YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2021 Multi Karya Bajatama, PT - MPI Services for H-Tech Project / Bintan - - Supply of MT Inspection as per ASME V Art. 7.

2021 J Steel Engineering Pty Ltd Sydney Fish Market Pty Ltd. - - MT/UT Inspection as per AS 1554.1 (NATA)
Supply UT/MT Inspector for Sydney Fish Market (SFM) Project (NATA) / Surabaya
2021 Dwi Sumber Arca Waja, PT Pertamina Hulu Mahakam Pertamina Hulu Kalimantan Timur Project / Batam - - Supply of AUT, UT, MT, and RT Inspection as per API 5L 46th Edition 2018

2021 Dwi Sumber Arca Waja, PT Medco Medco (Malong and Belinda Project) / Batam - - Supply of RT Inspection as per ASME IX 2019 & AWS D1.1 – 2020 for WQT

2021 Dredging International Asia Pacific Pte Ltd (Deme Group) - Supply of MPI Inspection for 3 units of Drilling Head / Batam - - Supply of MT Inspection as per AWS D1.1.

Rope Access, UT/MT/PT/ECT Inspection on LNG Cago Tank CT No. 2 as per ASME V, AWS D1.1 and
2021 Perusahaan Pelayaran Equinox, PT Golar LNG Partners LP FSRU Nusantara Regas Satu - Cargo Tank No. 1 Project / Offshore Jakarta - -
DNV
2021 Tomoe Valve Batam, PT - Supply of HT Inspection / Batam - - Supply of Hardness Testing Services

2021 Emira Energi, PT - Supply of RI Technician / Jakarta - - Supply of RI Technician.

2021 Pulau Intan, PT - Supply of RT Inspection for WPS / Batam - - Supply of RT Inspection as per AWS D1.1.

2021 Bintan Offshore Marine Centre, PT - MPI on 76 structural / Bintan - - Supply of MT Inspection as per AWS D1.1.

2021 Profab Indonesia, PT (NOV) NOV ITALY JN1397 - Platforms and Stairs Stair Tower 256 mm 20 mm Supply of MT Inspection as per ASME VIII Div. 1

2021 Profab Indonesia, PT (NOV) NOV - APL JN1403 - STP For Reliance KGD6 RUBY FPSO 310 mm 30 mm Supply of MT Inspection as per ASME VIII Div. 1

2021 Citra Tubindo Engineering ONGC A173 - (R3507) - ONGC Fabrication of Friction Clamp - - Supply of RT, MT, PT, UT Inspection as per AWS D1.1.
2020 Dua Utama Jaya, PT - RT Inspection for WQT in Banyumas - - Supply of RT Inspection as per AWS D1.1.
2020 Golden Metalindo Fabrikasi, PT - Supply of RT Inspection for WQT - - Supply of RT Inspection for 20 joints of 8" dia. pipe as per AWS D1.1.
ENI Merakes Development Project (Supply of RT/PMI/DPI CRA Inspection) / Offshore
2020 Timas Sapura Offshore JV ENI - - Supply of RT, PMI, PT for 1 joints of 8" pipe as per ASME BPVC Sec. V 2019.
Balikpapan
2020 Citra Tubindo Engineering Bladt Industries A164 CFXD - Changfang & Xidao Offshore Windfarms (Bladt) - - Supply of RT, MT, UT, HT, PMI Inspection as per DNV GL.
2020 Citra Tubindo Engineering XYZ ENGINEERING A172 - Mock Up Project to ISO 1090 & 3834 - - Supply of RT, MT, PT, UT Inspection as per ISO 15614-2, ISO 17637.
2021 Dwi Sumber Arca Waja, PT PT Pertamina (Persero) Supply of Line Pipes for Unloading Lines – RDMP Project Refinery Unit-V Balikpapan - - Supply of AUT Inspection as per API 5L.
2020 Citra Tubindo Engineering Traxys A171 - Pile Attachment Fabrication (DSAW-Traxys) - - Supply of UT and MT Inspection as per AWS D1.1 2020.
2020 El Nina Samudra, PT - Supply of RT & PT Inspection - - Supply of RT & PT Inspection as per AWS D1.1 for WQT.
2020 Bangun Bejana Baja, PT - Supply of UTM for Spherical Tank at Dumai - - Supply of UTM Inspection for 24 joints of 2 spherical tanks.
2020 Citra Tubindo Engineering, PT Qatargas A169 - Supply & Fabrication of 3 Unit CP Separator Tank (NFPS Project, Qatar Gas) - - Supply of RT, MT, UT, HT, PMI Inspection AWS D1.1 2020.
2020 H-Tech Oilfield Equipment, PT ( NOV) - Supply of MT & UT Inspection - - Supply of UT and MT Inspection as per AWS D1.1 Ed 2015.
2020 Probab Indonesia, PT Samsung Heavy Industries Supply of NDT Services as per DNV (for PAUT/ToFD) - JN 1369 - - Supply of PAUT & ToFD Inspection as per ASME VIII Div. 2.
2020 McDermott Indonesia, PT - BMB - SVDN I & T Project - - Supply of RT & PT Inspection as per ASME.
2020 Citra Tubindo Engineering, PT Seajacks International A170 - DS-8 MUD TANK SUPPORT BEAM REPAIR - PT ATLANTIC OIL FIELD SERVICES - - Supply of UT and MT Inspection as per AWS D1.1 Ed 2015.
2020 Probab Indonesia, PT - Supply of NDT Services as per DNV - - Supply of PAUT/ToFD Inspection, UT and MT as per DNV GL.
2020 Dua Utama Jaya, PT - Supply of PCN UT & MT Inspection for WQT - - Supply of UT and MT Inspection as per AWS D1.1 Ed 2015.
2020 Citra Tubindo Engineering, PT Keppel Fels Limited A161-Structural Steel & Block Fabrication Services HELIDECK for KEPPEL FELS Limited - - Supply of UT and MT Inspection as per AWS D1.1 Ed 2015.

