A preventive maintenance work order was created on September 9th, 2022 for a defibrillator located at Al Ain Hospital. The defibrillator is a Philips HeartStart MRx model that was installed in 2007. A routine 6-month preventive maintenance was performed on September 23rd by ONE HEALTH to check device functions and perform an equipment self-test. The defibrillator was handed back to the end user in good working condition.
A preventive maintenance work order was created on September 9th, 2022 for a defibrillator located at Al Ain Hospital. The defibrillator is a Philips HeartStart MRx model that was installed in 2007. A routine 6-month preventive maintenance was performed on September 23rd by ONE HEALTH to check device functions and perform an equipment self-test. The defibrillator was handed back to the end user in good working condition.
A preventive maintenance work order was created on September 9th, 2022 for a defibrillator located at Al Ain Hospital. The defibrillator is a Philips HeartStart MRx model that was installed in 2007. A routine 6-month preventive maintenance was performed on September 23rd by ONE HEALTH to check device functions and perform an equipment self-test. The defibrillator was handed back to the end user in good working condition.
Date Of Print: 9/26/2022 8:16:27 AM WO/Status:AAH-PM-202209-01301/PendingVerification
Preventive Maintenance
Work Order AAH-PM-202209-01301 Frequency Every 6 Month(s)
Work Description PPM FOR DEFIBRILLATOR-AA01-066740 Created Date 09-Sep-2022 05:31:56 PM
Location Full Path Department/Section Priority
Al Ain Hospital Medical Institute/Medical 5 4 (Low/PPM/Deferred)
Device Specification Equipment Type: Defibrillator Equipment ID
Serial No.: US00317008 Manufacturer: Philips Defibrillator/SEHA- 0000011280 Installation Date : 21-Mar-2007 Warranty Expiry Date: 21-Mar-2010 Local Asset No: AA01-066740 Type: CF Model No: HeartStart MRx External Asset No: 38197 RiskLevel:High Supplier: Emirates Technology Company Next PPM Date:01-Mar- (EMITAC) 2023 TypeOfmaintenance:Contractor Maintenance TypeOfMaintenance SpecialCondition: Previous PPM Date:01- Mar-2022 Assigned To (Company/Supervisor): Vendor Name: ONE HEALTH Class:Class I
Type of Work PPM-Biomedical Type of Service PM - Medical Equipments
Type of Problem Routine Biomedical Equipment Is the system/equipment down? NO
Yes/No. Maintenance If yes, Start Down Time: End Down Time:
Is CM Required? NO If Yes, CM Work ID:
Technical Remarks Physically available in Dialysis. PPM has been carried out as per the attached SEHA checklist. Checked device functions and performed EST, Equipment handed over to end user in good working condition.
Man Power Used
SN. Eng / Technician Planned Start Planned End Actual Start Actual End Signature Date/Time Date/Time Date/Time Date/Time 1 M. Vairamanickam 01-Sep-2022 30-Sep-2022 23-Sep-2022 23-Sep-2022 12:00:00 AM 12:00:00 AM 09:00:00 AM 10:30:00 AM
Comments
End User Engineering Deparment
Name Name: Signature Signature
Equipment "Approved" For Use Equipment "Not Approved" For Use