully deployed by 16:15 hr IST (/update/10-jun-2017/south-and-north-solar-arrays-of-gsat-
10, 19-have-been-successfully-deployed-1615-hr)
2017

Jun The fourth and ៛�nal orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 488 sec from 07:59 hr IST on
10, June 10, 2017 (/update/10-jun-2017/fourth-and-៛�nal-orbit-raising-operation-of-gsat-19-satellite-has-been)
2017

Jun The third orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 3469 sec from 09:55 hr IST on June 09,
10, 2017 (/update/10-jun-2017/third-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried)
2017

Jun The second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 5538 sec from 15:44 hr IST on June 07,
08, 2017. (/update/08-jun-2017/second-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried)
2017

Jun The ៛�rst orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 116 sec from 14:03 hr IST on June 06,
08, 2017. (/update/08-jun-2017/៛�rst-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried)
2017

Jun GSLV Mk III-D1 Successfully launches GSAT-19 (/update/05-jun-2017/gslv-mk-iii-d1-successfully-launches-gsat-19)


05,
2017

Jun GSLV Mk III-D1/GSAT-19 Mission: GSAT-19 separated and injected into orbit successfully. (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-gsat-
05, 19-separated-and-injected-orbit-successfully)
2017

Jun GSLV Mk III-D1/GSAT-19 Mission: Cryogenic Stage Performance is Normal (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-cryogenic-stage-


05, performance-normal)
2017

Jun GSLV Mk III-D1/GSAT-19 Mission: L110 Separated Successfully. C25 Ignition con៛�rmed. (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-l110-
05, separated-successfully-c25-ignition-con៛�rmed)
2017

Jun GSLV Mk III-D1/GSAT-19 Mission: L110 Ignited. Vehicle Peformance is Normal (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-l110-ignited-
05, vehicle-peformance-normal)
2017

Jun GSLV Mk III-D1/GSAT-19 Mission Lift off Normal (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-lift-normal)


05,
2017

Jun Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
05, ALS started for launch of GSLV Mk III D1 / GSAT-19 mission at 17:17 Hrs IST (/update/05-jun-2017/mission-director-has-authorised-vehicle-director-
2017 launch-automatic-launch-sequence)

Jun GSLV Mk III-D1/GSAT-19: Propellant ៛�lling operations of cryo stage are completed (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-propellant-៛�lling-
05, operations-of-cryo-stage-are-completed)
2017

Jun Propellant ៛�lling operations of L110 (Second Stage) of GSLV Mk III D1 are completed (/update/05-jun-2017/propellant-៛�lling-operations-of-l110-
05, second-stage-of-gslv-mk-iii-d1-are)
2017

Jun Propellant ៛�lling operations of L110 (Second Stage) of GSLV Mk III D1 are under progress. Countdown is progressing normally. (/update/04-jun-
04, 2017/propellant-៛�lling-operations-of-l110-second-stage-of-gslv-mk-iii-d1-are-under)
2017
Jun The 25 and half hr countdown operations of GSLV Mk III D1 / GSAT-19 mission started today, Sunday, June 04, 2017 at 15:58 hr IST (/update/04-jun-
04, 2017/25-and-half-hr-countdown-operations-of-gslv-mk-iii-d1-gsat-19-mission-started)
2017

Jun Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 25 and half hr countdown of GSLV MkIII D1 / GSAT-
02, 19 mission for Sunday, June 04,2017 starting at 15:58 hr IST (/update/02-jun-2017/mission-readiness-review-mrr-committee-and-launch-
2017 authorisation-board-lab-have)

Jun AstroSat CZTI and the search for X-ray counterparts to gravitational wave sources (/update/01-jun-2017/astrosat-czti-and-search-x-ray-
01, counterparts-to-gravitational-wave-sources)
2017

May GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from SDSC SHAR, Sriharikota (/update/29-may-
29, 2017/gslv-mk-iii-d1-gsat-19-mission-scheduled-to-be-launched-june-05-2017-1728-hrs-ist)
2017

May ISRO Receives Indira Gandhi Prize for Peace, Disarmament and Development for 2014 (/update/18-may-2017/isro-receives-indira-gandhi-prize-peace-
18, disarmament-and-development-2014)
2017

May GSLV-F09 / GSAT-9 - Message from President (/update/09-may-2017/gslv-f09-gsat-9-message-president)


09,
2017

May Deployment of East and West re៟�ectors have been successfully completed at 08:15 hr IST and 09:30 hr IST, respectively on May 08, 2017 (/update/08-
08, may-2017/deployment-of-east-and-west-re៟�ectors-have-been-successfully-completed-0815-hr)
2017

May The third orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine ៛�ring for 445.8 sec from 06:51:52 hr IST on May
08, 08, 2017 (/update/08-may-2017/third-orbit-raising-operation-of-south-asia-satellite-has-been-successfully)
2017

May Orbit Determination results from the second LAM ៛�ring are: apogee X perigee height was changed to 35858 km X 28608 km. Inclination is 0.755deg.
07, Orbital period is 20hr 58min. (/update/07-may-2017/orbit-determination-results-second-lam-៛�ring-are-apogee-x-perigee-height-was)
2017

May The second orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine ៛�ring for 3529.7 sec from 09.30 hr IST on
07, May 07, 2017 (/update/07-may-2017/second-orbit-raising-operation-of-south-asia-satellite-has-been-successfully)
2017

May The ៛�rst orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine (/update/06-may-2017/៛�rst-orbit-raising-
06, operation-of-south-asia-satellite-has-been-successfully)
2017

May India Successfully launches South Asia Satellite, GSAT-9 (/update/05-may-2017/india-successfully-launches-south-asia-satellite-gsat-9)


05,
2017

May Announcement of Opportunity (AO) soliciting proposals for third AO cycle observations (/update/03-may-2017/announcement-of-opportunity-ao-
03, soliciting-proposals-third-ao-cycle-observations)
2017

Mar Message from J&K Governor on PSLV-C37 Misson (/update/07-mar-2017/message-jk-governor-pslv-c37-misson)


07,
2017

Feb A minor ៛�re incident happened with the stored waste propellant at Sriharikota. (/update/27-feb-2017/minor-៛�re-incident-happened-with-stored-
27, waste-propellant-sriharikota)
2017

Feb PSLV- C37 / CARTOSAT- 2 Series Satellite - Message from President (/update/27-feb-2017/pslv-c37-cartosat-2-series-satellite-message-president)
27,
2017

Feb PM @narendramodi mentiones the accomplishments of @isro during #MannKiBaat (/update/26-feb-2017/pm-narendramodi-mentiones-


26, accomplishments-of-isro-during-mannkibaat)
2017

Feb ISRO Successfully Tests its Cryogenic Stage (C25) for GSLV MkIII for the Flight Duration (/update/18-feb-2017/isro-successfully-tests-its-cryogenic-
18, stage-c25-gslv-mkiii-៟�ight-duration)
2017

Feb PSLV-C37 Lift off and Onboard Camera Video (/update/15-feb-2017/pslv-c37-lift-and-onboard-camera-video)


15,
2017

Feb PSLV C37 / Cartosat-2 Series Mission - Third Stage Performance is Normal (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-third-stage-
15, performance-normal)
2017

Feb PSLV C37 / Cartosat-2 Series Mission - Second Stage Seperated. Third Stage Ignited. (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-
15, second-stage-seperated-third-stage-ignited)
2017
Feb PSLV-C37 / Cartosat 2 Series Mission - Heat Shield Seperated (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-heat-shield-seperated)
15,
2017

Feb PSLV C37 / Cartosat-2 Series Mission - Lift Off Normal (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-lift-normal)
15,
2017

Feb Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
15, ALS started for launch at 09:16 Hrs IST (/update/15-feb-2017/mission-director-has-authorised-vehicle-director-launch-automatic-launch-sequence)
2017

Feb Real Time System simulation & Data transmission checks Completed. Vehicle Internal Checks Completed. Countdown is progressing normally
15, (/update/15-feb-2017/real-time-system-simulation-data-transmission-checks-completed-vehicle-internal)
2017

Feb N2O4 tank ៛�lling and UH25 tank ៛�lling operations of Second Stage (PS2) of PSLV-C37 are completed. Countdown is progressing normally. (/update/15-
15, feb-2017/n2o4-tank-៛�lling-and-uh25-tank-៛�lling-operations-of-second-stage-ps2-of-pslv)
2017

Feb Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress.
14, (/update/14-feb-2017/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2017

Feb Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed (/update/14-feb-2017/mixed-oxides-of-nitrogen-mon-3-oxidiser-
14, ៛�lling-operation-of-ps4-completed)
2017

Feb Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C37 is completed (/update/14-feb-2017/mono-methyl-
14, hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2017

Feb The 28 Hrs countdown activity of PSLV-C37/Cartosat2 Series Satellite Mission has started at 05:28 Hrs IST today, Tuesday, February 14, 2017
14, (/update/14-feb-2017/28-hrs-countdown-activity-of-pslv-c37-cartosat2-series-satellite-mission-has)
2017

Feb Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 Hrs countdown of PSLV-C37 Launch
13, (/update/13-feb-2017/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)
2017