1 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2020 Citra Tubindo Engineering, PT Keppel Fels Limited A154 - Semi submersible drilling upper hull steel outfitting - Keppels - - Supply of UT and MT Inspection as per DNV.
Supply of Eddy Current Inspection on crane with total length 30m and height of 14m for BP Tangguh
2020 Fagioli Lifting and Transportation Indonesia, PT BP Berau Tangguh Expansion Project - -
Project.
2020 Arthamigas, PT ENI FPU ENI Jangkrik / Offshore Kalimantan - - Supply of MT Inspection as per DNV.
2020 Profab Indonesia, PT (NOV) GOLAR GIMI FLNG JN1340 - Golar Gimi FLNG Project 766 mm 23,88 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2020 Profab Indonesia, PT (NOV) PT NOV JN1344 - Shell Whale 2" 60 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2020 Profab Indonesia, PT (NOV) NOV - APL JN1360 - STP For Reliance KGD6 RUBY FPSO 4500 mm 50 mm Supply of MT, PT, UT Inspection as per ASME VIII Div. 1

2020 Profab Indonesia, PT (NOV) SAMSUNGH HEAVY INDUSTRIES JN1369 - KG D6 FPSO 1963 mm 189 mm Supply of PAUT & TOFD Inspection as per ASME VIII Div. 1

2020 Profab Indonesia, PT (NOV) MCDERMOTT MIDDLE EAST,INC JN1371 - North Field Production Sustainability (NFPS)Investment 1, Project 1 279 mm 160 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2020 Profab Indonesia, PT (NOV) Mc CONNELL DOWELL JN1385 - HMAS Coonawarra Project 154 mm 11,5 mm Supply of RT, MT, PT Inspection as per ASME VIII Div. 2

2020 Profab Indonesia, PT (NOV) PT NOV JN1386 - Mozambique LNG PROJECT - 38,01 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2020 Profab Indonesia, PT (NOV) NATIONAL OIL WELL VARCO-AUSTRALIA JN1396 - HMEL Cooling water pipe 3/4" 2,87 mm Supply of PT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PTMI JN1314 - Tyra Redevelopment Project - WHRP 3173 mm 18 mm Supply of MT, RT Inspection as per ASME VIII Div. 2

2019 Profab Indonesia, PT (NOV) PT NOV JN1315 - 48” ID Spherical Sand Trap Package 48 " 90 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PT NOV JN1318 - 36” ID Spherical Sand Trap Package 36" 150 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) JURONG SHIPYARD PTE LTD JN1323 - Transocean JE3T 914 mm 25,4 mm Supply of UT, MT, RT Inspection as per ASME VIII Div. 2

2019 Profab Indonesia, PT (NOV) JURONG SHIPYARD PTE LTD JN1324 - Transocean JE3T 914 mm 25,4 mm Supply of UT, MT, RT Inspection as per ASME VIII Div. 3

2019 Profab Indonesia, PT (NOV) PTMI JN1325 - Tyra Redevelopment Project - WHRP 2965 mm 15,88 mm Supply of MT, RT Inspection as per ASME VIII Div. 4

2019 Profab Indonesia, PT (NOV) PTMI JN 1298 - Tyra Redevelopment Project - WHRP 4134 mm 25,58 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PTMI JN 1300 - Tyra Redevelopment Project - WHRP 1124 mm 12 mm Supply of RT, PT, UT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PT NOV JN 1304 - 48” ID Spherical Sand Trap Package 4410mm 90 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PT NOV JN1307 - 48” ID Spherical Sand Trap Package 48 " 90 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PTMI JN1309 - Tyra Redevelopment Project - WHRP 857 mm 15,08 mm Supply of PT, RT Inspection as per ASME VIII Div. 1

2019 Profab Indonesia, PT (NOV) PTMI JN1312 - Tyra Redevelopment Project - WHRP 2713 mm 10 mm Supply of PT, RT Inspection as per ASME VIII Div. 1

2019* Citra Tubindo Engineering, PT Keppel Fels Limited A163 - Fabricate and assemble Upper Crane Columns and Houses - - Supply of RT, MT, PT, UT Inspection as per AWS D1.1 Ed 2015.

2019 Citra Tubindo Engineering, PT Seajacks International A166 - NDT Inspection of vessel crane hooks (Seajacks Zaratan) - - Supply of MT Inspection as per AWS D1.1 Ed 2015.

2020 Saipem Indonesia, PT ENI Onshore Merakes Project - -

2019* Rekayasa Industri, PT PT Pertamina EP Gas Development Project for the Unitization of the Jambaran Tiung Biru - - Supply of RT, MT, PT, PAUT Inspection as per ASME B31.3 at Shop and Field Fabrication.

2019* Citra Tubindo Engineering, PT Keppel Fels Limited A160 - Structural Steel & Block Fabrication Services HELIDECK for KEPPEL FELS Limited - - Supply of MT, UT Inspection as per AWS D1.1 Ed 2015.

2019* Citra Tubindo Engineering, PT Keppel Fels Limited A156 - Structural Steel & Block Fabrication Services for KEPPEL FELS Limited - - Supply of RT, MT Inspection as per AWS D1.1 Ed 2015.

