Professional Documents
Culture Documents
in/)
(https://india.gov.in/)
(/)
Department of Space
Indian Space Research Organisation
(/)
Search...
English (/update/26-mar-2019/young-scientist-programme-yuvika-online-registration)
िह ी (/hi/update/26-%E0%A4%AE%E0%A4%BE%E0%A4%B0%E0%A5%8D%E0%A4%9A-2019/%E0%A4%AF%E0%A5%81%E0%A4%B5%E0%A4%BE-
%E0%A4%B5%E0%A5%88%E0%A4%9C%E0%A5%8D%E0%A4%9E%E0%A4%BE%E0%A4%A8%E0%A4%BF%E0%A4%95-
%E0%A4%95%E0%A4%BE%E0%A4%B0%E0%A5%8D%E0%A4%AF%E0%A4%95%E0%A5%8D%E0%A4%B0%E0%A4%AE-
%E0%A4%AF%E0%A5%81%E0%A4%B5%E0%A4%BF%E0%A4%95%E0%A4%BE-%E0%A4%91%E0%A4%A8%E0%A4%B2%E0%A4%BE%E0%A4%87%E0%A4%A8-
%E0%A4%AA%E0%A4%82%E0%A4%9C%E0%A5%80%E0%A4%95%E0%A4%B0%E0%A4%A3)
The Program is primarily aimed at imparting basic knowledge on Space Technology, Space Science and Space Applications to the younger ones with the intent of
arousing their interest in the emerging areas of Space activities. The program is thus aimed at creating awareness amongst the youngsters who are the future
building blocks of our Nation. ISRO has chalked out this programme to "Catch them young".
The programme will be of two weeks duration during summer holidays (second half of May 2019) and the schedule will include invited talks, experience sharing by
the eminent scientists, facility and lab visits, exclusive sessions for discussions with experts, practical and feedback sessions.
It is proposed to select 3 students each from each State/ Union Territory to participate in this programme covering CBSE, ICSE and State syllabus.
There are a few seats left for the programme and it is proposed to select through online registration. Those who have just completed 9th standard (in the
academic year 2018-19) and waiting to join 10th Std (or just joined 10th Std) will be eligible for the online registration.
The selection is based on the 8th Standard academic performance and extracurricular activities. The selection criteria is given below.
Total 100%
Students belonging to the rural area have been given special weightage in the selection criteria. In case there is tie between the selected candidates, the younger
candidates will be given priority.
A few seats are left for the programme and the interested students can register online with the link given below from 25 March 2019 (1800 hrs) to 03 April 2019
(1800 hrs). The list of the provisionally selected candidates from each state will be announced on 06 April 2019. The provisionally selected candidates will be
requested to send the attested copies of the relevant certi៛�cates through E-mail. After verifying the relevant certi៛�cates the ៛�nal selection list will be published
on 13 April 2019.
The progamme is planned at 4 centres of ISRO during the second half of May 2019. The selected students will be accommodated in ISRO guest houses/hostels.
Expenditure towards the travel of student (II AC fare by train from nearest Rly Station to the reporting centre and back), course material, lodging and boarding
etc., during the entire course will be borne by ISRO. II AC fare will also be provided to one guardian/parent for drop and pick up of student from the reporting
centre.
Mar PSLV-C45 Mission - Propellant ៛�lling of second stage of PSLV-C45 commenced (/update/31-mar-2019/pslv-c45-mission-propellant-៛�lling-of-second-
31, stage-of-pslv-c45-commenced)
2019
Mar PSLV-C45 Mission - Propellant ៛�lling of fourth stage of PSLV-C45 completed (/update/31-mar-2019/pslv-c45-mission-propellant-៛�lling-of-fourth-
31, stage-of-pslv-c45-completed)
2019
Mar PSLV-C45 Mission - Filling of propellant for the fourth stage (PS4) Commenced. (/update/31-mar-2019/pslv-c45-mission-៛�lling-of-propellant-fourth-
31, stage-ps4-commenced)
2019
Mar The countdown for the launch of PSLV-C45 mission commenced today at 06:27 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
31, The launch is scheduled at 09:27 Hrs IST on 1st April 2019 (/update/31-mar-2019/countdown-launch-of-pslv-c45-mission-commenced-today-0627-
2019 hrs-ist-satish-dhawan)
Mar Upcoming NavIC (IRNSS) System Week Number (WN) Rollover Event (/update/28-mar-2019/upcoming-navic-irnss-system-week-number-wn-
28, rollover-event)
2019
Mar The PSLV-C45 vehicle was moved from the Vehicle Assembly Building to the Umbilical Tower today at 06:00 Hrs (IST) in Satish Dhawan Space Centre
28, (SDSC) SHAR, Sriharikota. Presently, all the electrical checks are being performed. (/update/28-mar-2019/pslv-c45-vehicle-was-moved-vehicle-
2019 assembly-building-to-umbilical-tower-today)
Mar Mr. Jean Yves Le Gall, President, French National Space Agency (CNES) visited ISRO Head Quarters on March 6, 2019 (/update/07-mar-2019/mr-jean-
07, yves-le-gall-president-french-national-space-agency-cnes-visited-isro)
2019
Mar Announcement of Opportunity (AO) soliciting proposals for Seventh AO cycle observations (/update/06-mar-2019/announcement-of-opportunity-ao-
06, soliciting-proposals-seventh-ao-cycle-observations)
2019
Feb Announcement of Opportunity (AO) for Establishing ISRO Chair at Institutes - Last date for submissions extended upto March 08, 2019
13, (/announcement-of-opportunity-ao-establishing-isro-chair-institutes-last-date-submissions-extended)
2019
Feb After the injection of GSAT-31 communication satellite into an elliptical Geosynchronous Transfer Orbit (GTO) on February 06, 2019, all the three orbit
09, raising manoeuvers have been completed successfully as planned using the satellite's propulsion system. (/update/09-feb-2019/after-injection-of-
2019 gsat-31-communication-satellite-elliptical-geosynchronous)
Feb The ៛�rst orbit raising manoeuver of GSAT-31 satellite has been successfully carried out today (February 7, 2019) at 0438 hrs (IST) by ៛�ring the Liquid
07, Apogee Motor (LAM) engine of the satellite for a duration of 4684 seconds. (/update/07-feb-2019/៛�rst-orbit-raising-manoeuver-of-gsat-31-satellite-
2019 has-been-successfully-carried)
Jan Ref. Request for Quali៛�cation (RFQ) - Technology Transfer of Lithium-ion Cell by ISRO to Indian Industries (/update/29-jan-2019/ref-request-
29, quali៛�cation-rfq-technology-transfer-of-lithium-ion-cell-isro-to)
2019
Jan PSLV-C44 Mission - Filling of propellant UH25 for the second stage (PS2) of PSLV-C44 completed (/update/24-jan-2019/pslv-c44-mission-៛�lling-of-
24, propellant-uh25-second-stage-ps2-of-pslv-c44-0)
2019
Jan PSLV-C44 Mission - Filling of propellant UH25 for second stage (PS2) of PSLV-C44 commenced. (/update/24-jan-2019/pslv-c44-mission-៛�lling-of-
24, propellant-uh25-second-stage-ps2-of-pslv-c44)
2019
Jan PSLV-C44 Mission - Filling of oxidizer (N204) for the second stage (PS2) completed (/update/24-jan-2019/pslv-c44-mission-៛�lling-of-oxidizer-n204-
24, second-stage-ps2-completed)
2019
Jan PSLV-C44 Mission - Propellants ៛�lling of fourth stage (PS4) of PSLV-C44 completed (/update/24-jan-2019/pslv-c44-mission-propellants-៛�lling-of-
24, fourth-stage-ps4-of-pslv-c44-completed)
2019
Jan The countdown for the launch of PSLV-C44 mission started today at 19:37 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. The
23, launch is scheduled at 23:37 Hrs IST on 24th January 2019 (/update/23-jan-2019/countdown-launch-of-pslv-c44-mission-started-today-1937-hrs-ist-
2019 satish-dhawan)
Jan Inauguration of Space Technology Incubation Centre, National Institute of Technology, Jalandhar, Punjab (/update/17-jan-2019/inauguration-of-space-
17, technology-incubation-centre-national-institute-of)
2019
Jan Announcement of Opportunity (AO) for Establishing ISRO Chair at Institutes (/update/16-jan-2019/announcement-of-opportunity-ao-establishing-
16, isro-chair-institutes)
2019
Jan Video of Press Meet - Brie៛�ng by Dr. K Sivan, Chairman, ISRO (/update/11-jan-2019/video-of-press-meet-brie៛�ng-dr-k-sivan-chairman-isro)
11,
2019
Dec Filling of propellant for Cryo stage (C15) of GSLV-F11/GSAT-7A mission completed (/update/19-dec-2018/៛�lling-of-propellant-cryo-stage-c15-of-gslv-
19, f11-gsat-7a-mission-completed)
2018
Dec Filling of propellant for Cryo stage (C15) of GSLV-F11/GSAT-7A mission commenced (/update/19-dec-2018/៛�lling-of-propellant-cryo-stage-c15-of-
19, gslv-f11-gsat-7a-mission-commenced)
2018
Dec GSLV-F11/GSAT-7A Mission - Propellant ៛�lling of liquid strap-on (L40) completed (/update/19-dec-2018/gslv-f11-gsat-7a-mission-propellant-៛�lling-of-
19, liquid-strap-l40-completed)
2018
Dec GSLV-F11/GSAT-7A Mission - Propellant ៛�lling of liquid strap-on (L40) commenced (/update/18-dec-2018/gslv-f11-gsat-7a-mission-propellant-៛�lling-
18, of-liquid-strap-l40-commenced)
2018
Dec GSLV-F11/GSAT-7A Mission - Second stage (GS2) propellant loading completed (/update/18-dec-2018/gslv-f11-gsat-7a-mission-second-stage-gs2-
18, propellant-loading-completed)
2018
Dec GSLV-F11/GSAT-7A Mission - Second stage (GS2) propellant loading commenced (/update/18-dec-2018/gslv-f11-gsat-7a-mission-second-stage-gs2-
18, propellant-loading-commenced)
2018
Dec The countdown for the launch of GSLV-F11/GSAT-7A mission started today at 14:10 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
18, The launch is scheduled at 16:10 Hrs IST on 19th December 2018 (/update/18-dec-2018/countdown-launch-of-gslv-f11-gsat-7a-mission-started-today-
2018 1410-hrs-ist-satish)
Dec The countdown for the launch of GSAT-11 mission onboard Ariane-5 launch vehicle started today (December 04, 2018) at 13:14 Hrs IST from French
04, Guiana. The launch is scheduled at 02:07 Hrs IST on December 05, 2018 (/update/04-dec-2018/countdown-launch-of-gsat-11-mission-onboard-
2018 ariane-5-launch-vehicle-started-today)
Nov PSLV-C43/HysIS Mission: Propellant ៛�lling for the second stage(PS2) of PSLV-C43 completed (/update/28-nov-2018/pslv-c43-hysis-mission-
28, propellant-៛�lling-second-stageps2-of-pslv-c43-completed)
2018
Nov PSLV-C43/HysIS Mission: Filling of oxidizer (N204) for the second stage (PS2) of PSLV-C43 completed (/update/28-nov-2018/pslv-c43-hysis-mission-
28, ៛�lling-of-oxidizer-n204-second-stage-ps2-of-pslv-c43)
2018
Nov PSLV-C43/HysIS Mission: Propellant ៛�lling for the second stage(PS2) of PSLV-C43 commenced (/update/28-nov-2018/pslv-c43-hysis-mission-
28, propellant-៛�lling-second-stageps2-of-pslv-c43-commenced)
2018
Nov PSLV-C43 / HysIS Mission: Fuel ៛�lling of PS4 stage (fourth stage) completed (/update/28-nov-2018/pslv-c43-hysis-mission-fuel-៛�lling-of-ps4-stage-
28, fourth-stage-completed)
2018
Nov The countdown for the launch of PSLV-C43/HysIS mission started today at 05:58 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
28, The launch is scheduled at 09:58 Hrs IST on 29th November 2018 (/update/28-nov-2018/countdown-launch-of-pslv-c43-hysis-mission-started-today-
2018 0558-hrs-ist-satish)
Nov PSLV-C43 lift off time is rescheduled to 09.58 Hrs IST on 29th November, 2018. Countdown will commence from 05.58 Hrs IST on 28th November, 2018
27, (/update/27-nov-2018/pslv-c43-lift-time-rescheduled-to-0958-hrs-ist-29th-november-2018-countdown-will)
2018
Nov The countdown for the launch of PSLV-C43 / HysIS Mission from Satish Dhawan Space Centre SHAR, Sriharikota is tentatively scheduled at 0557 Hrs
27, IST on November 28, 2018. The launch is tentatively scheduled at 0957 Hrs IST on November 29, 2018. (/update/27-nov-2018/countdown-launch-of-
2018 pslv-c43-hysis-mission-satish-dhawan-space-centre-shar)
Nov The third and ៛�nal orbit raising operation of GSAT-29 satellite has been successfully carried out today (November 17, 2018) by ៛�ring the Liquid Apogee
17, Motor (LAM) engine of the satellite at 0957 Hrs IST for a duration of 207 sec (/update/17-nov-2018/third-and-៛�nal-orbit-raising-operation-of-gsat-29-
2018 satellite-has-been)
Nov GSLV Mk III-D2/GSAT-29 Mission: The second orbit raising operation of GSAT-29 satellite has been successfully carried out today (November 16, 2018)
16, by ៛�ring the Liquid Apogee Motor (LAM) engine of the satellite at 1027 Hrs IST for a duration of 4988 sec (/update/16-nov-2018/gslv-mk-iii-d2-gsat-
2018 29-mission-second-orbit-raising-operation-of-gsat-29)
Nov GSLV Mk III-D2 / GSAT-29 Mission: The ៛�rst orbit raising operation of GSAT-29 satellite has been successfully carried out today (15th November) by
15, ៛�ring the Liquid Apogee Motor (LAM) engine of the satellite at 0834 Hrs IST for a duration of 4875 seconds (/update/15-nov-2018/gslv-mk-iii-d2-gsat-
2018 29-mission-៛�rst-orbit-raising-operation-of-gsat-29-satellite)
Nov GSLV Mk III-D2 / GSAT-29 Mission Launch: Filling of Liquid Oxygen in Cryogenic Stage completed and ៛�lling up of Liquid Hydrogen is in progress.
