Professional Documents
Culture Documents
Y DP Y-COUPLER
COMMUNICATIONS CABINET
JBT FIELD PROFIBUS JUNCTION BOX
311-COM-1001
NOTES
ET200M
RACK 03
RACK 04
RACK 05
RACK 06
RACK 07
T T
PA#
JBT JBT JBT
Juan.
49 PM
06:
2:
1
20/06/2018 dgn
ag\311\311-EBD-1001.
311-MCC-1001
REF DRG 311-ECS-1002
DP#
INCOMER &
DP# DOL DRIVES
T
ock Di
311-UPS-1031
ng\EBD Bl
DP#
NGW UPS
CAT 6
\02. Drafti
1824)
oduced.
ns
CLIENT
y
n
NGS
lnotbe passed on i
t
em ai
311-ECS-1001 311-PCC-1001 LOOP DIAGRAM SHEET 1 DRAWN A STEINOCHR 30.11.17 MINA DE COBRE PANAMA
d par
d.
ect
ylt
oj
om
y pr
ects\C1443 Mi
REFERENCE DRAW I
ng r
r
he pr
hi
r
ovalf
l
o any t
nal
311-ECS-1011 311-PCC-1001 TERMINATION DIAGRAM SHEET 1 CHECKED K REDWOOD 5.12.17 MINERA PANAMA SA
awi
ONS
ort
gi
en appr
s dr
i
thas been or
yf
SI
m att
DISCIPLINE
d.
BLOCK DIAGRAM
Thi
el
1 REVISED AS NOTED JRH KR JT 20.06.18 311-ECS-1005 311-PCC-1001 SCHEMATIC DIAGRAM SHEET 1 J TAN 6.12.17
REVI
t
ABN 53 131 815 337
yl
ENGINEER
ng shal
y ofPr
t
or
oni
PRINCIPAL
0 ISSUED FOR CONSTRUCTION AS KR JT 6.12.17 311-EGA-1005 311-PCC-1001 GENERAL ARRANGEMENT QUALITY ENGINEERING SOLUTIONS A DINGLEY 12.12.17
i
awi
ch i
\Proj
oper
ENGINEER
houtpr
r
ect
COPYRI
orwhi
s dr
A0 311-EBD-1001 1824 1
any el
tshal
www.ProcessEI.com.au
he pr
Thi
REV DESCRIPTION DRN CHK ENG DATE REV DESCRIPTION DRN CHK ENG DATE DRAWING No. DESCRIPTION CLIENT
t
wi
J:
Pr
Tel: +61 8 9344 6030
f
t