2019* Citra Tubindo Engineering, PT Technip FMC A165 - Gorgon Stage 2 Subsea Installation - Technip FMC - - Supply of RT Inspection as per ASME B31.3

2019* Dwi Sumber Arca Waja, PT Pertamina Hulu Mahakam PHM Project - - Supply of RT, UT, MT Inspection as per API 5L

2019* Wilmax Control System, PT - Various Project - - Supply of RT, UT, MT, PT, PMI as per AWS D1.1

2019* Perusahaan Pelayaran Equinox, PT Golar LNG Partners LP Nusantara Ragas Satu - Cargo Tank No. 04 Project - - Supply of UT Thickness Measurement and Eddy Current as per ASME V and DNV

2019* Timas Indonesia, PT ENI Merakes FPU Upgrade Project - - Supply of RT, MT, UT Inspection as per DNV

2019* Citra Tubindo Engineering, PT ENI A145 - Fabrication Slug Catcher - Merakes FPU Upgrade Project - - Supply of PAUT Inspection as per ASME B31.3

2019* Saipem Indonesia, PT ENI Merakes FPU Upgrade Project (Onshore Batam and Offshore Balikpapan) - - Supply of RT, MT, PT, UT, PMI, PAUT Inspection as per AWS D1.1

2019* CSTS JO BP Berau Tangguh Expansion Project - - Supply of RT, MT, PT, PMI, HT, EC, PWHT as per ASME B31.3
Royal Dutch Shell Plc. of the UK and Holland;
PETRONAS of Malaysia; PetroChina Co. Ltd. of
2019* Siemens Pte Ltd. LNG Canada Project - - Supply of RT, UT Inspection as per ISO 17025
China; Mitsubishi Corp. of Japan; and Korea Gas
Corporation of Korea.

2 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2019* Timas Indonesia, PT - Various Project - - Supply of PMI Inspection

2019* Citra Tubindo Engineering, PT - A157 - Structural Steel & Block Fabrication Services - - Supply of MT, UT Inspection as per AWS D1.1 Ed 2015.

2019* Citra Tubindo Engineering, PT ENI A159 - Merakes Project EPCI-4 Onshore Fabrication for Subsea Structure - - Supply of RT, MT, PT, UT Inspection as per AWS D1.1 Ed 2015 and DNV

2019* SMOE Indonesia, PT Orsted Hornsea 2 Project - - Supply of PAUT Inspection as per BS EN ISO 13588

2019* IWW CRA Energy Solutions, PT - Various Project - - Supply of UT Thickness Measurement and PT Inspection as per ASME V Art. 6

2019* Prospera Brillar Indonesia, PT BP Berau Tangguh Expansion Project - - Supply of MT, UT Inspection as per ASME B31.3

2019* Det Norske Veritas Pte. Ltd Orsted Hornsea 2 Project - - Supply of UT Inspector for crosschecker

2019* Citra Tubindo Engineering, PT XYZ ENGINEERING A151 - Renewal ASME Certification (ASME Demo Vessel) - - Supply of RT, MT Inspection as per ASME

2019* Citra Tubindo Engineering, PT - A150 - Procurement of Mast and Substructure - - RT, UT, MT Inspection for WQT work as per AWS D1.1

2019 NPS Engineering Company Ltd. IRPC Weld Work of F0601 (3100136579) P62040 - - Liquid Penetrant Examination for CS andSS Piping

2019 Bangchak Corporation Public Company Limited BCP Outlet Recycle Oil from 4C-3901 to 4P-3906 - - Phased Array Examination for AS (P5) Piping
2019 Bangchak Corporation Public Company Limited BCP Mini Shutdown Jul 19 Recycle Gas Piping - - Phased Array Examination for SS Piping
2019 Bangchak Corporation Public Company Limited BCP RBI Piping 4000U Loop 14-Sht.071 - - Phased Array Examination for CS Piping
2019 Thaioil Public Company Limited TOP Pipe Line Stream S25006 of K-2501 - - UTM for Pipe Line Stream S25006 of K-2501

2019 Wiztech International Co., Ltd. TOP Fabrication New Bundle - - LPI for Fabrication New Bundle CS

2019 Thaioil Public Company Limited TOP 24 " Raw Water GPSC - - PAUT 0 Degree Scan

2019 Thaioil Public Company Limited TOP MTA 2019 at Unit 9700 - - UTM for MTA 2019 at Unit 9700

2019 Future Development & Construction Co., Ltd. IRPC Pipeline Distribution System from CUP1 to PO Plant - - Phased Array Examination for CS, SS Piping
2019 Egco Engineering & Service Co., Ltd Danchang Bio Power Plant Replace Inspection Hydro Grate Stocker (Boiler #11) - - Phased Array Examination for AS Tube (STBA22 JIS
2019 Chaiwatthana Engineering Co., Ltd. IRPC Modify B 20 Truck Load LDDR - - Phased Array Examination for CS Piping
2019 Chaiwatthana Engineering Co., Ltd. IRPC Fuel Oil Export for IMO - - PAUT for Fuel Oil Export for IMO

2019 Tech Asia Co., Ltd. PTT Modify Globe Control Valve 1,2 701-PV007B - - ASTM A516-70N
2019 Wiztech International Co., Ltd. ESSO Fabrication Floating Head Cover - - Liquid Penetrant Examination for Floating Cover of Heat Exchanger

2019 Chatr Karnchang Laemchabang Co., Ltd. PTT Drain Line for 3215-D-001/002 to 3202-1-Y-002 - - Phased Array Examination for CS Piping
2019 Wiztech International Co., Ltd. TOP RE-Tube of Heat Exchanger MTA 2019 - - Liquid Penetrant Examination for SS Tube Sheet
2019 Thaioil Public Company Limited TOP Overhaul Compressor K-2101, 2100 CDU3 - - Liquid Penetrant Test for Critical Equipment Part for Compressor
2019 Wiztech International Co., Ltd. TOP Fabrication New Bundle - - Liquid Penetrant Examination for SS Tube Sheet
2019 Thaioil Public Company Limited TOP MTA 2019 at TOP - - Phased Array Examination for AS Shell Plate and UTM for equipments
2019 Thai Paraxylene Company Limited TPX MTA 2019 at TPX - - Phased Array Examination for CS Piping and UTM for UTM for equipments
2019 Thaioil Public Company Limited TOP MTA 2019 at TOC5
- - Phased Array Examination for SS Piping and Tube Sheet for Heat Exchanger and UTM for equipments
2019 Future Development & Construction Company Limited TTT Thai Tank Terminal VN-0029 Project - - Phased Array Examination for CS Piping
2019 TPT Petrochemical Public Company Limitted TPT Shut Down Jun 19 - - Phased Array Examination for SS Piping
Phased Array Examination for Finding Crack on OD and ID surface of Alloy Tubing and UTM for
2019 Thaioil Public Company Limited TOP PX MAX TAM 2019
- - equipments
2019 Chatr Karnchang Laemchabang Co., Ltd. PTT Drain Line for 3201-1/2-D003 to TEG Waste PIT - - Phased Array Examination for CS Piping
2019 Chatr Karnchang Laemchabang Co., Ltd. PTT Drain Line for 3215-D-001/002 to 3202-1-Y-002 - - Phased Array Examination for CS, SS Piping
2019 Thaioil Public Company Limited TOP Grid Scan UTM-CUI C9252 - - UTM for Grid Scan UTM-CUI C9252