14, (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-launch-៛�lling-of-liquid-oxygen-cryogenic-stage-0)
2018
Nov GSLV Mk III-D2 / GSAT-29 Mission Launch - GSAT-29 satellite powered on. It is a multi-band multi-band high throughout communication satellite. It is
14, the 33rd communication satellite built by ISRO (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-launch-gsat-29-satellite-powered-it-multi-
2018 band)
Nov GSLV Mk III-D2 / GSAT-29 Mission Launch - Filling of liquid oxygen in Cryogenic Stage commenced. Cryogenic Stage of GSLV Mklll is one of the
14, powerful Cryogenic Upper Stages developed in the world and it generates nearly 2MW power (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-
2018 launch-៛�lling-of-liquid-oxygen-cryogenic-stage)
Nov GSLV Mk III-D2 / GSAT-29 Mission Launch - Launch Vehicle Avionics health checks completed (/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-
14, mission-launch-launch-vehicle-avionics-health-checks)
2018
Nov Announcement of Opportunity (AO) for Utilization of Astrosat Archival Data (/update/13-nov-2018/announcement-of-opportunity-ao-utilization-of-
13, astrosat-archival-data)
2018
Nov Shri A. S. Kiran Kumar is presented with International Von Karman Wings Award (/update/13-nov-2018/shri-s-kiran-kumar-presented-with-
13, international-von-karman-wings-award)
2018
Nov The countdown for the launch of GSLV Mk III-D2 / GSAT-29 Mission from Satish Dhawan Space Centre SHAR, Sriharikota started today at 14:50 Hrs IST.
13, The launch is scheduled at 17:08 Hrs IST on 14th November 2018. (/update/13-nov-2018/countdown-launch-of-gslv-mk-iii-d2-gsat-29-mission-satish-
2018 dhawan-space-centre)
Nov Announcement of Opportunity (AO) for Low Earth Orbit based Microgravity Experiments (/announcement-of-opportunity-ao-low-earth-orbit-based-
07, microgravity-experiments)
2018
Nov Announcement of Opportunity (AO) to international science community for Space-Based Experiments to Study Venus (/update/06-nov-
06, 2018/announcement-of-opportunity-ao-to-international-science-community-space-based)
2018
Oct ISRO successfully tests Cryogenic Engine (CE-20) for GSLV Mk-III / Chandrayaan-2 Mission (/update/12-oct-2018/isro-successfully-tests-cryogenic-
12, engine-ce-20-gslv-mk-iii-chandrayaan-2-mission)
2018
Sep Mars Orbiter Mission (MOM) completes 4 years in its orbit (/update/24-sep-2018/mars-orbiter-mission-mom-completes-4-years-its-orbit)
24,
2018
Sep Visit of Chairman of Algerian Space Agency Governing Body & Director General of Algerian Space Agency (ASAL) to ISRO (/update/19-sep-2018/visit-
19, of-chairman-of-algerian-space-agency-governing-body-director-general-of)
2018
Sep Inauguration of Space Technology Incubation Centre, National Institute of Technology, Agartala, Tripura (/update/18-sep-2018/inauguration-of-
18, space-technology-incubation-centre-national-institute-of)
2018
Sep Inauguration of S-band Polarimetric Doppler Weather Radar at SDSC SHAR by Chairman ISRO (/update/16-sep-2018/inauguration-of-s-band-
16, polarimetric-doppler-weather-radar-sdsc-shar-chairman-isro)
2018
Sep The countdown begun today at 01:08 pm (IST) for the launch of PSLV C42 from Satish Dhawan Space Centre, Sriharikota. The scheduled launch is at
15, 10:08 pm (IST) tomorrow. (/update/15-sep-2018/countdown-begun-today-0108-pm-ist-launch-of-pslv-c42-satish-dhawan-space-centre)
2018
Sep The countdown begun today at 01:08 pm (IST) for the launch of PSLV C42 from Satish Dhawan Space Centre, Sriharikota. The scheduled launch is at
15, 10:08 pm (IST) tomorrow. (/update/15-sep-2018/countdown-begun-today-0108-pm-ist-launch-of-pslv-c42-satish-dhawan-space-centre)
2018
Aug 6th Bangalore Space Expo 2018, 6-8 September 2018 (/update/10-aug-2018/6th-bangalore-space-expo-2018-6-8-september-2018)
10,
2018
Aug Transfer of VSSC developed Lithium Ion Cell Technology to Industries (/update/06-aug-2018/transfer-of-vssc-developed-lithium-ion-cell-
06, technology-to-industries)
2018
Apr Shri A S Kiran Kumar selected to receive "International von Karman Wings Award" for the year 2018 (/update/25-apr-2018/shri-s-kiran-kumar-
25, selected-to-receive-international-von-karman-wings-award-year)
2018
Apr The fourth and the ៛�nal orbit raising operation of IRNSS-1I is successfully carried out at 21:05 hr IST on April 15, 2018. The achieved perigee height is
15, 35,462.9 km and apogee height is 35,737.8 km (/update/15-apr-2018/fourth-and-៛�nal-orbit-raising-operation-of-irnss-1i-successfully-carried-out)
2018
Apr The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14, 2018. The achieved perigee height is 31,426 km and
15, apogee height is 35,739 km (/update/15-apr-2018/third-orbit-raising-operation-of-irnss-1i-successfully-carried-out-2250-hr-ist)
2018
Apr The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14, 2018 (/update/14-apr-2018/third-orbit-raising-
14, operation-of-irnss-1i-successfully-carried-out-2250-hr-ist)
2018
Apr The second orbit raising operation of IRNSS-1I Satellite has been successfully carried out at 20:04 hr IST on April 13, 2018. The achieved perigee height is
14, 8683 km and apogee height is 35733 km. (/update/14-apr-2018/second-orbit-raising-operation-of-irnss-1i-satellite-has-been-successfully)
2018
Apr The second orbit raising operation of IRNSS-1I is successfully carried out at 20:04 hr IST on April 13, 2018 (/update/13-apr-2018/second-orbit-raising-
13, operation-of-irnss-1i-successfully-carried-out-2004-hr-ist)
2018
Apr The ៛�rst orbit raising operation of IRNSS-1I is successfully carried out at 4:19 hr IST on April 13, 2018 (/update/13-apr-2018/៛�rst-orbit-raising-
13, operation-of-irnss-1i-successfully-carried-out-419-hr-ist)
2018
Apr The ៛�rst orbit raising operation of IRNSS-1I is planned to be carried out at 4:15 hr IST on April 13, 2018. The targeted perigee height is 322 km and
12, apogee height is 35887 km (/update/12-apr-2018/៛�rst-orbit-raising-operation-of-irnss-1i-planned-to-be-carried-out-415-hr-ist)
2018
Apr The 32 hr countdown activity has commenced at 20:04hr IST on Tuesday, April 10, 2018 for the launch of PSLV-C41/IRNSS-1I Mission scheduled at 04:04
10, hr IST on April 12, 2018 (/update/10-apr-2018/32-hr-countdown-activity-has-commenced-2004hr-ist-tuesday-april-10-2018-launch-of)
2018
Apr The second orbit raising operation of GSAT-6A satellite has been successfully carried out by LAM Engine ៛�ring for about 53 minutes on March 31, 2018
01, in the morning. (/update/01-apr-2018/second-orbit-raising-operation-of-gsat-6a-satellite-has-been-successfully-carried)
2018
Mar The ៛�rst orbit raising operation of GSAT-6A Satellite has been successfully carried out by LAM Engine ៛�ring for 2188 sec from 09:22hr IST on March 30,
30, 2018. (/update/30-mar-2018/៛�rst-orbit-raising-operation-of-gsat-6a-satellite-has-been-successfully-carried)
2018
Mar GSLV-F08/GSAT-6A Cryogenic Upperstage Engine ignited. Third Stage performance is normal (/update/29-mar-2018/gslv-f08-gsat-6a-cryogenic-
29, upperstage-engine-ignited-third-stage-performance)
2018
Mar Mission Director has authorised Vehicle Director for launch. Vehicle Director has authorised initiation of Automatic Launch Secquence (ALS) program at
29, 16:40 hr IST. (/update/29-mar-2018/mission-director-has-authorised-vehicle-director-launch-vehicle-director-has)
2018
Mar Propellant ៛�lling operations of cryo stage are under progress (/update/29-mar-2018/propellant-៛�lling-operations-of-cryo-stage-are-under-progress)
29,
2018
Mar Preparations for propellant ៛�lling of cryo stage are under progress (/update/29-mar-2018/preparations-propellant-៛�lling-of-cryo-stage-are-under-
29, progress)
2018
Mar Real Time System simulation checks Completed. Countdown is progressing normally. (/update/29-mar-2018/real-time-system-simulation-checks-
29, completed-countdown-progressing-normally)
2018
Mar Propellant ៛�lling operation of L40 Stages is completed by 02:20 hr IST. (/update/29-mar-2018/propellant-៛�lling-operation-of-l40-stages-completed-
29, 0220-hr-ist)
2018
Mar Propellant ៛�lling operation of L40 Stages is under progress. Countdown is progressing normally. (/update/28-mar-2018/propellant-៛�lling-operation-
28, of-l40-stages-under-progress-countdown-progressing)
2018
Mar Second Stage (GS2) UH25 ៛�lling is completed by 19:45 hr IST (/update/28-mar-2018/second-stage-gs2-uh25-៛�lling-completed-1945-hr-ist)
28,
2018
Mar Preparation for Second Stage (GS2) UH25 ៛�lling is under progress (/update/28-mar-2018/preparation-second-stage-gs2-uh25-៛�lling-under-progress)
28,
2018
Mar Second Stage (GS2) N2O4 ៛�lling completed by 16:15 hr IST (/update/28-mar-2018/second-stage-gs2-n2o4-៛�lling-completed-1615-hr-ist)
28,
2018
Mar Preparations for GSLV-F08 Second stage (GS2) propellant ៛�lling operation are under progress (/update/28-mar-2018/preparations-gslv-f08-second-
28, stage-gs2-propellant-៛�lling-operation-are-under)
2018
Mar The 27 Hrs Countdown activities for the launch of GSLV-F08 / GSAT-6A Mission have started at 13:56 Hrs IST on Wednesday, March 28, 2018.
