Professional Documents
Culture Documents
Attached drawing fabricated spool no-01, need to modification. This spool need modification as per
site condition, for that we need cut out joint no 4, We make as built drawing with TSK QA/QC
approval.
Attachments: Yes √ No
Attachments: Yes No
Signature: Date:
Page 2 of 2
Rev. -, 17th March 2008-03-17
Perpared by: PG EC1 Klaus Kern