Activites

CONSTRUCTION
Earthworks
Demolitioin
Demolishing of Existing Building and Structure
Site Prepartion
Site Cleaning
Toppgraphic Survey
Soil Investigation
Mark- Out & Survey
Sub-Starta Assesment
Sub-Starta Assesment
Excavation
Excavation of Footings
Disposal
Disposal of Surplus Excavated Material
Filling
Filling to the Working Space
Filling below Foundation in Making up Levels
Surface Treatment
Application of Anti Termite Treatment
Dewatering
Dewatering

Structure Work
Sub Structure
Foundation
Formwork
Footing up to Grade Beam Level
Sub Grade Beam
Reinforcemetn Work
Reinforcement Work for Footing
Reinforcement Work for Subgrade Beam
Concrete Work
Pouring Concrete for Blinding
Pouring Concrete for Footing up to Grade Beam Level
Pouring Concrete for Subgrade Beam
Pouring Concrete for Subgrade Slab
Removal of Form Work
Footing up to Grade Beam Level
Sub Grade Beam
Super Structure
Ground Floor
GF: Form Work GF: Columns Formwork
GF: Staircase Formwork
GF: Beam and Slab Formwork
GF: Reinforcemetn Work GF: Column R/F Work
GF: Staircase R/F Work
GF: Beam and Slab R/F Work
GF: Concrete Work GF: Column Concrete Pouring
GF: Staircase Concrete Pouring
GF: Beam and Slab Concrete Pouring
GF: Removal of Form WorkGF: Column Formwork Removal
GF: Staircase Formwork Removal
GF: Beam and Slab Formwork Removal
First Floor
FF: Form Work FF: Columns Formwork
FF: Staircase Formwork
FF: Beam and Slab Formwork

FF: Reinforcemetn Work FF: Column R/F Work


FF: Staircase R/F Work
FF: Beam and Slab R/F Work

FF: Concrete Work FF: Column Concrete Pouring


FF: Staircase Concrete Pouring
FF: Beam and Slab Concrete Pouring

FF: Removal of Form WorkFF: Column Formwork Removal


FF: Staircase Formwork Removal
FF: Beam and Slab Formwork Removal
Finishing Work
Architectural Finishes
Ground Floor
Block Works
Wooden Door Frames
Water Proofing for Wet Areas
Internal Plastering
Floor Tiles
Suspended Ceiling/ Bulkheads
Aluminum Doors/Windows frames
Paint Primer/ 1st Coat
Wooden Door Shutter
Staircase Handrail
Skirting
Paint Final Coat
Beam Level
Activity Name Original Duration
BLDG-2.07.10.2 GROUND FLOOR 122
BLDG-2.07.10.2.1 Architectural Finishes 122
Block Works 8
Wooden Door Frames 5
Water Proofing for Wet Areas 5
Internal Plastering 24
Floor Tiles 24
Suspended Ceiling/ Bulkheads 14
Aluminum Doors/Windows frames 7
Paint Primer/ 1st Coat 24
Wooden Door Shutter 4
Staircase Handrail 16
Skirting 10
Paint Final Coat 6
BLDG-2.07.10.2.2 Electrical & Fire Alarm 84
Walls Electrical Conduits, Telephone, TV & Fire Alarm 21
Install of Cable Tray/ Trunking 21
Wiring for Power Lighting , F.A.S./ Emergency 21
Install of DB'S 15
Install of Light fittings & F/A Accssories Equip. 9
BLDG-2.07.10.2.3 Water Supply & Drainage 79
Install of Cold & Hot Water Piping in Walls 21
Install of Drainage Piping 21
Installation of water supply piping 21
Sanitary Ware Fixtures 9
BLDG-2.07.10.2.6 Fire Fighting 80
Install of Fire fighting Piping in Walls 21
Install of Sprinkler Heads 9
Install of Equip./ Hose Reels 10
BLDG-2.07.10.2.7 Natural Gas 80
Install Natural Gas Piping 22
Fixing Natural gas meter & accissories 9
Install Natural Gas Equipment 10
BLDG-2.07.10.2.4 Air conditioning 82
Install A/C Piping 19
Install of Duct 16
Install of FCU 16
Install of Grilles & Diffuser 9
Activity Name
AHE-P002-BPD-Rev.0.4.2.10.5 Blockwork
AHE-P002-BPD-Rev.0.4.2.10.5.1 Internal Block Works