28, (/update/28-mar-2018/27-hrs-countdown-activities-launch-of-gslv-f08-gsat-6a-mission-have-started-1356)
2018
Mar AstroSat Picture of the Month (March 2018) (/update/28-mar-2018/astrosat-picture-of-month-march-2018)
28,
2018
Mar Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 27 hr countdown activities starting at 13:56hr IST
27, on Wednesday, March 28, 2018 and the launch of GSLV-F08/GSAT-6A for Thursday, March 29, 2018 at 16:56hr IST (/update/27-mar-2018/mission-
2018 readiness-review-mrr-committee-and-launch-authorization-board-lab-have)
Mar Indian Space Research Organisation (ISRO) gears up for the ‘36 hour Smart India Hackathon 2018 Grand Finale’ (/update/24-mar-2018/indian-space-
24, research-organisation-isro-gears-%E2%80%9836-hour-smart-india-hackathon-2018)
2018
Feb Announcement of Opportunity (AO) for future Astronomy payload/ mission (/update/03-feb-2018/announcement-of-opportunity-ao-future-
03, astronomy-payload-mission)
2018
Feb AstroSat: Announcement of Opportunity (AO) soliciting proposals for fourth AO cycle observations (/update/02-feb-2018/astrosat-announcement-of-
02, opportunity-ao-soliciting-proposals-fourth-ao-cycle)
2018
Jan ISRO technology know-how for production of NavIC Messaging Receiver for Indian Industries (/update/27-jan-2018/isro-technology-know-how-
27, production-of-navic-messaging-receiver-indian-industries)
2018
Jan PSLV-C40 Successfully Launches Cartosat-2 Series Satellite along with 30 Co-passenger Satellites (/update/12-jan-2018/pslv-c40-successfully-
12, launches-cartosat-2-series-satellite-along-with-30-co)
2018
Jan Second Stage is shutdown. Third Stage is ignited. Performanc is normal (/update/12-jan-2018/second-stage-shutdown-third-stage-ignited-
12, performanc-normal)
2018
Jan Mission Director has authorised Vehicle Director for launch. Automatic Launch Secquence (ALS) program initiation authorised by Vehicle Director and
12, ALS started for launch at 09:13 hr IST. (/update/12-jan-2018/mission-director-has-authorised-vehicle-director-launch-automatic-launch)
2018
Jan PSLV-C40/Cartosat-2 Series Mission - Propellant ៛�lling operations of Second Stage (PS2) are in progress (/update/11-jan-2018/pslv-c40-cartosat-2-
11, series-mission-propellant-៛�lling-operations-of-second-stage)
2018
Jan Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress.
11, (/update/11-jan-2018/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2018
Jan Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C40 is completed. Countdown is progressing normally. (/update/11-jan-2018/propellant-
11, ៛�lling-operation-of-fourth-stage-ps4-of-pslv-c40-completed-countdown)
2018
Jan Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C40 is under progress (/update/11-jan-2018/propellant-៛�lling-operation-of-fourth-stage-ps4-
11, of-pslv-c40-under-progress)
2018
Jan The 28hr countdown activity of PSLV-C40/Cartosat2 Series Satellite Mission has started at 05:29hr IST today, Thursday, January 11, 2018 (/update/11-
11, jan-2018/28hr-countdown-activity-of-pslv-c40-cartosat2-series-satellite-mission-has)
2018
Jan Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C40/ Cartosat2 Series
10, Satellite mission for Thursday, January 11, 2018 starting at 05:29hr IST (/update/10-jan-2018/mission-readiness-review-mrr-committee-and-launch-
2018 authorisation-board-lab-have)
Nov Seeking comments on Draft "Space Activities Bill, 2017" from the stake holders/public -regarding. (/update/21-nov-2017/seeking-comments-draft-
21, space-activities-bill-2017-stake-holders-public-regarding)
2017
Oct Selection of Three Posters from Indian Students for APRSAF-24 Poster Contest (/update/23-oct-2017/selection-of-three-posters-indian-students-
23, aprsaf-24-poster-contest)
2017
Aug Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and
31, ALS started for launch of PSLV-C39/IRNSS-1H Satellite mission at 18:47 hr IST (/update/31-aug-2017/mission-director-has-authorised-vehicle-
2017 director-launch-automatic-launch-sequence)
Aug The countdown operations of PSLV-C39/IRNSS-1H mission are progressing normally (/update/31-aug-2017/countdown-operations-of-pslv-c39-irnss-
31, 1h-mission-are-progressing-normally)
2017
Aug Propellant ៛�lling operations of second stage (PS2) of PSLV-C39 are completed (/update/31-aug-2017/propellant-៛�lling-operations-of-second-stage-
31, ps2-of-pslv-c39-are-completed)
2017
Aug Propellant ៛�lling operations of second stage (PS2) of PSLV-C39 are under progress (/update/31-aug-2017/propellant-៛�lling-operations-of-second-
31, stage-ps2-of-pslv-c39-are-under-progress)
2017
Aug Propellant ៛�lling operations of fourth stage (PS4) of PSLV-C39 are completed (/update/30-aug-2017/propellant-៛�lling-operations-of-fourth-stage-
30, ps4-of-pslv-c39-are-completed)
2017
Aug Propellant ៛�lling operations of fourth stage (PS4) of PSLV-C39 are under progress (/update/30-aug-2017/propellant-៛�lling-operations-of-fourth-
30, stage-ps4-of-pslv-c39-are-under-progress)
2017
Aug The 29 hrs countdown operations of PSLV-C39/IRNSS-1H mission have started on Wednesday, Aug 30, 2017 at 14:00hr IST (/update/30-aug-2017/29-
30, hrs-countdown-operations-of-pslv-c39-irnss-1h-mission-have-started-wednesday)
2017
Aug Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 29hr countdown of PSLV-C39/ IRNSS-1H Satellite
29, mission for Wednesday, Aug 30, 2017 starting at 14:00 hr IST, (/update/29-aug-2017/mission-readiness-review-mrr-committee-and-launch-
2017 authorisation-board-lab-have)
Aug PSLV-C39/IRNSS-1H Mission is scheduled to be launched on Aug 31, 2017 at 19:00 Hrs from SDSC SHAR, Sriharikota. (/update/23-aug-2017/pslv-c39-
23, irnss-1h-mission-scheduled-to-be-launched-aug-31-2017-1900-hrs-sdsc-shar)
2017
Aug The IRNSS Signal-in-Space Interface Control Document ICD Ver 1.1 released (/update/18-aug-2017/irnss-signal-space-interface-control-document-
18, icd-ver-11-released)
2017
Jul Prof. U R Rao, Architect of Indian Satellite Programme passes away (/update/24-jul-2017/prof-u-r-rao-architect-of-indian-satellite-programme-
24, passes-away)
2017
Jul 3 axis stabilisation of GSAT-17 has been successfully completed by 07:40 hrs IST on July 03, 2017. Spacecraft systems are normal (/update/03-jul-
03, 2017/3-axis-stabilisation-of-gsat-17-has-been-successfully-completed-0740-hrs-ist-july)
2017
Jul Deployment of both the Solar arrays and two antenna re�ectors have been successfully completed by 16:15 hrs IST. (/update/02-jul-2017/deployment-
02, of-both-solar-arrays-and-two-antenna-re�ectors-have-been-successfully)
2017
Jul The third and ៛�nal orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine ៛�ring for 492 sec from 08:51 hr IST on
02, July 02, 2017 (/update/02-jul-2017/third-and-៛�nal-orbit-raising-operation-of-gsat-17-satellite-has-been)
2017
Jul The second orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine ៛�ring for 2896 sec from 11:03 hr IST on July 01,
01, 2017. (/update/01-jul-2017/second-orbit-raising-operation-of-gsat-17-satellite-has-been-successfully-carried)
2017
Jun The ៛�rst orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine ៛�ring for 5912 sec from 04:38 hrs IST on June 30,
30, 2017. (/update/30-jun-2017/៛�rst-orbit-raising-operation-of-gsat-17-satellite-has-been-successfully-carried)
2017
Jun GSAT-17 successfully launched by Ariane-5 VA-238 from Kourou, French Guiana (/update/29-jun-2017/gsat-17-successfully-launched-ariane-5-va-
29, 238-kourou-french-guiana)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission - Message from President (/update/24-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
24, message-president)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: All 31 Satellites separated successfully (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-
23, mission-all-31-satellites-separated)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Cartosat Seperated, NIUSAT Seperated, (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-
23, mission-cartosat-seperated-niusat-seperated)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Fourth stage engine shut off (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
23, fourth-stage-engine-shut)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Fourth Stage performance is normal (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-
23, mission-fourth-stage-performance-normal)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Third stage separated.Fourth Stage Engine ignited (/update/23-jun-2017/pslv-c38-cartosat-2-series-
23, satellite-mission-third-stage-separatedfourth-stage)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Coasting operation normal (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
23, coasting-operation-normal)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Third stage action completed. Coasting phase initiated (/update/23-jun-2017/pslv-c38-cartosat-2-
23, series-satellite-mission-third-stage-action-completed)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Third stage performance normal (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-
23, third-stage-performance-normal)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Second Stage Engine Shutoff, Third stage ignited (/update/23-jun-2017/pslv-c38-cartosat-2-series-
23, satellite-mission-second-stage-engine-shutoff-third)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: Heat shield separated (/update/23-jun-2017/pslv-c38-cartosat-2-series-satellite-mission-heat-shield-
23, separated)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: First Stage Seperated, Second Stage performance normal (/update/23-jun-2017/pslv-c38-cartosat-2-
23, series-satellite-mission-៛�rst-stage-seperated-second-stage-0)
2017
Jun PSLV-C38 / Cartosat-2 Series Satellite Mission: First Stage Seperated, Second Stage Ignited (/update/23-jun-2017/pslv-c38-cartosat-2-series-
23, satellite-mission-៛�rst-stage-seperated-second-stage)
2017
Jun Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and
23, ALS started for launch of PSLV-C38/Cartosat2 Series Satellite mission at 09:17 hr IST (/update/23-jun-2017/mission-director-has-authorised-vehicle-
2017 director-launch-automatic-launch-sequence)
Jun Propellant ៛�lling operations of Second Stage (PS2) are completed. Countdown is progressing normally. (/update/23-jun-2017/propellant-៛�lling-
23, operations-of-second-stage-ps2-are-completed-countdown)
2017
Jun Propellant ៛�lling operations of Second Stage (PS2) are in progress (/update/22-jun-2017/propellant-៛�lling-operations-of-second-stage-ps2-are-