Feb PSLV-C37 / Cartosat -2 Series Satellite Mission is scheduled to be launched on February 15, 2017 at 9.28 Hrs IST from SDSC SHAR Sriharikota
10, (/update/10-feb-2017/pslv-c37-cartosat-2-series-satellite-mission-scheduled-to-be-launched-february-15)
2017

Jan ISRO Successfully Tests C25 Cryogenic Upper Stage of GSLV MkIII (/update/26-jan-2017/isro-successfully-tests-c25-cryogenic-upper-stage-of-gslv-
26, mkiii)
2017

Dec PSLV-C36 / RESOURCESAT-2A - Message from President (/update/15-dec-2016/pslv-c36-resourcesat-2a-message-president)


15,
2016

Dec PSLV-C36/RESOURCESAT-2A: Solar panels deployed successfully (/update/07-dec-2016/pslv-c36-resourcesat-2a-solar-panels-deployed-


07, successfully)
2016

Dec PSLV-C36 Successfully launches RESOURCESAT-2A (/update/07-dec-2016/pslv-c36-successfully-launches-resourcesat-2a)


07,
2016

Dec PSLV-C36/RESOURCESAT-2A: Fourth Stage Performance is Normal (/update/07-dec-2016/pslv-c36-resourcesat-2a-fourth-stage-performance-


07, normal)
2016

Dec PSLV-C36/RESOURCESAT-2A: PS3 stage Seperated. PS4 stage Ignited. (/update/07-dec-2016/pslv-c36-resourcesat-2a-ps3-stage-seperated-ps4-


07, stage-ignited)
2016

Dec PSLV-C36/RESOURCESAT-2A: Second Stage is Seperated, Third stage is ignited (/update/07-dec-2016/pslv-c36-resourcesat-2a-second-stage-


07, seperated-third-stage-ignited)
2016

Dec PSLV-C36/RESOUCESAT-2A: Heat Shield Seperated, Vehicle Performance is Normal (/update/07-dec-2016/pslv-c36-resoucesat-2a-heat-shield-


07, seperated-vehicle-performance-normal)
2016

Dec PSLV-C36/RESOURCESAT-2A: Second Stage Performance is Normal (/update/07-dec-2016/pslv-c36-resourcesat-2a-second-stage-performance-


07, normal)
2016

Dec PSLV-C36/RESOURCESAT-2A: Air lead Strapon is Seperated (/update/07-dec-2016/pslv-c36-resourcesat-2a-air-lead-strapon-seperated)


07,
2016
Dec PSLV-C36/RESOURCESAT-2A: First Stage Seperation normal. Second Stage ignited. (/update/07-dec-2016/pslv-c36-resourcesat-2a-៛�rst-stage-
07, seperation-normal-second-stage-ignited)
2016

Dec PSLV-C36/RESOURCESAT-2A: Vehicle Lift of is Normal (/update/07-dec-2016/pslv-c36-resourcesat-2a-vehicle-lift-of-normal)


07,
2016

Dec Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and
07, ALS started for launch of PSLV-C36/RESOURCESAT-2A mission at 10:13 hr IST (/update/07-dec-2016/mission-director-has-authorised-vehicle-
2016 director-launch-automatic-launch-sequence)

Dec Real Time Simulation Checks and Data Transmission Checks completed. Resourcesat-2A Spacecraft Switched 'ON'. Launch Vechicle internal Checks
07, completed. Countdown is progressing normally. (/update/07-dec-2016/real-time-simulation-checks-and-data-transmission-checks-completed-
2016 resourcesat-2a)

Dec N2O4 and UH25 tank ៛�lling operations of Second Stage (PS2) of PSLV-C36 are completed by 23:20 hrs. Countdown is progressing normally.
06, (/update/06-dec-2016/n2o4-and-uh25-tank-៛�lling-operations-of-second-stage-ps2-of-pslv-c36-are)
2016

Dec Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress.
06, (/update/06-dec-2016/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2016

Dec Mono Methyl Hydrazine (MMH) fuel and Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operations of fourth stage (PS4) of PSLV-C36 are completed
06, (/update/06-dec-2016/mono-methyl-hydrazine-mmh-fuel-and-mixed-oxides-of-nitrogen-mon-3-oxidiser)
2016

Dec The 36 hr countdown activity of PSLV-C36/RESOURCESAT-2A Mission has started at 22.25 hr IST today, Monday, December 05, 2016 (/update/05-dec-
05, 2016/36-hr-countdown-activity-of-pslv-c36-resourcesat-2a-mission-has-started-2225-hr)
2016

Dec Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 36 hr countdown of PSLV-C36/RESOURCESAT-2A
05, mission for Monday, December 05,2016 starting at 22:25 hr IST (/update/05-dec-2016/mission-readiness-review-mrr-committee-and-launch-
2016 authorisation-board-lab-have)

Nov PSLV-C36 / RESOURCESAT-2A is scheduled to be launched on December 07, 2016 at 10:25 hrs from SDSC SHAR, Sriharikota (/update/30-nov-
30, 2016/pslv-c36-resourcesat-2a-scheduled-to-be-launched-december-07-2016-1025-hrs-sdsc)
2016

Nov ISRO/DOS community grieves the passing away of Prof. M G K Menon (/update/23-nov-2016/isro-dos-community-grieves-passing-away-of-prof-m-
23, g-k-menon)
2016

Oct All the planned activities of Station Acquisition Manoeuvres and In-Orbit-Testing (IOT) of GSAT-18 have been successfully completed (/update/26-oct-
26, 2016/all-planned-activities-of-station-acquisition-manoeuvres-and-orbit-testing-iot-of)
2016

Oct After all the successful deployments on GSAT-18, 3-axis stabilisation using reaction wheels has been achieved at 19:26hr IST on Oct 09, 2016. The
09, performance of subsystems of the spacecraft is normal (/update/09-oct-2016/after-all-successful-deployments-gsat-18-3-axis-stabilisation-using-
2016 reaction)

Oct North Solar Array and East Antenna have been successfully deployed (/update/09-oct-2016/north-solar-array-and-east-antenna-have-been-
09, successfully-deployed)
2016

Oct Solar Array and West Antenna of GSAT-18 have been successfully deployed (/update/09-oct-2016/solar-array-and-west-antenna-of-gsat-18-have-
09, been-successfully-deployed)
2016

Oct Orbit Determination results from the third LAM ៛�ring are: apogee X perigee height was changed to 35802km, 35294km, Inclination is 0.136deg. Orbital
09, period now is 23hr 44m (/update/09-oct-2016/orbit-determination-results-third-lam-៛�ring-are-apogee-x-perigee-height-was)
2016

Oct Third LAM ៛�ring of GSAT-18, for 256.17 sec has been successfully completed on October 9, 2016 starting from 10.21 hr IST (/update/09-oct-2016/third-
09, lam-៛�ring-of-gsat-18-25617-sec-has-been-successfully-completed-october-9)
2016

Oct The Second orbit raising manoeuvre of GSAT-18 has been successfully carried out by LAM Engine ៛�ring for sec from 11:29 hr IST on October 08, 2016
08, (/update/08-oct-2016/second-orbit-raising-manoeuvre-of-gsat-18-has-been-successfully-carried-out-lam)
2016

Oct The ៛�rst orbit raising manoeuvre of GSAT-18 has been successffully carried out by LAM Engine ៛�ring for 6040.6 sec from 03:46 Hrs IST on Oct 07, 2016.
07, (/update/07-oct-2016/៛�rst-orbit-raising-manoeuvre-of-gsat-18-has-been-successffully-carried-out-lam)
2016

Oct GSAT-18 successfully launched by Ariane-5 VA-231 from Kourou, French Guiana (/update/06-oct-2016/gsat-18-successfully-launched-ariane-5-va-
06, 231-kourou-french-guiana)
2016

Oct Launch of GSAT-18 is postponed by a day to Oct 06, 2016 (/update/05-oct-2016/launch-of-gsat-18-postponed-day-to-oct-06-2016)


05,
2016
Sep A science meet to commemorate one year of AstroSat in orbit (/update/29-sep-2016/science-meet-to-commemorate-one-year-of-astrosat-orbit)
29,
2016

Sep ISRO receives Priyadarshini Global Award 2016 (/update/29-sep-2016/isro-receives-priyadarshini-global-award-2016)


29,
2016

Sep GSAT-18 is scheduled to be launched on October 05, 2016 between 02:00 Hrs – 03:15 Hrs (IST) from Kourou, French Guiana by Ariane-5 VA-231
29, (/update/29-sep-2016/gsat-18-scheduled-to-be-launched-october-05-2016-between-0200-hrs-%E2%80%93-0315-hrs-ist)
2016

Sep PSLV-C35 Successfully placed all Satellites into their respective Orbits. (/update/26-sep-2016/pslv-c35-successfully-placed-all-satellites-their-
26, respective-orbits)
2016

Sep Path៛�nder-1 Satellite is Separated (/update/26-sep-2016/path៛�nder-1-satellite-separated)


26,
2016

Sep ALSAT-2B Satellite is Separated (/update/26-sep-2016/alsat-2b-satellite-separated)


