APSCL SOUTH Power Plant

REQUEST FOR INFORMATION (RFI) FORM

Date : 27/05/2015 RFI No: 13


Equipment/Component : 10 MAG10AC001/S200 CNS, WBS, or KKS No.:
Drawing : MAJ11 BR002-001 Revision: 00

DESCRIPTION OF INFORMATION REQUIRED ():

Need clarification for the following points to start Piping work:-

On site we see this Pipe spool & Equipment connection point is damage. We need to clarification about this
Connecting point.

Attachments: Yes √ No

Prepared by: Md. Sofiul Alam Jewel Organization/Dept.: QA/QC


Phone No – 01847 067560 QA/QC Engineer

SUGGESTED RESOLUTION ():

Prepared by: Organization/Dept.:


Phone No.:

Attachments: Yes No

Signature: Date:

Prepared by Miguelangel Ocando Page1 of 1


Rev. - ; 0, July 2014