You are on page 1of 6

Career Profile

Budi Arpianto
Career spans more than 20 years of professional experience as Designer
(Piping/Mechanical).

Email : dudiarpi@gmail.com
Mobile Phone : +62 813 1470 0610
Date of Birth : January 28, 1974
Current Position : Jakarta, Indonesia
Postal Address : Taman Mutiara H31, Tangerang City, Banten Province 15153
Country : Indonesia

Qualifications:
- Diploma from Polytechnic Shipbuilding - Institute Technology Sepuluh Nopember (ITS)
- Bachelor Degree in Naval Architect - Institute Technology Adhi Tama Surabaya

Market Sectors:
Offshore Platform Oil & Gas, FPSO, LNG, Power Plant, Petrochemical, Shipbuilding.

Overseas Experience:
Turkmenistan (Kyanli - Turkmenbasy)
Malaysia (Johor Bahru)
Singapore

Relevant Course/Training:

- PDMS and MDS (Certificate)


- Autocad 2D
- Naviswork
- Autocad Plant 3D
- Smartpalnt 3D - SP3D (incuding Isometric Plot, draft and Check To Do List) (Certificate)

Languages:
English, Malay, and Bahasa Indonesia
CAREER HIGHLIGHTS

Senior Designer (Piping/Mechanical)


PT. Truba Jaya Engineering
October 2018 – Current
Jakarta, Indonesia

Project : PLN (State Electricity Company under Indonesian Government)


subsidiary to build 70 Megawatt Gas Engine power plant at 7 location eastern region of
Indonesia.
Software : Autocad 2D
- Routing pipe base on PID, Plot Plant and etc.
- Provide pipe support base on pipe support standard.
- Provide piping arrangement and Isometric.
- Prepare location of lay down area.
- Work and share with other discipline.

Senior Designer (Piping/Mechanical)


KBR (Kellogg Brown and Root)
May 2018 – September 2018 (5 months)
Jakarta, Indonesia

Project :
Abadi LNG Project (Pre- FEED), INPEX Masela.
Software: Autocad 2D
- Site Master Plant and Plot Plant.
- Equipment layout based on PFD and UFD also follows requirements from Safety
Department.
- Prepare location of lay down area.
- Work and share with other discipline.

Senior Designer (Piping/Mechanical)


PT. Asia Pacific Rayon (Pulp and Paper Industry) managed by Royal Golden Eagle
January 2018 – March 2018 (3 months)
Pekanbaru, Indonesia

Software : Autocad Plant 3D


- Design piping layout and layout of equipment.
- Piping routing from equipment to equipment based on PID.
- Review and isometric check.
- Define support location with standard or special support.
- Design and review of location of valve easy to operated and maintenance.
- Review location of lay down area.

Scope of work: to layout pipe in chemical area CS2 and WSA.


Senior Designer (Piping/Mechanical)
KBR (Kellogg Brown and Root)
March 2011 – April 2017 (6 years and 2 months)
Jakarta, Indonesia

Project:

* MAERSK OIL Culzean Field Development, Offshore Platform (detail engineering)


Software: PDMS/MDS
- Create equipment base on data sheet.
- Design and review for nozzle orientation and platform equipment.
- Equipment layout base on plot plant.
- Piping routing from equipment to equipment by looking P&ID.
- Update isometric.
- Define support location with standard or special support.
- Prepare mechanical handling, maintenance access, operation access on model.

*Pacific Northwest LNG Plant (FEED), PETRONAS Carigali, Sdn. Bhd.


Software: SP3D
- Create equipment base on data sheet/ vendor data.
- Design and review for nozzle orientation and platform equipment.
- Piping routing from equipment to equipment by looking P&ID.
- To do list updated.
- Define support location with standard or special support.
- Update isometric.
- Prepare mechanical handling, maintenance access, operation access on model.

*Mansuriya NGL Plant (FEED) IRAQ, Turkish Petroleum.


Software: SP3D
- Create equipment base on data sheet/ vendor data.
- Design and review for nozzle orientation and platform equipment.
- Piping routing from equipment to equipment by looking P&ID.
- To do list updated.
- Update isometric.
- Prepare mechanical handling, maintenance access, operation access on model.