26,
2016

Sep ALSAT-1B Satellite is Separated (/update/26-sep-2016/alsat-1b-satellite-separated)


26,
2016

Sep PRATHAM and PISAT Satellites are Separated (/update/26-sep-2016/pratham-and-pisat-satellites-are-separated)


26,
2016

Sep NLS-19 Satellite is Separated (/update/26-sep-2016/nls-19-satellite-separated)


26,
2016

Sep ALSAT-1N Satellite is Separated (/update/26-sep-2016/alsat-1n-satellite-separated)


26,
2016

Sep PSLV-C35 Successfully launches SCATSAT-1. Seperation of the remaining 7 satellites expected to occur between 11.25 hr IST and 11.28 hr IST
26, (/update/26-sep-2016/pslv-c35-successfully-launches-scatsat-1-seperation-of-remaining-7-satellites)
2016

Sep PS4 Fourth Stage Engine Shut-off (/update/26-sep-2016/ps4-fourth-stage-engine-shut)


26,
2016

Sep PS4 Fourth Stage Performance Normal (/update/26-sep-2016/ps4-fourth-stage-performance-normal)


26,
2016

Sep PS4 Fourth Stage Engine Ignited (/update/26-sep-2016/ps4-fourth-stage-engine-ignited)


26,
2016

Sep PS3 Third Stage is Separated (/update/26-sep-2016/ps3-third-stage-separated)


26,
2016

Sep PS3 Third Stage Performance Normal (/update/26-sep-2016/ps3-third-stage-performance-normal)


26,
2016

Sep PS2 Stage Seperated, PS3 Thrid Stage Ignited (/update/26-sep-2016/ps2-stage-seperated-ps3-thrid-stage-ignited)


26,
2016

Sep Heat Shield Seperated (/update/26-sep-2016/heat-shield-seperated)


26,
2016

Sep PSLV-C35 PS1 Stage Seperated and PS2 Second Stage Ignited (/update/26-sep-2016/pslv-c35-ps1-stage-seperated-and-ps2-second-stage-ignited)
26,
2016

Sep Lift-off Normal (/update/26-sep-2016/lift-normal)


26,
2016

Sep Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
26, ALS started for launch at 09:00 hr IST (/update/26-sep-2016/mission-director-has-authorised-vehicle-director-launch-automatic-launch-sequence)
2016
Sep UH25 tank ៛�lling operations of Second Stage (PS2) are completed. Real time system simulation checks and Launch Vehicle internal checks are
26, completed. Countdown is progressing noramally (/update/26-sep-2016/uh25-tank-៛�lling-operations-of-second-stage-ps2-are-completed-real-time-
2016 system)

Sep Real time system simulation checks are under progress (/update/25-sep-2016/real-time-system-simulation-checks-are-under-progress)
25,
2016

Sep N2O4 tank ៛�lling of Second Stage (PS2) is completed. UH25 tank ៛�lling operations of Second Stage (PS2) are under progress (/update/25-sep-
25, 2016/n2o4-tank-៛�lling-of-second-stage-ps2-completed-uh25-tank-៛�lling-operations-of)
2016

Sep N2O4 tank ៛�lling of Second Stage (PS2) is under progress (/update/25-sep-2016/n2o4-tank-៛�lling-of-second-stage-ps2-under-progress)
25,
2016

Sep Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress
25, (/update/25-sep-2016/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2016

Sep PSLV-C35 / SCATSAT-1 Mission Countdown progressing normally (/update/25-sep-2016/pslv-c35-scatsat-1-mission-countdown-progressing-


25, normally)
2016

Sep MON-3 oxidiser ៛�lling operations of PS4 are completed by 18:00 hr IST (/update/24-sep-2016/mon-3-oxidiser-៛�lling-operations-of-ps4-are-
24, completed-1800-hr-ist)
2016

Sep Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under progress (/update/24-sep-2016/mixed-oxides-of-nitrogen-mon-3-
24, oxidiser-៛�lling-operation-of-ps4-are-under)
2016

Sep MMH Propellant ៛�lling operation has been completed by 12:30 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of
24, PS4 are under progress (/update/24-sep-2016/mmh-propellant-៛�lling-operation-has-been-completed-1230-hr-ist-preparations)
2016

Sep Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C35 is under progress (/update/24-sep-2016/mono-methyl-
24, hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016

Sep The 48 and half hr countdown activity of PSLV-C35/SCATSAT-1 Mission has started at 08:42 hr IST today, Saturday, September 24, 2016 (/update/24-
24, sep-2016/48-and-half-hr-countdown-activity-of-pslv-c35-scatsat-1-mission-has-started-0842)
2016

Sep Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48 and half hr countdown of PSLV-35/SCATSAT-1
23, Mission (/update/23-sep-2016/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)
2016

Sep PSLV-C35 is scheduled to be launched on Monday morning at 9:12 hrs (IST) on September 26, 2016 from SDSC SHAR , Sriharikota (/update/21-sep-
21, 2016/pslv-c35-scheduled-to-be-launched-monday-morning-912-hrs-ist-september-26-2016)
2016

Sep GSLV-F05 / INSAT-3DR - Message from President (/update/19-sep-2016/gslv-f05-insat-3dr-message-president)


19,
2016

Sep First IR Images from INSAT-3DR IMAGER taken today at 09:00 hrs IST (/update/17-sep-2016/៛�rst-ir-images-insat-3dr-imager-taken-today-0900-hrs-
17, ist)
2016

Sep Orbit Determination results from the third LAM ៛�ring are: apogee X perigee height was changed to 35908km, 35326km, Inclination is 0.121deg. Orbital
11, period is 23hr 47m 26sec (/update/11-sep-2016/orbit-determination-results-third-lam-៛�ring-are-apogee-x-perigee-height-was)
2016

Sep Third LAM ៛�ring of INSAT-3DR for 294 sec has been successfully completed on September 11, 2016 starting from 08:31 hr IST (/update/11-sep-
11, 2016/third-lam-៛�ring-of-insat-3dr-294-sec-has-been-successfully-completed-september)
2016

Sep Second LAM ៛�ring of INSAT-3DR, at apogee for 3174sec has been successfully completed (/update/10-sep-2016/second-lam-៛�ring-of-insat-3dr-
10, apogee-3174sec-has-been-successfully-completed)
2016

Sep The ៛�rst apogee raise maneuver of INSAT-3DR has been successfully carried out. (/update/09-sep-2016/៛�rst-apogee-raise-maneuver-of-insat-3dr-
09, has-been-successfully-carried-out)
2016

Sep GSLV-F05 Successfully launches INSAT-3DR (/update/08-sep-2016/gslv-f05-successfully-launches-insat-3dr)


08,
2016

Sep GSLV-F05 / INSAT-3DR Mission: Injected INSAT-3DR into orbit (/update/08-sep-2016/gslv-f05-insat-3dr-mission-injected-insat-3dr-orbit)


08,
2016
Sep GSLV-F05 / INSAT-3DR Mission: GS1 Stage Seperated. GS2 Ignited (/update/08-sep-2016/gslv-f05-insat-3dr-mission-gs1-stage-seperated-gs2-
08, ignited)
2016

Sep Cryo Stage Ignition is authorized (/update/08-sep-2016/cryo-stage-ignition-authorized)


08,
2016

Sep GSLV-F05 / INSAT-3DR Mission: Cryogenic Ignition con៛�rmed (/update/08-sep-2016/gslv-f05-insat-3dr-mission-cryogenic-ignition-con៛�rmed)


08,
2016

Sep GSLV-F05 / INSAT-3DR Mission: GS2 Performance is normal (/update/08-sep-2016/gslv-f05-insat-3dr-mission-gs2-performance-normal)


08,
2016

Sep GSLV-F05 / INSAT-3DR Mission: Heat Shield Separated (/update/08-sep-2016/gslv-f05-insat-3dr-mission-heat-shield-separated)


08,
2016

Sep GSLV-F05 / INSAT-3DR Mission: Lift-off Normal (/update/08-sep-2016/gslv-f05-insat-3dr-mission-lift-normal)


08,
2016

Sep GSLV-F05 Mission Director Authorized the Launch (/update/08-sep-2016/gslv-f05-mission-director-authorized-launch)


08,
2016

Sep Launch is rescheduled to 16:50 hr IST Countdown is progressing normally (/update/08-sep-2016/launch-rescheduled-to-1650-hr-ist-countdown-


08, progressing-normally)
2016

Sep Real Time System simulation checks Completed by 08:15 hr IST. Countdown is progressing normally (/update/08-sep-2016/real-time-system-
08, simulation-checks-completed-0815-hr-ist-countdown-progressing)
2016

Sep N2O4 ៛�lling into four L40 Strap-On Stages completed by 03:00 hr IST (/update/08-sep-2016/n2o4-៛�lling-four-l40-strap-stages-completed-0300-hr-
08, ist)
2016

Sep UH25 ៛�lling into four L40 Strap-On Stages completed by 21:00hr IST (/update/07-sep-2016/uh25-៛�lling-four-l40-strap-stages-completed-2100hr-ist)
07,
2016