AHE-P002-BPD-Rev.0.4.2.10.5.1.1 Internal Wall Partition Blocks


GF to MF - Blockworks (Internal Partition Walls)
AHE-P002-BPD-Rev.0.4.2.10.5.1.4 Internal Fire Rated Block

GF to MF - Internal Fire Rated Block Works


AHE-P002-BPD-Rev.0.4.2.10.5.1.2 SRC Blockworks
AHE-P002-BPD-Rev.0.4.2.10.5.2 External Blockworks
AHE-P002-BPD-Rev.0.4.2.10.5.2.4 External Red Clay Brick
GF to MF - Blockworks (External Red Clay Bricks)
AHE-P002-BPD-Rev.0.4.2.10.5.2.1 External Fire Rated Blocks
GF to MF - External Fire Rated Block Works
AHE-P002-BPD-Rev.0.4.2.10.3 Carpentry & Joinery
AHE-P002-BPD-Rev.0.4.2.10.3.1 Wooden Doors
GF - Install Wooden Door Frame
GF - Install Wooden Door Leaf
GF - Install Ironmongeries for wooden doors
AHE-P002-BPD-Rev.0.4.2.10.3.2 Kitchen Fittings
AHE-P002-BPD-Rev.0.4.2.10.3.3 Wardrobes
AHE-P002-BPD-Rev.0.4.2.10.3.4 Miscellaneous Items
GF - Install A/C Frame

AHE-P002-BPD-Rev.0.4.2.10.6 Metalworks
AHE-P002-BPD-Rev.0.4.2.10.6.1 Glazed Steel Windows
GF - Install Window Jambs for Glazed Steel Windows

GF - Install Window Frames for Glazed Steel Windows


GF - Install Window Glazing & Ironmongeries for Glazed Steel Windows
AHE-P002-BPD-Rev.0.4.2.10.6.2 Steel Door
GF - Install Door Frame for Steel Doors
GF - Install Door Leaf for Steel Doors
GF - Install Door Ironmongeries for Steel Doors
AHE-P002-BPD-Rev.0.4.2.10.6.3 Grill Door
GF - Install Door Frame for Grill Doors
GF - Install Door Leaf for Grill Doors
GF - Install Door Ironmongeries for Grill Doors
AHE-P002-BPD-Rev.0.4.2.10.6.4 Aluminum Door
GF - Install Door Leaf for Aluminum Doors
GF - Install Door Ironmongeries for Aluminum Doors
AHE-P002-BPD-Rev.0.4.2.10.6.5 Glazed Door
GF - Install Door Frame for Glazed Doors
GF - Install Door Leaf for Glazed Doors
GF - Install Door Ironmongeries for Glazed Doors
AHE-P002-BPD-Rev.0.4.2.10.6.6 Automatic Revolving Door
GF - Install Door Frame for Automatic Revolving Door
GF - Install Door Leaf for Automatic Revolving Door
GF - Install Door Ironmongeries for Automatic Revolving Door
AHE-P002-BPD-Rev.0.4.2.10.6.7 Handrail & Ballustrades
GF - Install Handrails & Ballustrades