* Shah Deniz Stage 2 Project - Offshore (FEED)


Caspian Sea - Azerbaijan Sector.
KBR providing engineering design and procurement support services for an offshore
complex consisting of two bridge-linked fixed jacket platforms as well as an onshore facility.
Software: PDMS/MDS
- Create equipment base on data sheet.
- Design and review for nozzle orientation and platform equipment.
- Equipment layout base on plot plant.
- Piping routing from equipment to equipment by looking P&ID.
- Update isometric.
- Define support location with standard or special support.
- Prepare mechanical handling, maintenance access, operation access on model.

* Quad 204 - FPSO (Detail Engineering)


Software: PDMS / MDS
- Create Equipment base on data sheet.
- Design and review for nozzle orientation and platform equipment.
- Equipment layout base on plot plant.
- Piping routing from equipment to equipment by looking P&ID.
- Update isometric.
- Define support location with standard or special support.
- Clash check.
- Prepare mechanical handling, maintenance access, operation access on model.

* Browser – LNG Project.


Job Description:
- MTO.

Senior Designer (Piping/Mechanical)


Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE) Malaysia
November 2009 – December 2010 (1 year and 2 months)
Turkmenistan

Software: PDMS/MDS
- Create Equipment base on data sheet.
- Design and review for nozzle orientation and platform equipment.
- Equipment layout base on plot plant.
- Piping routing from equipment to equipment by looking P&ID.
- Update isometric.
- Define support location with standard or special support.
- Clash check.
- Prepare mechanical handling, maintenance access, operation access on model.
Project:
* MCR-A topside, Caspian Sea
* Gravity based structure (GBS) Caspian Sea

Senior Piping Designer/ Checker


Sime Darby Engineering Sdn Bhd
May 2008 – November 2009 (1 year and 7 months)
Johor Bahru, Malaysia

Software: PDMS/MDS
- Update isometric.
- Review and check isometric ( line number, size, tag valve, instrument, flow, slope (if
needed), check continued pipe.
- Check pipe support location in isometric use standard or special support.
- Check equipment and check nozzle (tag number, size, rating, name to pipe
- Clash check.
Project:
* Kumang Central Processing Platform.
* Tangga Barat Cluster Gas and Condensate Field.

FIELD ENGINEER
PT. Pelita Mustika Mandiri
July 2007 – March 2008 (9 months)
Jakarta, Indonesia

- Rental and provide installation of offshore/ onshore facilities of mud cooler.


* Client: Conoco Philips, Chevron.

3D Designer (Mechanical and Piping)


PT. Alstom Power System Indonesia
December 2004 – May 2007 (2 years and 6 months)
Surabaya, Indonesia

Software: PDMS/MDS
 Responsible for developing the design graphic schedule based on scope of work under
Design graphic group Manager supervision.
 Manages execution of the drafting in accordance with the customer specification,
schedule requirements, applicable codes and company’s standard.
 Recommend changes in design to simplify or improve basic designs in relates with
Design graphics area.
 Check the drawings for accuracy, completeness, and practicality of manufacture,
installation, and maintenance.
 Responsible for reducing the repetition errors.
 Assist manufacturing with the technical details of drafting work.
 Designing pipe routings based on P&ID drawings in 3D model which will be used to
generate arrangement drawings, fabrication drawings, and material list.
 Pipe routings between equipments & inside structure using PDMS 11.6
 Spool drawings for fabrication/Isometric drawing.
 Material Take off (MTO).

Project: Castejon, Langage Energy Centre, Grain, and Aghada.

ENGINEER

PT. Plimsoll Indonesia


August 2003 – September 2004 (1 year and 2 months)
Surabaya, Indonesia

Rental and provide Installation of Offshore and Shipping Facilities Winches, Bollard etc.
DRAFTER

PT. Pan United Shipyard Indonesia


February 2002 – July 2003 (1 year and 6 months)
Batam, Indonesia

- Piping layout, piping section, isometric, MTO report


- Scope of work in repair and new shipbuilding

DRAFTER

PT. Dumas Tanjung Perak Shipyard


April 1998 – December 2001 (3 years and 9 months)
Surabaya, Indonesia

- Piping layout, piping section, isometric, MTO report


- Scope of work in repair and new shipbuilding

You might also like