22, progress)
2017
Jun Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress
22, (/update/22-jun-2017/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2017
Jun Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C38 is completed (/update/22-jun-2017/propellant-៛�lling-operation-of-fourth-stage-ps4-of-
22, pslv-c38-completed)
2017
Jun Propellant ៛�lling operation of fourth stage (PS4) of PSLV-C38 is under progress (/update/22-jun-2017/propellant-៛�lling-operation-of-fourth-stage-
22, ps4-of-pslv-c38-under-progress)
2017
Jun The 28 hr countdown operation of PSLV-C38/Cartosat2 Series Satellite Mission has started on Thursday, June 22, 2017 at 05:29 hr IST (/update/22-jun-
22, 2017/28-hr-countdown-operation-of-pslv-c38-cartosat2-series-satellite-mission-has)
2017
Jun Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C38/Cartosat-2 Series
21, Satellite mission for Thursday, June 22,2017 starting at 05:29 hr IST (/update/21-jun-2017/mission-readiness-review-mrr-committee-and-launch-
2017 authorisation-board-lab-have)
Jun West and East re�ectors of GSAT-19 have been successfully deployed by 18:47 hr IST. Three axis stabilisation of GSAT-19 has been achieved by 19:42 hr
10, IST (/update/10-jun-2017/west-and-east-re�ectors-of-gsat-19-have-been-successfully-deployed-1847-hr-ist)
2017
Jun South and North solar arrays of GSAT-19 have been successfully deployed by 16:15 hr IST (/update/10-jun-2017/south-and-north-solar-arrays-of-gsat-
10, 19-have-been-successfully-deployed-1615-hr)
2017
Jun The fourth and ៛�nal orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 488 sec from 07:59 hr IST on
10, June 10, 2017 (/update/10-jun-2017/fourth-and-៛�nal-orbit-raising-operation-of-gsat-19-satellite-has-been)
2017
Jun The third orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 3469 sec from 09:55 hr IST on June 09,
10, 2017 (/update/10-jun-2017/third-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried)
2017
Jun The second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 5538 sec from 15:44 hr IST on June 07,
08, 2017. (/update/08-jun-2017/second-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried)
2017
Jun The ៛�rst orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine ៛�ring for 116 sec from 14:03 hr IST on June 06,
08, 2017. (/update/08-jun-2017/៛�rst-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried)
2017
Jun GSLV Mk III-D1/GSAT-19 Mission: GSAT-19 separated and injected into orbit successfully. (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-gsat-
05, 19-separated-and-injected-orbit-successfully)
2017
Jun GSLV Mk III-D1/GSAT-19 Mission: L110 Separated Successfully. C25 Ignition con៛�rmed. (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-l110-
05, separated-successfully-c25-ignition-con៛�rmed)
2017
Jun GSLV Mk III-D1/GSAT-19 Mission: L110 Ignited. Vehicle Peformance is Normal (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-mission-l110-ignited-
05, vehicle-peformance-normal)
2017
Jun Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
05, ALS started for launch of GSLV Mk III D1 / GSAT-19 mission at 17:17 Hrs IST (/update/05-jun-2017/mission-director-has-authorised-vehicle-director-
2017 launch-automatic-launch-sequence)
Jun GSLV Mk III-D1/GSAT-19: Propellant ៛�lling operations of cryo stage are completed (/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-propellant-៛�lling-
05, operations-of-cryo-stage-are-completed)
2017
Jun Propellant ៛�lling operations of L110 (Second Stage) of GSLV Mk III D1 are completed (/update/05-jun-2017/propellant-៛�lling-operations-of-l110-
05, second-stage-of-gslv-mk-iii-d1-are)
2017
Jun Propellant ៛�lling operations of L110 (Second Stage) of GSLV Mk III D1 are under progress. Countdown is progressing normally. (/update/04-jun-
04, 2017/propellant-៛�lling-operations-of-l110-second-stage-of-gslv-mk-iii-d1-are-under)
2017
Jun The 25 and half hr countdown operations of GSLV Mk III D1 / GSAT-19 mission started today, Sunday, June 04, 2017 at 15:58 hr IST (/update/04-jun-
04, 2017/25-and-half-hr-countdown-operations-of-gslv-mk-iii-d1-gsat-19-mission-started)
2017
Jun Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 25 and half hr countdown of GSLV MkIII D1 / GSAT-
02, 19 mission for Sunday, June 04,2017 starting at 15:58 hr IST (/update/02-jun-2017/mission-readiness-review-mrr-committee-and-launch-
2017 authorisation-board-lab-have)
Jun AstroSat CZTI and the search for X-ray counterparts to gravitational wave sources (/update/01-jun-2017/astrosat-czti-and-search-x-ray-
01, counterparts-to-gravitational-wave-sources)
2017
May GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from SDSC SHAR, Sriharikota (/update/29-may-
29, 2017/gslv-mk-iii-d1-gsat-19-mission-scheduled-to-be-launched-june-05-2017-1728-hrs-ist)
2017
May ISRO Receives Indira Gandhi Prize for Peace, Disarmament and Development for 2014 (/update/18-may-2017/isro-receives-indira-gandhi-prize-peace-
18, disarmament-and-development-2014)
2017
May Deployment of East and West re�ectors have been successfully completed at 08:15 hr IST and 09:30 hr IST, respectively on May 08, 2017 (/update/08-
08, may-2017/deployment-of-east-and-west-re�ectors-have-been-successfully-completed-0815-hr)
2017
May The third orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine ៛�ring for 445.8 sec from 06:51:52 hr IST on May
08, 08, 2017 (/update/08-may-2017/third-orbit-raising-operation-of-south-asia-satellite-has-been-successfully)
2017
May Orbit Determination results from the second LAM ៛�ring are: apogee X perigee height was changed to 35858 km X 28608 km. Inclination is 0.755deg.
07, Orbital period is 20hr 58min. (/update/07-may-2017/orbit-determination-results-second-lam-៛�ring-are-apogee-x-perigee-height-was)
2017
May The second orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine ៛�ring for 3529.7 sec from 09.30 hr IST on
07, May 07, 2017 (/update/07-may-2017/second-orbit-raising-operation-of-south-asia-satellite-has-been-successfully)
2017
May The ៛�rst orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine (/update/06-may-2017/៛�rst-orbit-raising-
06, operation-of-south-asia-satellite-has-been-successfully)
2017
May Announcement of Opportunity (AO) soliciting proposals for third AO cycle observations (/update/03-may-2017/announcement-of-opportunity-ao-
03, soliciting-proposals-third-ao-cycle-observations)
2017
Feb A minor ៛�re incident happened with the stored waste propellant at Sriharikota. (/update/27-feb-2017/minor-៛�re-incident-happened-with-stored-
27, waste-propellant-sriharikota)
2017
Feb PSLV- C37 / CARTOSAT- 2 Series Satellite - Message from President (/update/27-feb-2017/pslv-c37-cartosat-2-series-satellite-message-president)
27,
2017
Feb ISRO Successfully Tests its Cryogenic Stage (C25) for GSLV MkIII for the Flight Duration (/update/18-feb-2017/isro-successfully-tests-its-cryogenic-
18, stage-c25-gslv-mkiii-�ight-duration)
2017
Feb PSLV C37 / Cartosat-2 Series Mission - Third Stage Performance is Normal (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-third-stage-
15, performance-normal)
2017
Feb PSLV C37 / Cartosat-2 Series Mission - Second Stage Seperated. Third Stage Ignited. (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-
15, second-stage-seperated-third-stage-ignited)
2017
Feb PSLV-C37 / Cartosat 2 Series Mission - Heat Shield Seperated (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-heat-shield-seperated)
15,
2017
Feb PSLV C37 / Cartosat-2 Series Mission - Lift Off Normal (/update/15-feb-2017/pslv-c37-cartosat-2-series-mission-lift-normal)
15,
2017
Feb Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
15, ALS started for launch at 09:16 Hrs IST (/update/15-feb-2017/mission-director-has-authorised-vehicle-director-launch-automatic-launch-sequence)
2017
Feb Real Time System simulation & Data transmission checks Completed. Vehicle Internal Checks Completed. Countdown is progressing normally
15, (/update/15-feb-2017/real-time-system-simulation-data-transmission-checks-completed-vehicle-internal)
2017
Feb N2O4 tank ៛�lling and UH25 tank ៛�lling operations of Second Stage (PS2) of PSLV-C37 are completed. Countdown is progressing normally. (/update/15-
15, feb-2017/n2o4-tank-៛�lling-and-uh25-tank-៛�lling-operations-of-second-stage-ps2-of-pslv)
2017
Feb Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress.
14, (/update/14-feb-2017/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2017
Feb Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed (/update/14-feb-2017/mixed-oxides-of-nitrogen-mon-3-oxidiser-
14, ៛�lling-operation-of-ps4-completed)
2017
Feb Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C37 is completed (/update/14-feb-2017/mono-methyl-
14, hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2017
Feb The 28 Hrs countdown activity of PSLV-C37/Cartosat2 Series Satellite Mission has started at 05:28 Hrs IST today, Tuesday, February 14, 2017
14, (/update/14-feb-2017/28-hrs-countdown-activity-of-pslv-c37-cartosat2-series-satellite-mission-has)
2017
Feb Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 Hrs countdown of PSLV-C37 Launch
13, (/update/13-feb-2017/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)
2017
Feb PSLV-C37 / Cartosat -2 Series Satellite Mission is scheduled to be launched on February 15, 2017 at 9.28 Hrs IST from SDSC SHAR Sriharikota
10, (/update/10-feb-2017/pslv-c37-cartosat-2-series-satellite-mission-scheduled-to-be-launched-february-15)
2017
Jan ISRO Successfully Tests C25 Cryogenic Upper Stage of GSLV MkIII (/update/26-jan-2017/isro-successfully-tests-c25-cryogenic-upper-stage-of-gslv-
26, mkiii)
2017
Dec Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and
07, ALS started for launch of PSLV-C36/RESOURCESAT-2A mission at 10:13 hr IST (/update/07-dec-2016/mission-director-has-authorised-vehicle-
2016 director-launch-automatic-launch-sequence)
Dec Real Time Simulation Checks and Data Transmission Checks completed. Resourcesat-2A Spacecraft Switched 'ON'. Launch Vechicle internal Checks
07, completed. Countdown is progressing normally. (/update/07-dec-2016/real-time-simulation-checks-and-data-transmission-checks-completed-
2016 resourcesat-2a)
Dec N2O4 and UH25 tank ៛�lling operations of Second Stage (PS2) of PSLV-C36 are completed by 23:20 hrs. Countdown is progressing normally.
06, (/update/06-dec-2016/n2o4-and-uh25-tank-៛�lling-operations-of-second-stage-ps2-of-pslv-c36-are)
2016
Dec Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress.