AHE-P002-BPD-Rev.0.4.2.10.6.8 Stainless Steel Louvers
GF - Install Stainless Steel Louvers
AHE-P002-BPD-Rev.0.4.2.10.6.9 Metal Louvers
GF - Install Metal Louvers
AHE-P002-BPD-Rev.0.4.2.10.6.10 Stainless Steel Features
AHE-P002-BPD-Rev.0.4.2.10.6.11 Stainless Steel Cladding
AHE-P002-BPD-Rev.0.4.2.10.6.12 Curtain Walling / Glazing
AHE-P002-BPD-Rev.0.4.2.10.6.13 Canopy
GF - Const. of Canopy @ Front Entrance
AHE-P002-BPD-Rev.0.4.2.10.6.14 Stainless Steel Cladding & Features
AHE-P002-BPD-Rev.0.4.2.10.6.15 Acoustic Louvers
AHE-P002-BPD-Rev.0.4.2.10.6.16 Grilles & Gratings
AHE-P002-BPD-Rev.0.4.2.10.4 Roofing & Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1 Waterproofing & Damp proofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.1 Underground Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.2 Pits Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.5 Tanks Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.3 Wet Areas Waterproofing
GF - Wet Areas Waterproofing on Kitchens
GF - Wet Areas Waterproofing on Toilets
AHE-P002-BPD-Rev.0.4.2.10.4.1.4 Planting Areas Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.6 Roof Deck Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.7 Swimming Pool Waterproofing
AHE-P002-BPD-Rev.0.4.2.10.4.1.8 Facade Damp proofing
GF to MF - Facade Damp Proofing
AHE-P002-BPD-Rev.0.4.2.10.4.2 Roofing
AHE-P002-BPD-Rev.0.4.2.10.1 Finishes
AHE-P002-BPD-Rev.0.4.2.10.1.1 Screed & Floor Topping
GF - Screeding & Floor Topping
AHE-P002-BPD-Rev.0.4.2.10.1.2 Plaster & Rendering
AHE-P002-BPD-Rev.0.4.2.10.1.2.1 Internal Plastering & Rendering
GF to MF - Internal Plastering & Rendering
AHE-P002-BPD-Rev.0.4.2.10.1.2.2 External Plastering & Rendering
GF to MF - External Plastering & Rendering
AHE-P002-BPD-Rev.0.4.2.10.1.3 Ceiling Finishes
AHE-P002-BPD-Rev.0.4.2.10.1.3.1 Gypsum False Ceiling
GF - Install Frames for Gypsum False Ceiling
GF - Install Board for Gypsum False Ceiling
AHE-P002-BPD-Rev.0.4.2.10.1.3.2 Anti Fungus Gypsum Ceiling
AHE-P002-BPD-Rev.0.4.2.10.1.4 Wall Finishes
AHE-P002-BPD-Rev.0.4.2.10.1.4.1 Internal Wall Finishes
AHE-P002-BPD-Rev.0.4.2.10.1.4.1.1 Internal Wall Marble Cladding

AHE-P002-BPD-Rev.0.4.2.10.1.4.1.2 Internal Marble Wall


GF - Marble Wall Works
AHE-P002-BPD-Rev.0.4.2.10.1.4.1.3 Internal Wall Marble Tiles
AHE-P002-BPD-Rev.0.4.2.10.1.4.1.4 Internal Wall Porcelain Tiles
GF - Porcelain Wall Tile Works
AHE-P002-BPD-Rev.0.4.2.10.1.4.1.5 Internal Wall Wood Cladding
AHE-P002-BPD-Rev.0.4.2.10.1.4.1.6 Non-Slipped Weatherproof Ceramic Tiles
AHE-P002-BPD-Rev.0.4.2.10.1.4.2 External Wall Finishes
AHE-P002-BPD-Rev.0.4.2.10.1.4.2.1 External Wall Stone Cladding
GF to MF - Stone Cladding Works (Front Elevation)
GF to MF - Stone Cladding Works (Right Elevation)
GF to MF - Stone Cladding Works (Rear Elevation)
GF to MF - Stone Cladding Works (Left Elevation)
AHE-P002-BPD-Rev.0.4.2.10.1.4.2.2 Polished Granite Tiles
GF to MF - Polished Granite Tile Works (Right Elevation)
GF to MF - Polished Granite Tile Works (Rear Elevation)
AHE-P002-BPD-Rev.0.4.2.10.1.4.3 Skirting
GF - Porcelain Skirting
GF - Granite Skirting
GF - Marble Skirting
AHE-P002-BPD-Rev.0.4.2.10.1.4.3.1 Granite Skirting
AHE-P002-BPD-Rev.0.4.2.10.1.4.3.2 Porcelain Skirting
AHE-P002-BPD-Rev.0.4.2.10.1.4.3.3 Wood Skirting
AHE-P002-BPD-Rev.0.4.2.10.1.4.3.4 Marble Skirting
AHE-P002-BPD-Rev.0.4.2.10.1.5 Floor Finishes
AHE-P002-BPD-Rev.0.4.2.10.1.5.1 Marble Floor Tiles
GF - Marble Floor Tile Works
AHE-P002-BPD-Rev.0.4.2.10.1.5.2 Granite Floor Tiles
GF - Granite Floor Tile Works for Stairs
GF - Granite Floor Tile Works
AHE-P002-BPD-Rev.0.4.2.10.1.5.3 Porcelain Floor Tiles
GF - Porcelain Floor Tile Works
AHE-P002-BPD-Rev.0.4.2.10.1.5.4 Carpet Flooring
AHE-P002-BPD-Rev.0.4.2.10.1.5.5 Granite Floor Pavers
GF - Granite Paver Floor Tile Works
AHE-P002-BPD-Rev.0.4.2.10.1.5.6 Ceramic Floor Tiles
AHE-P002-BPD-Rev.0.4.2.10.1.5.7 Wood Flooring
AHE-P002-BPD-Rev.0.4.2.10.1.5.8 Vinyl Flooring
AHE-P002-BPD-Rev.0.4.2.10.2 Painting & Decoration
AHE-P002-BPD-Rev.0.4.2.10.2.1 Internal Ceiling Painting
GF - Painting Works on Internal Ceilings
AHE-P002-BPD-Rev.0.4.2.10.2.2 Internal Wall Painting
GF to MF - Painting Works on Internal Walls
AHE-P002-BPD-Rev.0.4.2.10.2.3 Internal Wood Work Painting
GF - Painting Works on Internal Wood Works
AHE-P002-BPD-Rev.0.4.2.10.2.4 Floor Painting
AHE-P002-BPD-Rev.0.4.2.10.2.5 Metal Surface Painting
GF to MF - Painting Works on Metal Surfaces
AHE-P002-BPD-Rev.0.4.2.10.2.6 External Wall Painting
GF to MF - Painting Works on External Walls
Blockwork Internal Block Works

