You are on page 1of 5

INDRA MISTANTA

Jl. Merpati Bali 21 Rt. 011/009 No. 50B, Harapan Jaya


Bekasi Utara – Jakarta Utara PostCode: 17124
Email : indramistanta@yahoo.com
Home Phone : +62 812 80200045 (Indonesia)

PERSONAL DATA
Date of Birth : June, 01, 1978
Nationality : Indonesia
Marital Status : Married
Passport No. : A 3375301
Discipline : E/I Designer
Educations : Diploma III (D3)
Computer Skill : AutoCAD R 2000 R 2006 R 2007 Ms. Word, Ms. Excel,
Micro station, PDMS, In tools V 7
Informal : - Instrument Draftsman in International Technical,
Course (I.T.C. Jakarta)
- Training PDMS by PT. Singgar Mulia,
- Training INTOOLS V 7 by PT Singgar Mulia
- Training PDS by JGC Gulf International Co.Ltd
- Training COMOS by Aker Engineering Malaysia Sdn. Bhd.
- Training STIDLoop by Aker Engineering Malaysia Sdn. Bhd.
Qualification : Instrumentation
Geographical Areas of Work : Indonesia, Qatar Doha, Saudi Arabia & Brunei Darussalam, Malaysia
Languages Known : English & Indonesia

* EXPERIENCE SUMMARY
More than fifteen (15) years’ experience in Instrument Engineering Design and Construction for Oil & Gas
(Onshore/Offshore) facilities.
 Having excellent experiences to preparation of CAD Drawings and related documents for FEED and Detailed Design
Projects in Instrumentation Discipline, review and prepare Instrument Cable Block Diagram, Instrument Cable
layout, Instrument location Layout, Instrument Termination Diagrams, instrument Loop Diagram, Instrument
Process & Pneumatic Hook-ups, MTO, Checking for Clash PDMS and Supervision etc.
 Proficiency in AutoCAD application and MS Office applications relevant to his work assignment. Knowledge of
Industry and International standards relevant to discipline. Must have good verbal and written communication
skills to interface and communicate. Shall be fully conversant with Design Office Quality systems in the
preparation and issue of Project Drawings.
 I have 6 years’ experience of working overseas. Interaction with other disciplines such as process, piping,
electrical, mechanical, civil/structural, co-ordinate with designers to produce and check all required engineering
drawings for Instrumentation design deliverable.
 GCC Work experience in (Doha Qatar, Saudi Arabia Al Khobar).

* FIELD OF EXPERIENCE
As Built, Instrument Installation Checking, Construction, Site Visit.

WORK EXPERIENCE

Oct’ 2018 – Present: PT Truba Jaya Engineering


Position : Instrument Designer
Client : PT Perushaan Listrik Negra (Persero)
Project : Mobile Power Plant and Fixed Type Gas Engine (Location : Alor, Dobo, Nunukan, Namlea,
Serui, Saumlaki, Waingapu)
Responsible : Preparation for File Instrument location layout, Instrument Cable Routing Layout, Instrument Tray
Routing Layout, CCTV Cable Routing, Telecom System Cable Routing Layout, Wiring Diagram, Loop
Diagram, Instrument Mounting Details, Instrument Hook Up, MTO.

1 of 5
May 2016 – Oct’ 2016: SMOE Indonesia.
Position : E/I Designer
Client : Yamgaz
Project : Yamal LNG Project (Process Modul Compressor A,B and Inlet)
Responsible : Preparation for Instrument Location layout, Cable Tray layout, cable Routing Layout, Cable Tray
Support Details, Support Junction Boxes, Electrical Lighting Support Detail, Cable Tray Scondary
Routing, Cable Routing Layout, Cable Tray Support Details, Earthing Support, Panel Support
Details, and Checking All Equipment to Module.

January 2014 – Sept’ 2015 : AKER ENGINEERING MALAYSIA SDN. BHD.


Position : Instrument (Telecom) Designer
Client : Statoil
Project : Gina Krog Topside EPCH
Responsible : Preparation Instrument Location layout, Instrument Cable Routing Layout, Paga System
Interconnection Diagram, CCTV System Interconnection Diagram, Telecommunication Beacon
JB Layout, Telecommunication Speaker JB Layout, Telecommunication Hook Up Telephone JB
layout, Telecommunication Cable Schedule, Checking for Clash PDMS.

December 2011 – December 2013


Company : Damit WorleyParsons Engineering Sdn Bhd (Brunei Darussalam)
Position : Sr. Instrument Designer
Client : Brunei Shell Petroleum Co. Sdn. Bhd (Brunei)
Project : Darat Early Production Opportunity (DEPO) – Phase 2 Area F-32, TG-31,
E-38,39.
Responsible : Instrument Cable Block Diagram, Fire & Gas Cable Block Diagram, Fire & Gas Location layouts,
Fire & Gas Cable Routing Layout, instrument Building Equipment Layout, Instrument, Location
Layout, Instrument Cable Routing layout, Process Hook-Ups, instrument Mounting Details, Loop
Diagram, MTO. Using Smart plant (In tools for Loop Diagram, Input for Instrument Index and
Checking for Clash PDMS)

Project : West / Tali PRP2 Phase 1 (PID1856, PID1857, PID1858 & PID2063) - AMPP17
Decommissioning Scope

Responsible : Instrument Location Layout, Hook-up Details, MTO.

