This bill is for electrical work done at the International Airport in Bengaluru, India. It includes supplying and installing items like RCCB switches, electricity meters, wires with lugs and clamps. The total cost for the work is Rs. 11,985 which includes labor charges and transportation costs over 2 days.
This bill is for electrical work done at the International Airport in Bengaluru, India. It includes supplying and installing items like RCCB switches, electricity meters, wires with lugs and clamps. The total cost for the work is Rs. 11,985 which includes labor charges and transportation costs over 2 days.
This bill is for electrical work done at the International Airport in Bengaluru, India. It includes supplying and installing items like RCCB switches, electricity meters, wires with lugs and clamps. The total cost for the work is Rs. 11,985 which includes labor charges and transportation costs over 2 days.
B1/48, 1ST FLOOR, Lane 20, Kiran Garden Utham Nagar, NEW DELHI – 110059 GSTIN No. 07AALFB5625M1Z4
BILL
ELECTRICAL WORK AT INTERNATIONAL AIRPORT, BENGALURU
S.No. PARTICULARS UNIT RATE AMOUNT
1. 40 Arms 3 Phase 4 Pole RCCB 01 No. 2850.00 2850.00 2. 40 Arms 3 Phase Meter 01 No. 4000.00 4000.00 3. 2.5 Sq.mm wire 10 Mtrs. LS 250.00 4. 4Sq.mm wire 5 Mtrs. LS 275.00 5. 4 Pin type lugs 6 Nos. LS 60.00 6. C Clamp 12 Nos. LS 50.00 Bus fare 2 days 1000.00 Labour charges 2 ½ 3500.00
TOTAL 11985.00
( RUPEES ELEVEN THOUSAND NINE HUDNRED EIGHTY FIVE ONLY )