Sep Second Stage (GS2) UH25 ៛�lling completed by 17:40 hr IST (/update/07-sep-2016/second-stage-gs2-uh25-៛�lling-completed-1740-hr-ist)
07,
2016

Sep Second Stage (GS2) UH25 ៛�lling under progress (/update/07-sep-2016/second-stage-gs2-uh25-៛�lling-under-progress)


07,
2016

Sep Second Stage (GS2) N2O4 ៛�lling completed by 13:30 hr IST. Preparations for Second Stage (GS2) UH25 ៛�lling are under progress (/update/07-sep-
07, 2016/second-stage-gs2-n2o4-៛�lling-completed-1330-hr-ist-preparations-second-stage-gs2)
2016

Sep Second stage (GS2) N2O4 ៛�lling under progress (/update/07-sep-2016/second-stage-gs2-n2o4-៛�lling-under-progress)


07,
2016

Sep Preparations for Second stage (GS2) propellant ៛�lling operation are under progress (/update/07-sep-2016/preparations-second-stage-gs2-propellant-
07, ៛�lling-operation-are-under-progress)
2016

Sep The 29 hr countdown operation of GSLV-F05/INSAT-3DR Mission has started at 11:10 hr IST on Wednesday, September 7, 2016 (/update/07-sep-
07, 2016/29-hr-countdown-operation-of-gslv-f05-insat-3dr-mission-has-started-1110-hr-ist)
2016

Sep Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 29 hr countdown starting at 11.10 hr IST on
05, Wednsday, September 7, 2016 and the launch of GSLV-F05/INSAT-3DR Mission for Thursday, September 8, 2016 at 16.10 hr (/update/05-sep-
2016 2016/mission-readiness-review-mrr-committee-and-launch-authorization-board-lab-have)

Sep GSLV-F05 / INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs (IST) from SDSC, SHAR, Sriharikota (/update/01-sep-
01, 2016/gslv-f05-insat-3dr-mission-scheduled-to-be-launched-sept-08-2016-1610-hrs-ist)
2016

Sep President congratulates ISRO for the successful conduct of Futuristic Rocket Test - Advanced Technology Vehicle (ATV) (/president-congratulates-
01, isro-successful-conduct-of-futuristic-rocket-test-advanced-technology)
2016

Aug AstroSat observes the high energy X-ray variability of a black hole system (/pslv-c30-astrosat-mission/astrosat-observes-high-energy-x-ray-
31, variability-of-black-hole-system)
2016
Aug Remembering IRS-1B which was launched exactly 25 years back (/update/29-aug-2016/remembering-irs-1b-which-was-launched-exactly-25-years-
29, back)
2016

Jun President of India congratulates ISRO on the successful launch of PSLV-C34 (/update/22-jun-2016/president-of-india-congratulates-isro-successful-
22, launch-of-pslv-c34)
2016

Jun PSLV-C34 / CARTOSAT-2 Series Satellite Seperated and Injected into Orbit (/update/22-jun-2016/pslv-c34-cartosat-2-series-satellite-seperated-and-
22, injected-orbit)
2016

Jun PSLV-C34 / CARTOSAT-2 series PS4 Engine Shutdown. Injection Conditions achieved (/update/22-jun-2016/pslv-c34-cartosat-2-series-ps4-engine-
22, shutdown-injection-conditions-achieved)
2016

Jun PSLV-C34 / CARTOSAT-2 Series PS3 seperated. PS4 Engine Started. (/update/22-jun-2016/pslv-c34-cartosat-2-series-ps3-seperated-ps4-engine-
22, started)
2016

Jun PSLV-C34 / CARTOSAT-2 Series PS2 Seperated, Third stage performance is normal (/update/22-jun-2016/pslv-c34-cartosat-2-series-ps2-seperated-
22, third-stage-performance-normal)
2016

Jun PSLV-C34 / CARTOSAT-2 Series Launch Heat Shield is Seperated. 2nd stage performance is normal (/update/22-jun-2016/pslv-c34-cartosat-2-series-
22, launch-heat-shield-seperated-2nd-stage-performance)
2016

Jun PSLV-C34 / CARTOSAT-2 Series Lift-off Normal (/update/22-jun-2016/pslv-c34-cartosat-2-series-lift-normal)


22,
2016

Jun PSLV-C34 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle
22, Director and ALS started at 09:12 hr IST for launch (/update/22-jun-2016/pslv-c34-mission-director-has-authorised-vehicle-director-launch-
2016 automatic-launch)

Jun Propellant ៛�lling operation of Second stage (PS2) of PSLV-C34 is completed. Vehicle internal checks are in progress. Countdown is progressing normally.
22, (/update/22-jun-2016/propellant-៛�lling-operation-of-second-stage-ps2-of-pslv-c34-completed-vehicle)
2016

Jun Propellant ៛�ling operation of Second stage (PS2) of PSLV-C34 is under progress. (/update/21-jun-2016/propellant-៛�ling-operation-of-second-stage-
21, ps2-of-pslv-c34-under-progress)
2016

Jun Spacecraft health checks and preparations for propellant ៛�lling operation of second stage (PS2) of PSLV-C34 are under progress. Countdown is
21, progressing normally. (/update/21-jun-2016/spacecraft-health-checks-and-preparations-propellant-៛�lling-operation-of-second)
2016

Jun Filling of Mixed Oxides of Nitrogen (MON-3) of PS4 is Completed (/update/20-jun-2016/៛�lling-of-mixed-oxides-of-nitrogen-mon-3-of-ps4-


20, completed)
2016

Jun Filling of Mixed Oxides of Nitrogen (MON-3) of PS4 is under progress (/update/20-jun-2016/៛�lling-of-mixed-oxides-of-nitrogen-mon-3-of-ps4-
20, under-progress)
2016

Jun Mono Methyl Hydrazine (MMH) ៛�lling operation of Fourth stage (PS4) of PSLV-C34 is completed by 12:06 hr (IST). Preparations for ៛�lling of Mixed
20, Oxides of Nitrogen (MON-3) of PS4 are under progress (/update/20-jun-2016/mono-methyl-hydrazine-mmh-៛�lling-operation-of-fourth-stage-ps4-
2016 of-pslv-c34)

Jun The 48hr countdown activity of PSLV-C34/CARTOSAT-2 Series Satellite mission has started at 09:26 hr IST today, Monday, June 20, 2016 (/update/20-
20, jun-2016/48hr-countdown-activity-of-pslv-c34-cartosat-2-series-satellite-mission-has)
2016

Jun Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48 hr countdown starting at 09:26hr IST on
19, Monday, June 20, 2016 and the launch of PSLV-C34/CARTOSAT-2 Series Satellite Mission for Wednesday, June 22, 2016 (/update/19-jun-2016/mission-
2016 readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)

Jun PSLV-C34/CARTOSAT-2 Series Satellite Mission : Launch scheduled on June 22, 2016 at 09:25 hrs (IST) from SDSC, SHAR, Sriharikota (/update/16-jun-
16, 2016/pslv-c34-cartosat-2-series-satellite-mission-launch-scheduled-june-22-2016-0925)
2016

Jun ISRO receives NIQR-GKD Award for Outstanding Organisation (/update/14-jun-2016/isro-receives-niqr-gkd-award-outstanding-organisation)


14,
2016

Jun 17th IIRS Outreach Programme on "Geoweb Services and Geoportal applications” being conducted during June 28 - July 15, 2016 (/update/07-jun-
07, 2016/17th-iirs-outreach-programme-geoweb-services-and-geoportal-applications%E2%80%9D-being)
2016

May AstroSat Support Cell (ASC) has been Set up at IUCAA, Pune (/pslv-c30-astrosat-mission/astrosat-support-cell-asc-has-been-set-iucaa-pune)
20,
2016
May Orbit Determination results from fourth LAM ៛�ring are : apogee X perigee height was changed to 35811 km,35211 km,Inclination is 5.1 deg. Orbital period
03, now is 23 hr 42 min 04 sec (/update/03-may-2016/orbit-determination-results-fourth-lam-៛�ring-are-apogee-x-perigee-height-was)
2016

May India and France jointly released a set of two commemorative postage stamps, highlighting 50 years of space co-operation between the two countries
03, (/india-and-france-jointly-released-set-of-two-commemorative-postage-stamps-highlighting-50-years-of)
2016

May The fourth and the ៛�nal LAM ៛�ring of IRNSS-1G, for 231sec has been successfully completed on 03.05.2016 starting from 01:27hr IST (/update/03-may-
03, 2016/fourth-and-៛�nal-lam-៛�ring-of-irnss-1g-231sec-has-been-successfully-completed)
2016

May Orbit Determination results from the third LAM ៛�ring are: apogee X perigee height was changed to 35813km, 29050km, Inclination is 5.72deg. Orbital
02, period now is 21hr 08m 09sec (/update/02-may-2016/orbit-determination-results-third-lam-៛�ring-are-apogee-x-perigee-height-was)
2016

May Third LAM ៛�ring of IRNSS-1G, for 1609sec has been successfully completed on 01.05.2016 starting from 06:59:07 hr IST. (/update/01-may-2016/third-
01, lam-៛�ring-of-irnss-1g-1609sec-has-been-successfully-completed-01052016)
2016