Project : West / Tali PRP2 Phase 1 (PID1856, PID1857, PID1858 & PID2063) - AMDP22
Decommissioning Scope
Responsible : Instrument Location Layout, Hook-ups, MTO.

Project : Bulan-Bulan Development Project - Detail Design – Greenfield

Responsible : Instrument Cable Block Diagram, Fire & Gas Cable Block Diagram, Instrument Location Layouts,
Instrument Cable Routing Layouts, Fire & Gas Location Layouts Fire & Gas Cable Routing Layouts,
Process Hook-Ups, Instrument Mounting Details.

January 2011 – December 2011


Company : JGC Gulf International Co.Ltd (Al Khobar Saudi Arabia)
Position : Instrument Designer
Client : AL-KHAFJI EXPANSION PROJECT SAUDI ARABIA (Al Khobar)
Project : ONSHORE WTF-3 AND WIF.

Responsible : Instrument Cable Block Diagram, Instrument Building Equipment Layout,


Instrument Cable Routing layout, Instrument Location Layout, Instrument
JB Location Layout.

2 of 5
January 2009 – December 2010
Company : Black Cat Engineering & Construction. W.L.L. (Doha Qatar)
Position : Instrument Designer
Client : QATAR GAS
Project : CONSTRUCTION OF NEW ARRANGEMENT TO IMPROVE NITROGEN AVAILABILITY.
Responsible : Instrument Cable Block Diagram, Instrument Termination Diagram, Instrument Cable Routing,
instrument Equipment Layout, Instrument JB Location Layout, Instrument Process Hook-ups,
Instrument mounting Details.

Client : QATAR PETROLIUM


Project : PWI STATION NO. 2,6,8, & 9.
EPIC FOR PRODUCED WATER TREATMENT & INJECTION – PHASE 2.

Responsible : Instrument Cable Block Diagram, Instrument Equipment layout, Instrument Cable Layout, PLC
Configuration Diagram, Termination Drawings, Loop Diagrams, Process Pneumatic Hook-ups,
Mounting Details.

Project : STATION-U DUKHAN, STATION-FNFIS, STATION-N.


SWEET FUEL GAS SUPPLY TO DUKHAN CONSUMERS

Responsible : Instrument Cable Block Diagram, Instrument JB Location, Instrument cable


Routing Layout, instrument Control Room layout, Instrument Termination
Drawings, Instrument Loop Diagrams (ESD), Process Pneumatic Hook-Ups.
F&G Cable Block Diagram, F&G Detector Layout, F&G Termination Drawings.

Project : PWI STATION NO. 1 & 4 DUKHAN,


EPIC OF NEW SOURCE WATER WELLS DKW-41&42 AT PS-1&4

Responsible : Instrument Cable Block Diagram, Instrument, instrument Cable layout, Instrument Location
Layout, PLC Configuration Diagram, 'Process Graphic Displays, Control Room / Equipment
Room Layout, Instrument Process & Pneumatic Hook-ups, Instrument Termination Diagrams,
Instrument Loop Diagram, Telecom Cable Routing Layouts.

Project : FAHAHIL SOUTH DEGASSING STATION DUKHAN

Responsible : HSS System Location Layout-Control Room, B,MS, ACS & CCTV System Block Diagram,
Telecommunication Layout, Instrument Loop Diagram, Instrument Termination Diagram,
Instrument Hook Ups, Instrument Cable Routing, Instrument Location Layout.

Project : MESAIEED-NGL-1&2
EPIC FOR THE REPLACEMENT OF HALON SYSTEM AT MESAIEED
: Instrument As-built Drawings

Project : KHATIYAH MAIN DEGASSING STATION


EPIC FOR THE REPLACEMENT OF HALON SYSTEM AT DUKHAN.
Responsible : Instrument As-built Drawings

July 2000 – January 2009


Company : PT. SINGGAR MULIA,
Position : Instrumentation Designer
Client : TOTAL E&P INDONESIA
Project : Peciko 6 Field Development Project Phase 6 LP Compression EPSC-1

Responsible : Instr. Tray Layout, Instr. Cable Routing, Instrument Hook Up, Instr. Block Diagram, Instr.
Tubing layout Instr. Wiring Diagram, Instr. Trouble Shooting Loop Diagram Using In tools and
PDMS.

3 of 5
Client : SOME INDONESIA
Project : Tunu-11 Field Development NCP-2 & NMP-3, Project

Responsibilities : Shop drawing Instrumentation.

