1) A preventive maintenance work order was created on September 9th, 2022 for the yearly PPM of a Welch Allyn Sure Temp Plus 692 electronic oral thermometer located in the Anesthesia and Intensive Care Institute/ICU department at Al Ain Hospital.
2) The PPM was performed on September 22nd, 2022 by technician M. Vairamanickam and the unit was handed over to the end user in good working condition.
3) The next scheduled PPM for the unit is September 1st, 2023.
1) A preventive maintenance work order was created on September 9th, 2022 for the yearly PPM of a Welch Allyn Sure Temp Plus 692 electronic oral thermometer located in the Anesthesia and Intensive Care Institute/ICU department at Al Ain Hospital.
2) The PPM was performed on September 22nd, 2022 by technician M. Vairamanickam and the unit was handed over to the end user in good working condition.
3) The next scheduled PPM for the unit is September 1st, 2023.
1) A preventive maintenance work order was created on September 9th, 2022 for the yearly PPM of a Welch Allyn Sure Temp Plus 692 electronic oral thermometer located in the Anesthesia and Intensive Care Institute/ICU department at Al Ain Hospital.
2) The PPM was performed on September 22nd, 2022 by technician M. Vairamanickam and the unit was handed over to the end user in good working condition.
3) The next scheduled PPM for the unit is September 1st, 2023.
Date Of Print: 9/26/2022 8:24:44 AM WO/Status:AAH-PM-202209-01155/PendingVerification
Preventive Maintenance
Work Order AAH-PM-202209-01155 Frequency Every 1 Year(s)
Work Description YEARLY PPM FOR THERMOMETER, Created Date 09-Sep-2022 05:28:53 PM ELECTRONIC, ORAL, AA01-051258
Location Full Path Department/Section Priority
Al Ain Hospital Anesthesia and Intensive Care 4 (Low/PPM/Deferred) Institute/ICU
Device Specification Equipment Type: Thermometer, Electronic, Equipment ID
Oral Serial No.: 12401964 Manufacturer: Welch Allyn Thermometer, Electronic, Oral/SEHA- 0000020001 Installation Date : 30-Sep-2013 Warranty Expiry Date: Local Asset No: AA01-051258 Type: Model No: Sure Temp Plus 692 External Asset No:
RiskLevel:Low Supplier: New Medical Centre (NMC) Next PPM Date:01-Sep-
2023 TypeOfmaintenance:Supplier Maintenance TypeOfMaintenance SpecialCondition: Previous PPM Date:01- Sep-2021 Assigned To (Company/Supervisor): Vendor Name: ONE HEALTH Class:
Type of Work PPM-Biomedical Type of Service PM - Medical Equipments
Type of Problem Routine Biomedical Equipment Is the system/equipment down? NO
Yes/No. Maintenance If yes, Start Down Time: End Down Time:
Is CM Required? NO If Yes, CM Work ID:
Technical Remarks Carried out PPM as per SEHA checklist. Handed over the unit to end user in good working condition.
Man Power Used
SN. Eng / Technician Planned Start Planned End Actual Start Actual End Signature Date/Time Date/Time Date/Time Date/Time 1 M. Vairamanickam 01-Sep-2022 30-Sep-2022 22-Sep-2022 22-Sep-2022 01:00:00 AM 05:00:00 PM 09:00:00 AM 09:20:00 AM
Comments
End User Engineering Deparment
Name Name: Signature Signature
Equipment "Approved" For Use Equipment "Not Approved" For Use