2019 Thaioil Public Company Limited TOP Equipment : B-4011 Furnace Rear Wall Tube Panel - - UTM for Equipment : B-4011 Furnace Rear Wall Tube Panel

2019 Thaioil Public Company Limited TOP 2019 Overdue MP Injection Point Campaign U2100, 2600 - - UTM for 2019 Overdue MP Injection Point Campaign U2100, 2600

2019 NPS Engineering Company Ltd. IRPC Install New Steam Tracing for Sloop and Unloading Line (MRU) - - Liquid Penetrant Examination for CS Piping
2019 NPS Engineering Company Ltd. IRPC Piping Work for Silling 14-T006 Tankage to TPIPL - - Phased Array Examination for CS Piping

3 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2019 Future Development & Construction Co., Ltd. IRPC Pipeline Distribution System from CUP1 to PO Plant - - Phased Array Examination for CS Piping
2019 Thaioil Public Company Limited TOP UTM Equipment unit 9200 - - UTM for UTM Equipment unit 9200

2019 Thaioil Public Company Limited TOP UTM Piping for TOC 5 - - UTM for UTM Piping for TOC 5

2019 SCG Chemical Company Ltd. SCG Redundant Naphtha & PYGAS Pipeline - - Phased Array Examination for CS Piping
2019 NPS Engineering Company Ltd. IRPC Install New Steam Tracing for Sloop and Unloading Line (MRU) - - Phased Array Examination for CS Piping and Liquid Penetrant Examination for CS Piping
2019 Thaioil Public Company Limited TOP UTM Grid Scan Line MP Steam Leaked at U-5000 - - UTM Grid Scan Line MP Steam Leaked at U-5000

2019 Thaioil Public Company Limited TOP Confirm Thickness for CFP U-2300 - - UTM for Confirm Thickness for CFP U-2300

2019 Chaiwatthana Engineering Co., Ltd. IRPC Fuel Oil Export for IMO (Lube to UHV) - - Phased Array Examination for CS Piping
2019 Bangchak Corporation Public Company Limited BCP RBI Equipment Plant # 4 - - UTM for RBI Equipment Plant # 4

2019 Chaiwatthana Engineering Co., Ltd. IRPC Provide Facilities to Support Low Sulfur Fuel Oil Domestic Sale (IMO) - - Phased Array Examination for CS Piping
Ultrasonic Thickness Measurement Examination for CS U-Tube OD 25.40 mm Dia., Thickness 2.642
2019 Wiztech International Co., Ltd. WIT Shop Fabrication of New Buddle of Heat Exchanger 25.4 2.642 mm.
2019 NPS Engineering Company Ltd. IRPC AYC 62260, AYC 62259 and P62012 Phased Array Examination for CS Piping
- -

2019 Techasia Co., Ltd. PTT Pinch Across Plant Utilization Hot Oil from WHRS to LPG Recovery Column (PACP) Phased Array Examination for CS Piping and Magnetic Particle Examination for CS Structural
- -
2019 NPS Engineering Company Ltd. IRPC Fuel Oil Export For IMO (TPLT) - - Liquid Penetrant Examination for CS Piping

2019 Thaioil Public Company Limited TOP UTM Equipment TOC4 - - UTM for Equipments

2019 H.T.E. Service & Supply Company Limited. IRPC RIR_ Cracking Z1507(PCU) - - Phased Array Examination for CS Piping

2019 NPS Engineering Company Ltd. IRPC Increasing gasoline product from 135 to 150 MML/mount. Phased Array Examination for CS Piping Works and Liquid Penetrant Examination for CS Piping Works
- -
2019 Bangchak Corporation Public Company Limited BCP RBI Unit of 4000, 700, 1800 and 2400 - - Phased Array Examination for CS Piping

2019 Wiztech International Co., Ltd. WIT Shop Fabriction new bundle of heat exchanger. - - Liquid Penetrant Examination for CS plate

2019 NPS Engineering Company Ltd. IRPC 10603131 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603922 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603920 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603907 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603935 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC Welding & Piping Repair SD BDE 2019 - - Phased Array Examination for CS Piping Works

2019 MACS Co., Ltd. IRPC Repair Casing 31D003 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603884 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603882 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603918 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 10603910 - - Phased Array Examination for CS Piping Works

2019 Bangchak Corporation Public Company Limited BCP Piping & RBI-U1600-Loop-01, 04 - - Phased Array Examination for CS Piping Works

2019 Future Development & Construction Company Limited GPSC Pipeline Distribution To Ploys Plant Project - - Phased Array Examination for CS/SS Piping Works

2019 NPS Engineering Company Ltd. IRPC ECP Pipig System for Increase PRP Condensate Outlet - - Phased Array Examination for CS/SS Piping Works

2019 ACE Engineering & Construction Company Ltd. Mabtaphut Tank Terminal MTT-Enclosed Ground Flare - - Phased Array Examination for SS321 Piping Works