External Block works

Carpentry & Joinery


Wooden Doors

Kitchen Fittings

Miscellaneous Items

Metalworks
Aluminum Doors and Windows

Metal Louvers

Internal Partition

Waterproofing Wet Areas Waterproofing

Roof Waterproofing

Finishes Screed and top flooring

Plaster & Rendering

Ceiling Finishes
Skirting

Floor Finishes

Painting & Decoration


GF: Internal Block Works (Internal Partition Walls)

GF: External Block works

GF: Install Wooden Door Frame


GF: Install Wooden Door Leaf

Istallation of kitchen sink


Installation of pantry cupboard

GF: Installation of Aluminum Doors and Windows

GF: Installation of Metal Louvers

GF: Intallation of Internal Partition Wall

Wet Areas Waterproofing on Kitchens


Wet Areas Waterproofing on Toilets

Roof Water Proofing

GF - Screeding & Floor Topping

GF: Internal Plastering & Rendering


GF: External Plastering & Rendering
Install Frames for Gypsum False Ceiling
Install Board for Gypsum False Ceiling

Tile Skirting

Ceremic Floor Tile Finishes

Internal Wall Painting 1st Coat


Internal Wall Painting Final Coat
External Wall Painting 1st Coat
External Wall Painting Final Coat
Activity Name
AHE-P002-BPD-Rev.0.4.3.10 Ground Floor Ground Floor
AHE-P002-BPD-Rev.0.4.3.10.1 Plumbing Work
AHE-P002-BPD-Rev.0.4.3.10.1.1 Water Supply Water Pipe
AHE-P002-BPD-Rev.0.4.3.10.1.1.1 Water Supply Water Pipe (Level)
GF - [1st Fix-Level] - (WSP) Marking & Support
GF - [2nd Fix-Level] - (WSP) Piping
GF - [Fin Fix-Level] - (WSP) Water Tap, Valves, Mixers, Faucets etc.
AHE-P002-BPD-Rev.0.4.3.10.1.1.2 Water Supply Water Pipe (Riser)
GF to MF - [1st Fix-Riser] - (WSP) Support & PPR Pipe
AHE-P002-BPD-Rev.0.4.3.10.1.2 Drainage Piping Work
AHE-P002-BPD-Rev.0.4.3.10.1.2.1 Drainage Piping Work (Level)
GF - [1st Fix-Level] - (DPW) Marking & Support
GF - [2nd Fix-Level] - (DPW) Piping
GF - [Fin Fix-Level] - (PDW) Floor Drain, Clean out & Sanitary Ware
AHE-P002-BPD-Rev.0.4.3.10.1.2.2 Drainage Piping Work (Riser)
GF to MF - [1st Fix-Riser] - (DPW) Support & Piping Fixing
AHE-P002-BPD-Rev.0.4.3.10.2 Mechanical Work
AHE-P002-BPD-Rev.0.4.3.10.2.1 HVAC Ducting System
AHE-P002-BPD-Rev.0.4.3.10.2.1.1 HVAC Ducting System (Level)
GF - [1st Fix-Level] - (HVAC) Support & Ducting
GF - [3rd Fix-Level] - (HVAC) Final Connnection, VCD & Fire Damper
GF - [Fin Fix-Level] - (HVAC) Grilles & Diffuser
AHE-P002-BPD-Rev.0.4.3.10.2.1.2 HVAC Ducting System (Riser)
GF to MF - [1st Fix-Riser] - (HVAC) Support & Ducting
AHE-P002-BPD-Rev.0.4.3.10.2.2 Chilled Water Pipe System
AHE-P002-BPD-Rev.0.4.3.10.2.2.1 Chilled Water Pipe System (Level)
GF - [1st Fix-Level] - (CWPS) Support & Piping
GF - [Ini Test-Level] - (CWPS) Pressure Test
GF - [2nd Fix-Level] - (CWPS) Insulation
GF - [3rd Fix-Level] - (CWPS) Equipment Fix & Connection
AHE-P002-BPD-Rev.0.4.3.10.2.2.2 Chilled Water Pipe System (Riser)
AHE-P002-BPD-Rev.0.4.3.10.2.3 Building Management System
AHE-P002-BPD-Rev.0.4.3.10.2.3.1 Building Management System (Level)
GF - [1st Fix-Level] - Building Management System
GF - [2nd Fix-Level] - Building Management System
GF - [Fin Fix-Level] - Building Management System
AHE-P002-BPD-Rev.0.4.3.10.2.3.2 Building Management System (Riser)