06, (/update/06-dec-2016/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2016
Dec Mono Methyl Hydrazine (MMH) fuel and Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operations of fourth stage (PS4) of PSLV-C36 are completed
06, (/update/06-dec-2016/mono-methyl-hydrazine-mmh-fuel-and-mixed-oxides-of-nitrogen-mon-3-oxidiser)
2016
Dec The 36 hr countdown activity of PSLV-C36/RESOURCESAT-2A Mission has started at 22.25 hr IST today, Monday, December 05, 2016 (/update/05-dec-
05, 2016/36-hr-countdown-activity-of-pslv-c36-resourcesat-2a-mission-has-started-2225-hr)
2016
Dec Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 36 hr countdown of PSLV-C36/RESOURCESAT-2A
05, mission for Monday, December 05,2016 starting at 22:25 hr IST (/update/05-dec-2016/mission-readiness-review-mrr-committee-and-launch-
2016 authorisation-board-lab-have)
Nov PSLV-C36 / RESOURCESAT-2A is scheduled to be launched on December 07, 2016 at 10:25 hrs from SDSC SHAR, Sriharikota (/update/30-nov-
30, 2016/pslv-c36-resourcesat-2a-scheduled-to-be-launched-december-07-2016-1025-hrs-sdsc)
2016
Nov ISRO/DOS community grieves the passing away of Prof. M G K Menon (/update/23-nov-2016/isro-dos-community-grieves-passing-away-of-prof-m-
23, g-k-menon)
2016
Oct All the planned activities of Station Acquisition Manoeuvres and In-Orbit-Testing (IOT) of GSAT-18 have been successfully completed (/update/26-oct-
26, 2016/all-planned-activities-of-station-acquisition-manoeuvres-and-orbit-testing-iot-of)
2016
Oct After all the successful deployments on GSAT-18, 3-axis stabilisation using reaction wheels has been achieved at 19:26hr IST on Oct 09, 2016. The
09, performance of subsystems of the spacecraft is normal (/update/09-oct-2016/after-all-successful-deployments-gsat-18-3-axis-stabilisation-using-
2016 reaction)
Oct North Solar Array and East Antenna have been successfully deployed (/update/09-oct-2016/north-solar-array-and-east-antenna-have-been-
09, successfully-deployed)
2016
Oct Solar Array and West Antenna of GSAT-18 have been successfully deployed (/update/09-oct-2016/solar-array-and-west-antenna-of-gsat-18-have-
09, been-successfully-deployed)
2016
Oct Orbit Determination results from the third LAM ៛�ring are: apogee X perigee height was changed to 35802km, 35294km, Inclination is 0.136deg. Orbital
09, period now is 23hr 44m (/update/09-oct-2016/orbit-determination-results-third-lam-៛�ring-are-apogee-x-perigee-height-was)
2016
Oct Third LAM ៛�ring of GSAT-18, for 256.17 sec has been successfully completed on October 9, 2016 starting from 10.21 hr IST (/update/09-oct-2016/third-
09, lam-៛�ring-of-gsat-18-25617-sec-has-been-successfully-completed-october-9)
2016
Oct The Second orbit raising manoeuvre of GSAT-18 has been successfully carried out by LAM Engine ៛�ring for sec from 11:29 hr IST on October 08, 2016
08, (/update/08-oct-2016/second-orbit-raising-manoeuvre-of-gsat-18-has-been-successfully-carried-out-lam)
2016
Oct The ៛�rst orbit raising manoeuvre of GSAT-18 has been successffully carried out by LAM Engine ៛�ring for 6040.6 sec from 03:46 Hrs IST on Oct 07, 2016.
07, (/update/07-oct-2016/៛�rst-orbit-raising-manoeuvre-of-gsat-18-has-been-successffully-carried-out-lam)
2016
Oct GSAT-18 successfully launched by Ariane-5 VA-231 from Kourou, French Guiana (/update/06-oct-2016/gsat-18-successfully-launched-ariane-5-va-
06, 231-kourou-french-guiana)
2016
Sep GSAT-18 is scheduled to be launched on October 05, 2016 between 02:00 Hrs – 03:15 Hrs (IST) from Kourou, French Guiana by Ariane-5 VA-231
29, (/update/29-sep-2016/gsat-18-scheduled-to-be-launched-october-05-2016-between-0200-hrs-%E2%80%93-0315-hrs-ist)
2016
Sep PSLV-C35 Successfully placed all Satellites into their respective Orbits. (/update/26-sep-2016/pslv-c35-successfully-placed-all-satellites-their-
26, respective-orbits)
2016
Sep PSLV-C35 Successfully launches SCATSAT-1. Seperation of the remaining 7 satellites expected to occur between 11.25 hr IST and 11.28 hr IST
26, (/update/26-sep-2016/pslv-c35-successfully-launches-scatsat-1-seperation-of-remaining-7-satellites)
2016
Sep PSLV-C35 PS1 Stage Seperated and PS2 Second Stage Ignited (/update/26-sep-2016/pslv-c35-ps1-stage-seperated-and-ps2-second-stage-ignited)
26,
2016
Sep Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
26, ALS started for launch at 09:00 hr IST (/update/26-sep-2016/mission-director-has-authorised-vehicle-director-launch-automatic-launch-sequence)
2016
Sep UH25 tank ៛�lling operations of Second Stage (PS2) are completed. Real time system simulation checks and Launch Vehicle internal checks are
26, completed. Countdown is progressing noramally (/update/26-sep-2016/uh25-tank-៛�lling-operations-of-second-stage-ps2-are-completed-real-time-
2016 system)
Sep Real time system simulation checks are under progress (/update/25-sep-2016/real-time-system-simulation-checks-are-under-progress)
25,
2016
Sep N2O4 tank ៛�lling of Second Stage (PS2) is completed. UH25 tank ៛�lling operations of Second Stage (PS2) are under progress (/update/25-sep-
25, 2016/n2o4-tank-៛�lling-of-second-stage-ps2-completed-uh25-tank-៛�lling-operations-of)
2016
Sep N2O4 tank ៛�lling of Second Stage (PS2) is under progress (/update/25-sep-2016/n2o4-tank-៛�lling-of-second-stage-ps2-under-progress)
25,
2016
Sep Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant ៛�lling operation of Second Stage (PS2) are in progress
25, (/update/25-sep-2016/mobile-service-tower-mst-withdrawal-to-parking-end-completed-preparations)
2016
Sep MON-3 oxidiser ៛�lling operations of PS4 are completed by 18:00 hr IST (/update/24-sep-2016/mon-3-oxidiser-៛�lling-operations-of-ps4-are-
24, completed-1800-hr-ist)
2016
Sep Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under progress (/update/24-sep-2016/mixed-oxides-of-nitrogen-mon-3-
24, oxidiser-៛�lling-operation-of-ps4-are-under)
2016
Sep MMH Propellant ៛�lling operation has been completed by 12:30 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of
24, PS4 are under progress (/update/24-sep-2016/mmh-propellant-៛�lling-operation-has-been-completed-1230-hr-ist-preparations)
2016
Sep Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C35 is under progress (/update/24-sep-2016/mono-methyl-
24, hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016
Sep The 48 and half hr countdown activity of PSLV-C35/SCATSAT-1 Mission has started at 08:42 hr IST today, Saturday, September 24, 2016 (/update/24-
24, sep-2016/48-and-half-hr-countdown-activity-of-pslv-c35-scatsat-1-mission-has-started-0842)
2016
Sep Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48 and half hr countdown of PSLV-35/SCATSAT-1
23, Mission (/update/23-sep-2016/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)
2016
Sep PSLV-C35 is scheduled to be launched on Monday morning at 9:12 hrs (IST) on September 26, 2016 from SDSC SHAR , Sriharikota (/update/21-sep-
21, 2016/pslv-c35-scheduled-to-be-launched-monday-morning-912-hrs-ist-september-26-2016)
2016
Sep First IR Images from INSAT-3DR IMAGER taken today at 09:00 hrs IST (/update/17-sep-2016/៛�rst-ir-images-insat-3dr-imager-taken-today-0900-hrs-
17, ist)
2016
Sep Orbit Determination results from the third LAM ៛�ring are: apogee X perigee height was changed to 35908km, 35326km, Inclination is 0.121deg. Orbital
11, period is 23hr 47m 26sec (/update/11-sep-2016/orbit-determination-results-third-lam-៛�ring-are-apogee-x-perigee-height-was)
2016
Sep Third LAM ៛�ring of INSAT-3DR for 294 sec has been successfully completed on September 11, 2016 starting from 08:31 hr IST (/update/11-sep-
11, 2016/third-lam-៛�ring-of-insat-3dr-294-sec-has-been-successfully-completed-september)
2016
Sep Second LAM ៛�ring of INSAT-3DR, at apogee for 3174sec has been successfully completed (/update/10-sep-2016/second-lam-៛�ring-of-insat-3dr-
10, apogee-3174sec-has-been-successfully-completed)
2016
Sep The ៛�rst apogee raise maneuver of INSAT-3DR has been successfully carried out. (/update/09-sep-2016/៛�rst-apogee-raise-maneuver-of-insat-3dr-
09, has-been-successfully-carried-out)
2016
Sep Real Time System simulation checks Completed by 08:15 hr IST. Countdown is progressing normally (/update/08-sep-2016/real-time-system-
08, simulation-checks-completed-0815-hr-ist-countdown-progressing)
2016
Sep N2O4 ៛�lling into four L40 Strap-On Stages completed by 03:00 hr IST (/update/08-sep-2016/n2o4-៛�lling-four-l40-strap-stages-completed-0300-hr-
08, ist)
2016
Sep UH25 ៛�lling into four L40 Strap-On Stages completed by 21:00hr IST (/update/07-sep-2016/uh25-៛�lling-four-l40-strap-stages-completed-2100hr-ist)
07,
2016
Sep Second Stage (GS2) UH25 ៛�lling completed by 17:40 hr IST (/update/07-sep-2016/second-stage-gs2-uh25-៛�lling-completed-1740-hr-ist)
07,
2016
Sep Second Stage (GS2) N2O4 ៛�lling completed by 13:30 hr IST. Preparations for Second Stage (GS2) UH25 ៛�lling are under progress (/update/07-sep-
07, 2016/second-stage-gs2-n2o4-៛�lling-completed-1330-hr-ist-preparations-second-stage-gs2)
2016
Sep Preparations for Second stage (GS2) propellant ៛�lling operation are under progress (/update/07-sep-2016/preparations-second-stage-gs2-propellant-
07, ៛�lling-operation-are-under-progress)
2016
Sep The 29 hr countdown operation of GSLV-F05/INSAT-3DR Mission has started at 11:10 hr IST on Wednesday, September 7, 2016 (/update/07-sep-
07, 2016/29-hr-countdown-operation-of-gslv-f05-insat-3dr-mission-has-started-1110-hr-ist)
2016
Sep Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 29 hr countdown starting at 11.10 hr IST on
05, Wednsday, September 7, 2016 and the launch of GSLV-F05/INSAT-3DR Mission for Thursday, September 8, 2016 at 16.10 hr (/update/05-sep-
2016 2016/mission-readiness-review-mrr-committee-and-launch-authorization-board-lab-have)
Sep GSLV-F05 / INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs (IST) from SDSC, SHAR, Sriharikota (/update/01-sep-
01, 2016/gslv-f05-insat-3dr-mission-scheduled-to-be-launched-sept-08-2016-1610-hrs-ist)
2016
Sep President congratulates ISRO for the successful conduct of Futuristic Rocket Test - Advanced Technology Vehicle (ATV) (/president-congratulates-
01, isro-successful-conduct-of-futuristic-rocket-test-advanced-technology)
2016
Aug AstroSat observes the high energy X-ray variability of a black hole system (/pslv-c30-astrosat-mission/astrosat-observes-high-energy-x-ray-
31, variability-of-black-hole-system)
2016
Aug Remembering IRS-1B which was launched exactly 25 years back (/update/29-aug-2016/remembering-irs-1b-which-was-launched-exactly-25-years-
29, back)
2016
Jun President of India congratulates ISRO on the successful launch of PSLV-C34 (/update/22-jun-2016/president-of-india-congratulates-isro-successful-
22, launch-of-pslv-c34)
2016
Jun PSLV-C34 / CARTOSAT-2 Series Satellite Seperated and Injected into Orbit (/update/22-jun-2016/pslv-c34-cartosat-2-series-satellite-seperated-and-
22, injected-orbit)
2016
Jun PSLV-C34 / CARTOSAT-2 series PS4 Engine Shutdown. Injection Conditions achieved (/update/22-jun-2016/pslv-c34-cartosat-2-series-ps4-engine-
22, shutdown-injection-conditions-achieved)
2016
Jun PSLV-C34 / CARTOSAT-2 Series PS3 seperated. PS4 Engine Started. (/update/22-jun-2016/pslv-c34-cartosat-2-series-ps3-seperated-ps4-engine-
22, started)
2016
Jun PSLV-C34 / CARTOSAT-2 Series PS2 Seperated, Third stage performance is normal (/update/22-jun-2016/pslv-c34-cartosat-2-series-ps2-seperated-
22, third-stage-performance-normal)
2016
Jun PSLV-C34 / CARTOSAT-2 Series Launch Heat Shield is Seperated. 2nd stage performance is normal (/update/22-jun-2016/pslv-c34-cartosat-2-series-
22, launch-heat-shield-seperated-2nd-stage-performance)
2016
Jun PSLV-C34 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle
22, Director and ALS started at 09:12 hr IST for launch (/update/22-jun-2016/pslv-c34-mission-director-has-authorised-vehicle-director-launch-
2016 automatic-launch)
Jun Propellant ៛�lling operation of Second stage (PS2) of PSLV-C34 is completed. Vehicle internal checks are in progress. Countdown is progressing normally.