Client : Chevron Pacific Indonesia


Project : Feed of Rindu Separate Well Test Project

Responsible : Instrument Plot and Layout, Tray Layout and Cable Tray Layout,
Wiring Diagram, Loop Diagram, Material Take Off, Cable Schedule, Hook Up,

Client : Conoco Phillips Indonesia Inc. Ltd.


Project : Kerisi Development Project.

Responsible : Instrument Plot and Layout Review, Tubing Tray Layout Review & Implementation, Cable tray
layout Review & Implementation, Hook Up Implementation, Wiring Diagram Implementation,
trouble Shooting Loop Diagram Review, Fusible Plug Routing, Cable routing and Tubing
Routing, instrument Material Take Off, As Built Drawing, Using PDMS

Client : Chevron Pacific Indonesia


Project : Duri-Pekan Baru Riau MFU Refurbishment, CGS-1, 3, 4, 5
Responsible : Instrument Location Plan, Instrument Hook-Up, Instrument Cable Schedule, Instrument Wiring
Diagram, Material Take-Off. Using Micro station.

Client : Unocal Indonesia Project


Project : Seturian Field Development

Responsible : Instrument Location Plan, Instrument Hook-Up, Instrument Fire and Gas, Detector Layout,
Instrument Wiring Diagram, Instrument Tray Layout, Instrument Fusible Plug, Instrument
Loop Diagram, Instrument Marshalling Cabinet, Material Take-Off using AutoCAD.

Client : EMP Kangean Limited


Project : Terang Sirasun Batur Field Development

Responsible : Instrument Plan, Instrument Hook-Up, Instrument Fire and Gas Detector Layout, Instrument
Wiring Diagram, Material Take-Off. using AutoCAD.

Project : Sepanjang Production Facility Development

Responsible : Instrument Location Plan, Instrument Tubing and Tray Layout, Instrument Hook Up, Instrument
Fusible Plug Layout, Material Take-Off.

Client : Unocal Indonesia Project


Project : Serang “SA” Platform

Responsible : Instrument Plan, Instrument Hook-Up, Instrument Fire and Gas Detector, Layout, Instrument
Wiring Diagram, Instrument Loop Diagram, Instrument Marshalling Cabinet, Material Take-
Off. Using AutoCAD.

Client : Unocal Indonesia Project


Project : Melahin Platform

Responsible : Instrument Plant, Instrument Tray and Support, Instrument Routing Cable Tray, Instrument Fire
and Gas Detector Layout, Instrument Hook-Up, Instrument cable Schedule, Instrument
Marshalling Cabinet, Instrument Loop Diagram, Material Take-Off. Using AutoCAD.

Client : Unocal Indonesia Project


Project : Santan “STA” Platform

4 of 5
Responsible : Instrument Plan, Instrument Hook-Up, Instrument Fire and Gas Detector, Layout, Instrument
Wiring Diagram, Instrument Loop Diagram.

Client : Unocal Indonesia Project


Project : Senturian Field Development

Responsible : Instrument Plant, Cable layout Cellar Deck, Tray and Support Layout, Electrical Room,
Instrument loop Diagram, Wiring Interconnection Diagram (IJB-1000), Instrument Support
Detail for Junction Box (IJB-1000), Control Cable Schedule

Client : Unocal Indonesia Project


Project : Santan “STA” Platform, Gas Lift Compressor

Responsible : Instrument Plan, Instrument Hook-Up, Instrument Fire and Gas Detector Layout, Instrument
Wiring Diagram, Instrument Loop Diagram.
Client : Unocal Indonesia Project
Project : Mahoni Platform ECP-1000

Responsible : Instrument Plant, Cable layout Cellar Deck, Tray and Support Layout, Electrical Room,
Instrument loop Diagram, Wiring Interconnection Diagram (IJB-1000), Instrument Support
Detail for Junction Box (IJB-1000), Control Cable Schedule.

Client : Unocal Indonesia Project


Project : Yakin North “B” Platform
Responsible : Instrument Gas Controller Cable Schedule, Instrument Power and Safety Plan-Cellar Deck,
Instrument Tray and Support and Layout Below Main Deck, Tray and Support and Layout
Below Cellar Deck, Instrument Electrical Detail for SDV Gas Detector.

Client : Unocal Indonesia Project


Project : Melahin Platform

Responsible : Instrument Hook-Up, Instrument Plan, Instrument Loop Diagram, Instrument Wiring Diagram,
Instrument Cable Schedule, Instrument Control and Safety Architecture, Instrument Support
Cable Tray.

Client : CNOOC
Project : Banuwati-A Platform
Responsible : Instrument Hook-Up, Instrument Index, Instrument Cable Schedule.

Client : PREMIER OIL, INDONESIA


Project : West Lobe Wellhead Project
Responsible : Instrument Hook-Up, Instrument Plan, Instrument Block Diagram, Instrument Cable Schedule.

5 of 5

You might also like