SCHEDULE OF MEMBERS
FOUNDATION
Bored Pile Location Diameter Length Vertical Bars Transverse Reinforcement
BP-1 Loading Bay 2000 mm 20 m 32 - 36 mm ϕ 20 mm ϕ ties with 75 mm pitch spacing
COLUMN
Column Mark Location Dimension Vertical Bars Transverse Reinforcement
FTNG-2ND
GC-1 1000x1500 36- 36 mm ϕ 6 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
GC-1A 1000x1500 48 - 36 mm ϕ 6 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
GC-1B 1200x1700 54 - 36 mm ϕ 6 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
GC-2 1000x1500 46 - 36 mm ϕ 6 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
GC-2A 1200x1700 60 - 36 mm ϕ 6 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
GC-2B 1300x1800 70 - 36 mm ϕ 6 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
2ND – 3RD
SC-1 800x1000 36 - 32 mm ϕ 4 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
SC-2 800x1000 32 - 32 mm ϕ 4 sets 16 mm ϕ @ 100 mm, Joint/Conf. Hoops, rest @ 150 mm
PROJECT TITLE:
STEEL SCHEME
C1
C1
C2
C1
C1
REINFORCED / PRESTRESSED CONCRETE
(AASHTO I-BEAM)
PROJECT TITLE: