The document is a bill of materials listing 6 miscellaneous items for a construction project including area dressing, toilet, electrical cable, site office, labour hutment, and cube curing chamber. It provides the item description, unit, quantity, rate, and total amount for each item with a grand total of 1,150,000.
The document is a bill of materials listing 6 miscellaneous items for a construction project including area dressing, toilet, electrical cable, site office, labour hutment, and cube curing chamber. It provides the item description, unit, quantity, rate, and total amount for each item with a grand total of 1,150,000.
The document is a bill of materials listing 6 miscellaneous items for a construction project including area dressing, toilet, electrical cable, site office, labour hutment, and cube curing chamber. It provides the item description, unit, quantity, rate, and total amount for each item with a grand total of 1,150,000.
1 AREA DRESSING LOT 1 355000 355000 2 TOILET LOT 3 15000 45000 3 ELECTRICAL CABLE FOR SITE LOT 1 300000 300000 4 SITE OFFICE LOT 1 150000 150000 5 LABOUR HUTMENT LOT 1 200000 200000 6 CUBE CURING CHAMBER NOS 2 50000 100000 TOTAL 1150000