2019 Thaioil Public Company Limited TOP Thaioil Public Company Limited - - UTM for equipments

2019 Thaioil Public Company Limited TOP Out Let E-2106 CD to V2101 - - Phased Array Examination for CS Piping Works

2019 ACE Engineering & Construction Company Ltd. SCG Redundant Naphtha and Pygas Pipe Line - - Phased Array Examination for CS Piping Works

2019 Thaioil Public Company Limited TOP UTM U-2100,U-2600,U-2700,U-2900 (TOC4) - - UTM U-2100,U-2600,U-2700,U-2900 (TOC4)

2019 Chaiwatthana Engineering Co., Ltd. IRPC Renew Hydrogen Compressor of PP Plant - - PAUT for Renew Hydrogen Compressor of PP Plant

2019 NPS Engineering Company Ltd. IRPC PCP -RCPR-ERU Maximize UHV Fuel Gas Tie-in (P62021) - - Phased Array Examination for CS Piping Works

4 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2019 NPS Engineering Company Ltd. IRPC Welding Piping Repair SD 2019 (A62003) - - Phased Array Examination for CS Piping Works

2019 Chatr Karnchang Laemchabang Co., Ltd. PTT VEVT Line 320 FV 005 and 320 FV 025 - - Phased Array Examination for CS Piping Works

2019 Chatr Karnchang Laemchabang Co., Ltd. PTT Cooling Circulation Line - - Phased Array Examination for CS Piping Works
Phased Array Examination for SS321 Piping Works and Liquid Penetrant Examination for SS Piping
2019 Bangchak Corporation Public Company Limited BCP Mini Shut Down Plant # 4-2019
- - Works
2019 NPS Engineering Company Ltd. IRPC Piping Work for Install AIP line for Cleaning Filter Gala Dryer (P62017) - - Liquid Penetrant Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC Provide Online RI Analyzer for SEU Plant (P 62009) - - Liquid Penetrant Examination for CS Piping Works

2019 Chatr Karnchang Laemchabang Co., Ltd. PTT VEVT Line WHRU #1, 2 ESP for N2 Flush Hot Oil - - Phased Array Examination for CS Piping Works

2019 Thaioil Public Company Limited TOP UTM Dead End Unit 3250 - - UTM for UTM Dead End Unit 3250

2019 Chaiwatthana Engineering Co., Ltd. IRPC ABS Powder Expansion - - Phased Array Examination for CS and S/S Piping Works

2019 Chaiwatthana Engineering Co., Ltd. IRPC SIL Gap Closing for SAN 1-2 Plant - - Phased Array Examination for S/S Piping Works

2019 NPS Engineering Company Ltd. IRPC Repair Pipe Line 125-BY 390201-BB5N - - Phased Array Examination for CS Piping Works

2019 TRC Construction Public Co., Ltd. SCG Pipe Existing 4" Nitrogen and Pipe Existing 3" Plant Air - - Ultrasonic Thickness Measurement Examination for CS Piping Works

2019 Chaiwatthana Engineering Company Limited IRPC SAN Process Improvement for Plant Reliability - - Phased Array Examination for CS Piping Works

2019 Thaioil Public Company Limited TOC MTA Adit 2 U 1850 - - UTM for MTA Adit 2 U 1850
Phased Array Examination for CS Piping Works and Liquid Penetrant Examination for CS Piping/Plate
2019 NPS Engineering Company Ltd. IRPC 03E001B
- - Works
2019 Boonyanuch Engineering Company Ltd. PTTGC New Fabrication Air Fin of LDPE GC 11 Plant - - Phased Array Examination for Header Box CS Plate

2019 Chaiwatthana Engineering Co., Ltd. IRPC SIL Gap Closing for SAN3 Plant - - Phased Array Examination for S/S Piping Works

2019 MACS Company Limited IRPC Repair Level Drum PWP2/Unit 03 - - Phased Array Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC 30081057 A62004 - - Phased Array Examination for CS Piping Works

2019 Wiztech International Co., Ltd. Chevron Re Tubing of Heat Exchanger - - Ultrasonic Thickness Measurement Examination for CS U-Tube

2019 Wiztech International Co., Ltd. TPX Fabrication New Bundle of Heat Exchanger - - Ultrasonic Thickness Measurement Examination for CS U-Tube
Modify of new line LLP steam inlet of steam air preheater E7808A/B unstead to use LP
2019 Chaiwatthana Engineering Company Limited IRPC - - Phased Array Examination for CS Piping
steam
2019 Bangchak Corporation Public Company Limited BCP RBI Equipment Plant#4 - - Ultrasonic Thickness Measurement Examination for Equipment

2019 Thai Paraxylene Company Limited TPX Injection Point-TPX 2019 - - UTM for Injection Point-TPX 2019

2019 TPT Petrochemical Public Company Limitted TPT B-3130 A Superheat Tube Shut Down - - Phased Array Examination for AS Tubes

2019 HTE Service & Supply Co., Ltd. IRPC Move of Pipe 12" for lift Up Pump 69P064A-B - - Phased Array Examination for CS Piping Works

2019 Thaioil Public Company Limited TOC R-701 Leaking at Stripper Line - - UTM for R-701 Leaking at Stripper Line

2019 MACS Co., Ltd. IRPC Convertor Weld and Repair Piping RDCC SD 2019 - - Phased Array Examination for SS A312 GR. TP321 Piping

2019 Chaiwatthana Engineering Co., Ltd. IRPC EPS Green Thermal Insulation Expansion - - Phased Array Examination for CS Piping Works

2019 Bangchak Corporation Public Company Limited BCP Vessel No.2D-102(N) and 8"-P24017-A21A - - Phased Array Examination for CS Piping

2019 Chaiwatthana Engineering Co., Ltd. IRPC Piping Work for UHV Produce Valve Added Sea Side - - Phased Array Examination for CS Piping

2019 Chaiwatthana Engineering Co., Ltd. IRPC Add BV and Isolation Blind 58K001 - - Phased Array Examination for CS Piping