May Orbit Determination results from second LAM ៛�ring are:apogee X perigee height was changed to 35803km,7750km,Inclination is 10.77deg.Orbital period
01, now is 13h 03m 35sec (/update/01-may-2016/orbit-determination-results-second-lam-៛�ring-areapogee-x-perigee-height-was)
2016

Apr PSLV-C33 / IRNSS-1G Update : Second LAM ៛�ring of IRNSS-1G, at apogee for 1581 sec has been successfully completed on April 30, 2016 starting from
30, 04:52:17 hrs IST. (/update/30-apr-2016/pslv-c33-irnss-1g-update-second-lam-៛�ring-of-irnss-1g-apogee-1581-sec-has-been)
2016

Apr PSLV-C33 / IRNSS-1G Update : The ៛�rst apogee raise maneuver of IRNSS-1G has been successfully carried out for 1147 sec from 13:05 hrs IST on April
30, 29,2016. (/update/30-apr-2016/pslv-c33-irnss-1g-update-៛�rst-apogee-raise-maneuver-of-irnss-1g-has-been)
2016

Apr PSLV-C33 / IRNSS-1G Update : Lift off normal (/update/28-apr-2016/pslv-c33-irnss-1g-update-lift-normal)


28,
2016

Apr Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
28, ALS started for launch at 12:38 hrs IST. (/update/28-apr-2016/mission-director-has-authorised-vehicle-director-launch-automatic-launch-sequence)
2016

Apr Real Time simulation & Data transmission checks completed. Vehicle Internal Checks Completed. (/update/28-apr-2016/real-time-simulation-data-
28, transmission-checks-completed-vehicle-internal-checks)
2016

Apr Propellant (N2O4 and UH25) ៛�lling operations of Second Stage (PS2) are completed by midnight. Countdown is progressing normally. (/update/28-apr-
28, 2016/propellant-n2o4-and-uh25-៛�lling-operations-of-second-stage-ps2-are-completed)
2016

Apr Mobile Service Tower(MST) withdrawal to parking End is completed. (/update/27-apr-2016/mobile-service-towermst-withdrawal-to-parking-end-


27, completed)
2016

Apr Countdown operations are progressing normally. Preparations for Mobile Service Tower (MST) withdrawal and Propellant ៛�lling operation of second
27, stage (PS2) are in progress. (/update/27-apr-2016/countdown-operations-are-progressing-normally-preparations-mobile-service-tower)
2016

Apr Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed.Countdown is progressing normally (/update/26-apr-2016/mixed-
26, oxides-of-nitrogen-mon-3-oxidiser-៛�lling-operation-of-ps4)
2016

Apr MMH propellant ៛�lling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under
26, progress. (/update/26-apr-2016/mmh-propellant-៛�lling-operation-has-been-completed-preparations-mixed-oxides-of)
2016

Apr Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C33 is commenced and is under process (/update/26-apr-
26, 2016/mono-methyl-hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016

Apr The 51 hr 30 min countdown activity of PSLV-C33/IRNSS-1G Mission has started at 9:20 hr IST today, Tuesday, April 26, 2016 (/update/26-apr-2016/51-
26, hr-30-min-countdown-activity-of-pslv-c33-irnss-1g-mission-has-started-920-hr)
2016

Apr Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 51.5 hr countdown starting at 09:20hr IST on
25, Tuesday, April 26, 2016 and the launch of PSLV-C33/IRNSS-1G Mission for Thursday, April 28, 2016 at 12:50 hr. IST (/update/25-apr-2016/mission-
2016 readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)

Apr Asia Paci៛�c Remote Sensing Symposium held at New Delhi (/asia-paci៛�c-remote-sensing-symposium-held-new-delhi)
12,
2016

Mar IRNSS-1F UPDATE: After successful completion of four station acquisition manoeuvers and In Orbit Testing (IOT) of the spacecraft, IRNSS-1F has been
30, placed in the intended Geo-synchronous orbit (/update/30-mar-2016/irnss-1f-update-after-successful-completion-of-four-station-acquisition)
2016
Mar PSLV-C32 - Message from President (/update/16-mar-2016/pslv-c32-message-president)
16,
2016

Mar IRNSS-1F UPDATE: Orbit Determination results from fourth LAM ៛�ring (/update/15-mar-2016/irnss-1f-update-orbit-determination-results-fourth-
15, lam-៛�ring)
2016

Mar IRNSS-1F UPDATE: Fourth LAM ៛�ring of IRNSS-1F, for 78.8 sec has been successfully completed on 14.3.2016 starting from 11:42:44 hr (IST). (/update/14-
14, mar-2016/irnss-1f-update-fourth-lam-៛�ring-of-irnss-1f-788-sec-has-been-successfully)
2016

Mar IRNSS-1F UPDATE: Orbit Determination results from the third LAM ៛�ring (/update/14-mar-2016/irnss-1f-update-orbit-determination-results-third-
14, lam-៛�ring)
2016

Mar IRNSS-1F UPDATE: Third LAM ៛�ring of IRNSS-1F, for 1561 sec has been successfully completed on 13.3.2016 starting from 11:32 hr IST. (/update/13-mar-
13, 2016/irnss-1f-update-third-lam-៛�ring-of-irnss-1f-1561-sec-has-been-successfully)
2016

Mar IRNSS-1F UPDATE:Orbit Determination results from second LAM ៛�ring (/update/13-mar-2016/irnss-1f-updateorbit-determination-results-second-
13, lam-៛�ring)
2016

Mar Second LAM ៛�ring of IRNSS-1F, at apogee for 1918.5 sec has been successfully completed on 12.3.2016 starting from 07:57:54 hr IST. (/update/12-mar-
12, 2016/second-lam-៛�ring-of-irnss-1f-apogee-19185-sec-has-been-successfully-completed)
2016

Mar The apogee raise maneuver of IRNSS-1F has been successfully carried out (/update/12-mar-2016/apogee-raise-maneuver-of-irnss-1f-has-been-
12, successfully-carried-out)
2016

Mar PSLV-C32/ IRNSS-1F: PSLV C32 Successfully Launches IRNSS 1F into the orbit (/update/10-mar-2016/pslv-c32-irnss-1f-pslv-c32-successfully-
10, launches-irnss-1f-orbit)
2016

Mar PSLV-C32/ IRNSS-1F: Lift off normal! (/update/10-mar-2016/pslv-c32-irnss-1f-lift-normal)


10,
2016

Mar PSLV-C32/ IRNSS-1F: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by
10, Vehicle Director and ALS started at 15:48hr IST for launch (/update/10-mar-2016/pslv-c32-irnss-1f-mission-director-has-authorised-vehicle-director-
2016 launch)

Mar PSLV-C32/ IRNSS-1F UPDATE: The launch time is revised to 16:01 hr (IST) for collision avoidance as per the space debris studies. Countdown status
10, normal. (/update/10-mar-2016/pslv-c32-irnss-1f-update-launch-time-revised-to-1601-hr-ist-collision-avoidance)
2016

Mar PSLV-C32/ IRNSS-1F UPDATE: IRNSS-1F spacecraft switched ON. PSLV-C32 - VEHICLE INTERNAL CHECKS Completed. Countdown status normal.
10, (/update/10-mar-2016/pslv-c32-irnss-1f-update-irnss-1f-spacecraft-switched-pslv-c32-vehicle-internal)
2016

Mar PSLV-C32/ IRNSS-1F UPDATE: Real time simulation checks and data transmission checks completed. (/update/10-mar-2016/pslv-c32-irnss-1f-update-
10, real-time-simulation-checks-and-data-transmission-checks)
2016

Mar PSLV-C32/ IRNSS-1F UPDATE: UH-25 tank ៛�lling operation of second stage (PS2) is completed by 03:00hr (IST)Countdown activities are progressing
10, normally. (/update/10-mar-2016/pslv-c32-irnss-1f-update-uh-25-tank-៛�lling-operation-of-second-stage-ps2)
2016

Mar PSLV-C32/ IRNSS-1F UPDATE: N2O4 tank ៛�lling of Second Stage (PS2) is completed by 00:15 hrs (IST) of March 10, 2016. (/update/10-mar-2016/pslv-
10, c32-irnss-1f-update-n2o4-tank-៛�lling-of-second-stage-ps2-completed-0015-hrs)
2016

Mar PSLV-C32/ IRNSS-1F UPDATE: Preparations for N2O4 tank ៛�lling of Second stage (PS2) are under progress. PSLV-C32 Mission-Countdown. Progressing
09, status- normal. (/update/09-mar-2016/pslv-c32-irnss-1f-update-preparations-n2o4-tank-៛�lling-of-second-stage-ps2-are)
2016

Mar PSLV-C32/ IRNSS-1F UPDATE: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed. Countdown is progressing normally
08, (/update/08-mar-2016/pslv-c32-irnss-1f-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling)
2016

Mar PSLV-C32/IRNSS-1F UPDATE: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is started at 19:00hr (IST) (/update/08-mar-
08, 2016/pslv-c32-irnss-1f-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling-0)
2016

Mar MMH propellant ៛�lling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under
08, progress (/update/08-mar-2016/mmh-propellant-៛�lling-operation-has-been-completed-preparations-mixed-oxides-of)
2016