22, (/update/22-jun-2016/propellant-៛�lling-operation-of-second-stage-ps2-of-pslv-c34-completed-vehicle)
2016
Jun Propellant ៛�ling operation of Second stage (PS2) of PSLV-C34 is under progress. (/update/21-jun-2016/propellant-៛�ling-operation-of-second-stage-
21, ps2-of-pslv-c34-under-progress)
2016
Jun Spacecraft health checks and preparations for propellant ៛�lling operation of second stage (PS2) of PSLV-C34 are under progress. Countdown is
21, progressing normally. (/update/21-jun-2016/spacecraft-health-checks-and-preparations-propellant-៛�lling-operation-of-second)
2016
Jun Filling of Mixed Oxides of Nitrogen (MON-3) of PS4 is under progress (/update/20-jun-2016/៛�lling-of-mixed-oxides-of-nitrogen-mon-3-of-ps4-
20, under-progress)
2016
Jun Mono Methyl Hydrazine (MMH) ៛�lling operation of Fourth stage (PS4) of PSLV-C34 is completed by 12:06 hr (IST). Preparations for ៛�lling of Mixed
20, Oxides of Nitrogen (MON-3) of PS4 are under progress (/update/20-jun-2016/mono-methyl-hydrazine-mmh-៛�lling-operation-of-fourth-stage-ps4-
2016 of-pslv-c34)
Jun The 48hr countdown activity of PSLV-C34/CARTOSAT-2 Series Satellite mission has started at 09:26 hr IST today, Monday, June 20, 2016 (/update/20-
20, jun-2016/48hr-countdown-activity-of-pslv-c34-cartosat-2-series-satellite-mission-has)
2016
Jun Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48 hr countdown starting at 09:26hr IST on
19, Monday, June 20, 2016 and the launch of PSLV-C34/CARTOSAT-2 Series Satellite Mission for Wednesday, June 22, 2016 (/update/19-jun-2016/mission-
2016 readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)
Jun PSLV-C34/CARTOSAT-2 Series Satellite Mission : Launch scheduled on June 22, 2016 at 09:25 hrs (IST) from SDSC, SHAR, Sriharikota (/update/16-jun-
16, 2016/pslv-c34-cartosat-2-series-satellite-mission-launch-scheduled-june-22-2016-0925)
2016
Jun 17th IIRS Outreach Programme on "Geoweb Services and Geoportal applications” being conducted during June 28 - July 15, 2016 (/update/07-jun-
07, 2016/17th-iirs-outreach-programme-geoweb-services-and-geoportal-applications%E2%80%9D-being)
2016
May AstroSat Support Cell (ASC) has been Set up at IUCAA, Pune (/pslv-c30-astrosat-mission/astrosat-support-cell-asc-has-been-set-iucaa-pune)
20,
2016
May Orbit Determination results from fourth LAM ៛�ring are : apogee X perigee height was changed to 35811 km,35211 km,Inclination is 5.1 deg. Orbital period
03, now is 23 hr 42 min 04 sec (/update/03-may-2016/orbit-determination-results-fourth-lam-៛�ring-are-apogee-x-perigee-height-was)
2016
May India and France jointly released a set of two commemorative postage stamps, highlighting 50 years of space co-operation between the two countries
03, (/india-and-france-jointly-released-set-of-two-commemorative-postage-stamps-highlighting-50-years-of)
2016
May The fourth and the ៛�nal LAM ៛�ring of IRNSS-1G, for 231sec has been successfully completed on 03.05.2016 starting from 01:27hr IST (/update/03-may-
03, 2016/fourth-and-៛�nal-lam-៛�ring-of-irnss-1g-231sec-has-been-successfully-completed)
2016
May Orbit Determination results from the third LAM ៛�ring are: apogee X perigee height was changed to 35813km, 29050km, Inclination is 5.72deg. Orbital
02, period now is 21hr 08m 09sec (/update/02-may-2016/orbit-determination-results-third-lam-៛�ring-are-apogee-x-perigee-height-was)
2016
May Third LAM ៛�ring of IRNSS-1G, for 1609sec has been successfully completed on 01.05.2016 starting from 06:59:07 hr IST. (/update/01-may-2016/third-
01, lam-៛�ring-of-irnss-1g-1609sec-has-been-successfully-completed-01052016)
2016
May Orbit Determination results from second LAM ៛�ring are:apogee X perigee height was changed to 35803km,7750km,Inclination is 10.77deg.Orbital period
01, now is 13h 03m 35sec (/update/01-may-2016/orbit-determination-results-second-lam-៛�ring-areapogee-x-perigee-height-was)
2016
Apr PSLV-C33 / IRNSS-1G Update : Second LAM ៛�ring of IRNSS-1G, at apogee for 1581 sec has been successfully completed on April 30, 2016 starting from
30, 04:52:17 hrs IST. (/update/30-apr-2016/pslv-c33-irnss-1g-update-second-lam-៛�ring-of-irnss-1g-apogee-1581-sec-has-been)
2016
Apr PSLV-C33 / IRNSS-1G Update : The ៛�rst apogee raise maneuver of IRNSS-1G has been successfully carried out for 1147 sec from 13:05 hrs IST on April
30, 29,2016. (/update/30-apr-2016/pslv-c33-irnss-1g-update-៛�rst-apogee-raise-maneuver-of-irnss-1g-has-been)
2016
Apr Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and
28, ALS started for launch at 12:38 hrs IST. (/update/28-apr-2016/mission-director-has-authorised-vehicle-director-launch-automatic-launch-sequence)
2016
Apr Real Time simulation & Data transmission checks completed. Vehicle Internal Checks Completed. (/update/28-apr-2016/real-time-simulation-data-
28, transmission-checks-completed-vehicle-internal-checks)
2016
Apr Propellant (N2O4 and UH25) ៛�lling operations of Second Stage (PS2) are completed by midnight. Countdown is progressing normally. (/update/28-apr-
28, 2016/propellant-n2o4-and-uh25-៛�lling-operations-of-second-stage-ps2-are-completed)
2016
Apr Countdown operations are progressing normally. Preparations for Mobile Service Tower (MST) withdrawal and Propellant ៛�lling operation of second
27, stage (PS2) are in progress. (/update/27-apr-2016/countdown-operations-are-progressing-normally-preparations-mobile-service-tower)
2016
Apr Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed.Countdown is progressing normally (/update/26-apr-2016/mixed-
26, oxides-of-nitrogen-mon-3-oxidiser-៛�lling-operation-of-ps4)
2016
Apr MMH propellant ៛�lling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under
26, progress. (/update/26-apr-2016/mmh-propellant-៛�lling-operation-has-been-completed-preparations-mixed-oxides-of)
2016
Apr Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C33 is commenced and is under process (/update/26-apr-
26, 2016/mono-methyl-hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016
Apr The 51 hr 30 min countdown activity of PSLV-C33/IRNSS-1G Mission has started at 9:20 hr IST today, Tuesday, April 26, 2016 (/update/26-apr-2016/51-
26, hr-30-min-countdown-activity-of-pslv-c33-irnss-1g-mission-has-started-920-hr)
2016
Apr Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 51.5 hr countdown starting at 09:20hr IST on
25, Tuesday, April 26, 2016 and the launch of PSLV-C33/IRNSS-1G Mission for Thursday, April 28, 2016 at 12:50 hr. IST (/update/25-apr-2016/mission-
2016 readiness-review-mrr-committee-and-launch-authorisation-board-lab-have)
Apr Asia Paci៛�c Remote Sensing Symposium held at New Delhi (/asia-paci៛�c-remote-sensing-symposium-held-new-delhi)
12,
2016
Mar IRNSS-1F UPDATE: After successful completion of four station acquisition manoeuvers and In Orbit Testing (IOT) of the spacecraft, IRNSS-1F has been
30, placed in the intended Geo-synchronous orbit (/update/30-mar-2016/irnss-1f-update-after-successful-completion-of-four-station-acquisition)
2016
Mar PSLV-C32 - Message from President (/update/16-mar-2016/pslv-c32-message-president)
16,
2016
Mar IRNSS-1F UPDATE: Orbit Determination results from fourth LAM ៛�ring (/update/15-mar-2016/irnss-1f-update-orbit-determination-results-fourth-
15, lam-៛�ring)
2016
Mar IRNSS-1F UPDATE: Fourth LAM ៛�ring of IRNSS-1F, for 78.8 sec has been successfully completed on 14.3.2016 starting from 11:42:44 hr (IST). (/update/14-
14, mar-2016/irnss-1f-update-fourth-lam-៛�ring-of-irnss-1f-788-sec-has-been-successfully)
2016
Mar IRNSS-1F UPDATE: Orbit Determination results from the third LAM ៛�ring (/update/14-mar-2016/irnss-1f-update-orbit-determination-results-third-
14, lam-៛�ring)
2016
Mar IRNSS-1F UPDATE: Third LAM ៛�ring of IRNSS-1F, for 1561 sec has been successfully completed on 13.3.2016 starting from 11:32 hr IST. (/update/13-mar-
13, 2016/irnss-1f-update-third-lam-៛�ring-of-irnss-1f-1561-sec-has-been-successfully)
2016
Mar IRNSS-1F UPDATE:Orbit Determination results from second LAM ៛�ring (/update/13-mar-2016/irnss-1f-updateorbit-determination-results-second-
13, lam-៛�ring)
2016
Mar Second LAM ៛�ring of IRNSS-1F, at apogee for 1918.5 sec has been successfully completed on 12.3.2016 starting from 07:57:54 hr IST. (/update/12-mar-
12, 2016/second-lam-៛�ring-of-irnss-1f-apogee-19185-sec-has-been-successfully-completed)
2016
Mar The apogee raise maneuver of IRNSS-1F has been successfully carried out (/update/12-mar-2016/apogee-raise-maneuver-of-irnss-1f-has-been-
12, successfully-carried-out)
2016
Mar PSLV-C32/ IRNSS-1F: PSLV C32 Successfully Launches IRNSS 1F into the orbit (/update/10-mar-2016/pslv-c32-irnss-1f-pslv-c32-successfully-
10, launches-irnss-1f-orbit)
2016
Mar PSLV-C32/ IRNSS-1F: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by
10, Vehicle Director and ALS started at 15:48hr IST for launch (/update/10-mar-2016/pslv-c32-irnss-1f-mission-director-has-authorised-vehicle-director-
2016 launch)
Mar PSLV-C32/ IRNSS-1F UPDATE: The launch time is revised to 16:01 hr (IST) for collision avoidance as per the space debris studies. Countdown status
10, normal. (/update/10-mar-2016/pslv-c32-irnss-1f-update-launch-time-revised-to-1601-hr-ist-collision-avoidance)
2016
Mar PSLV-C32/ IRNSS-1F UPDATE: IRNSS-1F spacecraft switched ON. PSLV-C32 - VEHICLE INTERNAL CHECKS Completed. Countdown status normal.