GF to MF - [1st Fix-Riser] - Building Management System
GF to MF - [2nd Fix-Riser] - Building Management System
AHE-P002-BPD-Rev.0.4.3.10.2.4 Fire Fighting Work
AHE-P002-BPD-Rev.0.4.3.10.2.4.1 Fire Fighting Work (Level)
GF - [1st Fix-Level] - (FFS) Support & Main Pipe
GF - [2nd Fix-Level] - (FFS) Range Pipe & Branch Pipe
GF - [Ini Test-Level] - (FFS) Pressure Testing
GF - [Fin Fix-Level] - (FFS) Sprinkler Points & Equipments
AHE-P002-BPD-Rev.0.4.3.10.2.4.2 Fire Fighting Work (Riser)
GF to MF - [1st Fix-Riser] - (FFS) Support & Main Pipe
AHE-P002-BPD-Rev.0.4.3.10.3 Electrical Work
AHE-P002-BPD-Rev.0.4.3.10.3.1 Lighting & Small Power Work
AHE-P002-BPD-Rev.0.4.3.10.3.1.1 Lighting & Small Power Work (Level)
GF - [1st Fix-Level] - (LSPW) Rough-in,Conduit,Pull Wire Inst.
GF - [2nd Fix-Level] - (LSPW) Cabling
GF - [Fin Fix-Level] - (LSPW) Inst. Devices & Termination
GF - [Eqt Fix-Level] - (LSPW) Inst. Equipment
AHE-P002-BPD-Rev.0.4.3.10.3.1.2 Lighting & Small Power Work (Riser)
GF to MF - [1st Fix-Riser] - (LSPW) Rough-in,Conduit,Pull Wire Inst.
GF to MF - [2nd Fix-Riser] - (LSPW) Cabling
AHE-P002-BPD-Rev.0.4.3.10.3.4 Power Distribution Work
AHE-P002-BPD-Rev.0.4.3.10.3.4.1 Power Distribution Work (Level)
GF - [1st Fix-Level] - (PDW) Cable Ladder for Power Distribution
GF - [1st Fix-Level] - (PDW) Cable Tray & Trunking for Power Distribution
GF - [2nd Fix-Level] - (PDW) Cabling for Power Distribution
GF - [3rd Fix-Level] - (PDW) Electrical Panel Installation
GF - [4th Fix-Level] - (PDW) Electrical Panel Termination
AHE-P002-BPD-Rev.0.4.3.10.3.4.2 Power Distribution Work (Riser)
GF to MF - [1st Fix-Riser] - (PDW) Rough-in,Conduit,Pull Wire Inst.
GF to MF - [2nd Fix-Riser] - (PDW) Cabling
AHE-P002-BPD-Rev.0.4.3.10.3.2 Low Current System
AHE-P002-BPD-Rev.0.4.3.10.3.2.1 Low Current System (Level)
GF - [1st Fix-Level] - (LCS) Conduit,Cable Tray
GF - [2nd Fix-Level] - (LCS) Cabling
GF - [3rd Fix-Level] - (LCS) Faceplate,Module
GF - [Fin Fix-Level] - (LCS) Devices
AHE-P002-BPD-Rev.0.4.3.10.3.2.2 Low Current System (Riser)
GF to MF - [1st Fix-Riser] - (LCS) Conduit
GF to MF - [2nd Fix-Riser] - (LCS) Cabling
AHE-P002-BPD-Rev.0.4.3.10.3.3 Fire Alarm System
AHE-P002-BPD-Rev.0.4.3.10.3.3.1 Fire Alarm System (Level)
GF - [1st Fix-Level] - (FAS) Conduiting
GF - [2nd Fix-Level] - (FAS) Cabling
GF - [3rd Fix-Level] - (FAS) Install Base,Modules,Termination
GF - [Fin Fix-Level] - (FAS) Device Installation
AHE-P002-BPD-Rev.0.4.3.10.3.3.2 Fire Alarm System (Riser)
GF to MF - [1st Fix-Riser] - (FAS) Conduiting
GF to MF - [2nd Fix-Riser] - (FAS) Cabling
Plumbing Work
Water Supply Water Pipe
GF: Marking & Support (First Fix)
GF: Piping (Second Fix)
GF: Water Tap, Valves, Mixers, Faucets etc. (Final Fix)
Drainage Work
GF: Marking & Support (First Fix)
GF: Piping (Second Fix)
GF: Floor Drain, Clean out & Sanitary Ware. (Final Fix)
Mechanical Work
HVAC Ducting System
GF: Support & Ducting (First Fix)
GF: Final Connnection (Second Fix)
GF: Grilles & Diffuser (Final Fix)
Fire Fighting Work
GF: Support & Main Pipe (First Fix)
GF: Range Pipe & Branch Pipe (Second Fix)
GF: Pressure Testing (Initial Test)
GF: Sprinkler Points & Equipments (Final Fix)

