You are on page 1of 2

GT NNN FORM NO: NW-BH-OPN-F-016

NORTH-WEST POWER GENERATION COMPANY LIMITED


EFFECTIVE DATE: 21.04.2018
Fault Notification & Permit To Work REVISION: 00

Location: Bheramara Combined Cycle Power Plant

PART- 1 [OPERATION] : NOTIFICATION OF FAULT FNR: 20-0577


Notified By: Obaydur Rahman Contact No. 01740851629 Date: 09/12/2020

KKS:
Urgency Level: Immediate/ASAP/minor/next outage/Monitor Only/info:
Area/system/Agreement: HP/IP BFP

Fault Details: Referred to Dept. of MMD-02

Water is leaking through the HP discharge ARC of HP/IP BFP-A.

Isolation & Normalization Form Reference (INFR):


F/N Issued By SCE F/N Received By Ex.En. ( M / E / I / C ) Fault Validated by (Maint.)

F/N found: Valid & Accepted / Not Valid & Returned/ Valid but Referred to: Warranty Claim /

PART- 2 [MAINTENANCE] : WORK REQUEST WRR:


Assigned to: Contact No.: Date:
Description of Jobs to be Done: Special Work: Yes/ No S/D Reqd.: Yes/No Isolation Required: Yes / No
HP/IP BFP-A ARC Leakage checking for rectification.

INFR: Personnel Available: Yes / No Planned duration:(Date & Time)

Tools Available: Yes / No Spares Available: Yes / No


Waiting / Postponed due to: Comments: W/R Issued By
Ex. En (M /E / I /C):
FORM NO: NW-BH-OPN-F-016
NORTH-WEST POWER GENERATION COMPANY LIMITED
EFFECTIVE DATE: 21.04.2018
Fault Notification & Permit To Work REVISION: 00

Location: Bheramara Combined Cycle Power Plant


Shutd
PART- 3 [OPERATION] : PERMIT TO WORK CSE H/ W @ Height PTWR:
own
Issued to: Contact No.: 01708152267 Issue Date:
Date Date 13.07.2020 Extended: No / Yes up to
Allotted time till
Time Time 15:30 Date: Time:
Mntnc: SCE:
Job(s) listed below is/are permitted to perform with this PTW:
INFR:

Safety Instruction:
 Proper PPE should be
maintained.
 Potable Fire Extinguisher
must be kept near for Hot
Works
 LOTO Procedure must be
followed.
 All type of Safeties must be
ensured during the work(s).
Issued for Isolation/ Inspection By SCE: Isolation/ Inspection Performed By Checked by (Maint.):
[with date & time]: (Operation): [with date & time]: [with date & time]:

PTW Issued By SCE: [Activate] I understand and accept my responsibilities for Name:
this PTW:

Signature Designation: SAE


(Received by Maintenance Personnel)
PART- 4 [MAINTENANCE] : CLEARANCE Completion Date & Time:

Detail Reports of work done:

Equipment Tested by: (O&M) I certify that all persons working under this PTW have been withdrawn from the specified area and warned
not to continue work / test. All equipment, tools, loose materials and drain earths are removed, guards and
access doors refitted.
(Maintenance)

Signature
(Operation) (Returned by Maintenance Personnel)
Normalized By (Operation): Checked by (Operation): PTW Closed By SCE:
[with date & time] [with date & time] [with date & time] [Inactivate]

SFT No Initial Sign Final Sign Comments: Process closed by SE (Opn)


Status Status [with date & time]:

Signature