2019 Rayong Intania Company Limited PTT Odor Removal Unit for LPG Aerosol Phase 2 - - Phased Array Examination for CS Piping

2019 Bangchak Corporation Public Company Limited BCP UTM Dead Legs for BCP Plant #4 (2019) - - Ultrasonic Thickness Measurement Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC Cut and Change of Line 6’’-UW-E8308-HA1 - - Liquid Penetrant Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC Repair Pipe Line 100"-CG-390001-BE5N - - Phased Array Examination for CS Piping

2019 Chaiwatthana Engineering Co., Ltd. IRPC Reduce and Extend Yearly Shut Down PP - - Phased Array Examination for CS Piping

2019 NPS Engineering Company Ltd. IRPC Reduce and Extend Yearly Shut Down PP - - Phased Array Examination and Liquid Penetrant Examination for CS Piping Works

2019 MACS Co., Ltd. IRPC Convertor Loop Maintenance Welding & Pipe Repair - - Phased Array Examination for CS Piping

2019 NPS Engineering Company Ltd. IRPC Improvement Demineralized Water System for ETP Area - - Phased Array Examination for SS Piping

2019 Chaiwatthana Engineering Co., Ltd. IRPC Add Rigid Line From SWS to CPI - - Phased Array Examination for SS Piping

5 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2019 Bangchak Corporation Public Company Limited BCP Tank No. 4D-107 - - Phased Array Examination for CS Piping Works

2019 Future Development & Construction Co., Ltd. GPSC Pipeline Distribution System CUP-1 to PO Plant - - Phased Array Examination for CS Piping

2019 Bangchak Corporation Public Company Limited BCP UTM Dead Legs for BCP Plant #4 - - Ultrasonic Thickness Measurement Examination for CS Piping Works

2019 Future Development & Construction Co., Ltd. GPSC Installation 12" Isolated Valve - - Phased Array Examination for AS Piping Works

2019 Chaiwatthana Engineering Co., Ltd. IRPC Modify Vapor Asphalt to Scurb at W3A - - Phased Array Examination for CS Piping

2019 Thaioil Public Company Limited TOC B-84053-Statutory Inspection - - Magnetic Particle Examination and UTM for Pipin Works

2019 Thaioil Public Company Limited TOC Shutdown Unit 2300 - - Magnetic Particle Examination and UTM for Pipin Works

2019 Bangchak Corporation Public Company Limited BCP RBI Piping Unit 2400 Loop 04 - - Phased Array Examination for KCS Piping Works

2019 NPS Engineering Company Ltd. IRPC Welding & Piping Repair of PWP 1 - - Liquid Penetrant Examination for CS Plate

2019 Thaioil Public Company Limited TOC UTM for Line 4" Catalyst R-701 and 702 - - UTM for Line 4" Catalyst R-701 and 702

2019 HTE Service & Supply Co., Ltd. IRPC Fuel Oil Export IMO Project DCC Tankage - - Phased Array Examination for CS Piping

2019 HTE Service & Supply Co., Ltd. IRPC Welding & Piping Repair PWP-SD2018 - - Phased Array Examination for CS Piping

2019 Techasia Co., Ltd. PTT Improve of Gas Line 34" for Insatll Bypass for 300HOV4 - - Ultrasonic Thickness Measurement for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC Additional LPG to OVHD of Debutanizer for Incresing PNU Capacity - - Phased Array Examination and Liquid Penetrant Examination for CS Piping Works

2019 NPS Engineering Company Ltd. IRPC EPC Piping System E$E-UHV-RCH-RCHR-52X005-Slop Reduction - - Phased Array Examination for CS Piping

2019 Thaioil Public Company Limited TOC Overhaul Type "C" for K-2502D - - Liquid Penetrant Test for Critacal Part for K-2502D

2019 NPS Engineering Company Ltd. IRPC E4E-Install New C4 Cut Line to TF 2 for Exporting During BDE - - Phased Array Examination and Liquid Penetrant Examination for CS and SS Piping Works

2019 Bangchak Corporation Public Company Limited BCP Tower Crane Port 18 F - - Magnetic Particle Examination and Liquid Penetrant Examination for Structural Beams

2019 MACS Co., Ltd. Glow Energy Planing Schedule for Remove and Reinstall Heater LP#3 and #4 - - Phased Array Examination for CS Piping

2019 HTE Service & Supply Co., Ltd. IRPC 58 R 003 Purge System Improvement - - Phased Array Examination for CS Piping

2019 Thaioil Public Company Limited TOC UTM Scan for Dead End and U-9700 - - Ultrasonic Thickness Measurement Examination for CS Piping Works
2019-2021 Ledcor/SICIM/Somerville Aecon TransMountain Pipeline LP. (Kinder Morgan) TransMountain Expansion - TMEP (Alberta, Britsh Columbia) 36"/42" 370km CSA Z662 / Wall Thicknesses: 11.8mm, 14.7mm, 19.0mm, 13.8mm, 22.2mm

2019-2021 TBD TransCanada Pipelines Keystone XL (Montana, South Dakota, Nebraska) 36" 275 Miles API 1104 / Wall Thicknesses: 9.8mm, 11.8mm, 13.1mm, 14.5mm, 15.8mm, 19.1mm

2019* Citra Tubindo Engineering, PT Taurus Mining Solutions Pty Ltd. A152 - 3x Taurus 773e cAT oht Coal Bodies Project - - RT, UT, and MT Inspection for AWS D1.1 2015

2019* Transalindo Eka Persada, PT - Suppy of Standard NDT Services for Yinson Project (DNV) - - RT/MT/PT/UT Inspection as per DNV

2019* Rotary Engineering Indonesia, PT ENERGEAN OIL & GAS Karish Gas Development Project - - RT/UT/MT/PT/PAUT/PMI/HT Inspection as per DNV