10, (/update/10-mar-2016/pslv-c32-irnss-1f-update-irnss-1f-spacecraft-switched-pslv-c32-vehicle-internal)
2016
Mar PSLV-C32/ IRNSS-1F UPDATE: Real time simulation checks and data transmission checks completed. (/update/10-mar-2016/pslv-c32-irnss-1f-update-
10, real-time-simulation-checks-and-data-transmission-checks)
2016
Mar PSLV-C32/ IRNSS-1F UPDATE: UH-25 tank ៛�lling operation of second stage (PS2) is completed by 03:00hr (IST)Countdown activities are progressing
10, normally. (/update/10-mar-2016/pslv-c32-irnss-1f-update-uh-25-tank-៛�lling-operation-of-second-stage-ps2)
2016
Mar PSLV-C32/ IRNSS-1F UPDATE: N2O4 tank ៛�lling of Second Stage (PS2) is completed by 00:15 hrs (IST) of March 10, 2016. (/update/10-mar-2016/pslv-
10, c32-irnss-1f-update-n2o4-tank-៛�lling-of-second-stage-ps2-completed-0015-hrs)
2016
Mar PSLV-C32/ IRNSS-1F UPDATE: Preparations for N2O4 tank ៛�lling of Second stage (PS2) are under progress. PSLV-C32 Mission-Countdown. Progressing
09, status- normal. (/update/09-mar-2016/pslv-c32-irnss-1f-update-preparations-n2o4-tank-៛�lling-of-second-stage-ps2-are)
2016
Mar PSLV-C32/ IRNSS-1F UPDATE: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed. Countdown is progressing normally
08, (/update/08-mar-2016/pslv-c32-irnss-1f-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling)
2016
Mar PSLV-C32/IRNSS-1F UPDATE: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is started at 19:00hr (IST) (/update/08-mar-
08, 2016/pslv-c32-irnss-1f-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling-0)
2016
Mar MMH propellant ៛�lling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under
08, progress (/update/08-mar-2016/mmh-propellant-៛�lling-operation-has-been-completed-preparations-mixed-oxides-of)
2016
Mar Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C32 is commenced at 12:30 (IST) and is under progress
08, (/update/08-mar-2016/mono-methyl-hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016
Mar The 54hr 30min countdown activity of PSLV-C32/IRNSS-1F Mission has started at 09:30hr IST today, Tuesday, March 8, 2016 (/update/08-mar-
08, 2016/54hr-30min-countdown-activity-of-pslv-c32-irnss-1f-mission-has-started-0930hr-ist)
2016
Mar PSLV-C32/IRNSS-1F UPDATE: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 54 and half hr
08, countdown starting at 09:30hr IST on Tuesday, March 8, 2016 and the launch for March 10, 2016 (/update/08-mar-2016/pslv-c32-irnss-1f-update-
2016 mission-readiness-review-mrr-committee-and-launch)
Jan IRNSS-1E Update: The fourth and ៛�nal orbit raising operation has been successfully carried out for 447 sec (~7.45 min) from 22:49 hrs IST on Jan 23,
24, 2016. (/update/24-jan-2016/irnss-1e-update-fourth-and-៛�nal-orbit-raising-operation-has-been-successfully)
2016
Jan IRNSS-1E Update: The third orbit raising operation has been successfully carried out by ៛�ring the LAM engine for 1507 sec (~25 min) from 03:19 hrs IST
23, on Jan 23, 2016. (/update/23-jan-2016/irnss-1e-update-third-orbit-raising-operation-has-been-successfully-carried-out)
2016
Jan IRNSS-1E Update: The perigee raise maneuver has been successfully carried out for 1515.36 sec (~25.5 min) from 01:29 hrs IST on Jan 22,2016.
23, (/update/23-jan-2016/irnss-1e-update-perigee-raise-maneuver-has-been-successfully-carried-out-151536)
2016
Jan IRNSS-1E Update: The apogee raise maneuver of IRNSS-1E has been successfully carried out for 1197 sec (~20 min) from 09:41 hrs IST on Jan 21, 2016.
21, This LAM ៛�ring is expected to change apogee X perigee height to 35882kmX320 km (/update/21-jan-2016/irnss-1e-update-apogee-raise-maneuver-of-
2016 irnss-1e-has-been-successfully-carried)
Jan PSLV-C31/IRNSS-1E Launch Update: PSLV-C31 Successfully Launches IRNSS-1E into the orbit. (/update/20-jan-2016/pslv-c31-irnss-1e-launch-
20, update-pslv-c31-successfully-%03launches-irnss-1e-orbit)
2016
Jan PSLV-C31/IRNSS-1E Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation
20, authorised by Vehicle Director and ALS started for launch at 09:19hr IST (/update/20-jan-2016/pslv-c31-irnss-1e-launch-update-mission-director-
2016 has-authorised-vehicle-director)
Jan PSLV-C31/IRNSS-1E Update: UH-25 tank ៛�lling operation of second stage (PS2) is completed by 22:00hr (IST) (/update/19-jan-2016/pslv-c31-irnss-1e-
19, update-uh-25-tank-៛�lling-operation-of-second-stage-ps2)
2016
Jan PSLV-C31/IRNSS-1E Update: N2O4 tank ៛�lling of Second Stage (PS2) completed by 18:45hr IST (/update/19-jan-2016/pslv-c31-irnss-1e-update-n2o4-
19, tank-៛�lling-of-second-stage-ps2-completed-1845hr)
2016
Jan PSLV-C31/IRNSS-1E Update: N2O4 tank ៛�lling of Second Stage (PS2) is under progress (/update/19-jan-2016/pslv-c31-irnss-1e-update-n2o4-tank-
19, ៛�lling-of-second-stage-ps2-under-progress)
2016
Jan Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C31 is under progress (/update/18-jan-2016/mono-methyl-
18, hydrazine-mmh-propellant-៛�lling-operation-of-fourth-stage-ps4-of)
2016
Jan PSLV-C31/ IRNSS-1E update: MMH propellant ៛�lling operation has been completed by 13:00 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3)
18, oxidiser ៛�lling operation of PS4 are under progress (/update/18-jan-2016/pslv-c31-irnss-1e-update-mmh-propellant-៛�lling-operation-has-been-
2016 completed-1300)
Jan The 48hr countdown activity of PSLV-C31/IRNSS-1E Mission has started at 09:31hr IST today, Monday, January 18, 2016 (/update/18-jan-2016/48hr-
18, countdown-activity-of-pslv-c31-irnss-1e-mission-has-started-0931hr-ist-today)
2016
Jan PSLV-C31/IRNSS-1E Update: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed by 18:15 hr IST. Countdown is progressing
18, normally (/update/18-jan-2016/pslv-c31-irnss-1e-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling)
2016
Jan PSLV-C31/IRNSS-1E Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48hr countdown
17, starting at 09:31 Hrs IST on Monday, January 18, 2016 (/update/17-jan-2016/pslv-c31-irnss-1e-update-mission-readiness-review-mrr-committee-and-
2016 launch)
Jan Vacancy Noti៛�cation,Advertisement & Application Format for the post of director-PRL (/update/05-jan-2016/vacancy-noti៛�cationadvertisement-
05, application-format-post-of-director-prl)
2016
Dec PSLV-C29/TeLEOS-1 Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation
16, authorised by Vehicle Director and ALS started for launch at 17:48hr IST (/update/16-dec-2015/pslv-c29-teleos-1-launch-update-mission-director-
2015 has-authorised-vehicle-director)
Dec PSLV-C29/TeLEOS-1 Launch Update: Mobile Service Tower (MST) withdrawal to Parking End is completed. Propellant (N2O4 and UH25) ៛�lling
16, operations of Second Stage (PS2) are completed. Countdown is progressing normally. (/update/16-dec-2015/pslv-c29-teleos-1-launch-update-mobile-
2015 service-tower-mst-withdrawal-to-parking)
Dec PSLV-C29/TeLEOS-1 Launch Update: Countdown is progressing normally. Live telecast by DD National and Webcast is available from 17:30 Hrs IST, Dec
15, 16, 2015 (/update/15-dec-2015/pslv-c29-teleos-1-launch-update-countdown-progressing-normally-live-telecast-dd)
2015
Dec PSLV-C29/TeLEOS-1 Launch Update: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 is completed by 15:00 hr IST (/update/14-dec-
14, 2015/pslv-c29-teleos-1-launch-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling)
2015
Dec PSLV-C29/TeLEOS-1 Launch Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) has been completed by 10:45 hr
14, IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of PS4 are under progress (/update/14-dec-2015/pslv-c29-teleos-1-
2015 launch-update-mono-methyl-hydrazine-mmh-propellant-៛�lling)
Dec PSLV-C29/TeLEOS-1 Mission Update: The countdown has started at 07:00 hr IST today, Monday, December 14, 2015 (/update/14-dec-2015/pslv-c29-
14, teleos-1-mission-update-countdown-has-started-0700-hr-ist-today-monday)
2015
Dec PSLV-C29/TeLEOS-1 mission Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the countdown
13, (/update/13-dec-2015/pslv-c29-teleos-1-mission-update-mission-readiness-review-mrr-committee-and)
2015
Dec Launch of PSLV-C29 carrying six satellites of Singapore is scheduled at 6:00 pm on Dec 16, 2015 . (/update/10-dec-2015/launch-of-pslv-c29-carrying-
10, six-satellites-of-singapore-scheduled-600-pm-dec-16)
2015
Nov Framing of the Recruitment Rules for the post of Director,Physical Research Laboratory,Ahmedabad-Regarding (/update/26-nov-2015/framing-of-
26, recruitment-rules-post-of-directorphysical-research)
2015
Nov GSAT-15 Update: Station acquisition maneuvers for GSAT-15 were completed and s/c is successfully collocated at 93.5 deg E during night of Nov
25, (/update/25-nov-2015/gsat-15-update-station-acquisition-maneuvers-gsat-15-were-completed-and-s-c)
2015
Nov Payload (Ku and GAGAN) In Orbit Testing (IOT) is under progress. (/update/20-nov-2015/payload-ku-and-gagan-orbit-testing-iot-under-progress)
20,
2015
Nov First orbit raising operation of GSAT-15 was successfully completed (/update/12-nov-2015/៛�rst-orbit-raising-operation-of-gsat-15-was-successfully-
12, completed)
2015
Nov GSAT-15 Launch -Live telecast by DD National is available from 02:30 Hrs IST, Nov. 11, 2015 (/update/10-nov-2015/gsat-15-launch-live-telecast-dd-
10, national-available-0230-hrs-ist-nov-11-2015)
2015
Oct Astrosat Soft X-ray Telescope (SXT)views the blazar PKS2155-304 (/update/27-oct-2015/astrosat-soft-x-ray-telescope-sxtviews-blazar-pks2155-304)
27,
2015
Oct Scanning Sky Monitor (SSM) Payload onboard AstroSat made Operational – October 12th, 2015 (/pslv-c30-astrosat-mission/scanning-sky-monitor-
19, ssm-payload-onboard-astrosat-made-operational-%E2%80%93)
2015
