Professional Documents
Culture Documents
ULLAGE/SOUNDING REPORT
2P
2S
3P
3S
4P
4S
5P
5S
GRAND TOTAL
SUMMARY
Grade Bill Of Loading Ship’ Loaded Ship Arrived Difference Percentage
Crude Palm Oil 1.850.000
THIS INSPECTION HAS BEEN CARRIED OUT CONSCIENTIOUSLY AND TO THE BEST OF OUR ABILITY. THE CERTIFICATE DOES NOT RELIEVE THE SHIPPERS, SELLERS AND/OR
INTERMEDIARSES OF THEIR CONTRACTIAL OBLIGATIONS, ESPECIALLY IN CASE OF A HIDDEN EFFECT OF THE GOODS, NOT DETECTED DURING THE INSPECTION