PTB Timeline

Length
Sl.No Elements Nos (RM) Design
(Sqm) (Days)

1 Secondary Beams (0.3m x 0.7m) 770 3667 22


2 Secondary Beams (0.25m x 0.6m)
3 Slabs (70mm thk) 17142 1200 22
4 Staircase-Flight (1m x 4.5m) 42 22
5 Ramps (200 Thk) 432 144 22
6 Utility Trench - Top Slab (250mm Thk) 1080 360 22
7 Electrical Trench (0.7m x 0.85m) 50 22
8 Manholes 71 22
9 Exterior Walls (200 thk)
Timeline ATC Tower ATC-TB Timeline
Length
Nos Nos
Manufacture Delivery and (RM) Design
Erection (Sqm) (Sqm)
(Days) (Days)
(Days)
45 40
67 400 22
60 45 2950 206 22
30 20 28 9 22
27 20 22
45 45 22
22 14 22
45 15 2 22
22
Timeline Timeline
Delivery Length
(RM) Delivery and
Manufacture and Design Manufacture Erection
(Days) Erection (Days) (Days) (Days)
(Days)
22
30 40
15 25
15 20

14
4940 535