Oct Astrosat mission -Scanning Sky Monitor (SSM) payload switched ON (/update/16-oct-2015/astrosat-mission-scanning-sky-monitor-ssm-payload-
16, switched)
2015
Oct Presentation By Chairman ISRO on Foundation Dayand Award Ceremony of UAS Bengaluru (/about-isro/presentation-chairman-isro-foundation-
09, dayand-award-ceremony-of-uas-bengaluru)
2015
Oct Astrosat-Spacecraft star sensor performance in crossing albedo evaluated for different orientations. (/update/08-oct-2015/astrosat-spacecraft-star-
08, sensor-performance-crossing-albedo-evaluated-different)
2015
Oct Astrosat-The SXT and LAXPC regular operations carried out. (/update/08-oct-2015/astrosat-sxt-and-laxpc-regular-operations-carried-out)
08,
2015
Oct Astrosat-CZTI is pointed towards Cygnus-X1 for whole day and collected data. (/update/08-oct-2015/astrosat-czti-pointed-towards-cygnus-x1-
08, whole-day-and-collected-data)
2015
Oct Astrosat-Soft X-ray Telescope (SXT) Venting operations are being carried out regularly. (/update/04-oct-2015/astrosat-soft-x-ray-telescope-sxt-
04, venting-operations-are-being-carried-out)
2015
Oct Astrosat-Cadmium Zinc Telluride Imager (CZTI) was tested and kept in ON state. (/update/03-oct-2015/astrosat-cadmium-zinc-telluride-imager-czti-
03, was-tested-and-kept-state)
2015
Oct Astrosat-CZTI processing electronics were made ON (/update/02-oct-2015/astrosat-czti-processing-electronics-were-made)
02,
2015
Sep Charged Particle Monitor (CPM) switched ON and the performance is normal. (/update/30-sep-2015/charged-particle-monitor-cpm-switched-and-
30, performance-normal)
2015
Sep Further modes testing of SSM platform were carried out. (/update/30-sep-2015/further-modes-testing-of-ssm-platform-were-carried-out)
30,
2015
Sep Soft X-ray Telescope (SXT) Venting operations were carried out (/update/30-sep-2015/soft-x-ray-telescope-sxt-venting-operations-were-carried-
30, out)
2015
Sep Large Area X-ray Proportional Counter – Processing Electronics (LAXPC-PE) was switched ON (/update/30-sep-2015/large-area-x-ray-proportional-
30, counter-%E2%80%93-processing-electronics-laxpc-pe-was)
2015
Sep PSLV-C30 / ASTROSAT Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program
28, started at 09:48 hr IST (/update/28-sep-2015/pslv-c30-astrosat-launch-update-mission-director-has-authorised-vehicle-director)
2015
Sep Solar Panel and Scanning Sky Monitor (SSM) were deployed. (/update/28-sep-2015/solar-panel-and-scanning-sky-monitor-ssm-were-deployed)
28,
2015
Sep Celebrating one year of Mars Orbiter Mission in Orbit; Release of Mars Atlas (/pslv-c25-mars-orbiter-mission/celebrating-one-year-of-mars-orbiter-
24, mission-orbit-release-of-mars)
2015
Sep GSAT-6 update :GSAT 6 has been successfully positioned in its orbital slot (/update/06-sep-2015/gsat-6-update-gsat-6-has-been-successfully-
06, positioned-its-orbital-slot)
2015
Aug GSAT-6 Update: Third orbit raising operation of GSAT-6 was successfully completed (/update/30-aug-2015/gsat-6-update-third-orbit-raising-
30, operation-of-gsat-6-was-successfully-completed)
2015
Aug GSAT-6 update : Deployment of the unfurlable antenna (UFA) is in progress (/update/30-aug-2015/gsat-6-update-deployment-of-unfurlable-antenna-
30, ufa-progress)
2015
Aug GSAT-6 UPDATE: Deployment of the unfurlable antenna (UFA) is successfully completed (/update/30-aug-2015/gsat-6-update-deployment-of-
30, unfurlable-antenna-ufa-successfully-completed)
2015
Aug GSAT-6 UPDATE: Second orbit raising operation of GSAT-6 was successfully completed (/update/29-aug-2015/gsat-6-update-second-orbit-raising-
29, operation-of-gsat-6-was-successfully-completed)
2015
Aug Online registration process for Chennai based media persons to cover GSLV D6 / GSAT 6 launch is open (/online-registration-process-chennai-based-
13, media-persons-to-cover-gslv-d6-gsat-6-launch-open)
2015
Jul First image taken by MCC after MOM comes out of blackout (/pslv-c25-mars-orbiter-mission/៛�rst-image-taken-mcc-after-mom-comes-out-of-
25, blackout)
2015
Jul PSLV-C28 / DMC3 Update: Propellant ៛�lling operations are completed. Countdown operations are progressing normally. (/update/10-jul-2015/pslv-
10, c28-dmc3-update-propellant-៛�lling-operations-are-completed-countdown)
2015
Jul PSLV-C28 / DMC3 Update: UH-25 propellant ៛�lling operation of second stage (PS2) is completed by 09:40hr (IST) (/update/10-jul-2015/pslv-c28-
10, dmc3-update-uh-25-propellant-៛�lling-operation-of-second-stage-ps2-0)
2015
Jul PSLV-C28 / DMC3 Update: UH-25 propellant ៛�lling operation of second stage (PS2) is in progress. (/update/10-jul-2015/pslv-c28-dmc3-update-uh-
10, 25-propellant-៛�lling-operation-of-second-stage-ps2)
2015
Jul PSLV-C28 / DMC3 Update: Mobile Service Tower (MST) withdrawal upto parking end and N2O4 propellant ៛�lling operation of second stage (PS2) are
10, completed by 07:00 hr (IST) (/update/10-jul-2015/pslv-c28-dmc3-update-mobile-service-tower-mst-withdrawal-upto-parking-end-and)
2015
Jul PSLV-C28 / DMC3 Update: Countdown operations are progressing normally. Preparations for Mobile Service Tower (MST) withdrawal and Propellant
09, ៛�lling operation of second stage (PS2) are in progress. (/update/09-jul-2015/pslv-c28-dmc3-update-countdown-operations-are-progressing-
2015 normally-preparations-0)
Jul PSLV-C28 / DMC3 Update: Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation of Fourth Stage has commenced at 17:45 hr (IST) (/update/08-
08, jul-2015/pslv-c28-dmc3-update-mixed-oxides-of-nitrogen-mon-3-oxidiser-៛�lling-operation-of)
2015
Jul PSLV-C28 / DMC3 update: MON-3, oxidiser ៛�lling operation of Fourth Stage (PS4) has been completed (/update/08-jul-2015/pslv-c28-dmc3-update-
08, mon-3-oxidiser-៛�lling-operation-of-fourth-stage-ps4-has)
2015
Jul PSLV-C28 / DMC3 Update: MMH propellant ៛�lling operation has been completed.Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling
08, operationof fourth stage are under progress (/update/08-jul-2015/pslv-c28-dmc3-update-mmh-propellant-៛�lling-operation-has-been)
2015
Jul PSLV-C28 / DMC3 Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operationof Fourth Stage (PS4) of PSLV-C28 has commenced at 10:10 hr
08, (IST) (/update/08-jul-2015/pslv-c28-dmc3-update-mono-methyl-hydrazine-mmh-propellant-៛�lling-operationof)
2015
Jul PSLV-C28 / DMC3 Update : The 62 and half hr countdown activity of PSLV-C28/DMC3 Mission has commenced today, Wednesday, July 08, 2015 at
08, 07:28hr (IST). Launch is scheduled at 21:58 hr (IST) on July 10, 2015 (/update/08-jul-2015/pslv-c28-dmc3-update-62-and-half-hr-countdown-activity-
2015 of-pslv-c28-dmc3-mission)
Jul PSLV-C28 / DMC3 Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the starting of the 62 and
07, half hr countdown of PSLV-C28/DMC3 Mission for tomorrow, Wednesday , July 08, 2015 at 07:28hr IST (/update/07-jul-2015/pslv-c28-dmc3-update-
2015 mission-readiness-review-mrr-committee-and-launch)
Jul Impact crater located SW of Huygens crater, imaged by Mars Color Camera (MCC) (/pslv-c25-mars-orbiter-mission/impact-crater-located-sw-of-
06, huygens-crater-imaged-mars-color-camera)
2015
May MOU Signed Between ISRO's National Remote Sensing Centre and Department of Land Resources (/update/01-may-2015/mou-signed-between-isros-
01, national-remote-sensing-centre-and-department-of-land)
2015
Mar IRNSS-1D post launch update: Third orbit raising operation of IRNSS-1D is successfully completed. (/update/31-mar-2015/irnss-1d-post-launch-
31, update-third-orbit-raising-operation-of-irnss-1d)
2015
Mar IRNSS-1D post launch update: ៛�rst orbit raising operation of IRNSS-1D is successfully completed (/update/30-mar-2015/irnss-1d-post-launch-update-
30, ៛�rst-orbit-raising-operation-of-irnss-1d)
2015
Mar PSLV-C27/IRNSS-1D countdown operations are progressing normally. Propellant ៛�lling operation of second stage (PS2) of PSLV-C27 will be initiated by
27, midnight of today. (/update/27-mar-2015/pslv-c27-irnss-1d-countdown-operations-are-progressing-normally-propellant)
2015
Mar PSLV-C27/IRNSS-1D Mission Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C27 has been completed.
26, Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser ៛�lling operation are under progress. (/update/26-mar-2015/pslv-c27-irnss-1d-mission-
2015 update-mono-methyl-hydrazine-mmh-propellant-៛�lling-0)
Mar PSLV-C27/IRNSS-1D Mission Update: Mono Methyl Hydrazine (MMH) propellant ៛�lling operation of fourth stage (PS4) of PSLV-C27 has commenced at
26, 09:40 hr (IST) (/update/26-mar-2015/pslv-c27-irnss-1d-mission-update-mono-methyl-hydrazine-mmh-propellant-៛�lling)
2015
Mar The 59 and half hour count-down of PSLV-C27/IRNSS-1D Mission has started at 05:49 hr IST on Thursday, March 26, 2015 (/update/26-mar-2015/59-
26, and-half-hour-count-down-of-pslv-c27-irnss-1d-mission-has-started-0549-hr-ist)
2015
Mar Mission Readiness Review committee and Launch Authorisation Board cleared the starting of the 59 and half hour count-down of PSLV-C27/IRNSS-1D
25, mission tomorrow, Thursday, March 26, 2015 at 05:49 hr IST (/update/25-mar-2015/mission-readiness-review-committee-and-launch-authorisation-
2015 board-cleared)
Jan Vikram Sarabhai Space Centre Conducts a Series of Sounding Rocket Launches to Study the Annular Solar Eclipse (/update/15-jan-2010/vikram-
15, sarabhai-space-centre-conducts-series-of-sounding-rocket-launches-to-study)
2010
Site Map (/sitemap) | Timeline (/about-isro/isros-timeline-1960s-to-today) | FAQ (/node/290) | Disclaimer (/node/146) | Careers (/careers-new) | Feedback
(/feed-back) | Contact us (/contact-us-1) | Help (/help)
Copyright © 2017 ISRO, All Rights Reserved. Terms of Use (/node/148) | Privacy Policy (/privacy-policy)
(/sites/default/៛�les/cqw_isrowebsite_www_isro_gov_in.pdf)