Mar Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C32 is commenced at 12:30 (IST) and is under progress
08, (/update/08-mar-2016/mono-methyl-hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016
Mar The 54hr 30min countdown activity of PSLV-C32/IRNSS-1F Mission has started at 09:30hr IST today, Tuesday, March 8, 2016 (/update/08-mar-
08, 2016/54hr-30min-countdown-activity-of-pslv-c32-irnss-1f-mission-has-started-0930hr-ist)
2016

Mar PSLV-C32/IRNSS-1F UPDATE: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 54 and half hr
08, countdown starting at 09:30hr IST on Tuesday, March 8, 2016 and the launch for March 10, 2016 (/update/08-mar-2016/pslv-c32-irnss-1f-update-
2016 mission-readiness-review-mrr-committee-and-launch)

Mar Media Registration for PSLV-C32/IRNSS-1F Launch (/update/02-mar-2016/media-registration-pslv-c32-irnss-1f-launch)


02,
2016

Feb Global Albedo Map of Mars (/pslv-c25-mars-orbiter-mission/global-albedo-map-of-mars)


28,
2016

Feb CE 20 Engine of GSLV MKIII successfully hot tested (/update/22-feb-2016/ce-20-engine-of-gslv-mkiii-successfully-hot-tested)


22,
2016

Feb PSLV-C31-Message From President (/update/01-feb-2016/pslv-c31-message-president)


01,
2016

Jan IRNSS-1E Update: The fourth and ៛�nal orbit raising operation has been successfully carried out for 447 sec (~7.45 min) from 22:49 hrs IST on Jan 23,
24, 2016. (/update/24-jan-2016/irnss-1e-update-fourth-and-៛�nal-orbit-raising-operation-has-been-successfully)
2016

Jan IRNSS-1E Update: The third orbit raising operation has been successfully carried out by ៛�ring the LAM engine for 1507 sec (~25 min) from 03:19 hrs IST
23, on Jan 23, 2016. (/update/23-jan-2016/irnss-1e-update-third-orbit-raising-operation-has-been-successfully-carried-out)
2016

Jan IRNSS-1E Update: The perigee raise maneuver has been successfully carried out for 1515.36 sec (~25.5 min) from 01:29 hrs IST on Jan 22,2016.
23, (/update/23-jan-2016/irnss-1e-update-perigee-raise-maneuver-has-been-successfully-carried-out-151536)
2016

Jan IRNSS-1E Update: The apogee raise maneuver of IRNSS-1E has been successfully carried out for 1197 sec (~20 min) from 09:41 hrs IST on Jan 21, 2016.
21, This LAM ៛�ring is expected to change apogee X perigee height to 35882kmX320 km (/update/21-jan-2016/irnss-1e-update-apogee-raise-maneuver-of-
2016 irnss-1e-has-been-successfully-carried)

Jan PSLV-C31/IRNSS-1E Launch Update: PSLV-C31 Successfully Launches IRNSS-1E into the orbit. (/update/20-jan-2016/pslv-c31-irnss-1e-launch-
20, update-pslv-c31-successfully-%03launches-irnss-1e-orbit)
2016

Jan PSLV-C31/IRNSS-1E Launch Update: Lift off Normal (/update/20-jan-2016/pslv-c31-irnss-1e-launch-update-lift-normal)


20,
2016

Jan PSLV-C31/IRNSS-1E Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation
20, authorised by Vehicle Director and ALS started for launch at 09:19hr IST (/update/20-jan-2016/pslv-c31-irnss-1e-launch-update-mission-director-
2016 has-authorised-vehicle-director)

Jan PSLV-C31/IRNSS-1E Update: Countdown is progressing normally. 20 minutes to launch. (/update/20-jan-2016/pslv-c31-irnss-1e-update-countdown-


20, progressing-normally-20-minutes-to-launch)
2016

Jan PSLV-C31/IRNSS-1E Update: UH-25 tank ៛�lling operation of second stage (PS2) is completed by 22:00hr (IST) (/update/19-jan-2016/pslv-c31-irnss-1e-
19, update-uh-25-tank-៛�lling-operation-of-second-stage-ps2)
2016

Jan PSLV-C31/IRNSS-1E Update: N2O4 tank ៛�lling of Second Stage (PS2) completed by 18:45hr IST (/update/19-jan-2016/pslv-c31-irnss-1e-update-n2o4-
19, tank-៛�lling-of-second-stage-ps2-completed-1845hr)
2016

Jan PSLV-C31/IRNSS-1E Update: N2O4 tank ៛�lling of Second Stage (PS2) is under progress (/update/19-jan-2016/pslv-c31-irnss-1e-update-n2o4-tank-
19, ៛�lling-of-second-stage-ps2-under-progress)
2016

Jan Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C31 is under progress (/update/18-jan-2016/mono-methyl-
18, hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016

Jan PSLV-C31/ IRNSS-1E update: MMH propellant ៛�lling operation has been completed by 13:00 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3)
18, oxidiser ៛�lling operation of PS4 are under progress (/update/18-jan-2016/pslv-c31-irnss-1e-update-mmh-propellant-៛�lling-operation-has-been-
2016 completed-1300)

Jan The 48hr countdown activity of PSLV-C31/IRNSS-1E Mission has started at 09:31hr IST today, Monday, January 18, 2016 (/update/18-jan-2016/48hr-
18, countdown-activity-of-pslv-c31-irnss-1e-mission-has-started-0931hr-ist-today)
2016

Jan PSLV-C31/IRNSS-1E Update: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed by 18:15 hr IST. Countdown is progressing
18, normally (/update/18-jan-2016/pslv-c31-irnss-1e-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling)
2016
Jan PSLV-C31/IRNSS-1E Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48hr countdown
17, starting at 09:31 Hrs IST on Monday, January 18, 2016 (/update/17-jan-2016/pslv-c31-irnss-1e-update-mission-readiness-review-mrr-committee-and-
2016 launch)

Jan Book on AstroSat Released - Download the Free Copy (/pslv-c30-astrosat-mission/book-astrosat-released-download-free-copy)


14,
2016

Jan Media Registration for PSLV-C31/IRNSS-1E Launch (/update/13-jan-2016/media-registration-pslv-c31-irnss-1e-launch)


13,
2016

Jan Vacancy Noti៛�cation,Advertisement & Application Format for the post of director-PRL (/update/05-jan-2016/vacancy-noti៛�cationadvertisement-
05, application-format-post-of-director-prl)
2016

Jan GSAT-15 Satellite is Operational. The health of spacecraft is normal (/update/04-jan-2016/gsat-15-satellite-operational-health-of-spacecraft-normal)


04,
2016

Jan Commissioning of 200 KWp Solar Power Plant at SAC (/update/02-jan-2016/commissioning-of-200-kwp-solar-power-plant-sac)


02,
2016

Dec PSLV-C29 - Message from President (/update/31-dec-2015/pslv-c29-message-president)


31,
2015

Dec PRL-Recruitment Rules for the post of Directer,PRL (/update/30-dec-2015/prl-recruitment-rules-post-of-directerprl)


30,
2015

Dec PSLV Successfully Launches Six Satellites from Singapore (/update/16-dec-2015/pslv-successfully-launches-six-satellites-singapore)


16,
2015

Dec PSLV-C29/TeLEOS-1 Launch Update: Lift-off normal (/update/16-dec-2015/pslv-c29-teleos-1-launch-update-lift-normal)


16,
2015

Dec PSLV-C29/TeLEOS-1 Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation
16, authorised by Vehicle Director and ALS started for launch at 17:48hr IST (/update/16-dec-2015/pslv-c29-teleos-1-launch-update-mission-director-
2015 has-authorised-vehicle-director)

Dec PSLV-C29/TeLEOS-1 Launch Update: Mobile Service Tower (MST) withdrawal to Parking End is completed. Propellant (N2O4 and UH25) ៛�lling
16, operations of Second Stage (PS2) are completed. Countdown is progressing normally. (/update/16-dec-2015/pslv-c29-teleos-1-launch-update-mobile-
2015 service-tower-mst-withdrawal-to-parking)

Dec PSLV-C29/TeLEOS-1 Launch Update: Countdown is progressing normally. Live telecast by DD National and Webcast is available from 17:30 Hrs IST, Dec
15, 16, 2015 (/update/15-dec-2015/pslv-c29-teleos-1-launch-update-countdown-progressing-normally-live-telecast-dd)
2015

Dec PSLV-C29/TeLEOS-1 Launch Update: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed by 15:00 hr IST (/update/14-dec-
14, 2015/pslv-c29-teleos-1-launch-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling)
2015

Dec PSLV-C29/TeLEOS-1 Launch Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) has been completed by 10:45 hr
14, IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under progress (/update/14-dec-2015/pslv-c29-teleos-1-
2015 launch-update-mono-methyl-hydrazine-mmh-propellant-៛�lling)

Dec PSLV-C29/TeLEOS-1 Mission Update: The countdown has started at 07:00 hr IST today, Monday, December 14, 2015 (/update/14-dec-2015/pslv-c29-
14, teleos-1-mission-update-countdown-has-started-0700-hr-ist-today-monday)
2015