Electrical Work
Lighting & Small Power Work
GF: Rough-in,Conduit,Pull Wire Inst (First Fix)
GF:Cabling (Second Fix)
GF: Inst. Devices (Final Fix)
Power Distribution Work
GF: Cable Ladder for Power Distribution (First Fix)
GF:Cable Tray & Trunking for Power Distribution (Second Fix)
GF: Electrical Panel Installation (Final Fix)
Fire Alarm System
GF: Conduiting (First Fix)
GF: Cabling (Second Fix)
GF: Install Base,Modules,Termination (Third Fix)
GF: Device Installation (Final Fix)
Lightning Aresseter
Intstallation of Ligthning Arrester
Activity Name
BLDG-1.02 ENGINEERING WORKS
BLDG-1.02.01 PRE QUALIFICATIONS
BLDG-1.02.01.01 SUBCONTRACTOR
BLDG-1.02.01.02 SUPPLIERS
Submit & Approve Ready Mix Concrete Supplier
Submit & Approve Reinforcem. steel Subcontractor
Submit & Approve Block Supplier
Submit & Appr Waterproofing Subcontractor
Submit & Approve MEP Supplier
Submit & Approve Painting Supplier
Submit & Approve Ceramic Tiles Supplier
Submit & Approve Doors Supplier
Submit & Approve Suspended Ceiling Supplier
BLDG-1.02.02 MATERIAL SUBMISSION
BLDG-1.02.02.01 CIVIL / STRUCTURAL
Submit and Approve Concrete Materials
Submit and Approve Wproof. Material
Submit and Approve Block work Materials
Submit and Approve Reinforce. steel
BLDG-1.02.02.02 ARCHITECTURAL
Submit and Approve Wproof for Wet Areas
Submit and Approve Ceramic Tile Material
Submit and Approve Plastering Materials
Submit and Approve Windows
Submit and Approve Doors
Submit and Approve False Ceiling Materials
Submit and Approve Painting Materials
BLDG-1.02.02.03 MEP
Submit and Approved Sanitary & Fittings Material
Sub. & Appr. of Power Cabling
Sub. & Appr. of Drainage Pipe & Fittings
Sub. & Grills, Diffusers & Louvers
Sub. & Appr. of PVC Conduits & Accessories
Sub. & Appr. of DB, SMDB, MDB
Sub. & Appr. of Hot & Cold Water Pipes
Sub. & Appr. of Chilled Water Pumps
Sub. & Appr. of Fire Fighting Pipe & Fittings
Sub. & Appr. of Fire Pump
Sub. & Appr. of Fire System Accessories
BLDG-1.02.03 SHOP DRAWINGS
BLDG-1.02.03.01 CIVIL / STRUCTURAL
Submit Substructure Shop Dwgs
Approve. Substructure Shop Dwgs
Submit Superstructure Shop Dwgs
Approve. Superstructure Shop Dwgs
BLDG-1.02.03.02 ARCHITECTURAL
Submit Architectural Shop Dwgs
Approve. Architectural Shop Dwgs
BLDG-1.02.03.03 MEP
MEP Shop Drawings Submission
MEP Shop Drawings Approval
BLDG-1.02.04 MATERIAL PROCUREMENT
BLDG-1.02.04.01 CIVIL / STRUCTURAL
Procure & Delivery to Site - Waterproofing
Procure & Delivery to Site - Blockwork Material
Procure & Delivery to Site - Concrete Materials
Procure & Delivery to Site - Reinforcem. steel
BLDG-1.02.04.02 ARCHITECTURAL
Procure & Delivery to Site - Plastering Material
Procure & Delivery to Site - Tiles
Procure & Delivery to Site - Wproof for Wet Area
Procure & Delivery to Site - Suspended Ceiling
Procure & Delivery to Site - Windows Materials
Procure & Delivery to Site - Painting
Procure & Delivery to Site - Doors Works
BLDG-1.02.04.03 MEP
Proc. Power Cabling
Proc. Conduits & Accessories
Proc. Hot & Cold Water Pipes
Proc. Grills, Diffusers & Louvers
Proc. Fire Fighting Pipe & Fittings
Proc. Drainage Pipe & Fittings
Proc. Fire System Accessories
Proc. Fire Pump Set
Proc. DB, SMDB, MDB
Procure & Delivery to Site - Sanitary Fixtures
Proc. Chilled Water Pumps
Activity Name
AHE-P002-BPD-Rev.0.4.5 External Work
AHE-P002-BPD-Rev.0.4.5.1 External General Earthwork
External General Earthwork
GF - Application of Anti Termite Treatment (Hotel Building Perimeter)
AHE-P002-BPD-Rev.0.4.5.2 Boundary Fence
Const. of Boundary Fence
AHE-P002-BPD-Rev.0.4.5.4 MEP Networks
MEP Networks