2019* BW Offshore TSB Invest, PT BW Offshore Joko Tole Project - - UT Thickness Inspection

2019* Chandra Asri Petrochemical Tbk., PT Chandra Asri Petrochemical Polymer TAM 2019 Project - - PAUT Inspection as per ASME B31.3

2019* Citra Tubindo Engineering, PT - A145 - Fabrication Slug Catcher - Merakes FPU Upgrade Project - - RT, MT, PT, UT, PMI Inspection as per ASME VIII

2019* Penta Global Kontraktor, PT British Petroleum (BP) Berau Ltd BP Tangguh Project - - RT/MT/PT/PAUT/PMI/PWHT Inspection for piping as per ASME B31.3

2019* Dua Utama Jaya, PT - Supply of NDT Services 2019 - - RT Inspection for WQT work as per AWS D1.1 and ASME B31.3

2019* Citra Tubindo Engineering, PT - A147 - Provision of Fabrication Monkey Board Drill Rig PDSI Project - - MT Inspection as per AWS D1.1

2019* Dwi Sumber Arca Waja, PT - Hornsea 02 Jacket Project - - MT Inspection as per AWS D1.1

2019* SM Engineering, PT - Supply of Penetrant Testing for 2 units reservoir dan lifting - - PT Inspection for 2 units reservoir and lifting as per ASME B31.3

2019* Dwi Sumber Arca Waja, PT - Suppy of NDT Inspection for 18 5/8IN - - RT Inspection for WQT work as per AWS D1.1 and ASME B31.3

2019* Toyo Kanetsu Indonesia, PT - Butene-1 and MTBE Project - - PAUT Inspection as per ASME Sec. VIII Div. 1

2019* Dwi Sumber Arca Waja, PT NOC NOC - Gallaf Project - - RT Inspection for WQT work as per AWS D1.1 and ASME B31.3

2019* McDermott Indonesia, PT Reliance Industries Limited R3923 - Reliance KG-D6 Project (S-Cluster) - - RT/MT/PT/UT Inspection for Piping as per ASME and DNV and Structural works as per AWS D1.1

2019* Dwi Sumber Arca Waja, PT Supreme Energy Rantau Dedap, PT Rantau Dedap Project - - UT/MT Inspection for Piping work as per ASME B31.3

6 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2019* J Steel Australasia Pty Limited - NATA Project - - UT Inspection as per NATA / AS 1554.1

2019* Citra Tubindo Engineering, PT ENI A144 - Fabrication Pig Trap Launcher Receiver - MERAKES FPU UPGRADE PROJECT - - RT/MT/UT/PT, PMI, FT Inspection for PQR woks as per ASME VIII

2019* Dwi Sumber Arca Waja, PT ENERGEAN OIL & GAS Karish Gas Development Project - - RT/MT/PT/UT Inspection as per DNV

2019* Toyo Kanetsu Indonesia, PT - Renewal ASME - - RT/UT/PAUT Inspection as per ASME VIII Div. 1

2019* Nippon Steel & Sumikin Engineering Co.Ltd - RT Inspection for 10 test pieces - - RT Inspection as per API 1104 2013

Sarawak Shell Berhad (SSB) and Sapura Exploration RT/MT/UT Inspection as per API 1104 for diameter 8", 12", 16", 28" and various thickness 17.5mm,
2019* McDermott Indonesia, PT Pan Malaysia Project 8", 12", 16", 28" -
and Production (SEP) 18.3mm, 12.7mm, 30mm, 25.4mm
2019* Toyo Kanetsu Indonesia, PT - PAUT Validation - - PAUT Inspection as per ASME VIII Div. 2

2019* Namitra Jaya Mandiri, PT - Various Project - - Supply of Hardness Testing Services

2019* Steelaris Pte. Ltd. GE Gorgon Phase 2 Project - - UT Inspection as per AWS D1.1 2015

2018/2019 Bannister/Surerus/Macro TransCanada Pipelines North Montney Pipeline Project - 3 Spreads / Natural Gas Pipeline 36" 182km CSA Z662 / Wall Thicknesses: 13.7mm, 15.2mm, 18.3mm, 22.2mm on pipeline

2018/2019 US Trinity Energy Services EQT Midstream Partners/Nextera Energy Mountain Valley (MVP) Project (WV) 42" 40 Miles API 1104 / Wall Thicknesses: 13.7mm, 15.2mm, 18.3mm, 22.2mm

2018* Singatac Engineering Pte Ltd - Various Project - - RT/MT/PT/UT Inspection as per AWS D1.1 2015

2018* Starindo Tunggal Pratama, PT ENERGEAN OIL & GAS Karish Gas Development E-House Project - - RT Inspection as per DNV

2018 Dwi Sumber Arca Waja, PT PT Pertamina (Persero) RDMP Lawe-Lawe Project - - RT/MT/UT Inspection as per API 5L

2018* ASL Shipyard Indonesia, PT DNV GL Various Project as per DNV Class - - UT Inspection as per DNV Class

2018* Citra Tubindo Engineering, PT Premier Oil A143 - Fabrication Services for Subsea Structure & Piping BIGP Project - - RT/UT/MT/PT/FT/PMI/HT Inspection as per AWS D1.1 2015 and ASME B31.3

2018* Steel Point Ltd. - Supply of CSWIP 3.1 Inspector for Waimakariri River Bridge Project - - QC Inspection

2018* Jinfindo, PT - Supply of MT Services - - MT Inspection

2018* H-Tech Oilfield Equipment, PT ( NOV) - Supply of MT Services - - MT Inspection

2018* Saipem Indonesia, PT ENI Jangkrik FPU Project Offshore / Kalimantan - - PAUT Inspection as per DNV

2018 Dwi Sumber Arca Waja, PT PT Pertamina Hulu Mahakam PHM Project 20" 15.88; 16 UTScan Inspection as per API 5L

2018* Inti Karya Persada Teknik, PT Chandra Asri Petrochemical NPE Project - - PAUT Inspection as per ASME B31.3

