You are on page 1of 1

INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS

OF THE PHILIPPINES, INCORPORATED


BAHRAIN CHAPTER
PRC Accreditation No. I-APO-016
Chapter No. XX

PROFESSIONAL ELECTRICAL ENGINEER EXAMINEES ( PEE ) - DATABASE (BATCH 2)

Contact Details DATE NO. OF YEARS OF WORK EXPERIENCES DOCUMENTS


NO. Picture FULL NAME POSITION AND NAME REGISTERED PRC IIEE ID PROPOSED TITLE OF TER REMARKS DATE SUBMITTED
Pernament Home Address
OF COMPANY AS VALIDITY VALIDITY UTILITY 12.
Construction
TOTAL YEARS of 1. Letter of 2. Proposed 3. TER 4. Comprehensive 5. Oneself 9. PRC REE Board 11. Awards &
Email add Mobile No (REE)
Engineering Project
Management
Quality Operation
Academe
Generation, Sales Other
EXPERIENCE
ONESELF 6. PRC IDS 7. IIEE ID 8. REE Cert 10. CPD Cert Outstanding 13. PRC Form
& Design Management Assurance & Maintenance Transmission & Marketing Specialization Intent Title Outline Resume Word Rating Recognition
Achievements
& Supervision
& Distribution
Electricity and Water
ELECTRICAL DESIGN REVIEW DIYAR HOMES PHASE
66-B E. Rags St,. Brgy Sta. Authority - Kingdom of
1 Ryan Isidoro engr.rnisidoro@yahoo.com 36632241
Ana Pateros Metro Manila Bahrain
8-May-07 3-Mar-19 Lifetime 4 8 12 2 INFRASTRUCTURE DEVELOPMENT AT DIYAR AL
MUHARRAQ, KINGDOM OF BAHRAIN
√ √ √ For Renewal √ √ √ √
ELECTRICAL ENGINEER
7-7 Dona Martha St.,
Garcia Heights Subd., San Design Review of Area Control Center power
2 Domingo Ombao noyombao@yahoo.com 36022088-
Antonio, Sucat Paranaque
Bahrain Airport Company 4-Jan-00 29-Jun-21 29-Jun-21 3 19 22
distribution system - Bahrain Internationa Airport √ √ √ √ √ √ √ √ √ √ √
City

Block 5 lot 3 Greentown


Design and review of new CAA Headquarters Power
3 Garizaldy Arachea gary_arachea@yahoo.com 36022077 Villas 2 Bayanan, Bacoor
Cavite
Bahrain Airport Company 11-Dec-98 30-Dec-21 4-Jul-19 7 6 13 26
System installation √ √ √ √ √ √ √ √ √ √
DESIGN REVIEW OF
POWER DISTRIBUTION SYSTEM OF
P2, Anislagan, Placer,
4 Felix Cinco felixmsg@yahoo.com 36255636
Surigao del Norte
Mabanee Bahrain 29-Jun-07 17-Feb-19 17-Feb-18 1 11 12 A SHOPPING MALL COMPLEX IN
KINGDOM OF BAHRAIN
√ √ √ √ √ For Renewal For Renewal √ √ √
STUDY OF THE LOW VOLTAGE AUXILIARY POWER
P4 Gomez St. Nacional,
jason_paradero@yahoo.co SUPPLY OF 720MW MUARA KARANG COMBINED
5 Jason Ruel Paradero
m
66768722, Jimenez, Misamis
Occidental
Bechtel 27-Nov-97 4-Apr-17 Lifetime 2 19 21
CYCLE POWER PLANT PROJECT, JAKARTA, √ √ √ √ √ √
INDONESIA

B143 L6 F. Marcos St. Brgy


olivermarcsanchez@yahoo. Bahrain Petroleum Electrical System Design for Waste Water Treatment
6 Oliver Sanchez
com
+639328561117, Rizal Makati City
Philippines 1208
Company BSC (closed)
10-Oct-06 2020 1-Jan-20 12 12
Plant in the Petroleum Refinery √ √ √ √ √ √ √ √ √ √ √

#196 Dr. Nuñez St., DESIGN OF ELECTRICAL SYSTEM


jhunelcatumber@gmail.co Al Ansari Engineering
7 Jhunel Catumber
m
66914222, Poblacion 2, Ternate,
Cavite
Services
10-Mar-14 31-Oct-20 31-Oct-20 2.5 1.5 1 5 OF MIX PROJECT APARTMENT AND COMMERCIAL
BUILDING
√ √ √ √
ELECTRICAL SYSTEM DESIGN FOR THE
B9 lot 24 phase 2, Avida
REPLACEMENT OF
residence sta catalina, Bahrain Petroleum
8 Jay-ar Murillo Jay.murillo@icloud.com 38090168,
Salawag Dasmarinas Company BSC (closed)
18-Oct-04 2020 2020 14 14 OLD KERO RERUN UNIT SUBSTATION IN A REFINERY
PLANT FOCUSING ON THE
√ √ √ √
Cavite
LOW VOLTAGE SYSTEM

#264 St. Michael Subd. Electrical Design Distribution System of Al Gosaibi


9 Michael D. Lapeña michael.lapena@gmail.com 36928419 AECOM Middle East 15/12/2002 7-Apr-21 Lifetime 8 3 2 3 16
Mayapa, Calamba City Office Building in Manama, Kingdom of Bahrain

10 Renato A. Cerezo rencer888@gmail.com 36643251 Manaoag, Pangasinan Zohal Construction 10-Oct-91 4-Sep-19 2020 15 4 8 27 Assessment of Lift Station at ASRY Quay Wall Project

ELECTRICAL ENGINEER
Milla St. Poblacion West, REVIEW OF ELECTRICAL DESIGN OF TOYOTA PLAZA,
11 Gerry D. Robillos robger0620@gmail.com 33376088
Sta. Ignacia, Tarlac
Ebrahim K. Kanoo BSC
(closed)
8-May-06 20-Jun-20 20-Jun-20 12 12
TUBLI, KINGDOM OF BAHRAIN √ √ √ √ √ √ √ √

Green Meadow Sudb., EVALUATION OF BACKUP ELECTRICAL PROTECTION


Sumitomo Corp. / Fuji
12 Joseph Heril B. Catubig rhel_catz@yahoo.com 39953402 Kimba, San Roque, Talisay
City, Cebu
Electric
21-Apr-07 10-May-22 Lifetime 10 10 SYSTEM OF 66kV LOOP TYPE SUBSTATION, RAS
ZUWAYED LOOP SS, KINGDOM OF BAHRAIN
√ √ √ √ √
Arezzo Place
Condominium, A. Sandoval Design Review of a University Electrical System in
13 Franklin N. Bosi franklin.bosi@gmail.com 36004465
Avenue, Pimagbuhatan,
Bahrain Training Institute 12-Nov-02 8-Sep-20 Lifetime 16 16
Federal Democratic Republic of Ethiopia √ √ √ √ √ √ √
Pasig City

Brgy 21, St. Martin Subd.


Bahrain Engineering Electrical System Design of the Multi-Story
14 Richard Obera richard_obera@yahoo.com +639076675465, phase 2, Victorias City,
Negros Occidental
Bureau SPC
4-Jun-09 24-May-20 24-May-20 8.2 2 2.1 12.3
Residential Building at Busaiteen, Kingdom of Bahrain √ √ √ √

Page 1 of 1