Dec PSLV-C29/TeLEOS-1 mission Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the countdown
13, (/update/13-dec-2015/pslv-c29-teleos-1-mission-update-mission-readiness-review-mrr-committee-and)
2015

Dec Launch of PSLV-C29 carrying six satellites of Singapore is scheduled at 6:00 pm on Dec 16, 2015 . (/update/10-dec-2015/launch-of-pslv-c29-carrying-
10, six-satellites-of-singapore-scheduled-600-pm-dec-16)
2015

Dec Media Registration for PSLV-C29/TeLEOS MISSION (/update/09-dec-2015/media-registration-pslv-c29-teleos-mission)


09,
2015

Dec Media Registration for PSLV-C29/TeLEOS-1 MISSION (/update/09-dec-2015/media-registration-pslv-c29-teleos-1-mission)


09,
2015

Nov Framing of the Recruitment Rules for the post of Director,Physical Research Laboratory,Ahmedabad-Regarding (/update/26-nov-2015/framing-of-
26, recruitment-rules-post-of-directorphysical-research)
2015
Nov GSAT-15 Update: Station acquisition maneuvers for GSAT-15 were completed and s/c is successfully collocated at 93.5 deg E during night of Nov
25, (/update/25-nov-2015/gsat-15-update-station-acquisition-maneuvers-gsat-15-were-completed-and-s-c)
2015

Nov Payload (Ku and GAGAN) In Orbit Testing (IOT) is under progress. (/update/20-nov-2015/payload-ku-and-gagan-orbit-testing-iot-under-progress)
20,
2015

Nov India’s RISAT-1 High Resolution SpotLight (HRS) (/pslv-c19-risat-1/india%E2%80%99s-risat-1-high-resolution-spotlight-hrs)


16,
2015

Nov First orbit raising operation of GSAT-15 was successfully completed (/update/12-nov-2015/៛�rst-orbit-raising-operation-of-gsat-15-was-successfully-
12, completed)
2015

Nov GSAT-15 Launch -Live telecast by DD National is available from 02:30 Hrs IST, Nov. 11, 2015 (/update/10-nov-2015/gsat-15-launch-live-telecast-dd-
10, national-available-0230-hrs-ist-nov-11-2015)
2015

Oct Astrosat Soft X-ray Telescope (SXT)views the blazar PKS2155-304 (/update/27-oct-2015/astrosat-soft-x-ray-telescope-sxtviews-blazar-pks2155-304)
27,
2015

Oct Astrosat-Switching on of LAXPC Payload (/update/26-oct-2015/astrosat-switching-of-laxpc-payload)


26,
2015

Oct CZT Imager detects a Gamma-ray Burst (/pslv-c30-astrosat-mission/czt-imager-detects-gamma-ray-burst)


19,
2015

Oct Scanning Sky Monitor (SSM) Payload onboard AstroSat made Operational – October 12th, 2015 (/pslv-c30-astrosat-mission/scanning-sky-monitor-
19, ssm-payload-onboard-astrosat-made-operational-%E2%80%93)
2015

Oct Astrosat Updates As on 19/10/2015 (/update/18-oct-2015/astrosat-updates-19-10-2015)


18,
2015

Oct Astrosat mission -Scanning Sky Monitor (SSM) payload switched ON (/update/16-oct-2015/astrosat-mission-scanning-sky-monitor-ssm-payload-
16, switched)
2015

Oct Astrosat- Message from President (/update/12-oct-2015/astrosat-message-president)


12,
2015

Oct Presentation By Chairman ISRO on Foundation Dayand Award Ceremony of UAS Bengaluru (/about-isro/presentation-chairman-isro-foundation-
09, dayand-award-ceremony-of-uas-bengaluru)
2015

Oct Astrosat-Spacecraft health is normal (/update/08-oct-2015/astrosat-spacecraft-health-normal)


08,
2015

Oct Astrosat-Spacecraft star sensor performance in crossing albedo evaluated for different orientations. (/update/08-oct-2015/astrosat-spacecraft-star-
08, sensor-performance-crossing-albedo-evaluated-different)
2015

Oct Astrosat-The SXT and LAXPC regular operations carried out. (/update/08-oct-2015/astrosat-sxt-and-laxpc-regular-operations-carried-out)
08,
2015

Oct Astrosat-CZTI is pointed towards Cygnus-X1 for whole day and collected data. (/update/08-oct-2015/astrosat-czti-pointed-towards-cygnus-x1-
08, whole-day-and-collected-data)
2015

Oct Astrosat-Cadmium Zinc Telluride Imager (CZTI) is operational (/update/07-oct-2015/astrosat-cadmium-zinc-telluride-imager-czti-operational)


07,
2015

Oct Astrosat-The payloads are working ៛�ne. (/update/04-oct-2015/astrosat-payloads-are-working-៛�ne)


04,
2015

Oct Astrosat-Soft X-ray Telescope (SXT) Venting operations are being carried out regularly. (/update/04-oct-2015/astrosat-soft-x-ray-telescope-sxt-
04, venting-operations-are-being-carried-out)
2015

Oct Astrosat-Cadmium Zinc Telluride Imager (CZTI) was tested and kept in ON state. (/update/03-oct-2015/astrosat-cadmium-zinc-telluride-imager-czti-
03, was-tested-and-kept-state)
2015
Oct Astrosat-CZTI processing electronics were made ON (/update/02-oct-2015/astrosat-czti-processing-electronics-were-made)
02,
2015

Oct Astrosat-Charged Particle Monitor (CPM) is operational (/update/01-oct-2015/astrosat-charged-particle-monitor-cpm-operational)


01,
2015

Oct Astrosat-LAXPC front-end electronics is made on and is normal. (/update/01-oct-2015/astrosat-laxpc-front-end-electronics-made-and-normal)


01,
2015

Oct Charged Particle Monitor (CPM) is operational (/update/01-oct-2015/charged-particle-monitor-cpm-operational)


01,
2015

Sep Charged Particle Monitor (CPM) switched ON and the performance is normal. (/update/30-sep-2015/charged-particle-monitor-cpm-switched-and-
30, performance-normal)
2015

Sep Further modes testing of SSM platform were carried out. (/update/30-sep-2015/further-modes-testing-of-ssm-platform-were-carried-out)
30,
2015

Sep Soft X-ray Telescope (SXT) Venting operations were carried out (/update/30-sep-2015/soft-x-ray-telescope-sxt-venting-operations-were-carried-
30, out)
2015

Sep Scanning Sky Monitor (SSM) electronics was switched ON (/update/30-sep-2015/scanning-sky-monitor-ssm-electronics-was-switched)


30,
2015

Sep Large Area X-ray Proportional Counter – Processing Electronics (LAXPC-PE) was switched ON (/update/30-sep-2015/large-area-x-ray-proportional-
30, counter-%E2%80%93-processing-electronics-laxpc-pe-was)
2015

Sep S/C operations were as planned and went on smoothly. (/update/29-sep-2015/s-c-operations-were-planned-and-went-smoothly)


29,
2015

Sep PSLV-C30 / ASTROSAT Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program
28, started at 09:48 hr IST (/update/28-sep-2015/pslv-c30-astrosat-launch-update-mission-director-has-authorised-vehicle-director)
2015

Sep PSLV-C30 successfully launches ASTROSAT into the orbit (/update/28-sep-2015/pslv-c30-successfully-launches-astrosat-orbit)


28,
2015

Sep PSLV-C30 / ASTROSAT Launch Update: Lift off Normal (/update/28-sep-2015/pslv-c30-astrosat-launch-update-lift-normal)


28,
2015

Sep Star sensor tracked and provided correct attitude (/update/28-sep-2015/star-sensor-tracked-and-provided-correct-attitude)


28,
2015

Sep Spacecraft three axis stabilised (/update/28-sep-2015/spacecraft-three-axis-stabilised)


28,
2015

Sep Solar Panel and Scanning Sky Monitor (SSM) were deployed. (/update/28-sep-2015/solar-panel-and-scanning-sky-monitor-ssm-were-deployed)
28,
2015

Sep Celebrating one year of Mars Orbiter Mission in Orbit; Release of Mars Atlas (/pslv-c25-mars-orbiter-mission/celebrating-one-year-of-mars-orbiter-
24, mission-orbit-release-of-mars)
2015

Sep GSAT-6 update :GSAT 6 has been successfully positioned in its orbital slot (/update/06-sep-2015/gsat-6-update-gsat-6-has-been-successfully-
06, positioned-its-orbital-slot)
2015

Sep The GSLV Saga (/update/03-sep-2015/gslv-saga)


03,
2015

Sep GSAT-6 orbit after third orbit raising (/update/01-sep-2015/gsat-6-orbit-after-third-orbit-raising)


01,
2015

Aug GSAT-6 Update: Third orbit raising operation of GSAT-6 was successfully completed (/update/30-aug-2015/gsat-6-update-third-orbit-raising-
30, operation-of-gsat-6-was-successfully-completed)
2015
Aug GSAT-6 update : Deployment of the unfurlable antenna (UFA) is in progress (/update/30-aug-2015/gsat-6-update-deployment-of-unfurlable-antenna-
30, ufa-progress)
2015