AHE-P002-BPD-Rev.0.4.5.5 Pavements & Finishes
Construct Pavements & Finishes
AHE-P002-BPD-Rev.0.4.5.6 Landscaping
Landscaping Works
AHE-P002-BPD-Rev.0.4.5.3 Other External Miscellaneous Items
Other External Miscellaneous Items
Activity Name Original Duration
P064-1.1.D4.0A01.0089 Inground Services 84
P064-1.1.D4.0A01.0089.ES01 Storm Water Drainage 51
Area 01 : Formation upto Invert Level 6
Area 01 : Compaction 6
Area 01 : Bedding Works 6
Area 01 : Manhole Structural Works 6
Area 01 : Pipe laying & Connections 6
Area 01 : GRP Access Ladder 6
Area 01 : Pipe Testing & Signoff 6
Area 01 : Gravel / Sand Filling 6
Area 01 : Manhole Coal Tar Epoxy Coating 6
Area 01 : Backfilling & Compaction 6
Area 01 : Cover Slab & Manhole Fixing 6
P064-1.1.D4.0A01.0089.ES02 Foul Water Drainage 54
Area 01 : Formation upto Invert Level 6
Area 01 : Compaction 6
Area 01 : Bedding Works 6
Area 01 : Manhole Structural Works 6
Area 01 : Pipe laying & Connections 6
Area 01 : Pipe Testing & Signoff 6
Area 01 : Gravel / Sand Filling 6
Area 01 : Manhole Coal Tar Epoxy Coating 6
Area 01 : Backfilling & Compaction 6
Area 01 : GRP Access Ladder 6
Area 01 : Cover Slab & Manhole Fixing 6
P064-1.1.D4.0A01.0089.ES07 Electrical 27
Area 01 : Excavation 6
Area 01 : Sand Bedding 6
Area 01 : Cable laying 6
Area 01 : Sand backfilling 6
Area 01 : Normal back filling 6
Area 01 : Compaction 6
Area 01 : Feeder Pillar Works 6
P064-1.1.D4.0A01.0089.ES09 Fire Fighting Pipe Lines 27
Area 01 : Excavation 6
Area 01 : Bedding Works 6
Area 01 : Fire Fighting Mainline laying 6
Area 01 : Backfilling 6
Area 01 : Control Units installation 6
P064-1.1.D4.0A01.0093 Hard Landscaping 88
Area 01 : Clear Site Office Area 3
Area 01 : Backfilling / Levelling 3
Area 01 :Retaining Wall Structures & Foundations 10
Area 01 : Paving Works 12
Area 01 : Backfilling 9
Area 01 : Inspection & Handover 3
Area 01 : Sidewalk Paving & Stone 9
Area 01 : Fix Benches 6
P064-1.1.D4.0A01.0094 Access Roads 63
Area 01 : Site Clearing & Excavation of Top Soil 9
Area 01 : Foundations for Signage/Street lamps 6
Area 01 : Backfill with Approved Filling 6
Area 01 : Compaction 6
Area 01 : Install Kerbs 9
Area 01 : Install Traffic Signal/ Street Lamps 9
Area 01 : Road Paving 9
Area 01 : Install Wayfinder & Traffic Signage 9
P064-1.1.D4.0A01.0095 Soft Landscaping 84
Area 01 : Planter Construction inc drainage 6
Area 01 : Surface Preparation 6
Area 01 : Water Proofing & testing 6
Area 01 : Protection Screed 6
Area 01 : Install signages 6
Area 01 : Fixing Sprinklers & accessories 6
Area 01 : Backfill with approved Soil 6
Area 01 : Tree Planting 6
Area 01 : Landscaping works 6
Area 01 : Consultants Inspection 6
Activity Name Original Duration
BLDG-1.07.1.01 PILING WORKS 127
BLDG-1.07.1.01.01 DEWATERING 127
Dewatering 127
BLDG-1.07.1.01.02 EARTH WORKS 127
General site Cleaning 1
Excavation for pile cap 13
Excavation for lift pits 5
Disposal for surplus Material 44
Granular material fill/compact ion over pile caps 36
Fill material over 1st basement 8
Fill material over 2nd Stage basement 8
Fill material final stage 8
BLDG-1.07.1.01.03 PILE CAPS 50
Pile head Trimming 18
Pile head treatment/water proofing 1st stage 36
Solid Block for pile caps 36
Water proofing for pile caps 2nd stage 36
Pile caps rebar fixing / Concrete Pouring 36
BLDG-1.07.1.01.04 RAFT FOUNDATION 45
Anti-termite ,Blinding / W.proofing to lift pits 8
Construction of lift pits bottom slab/water stop 8
Construction of lift pits side walls 8
Formation preparation, Anti-Termite and Blinding 36
Base slab rebar/ Concrete pouring 36
Tower crane foundation 9