PT. PERTA DAYA GAS PT. WIJAYA KARYA (Persero) Tbk

PROJECT NAME : FRONT END ENGINEERING DESIGN (FEED) OF


EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
CLIENT : PT. PERTA DAYA GAS
CONSULTANT : PT. WIJAYA KARYA (Persero) Tbk
PROJECT LOCATION : MAKASSAR
DOCUMENT TITLE : UFD INSTRUMENT AND UTILITY AIR SYSTEM
DOCUMENT NO. : FPM-02-PRO-UFD-002-A3

E 01-07-13 IFB FAW ARF AA


D 29-06-13 IFA FAW ARF AA
C 26-06-13 IFA FAW ARF AA
B 18-06-13 IFR FAW ARF AA
A 20-05-13 IFR FAW ARF AA
WIKA PMC PDG
REV DATE DESCRIPTION DATE
PREP'D CHK'D APP'D CHK’D APP’D
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)

Rev. No :E
FPM-02-PRO-UFD-002-A3 UFD INSTRUMENT AND UTILITY AIR SYSTEM
Page : 2/3

LIST OF REVIEW

Rev.
Paragraph Page Number Description of Change
No.