Aug GSAT-6 UPDATE: Deployment of the unfurlable antenna (UFA) is successfully completed (/update/30-aug-2015/gsat-6-update-deployment-of-
30, unfurlable-antenna-ufa-successfully-completed)
2015

Aug GSAT-6 UPDATE: Second orbit raising operation of GSAT-6 was successfully completed (/update/29-aug-2015/gsat-6-update-second-orbit-raising-
29, operation-of-gsat-6-was-successfully-completed)
2015

Aug RISAT-1 Hybrid polarimetry image of Mt. Sinabung, Indonesia (/pslv-c19-risat-1-mission/risat-1-hybrid-polarimetry-image-of-mt-sinabung-indonesia)


14,
2015

Aug Online registration process for Chennai based media persons to cover GSLV D6 / GSAT 6 launch is open (/online-registration-process-chennai-based-
13, media-persons-to-cover-gslv-d6-gsat-6-launch-open)
2015

Jul First image taken by MCC after MOM comes out of blackout (/pslv-c25-mars-orbiter-mission/៛�rst-image-taken-mcc-after-mom-comes-out-of-
25, blackout)
2015

Jul PSLV-C28 / DMC3 Update: Propellant ៛�lling operations are completed. Countdown operations are progressing normally. (/update/10-jul-2015/pslv-
10, c28-dmc3-update-propellant-៛�lling-operations-are-completed-countdown)
2015

Jul PSLV-C28 / DMC3 Update: UH-25 propellant ៛�lling operation of second stage (PS2) is completed by 09:40hr (IST) (/update/10-jul-2015/pslv-c28-
10, dmc3-update-uh-25-propellant-៛�lling-operation-of-second-stage-ps2-0)
2015

Jul PSLV-C28 / DMC3 Update: UH-25 propellant ៛�lling operation of second stage (PS2) is in progress. (/update/10-jul-2015/pslv-c28-dmc3-update-uh-
10, 25-propellant-៛�lling-operation-of-second-stage-ps2)
2015

Jul PSLV-C28 / DMC3 Update: Mobile Service Tower (MST) withdrawal upto parking end and N2O4 propellant ៛�lling operation of second stage (PS2) are
10, completed by 07:00 hr (IST) (/update/10-jul-2015/pslv-c28-dmc3-update-mobile-service-tower-mst-withdrawal-upto-parking-end-and)
2015

Jul PSLV-C28 / DMC3 Update: Countdown operations are progressing normally. Preparations for Mobile Service Tower (MST) withdrawal and Propellant
09, ៛�lling operation of second stage (PS2) are in progress. (/update/09-jul-2015/pslv-c28-dmc3-update-countdown-operations-are-progressing-
2015 normally-preparations-0)

Jul PSLV-C28 / DMC3 Update: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of Fourth Stage has commenced at 17:45 hr (IST) (/update/08-
08, jul-2015/pslv-c28-dmc3-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling-operation-of)
2015

Jul PSLV-C28 / DMC3 update: MON-3, oxidiser ៛�lling operation of Fourth Stage (PS4) has been completed (/update/08-jul-2015/pslv-c28-dmc3-update-
08, mon-3-oxidiser-៛�lling-operation-of-fourth-stage-ps4-has)
2015

Jul PSLV-C28 / DMC3 Update: MMH propellant ៛�lling operation has been completed.Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling
08, operationof fourth stage are under progress (/update/08-jul-2015/pslv-c28-dmc3-update-mmh-propellant-៛�lling-operation-has-been)
2015

Jul PSLV-C28 / DMC3 Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operationof Fourth Stage (PS4) of PSLV-C28 has commenced at 10:10 hr
08, (IST) (/update/08-jul-2015/pslv-c28-dmc3-update-mono-methyl-hydrazine-mmh-propellant-៛�lling-operationof)
2015

Jul PSLV-C28 / DMC3 Update : The 62 and half hr countdown activity of PSLV-C28/DMC3 Mission has commenced today, Wednesday, July 08, 2015 at
08, 07:28hr (IST). Launch is scheduled at 21:58 hr (IST) on July 10, 2015 (/update/08-jul-2015/pslv-c28-dmc3-update-62-and-half-hr-countdown-activity-
2015 of-pslv-c28-dmc3-mission)

Jul PSLV-C28 / DMC3 Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the starting of the 62 and
07, half hr countdown of PSLV-C28/DMC3 Mission for tomorrow, Wednesday , July 08, 2015 at 07:28hr IST (/update/07-jul-2015/pslv-c28-dmc3-update-
2015 mission-readiness-review-mrr-committee-and-launch)

Jul Impact crater located SW of Huygens crater, imaged by Mars Color Camera (MCC) (/pslv-c25-mars-orbiter-mission/impact-crater-located-sw-of-
06, huygens-crater-imaged-mars-color-camera)
2015

Jun Mars Orbiter Spacecraft under ‘solar conjunction’ at Mars (/update/09-jun-2015/mars-orbiter-spacecraft-under-%E2%80%98solar-


09, conjunction%E2%80%99-mars)
2015

Jun New Directors for Three Major ISRO Centres (/update/01-jun-2015/new-directors-three-major-isro-centres)


01,
2015

May MOU Signed Between ISRO's National Remote Sensing Centre and Department of Land Resources (/update/01-may-2015/mou-signed-between-isros-
01, national-remote-sensing-centre-and-department-of-land)
2015
Mar IRNSS-1D post launch update: Third orbit raising operation of IRNSS-1D is successfully completed. (/update/31-mar-2015/irnss-1d-post-launch-
31, update-third-orbit-raising-operation-of-irnss-1d)
2015

Mar IRNSS-1D post launch update: ៛�rst orbit raising operation of IRNSS-1D is successfully completed (/update/30-mar-2015/irnss-1d-post-launch-update-
30, ៛�rst-orbit-raising-operation-of-irnss-1d)
2015

Mar PSLV-C27/IRNSS-1D countdown operations are progressing normally. Propellant ៛�lling operation of second stage (PS2) of PSLV-C27 will be initiated by
27, midnight of today. (/update/27-mar-2015/pslv-c27-irnss-1d-countdown-operations-are-progressing-normally-propellant)
2015

Mar PSLV-C27/IRNSS-1D Mission Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C27 has been completed.
26, Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation are under progress. (/update/26-mar-2015/pslv-c27-irnss-1d-mission-
2015 update-mono-methyl-hydrazine-mmh-propellant-៛�lling-0)

Mar PSLV-C27/IRNSS-1D Mission Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C27 has commenced at
26, 09:40 hr (IST) (/update/26-mar-2015/pslv-c27-irnss-1d-mission-update-mono-methyl-hydrazine-mmh-propellant-៛�lling)
2015

Mar The 59 and half hour count-down of PSLV-C27/IRNSS-1D Mission has started at 05:49 hr IST on Thursday, March 26, 2015 (/update/26-mar-2015/59-
26, and-half-hour-count-down-of-pslv-c27-irnss-1d-mission-has-started-0549-hr-ist)
2015

Mar Mission Readiness Review committee and Launch Authorisation Board cleared the starting of the 59 and half hour count-down of PSLV-C27/IRNSS-1D
25, mission tomorrow, Thursday, March 26, 2015 at 05:49 hr IST (/update/25-mar-2015/mission-readiness-review-committee-and-launch-authorisation-
2015 board-cleared)

Mar Launch of IRNSS-1D by PSLV-C27 on March 28, 2015 (/update/23-mar-2015/launch-of-irnss-1d-pslv-c27-march-28-2015)


23,
2015

Mar Media Registration for Covering PSLV-C27/IRNSS-1D Launch (/update/23-mar-2015/media-registration-covering-pslv-c27-irnss-1d-launch)


23,
2015

Mar Launch of PSLV-C27 with IRNSS-1D postponed (/update/04-mar-2015/launch-of-pslv-c27-with-irnss-1d-postponed)


04,
2015

Jan Vikram Sarabhai Space Centre Conducts a Series of Sounding Rocket Launches to Study the Annular Solar Eclipse (/update/15-jan-2010/vikram-
15, sarabhai-space-centre-conducts-series-of-sounding-rocket-launches-to-study)
2010

Oct Chandrayaan-1 Spacecraft's Orbit Raised Further (/update/25-oct-2008/chandrayaan-1-spacecrafts-orbit-raised-further)


25,
2008

Nov Indigenous Cryogenic Stage Successfully Quali៛�ed (/update/15-nov-2007/indigenous-cryogenic-stage-successfully-quali៛�ed)


15,
2007

 Site Map (/sitemap) |  Timeline (/about-isro/isros-timeline-1960s-to-today) |  FAQ (/node/290) |   Disclaimer (/node/146) |  Careers (/careers-new) |   Feedback
(/feed-back) |   Contact us (/contact-us-1) |   Help (/help)

Copyright © 2017 ISRO, All Rights Reserved. Terms of Use (/node/148) |   Privacy Policy (/privacy-policy)

(/sites/default/៛�les/cqw_isrowebsite_www_isro_gov_in.pdf)

You might also like