2018* Cameron System, PT - Supply of PMI Services for Various Project - - PMI Inspection as per client specification
RT/UT/MT/PT Inspection as per AWS D1.1 2010 and ASME B31.3 for diameter4", 18" and various
2018* McDermott Indonesia, PT Reliance Industries Limited BMB - Reliance KG-D6 Project 4", 18" -
thickness 9.8mm, 22.2mm, 26.4mm, 31.8mm, 10.3mm,11.1mm, 32mm
2018* Steel Point Ltd. - NATA Project - - MT/UT Inspection as per AS 1554.1 (NATA)

2018* Dwi Sumber Arca Waja, PT - Supply Tubular CS - - RT/UT Inspection as per AWS D1.1 2015

2018* Citra Tubindo Engineering, PT - A140 Project - - RT/MT/PT/UT Inspection as per AWS D1.1 and ASME B31.3

2018* Citra Tubindo Engineering, PT - A138 Project - - RT Inspection as per ASME B31.3

2018* Profab Indonesia, PT (NOV) - Master Services Agreement for Phased Array Ultrasonic Testing - - PAUT Inspection on vessel as per ASME VIII Div. 1

2018* Profab Indonesia, PT (NOV) - Spherical Sand Trap Project 36" - PAUT Inspection on vessel as per ASME VIII Art. 4 Mandatory Appendix VIII for Dia. 36", thk 150mm

2018* McDermott Indonesia, PT Reliance Industries Limited Supply of NDT Services for Reliance KG-D6 Project at Fabrication Yard - - RT/MT/PT/UT Inspection as per AWS D1.1 and ASME B31.3

2018* McDermott Indonesia, PT Maersk Oil N0510-SC029 & N0511-SC028 -Maersk Tyra Future Facilities - - RT/MT/PT/UT Inspection as per AWS D1.1 and ASME B31.3

2018* McDermott Indonesia, PT Qatar Petroleum Bul Hanine Re-Development Phase 1B Project - - RT/MT/PT/UT Inspection as per AWS D1.1 and ASME B31.3

2018* McDermott Indonesia, PT GE R3412 - Chevron Gorgon Stage 2 - Fabrication of Manifolds, PTS, PLET & SSPLR - - RT/MT/PT/UT Inspection as per AWS D1.1 and ASME B31.3
RT/UT/MT Inspection JIS Z 3060 on on cranes, spreader bar, MT3010 Johor, joint girder WEB and
2018* MES Machinery Indonesia, PT Mitsui MT6001 Project - -
Flane, Equalizer Beam Belawan (MT4005 Project), Sill Beam of Kuantan Project (MT3030), Lifting Lug
2018* Karimun Sembawang Shipyard, PT Trans Ocean Trans Ocean Project - - RT/MT/UT Inspection as per DNVGL CP0484

7 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018* Citra Tubindo Engineering, PT Premier Oil A142 - Fabrication of Deck Extension Structure & Piping for Bison Iguana and Gajah - - RT/UT Inspection as per ASME B31.3 and AWS D1.1

2018* Citra Tubindo Engineering, PT Drillmec (Trevi Group) A139 - Additional Scope of Landrig 1500HP AC - - RT/UT/MT/PT Inspection as per ASME B31.3 and AWS D1.1

2018 Profab Indonesia, PT (NOV) SAMSUNGH HEAVY INDUSTRIES JN 1243 - Mad Dog Phase 2 PROJECT 1525 mm 64 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) SAMSUNGH HEAVY INDUSTRIES JN 1245 - Pilling - 18 to 32 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1253 - Moon Pool 12000 mm 50 mm Supply of UT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1260 - Angore Surface Facilities and Pipelines Project - Flowline Module 12" 19,05 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1261 - Angore Surface Facilities and Pipelines Project - Flowline Module 6" 31,72 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1262 - Angore Surface Facilities and Pipelines Project - Flowline Module 10" 44,45 mm Supply of RT, PT, UT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1263 - SHELL VITO FPS, Gulf of Mexico 2" 60 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1264 - 48” ID Spherical Sand Trap Package 48 " 60 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1265 - Angore Surface Facilities and Pipelines Project - Flowline Module 50 mm 6 mm Supply of MT Inspection as per ASME VIII Div. 2

2018 Profab Indonesia, PT (NOV) YINSON PRODUCTION JN 1272 - FPSO Helang 2375mm 60 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1275 - 48” ID Spherical Sand Trap Package 4415mm 90 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1279 - 48” ID Spherical Sand Trap Package 4410mm 90 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1287 - 36” ID SPHERICAL SAND TRAP PACKAGE 3640 mm 130 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1295 - 48” ID Spherical Sand Trap Package 4410mm 90 mm Supply of PAUT Inspection as per ASME VIII Div. 1

2018 Profab Indonesia, PT (NOV) PT NOV JN 1296 - Well Head Desanding 2910 mm 180 mm Supply of PAUT, MT, UT Inspection as per ASME VIII Div. 2

2018 Profab Indonesia, PT (NOV) PTMI JN1313 - Tyra Redevelopment Project - WHRP 2250 mm 75 mm Supply of UT, MT Inspection as per ASME VIII Div. 1

2017 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1259 - Angore Surface Facilities and Pipelines Project 2" 8,74 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2017 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1217 - Angore Surface Facilities and Pipelines Project 178 mm 33,32 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2017 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1231 - Angore Surface Facilities and Pipelines Project 12" 53,98 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2017 Profab Indonesia, PT (NOV) WOOD GROUP PSN JN 1242 - Angore Surface Facilities and Pipelines Project 14" 57,15 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2017-2018 OJ Pipelines TransCanada Pipelines Boundry Lake North Project - NWML Loop 36"/30" 91. km CSA Z662 / Wall Thicknesses: 11.8mm, 14.5mm, 15.7mm, 15.9mm, 19.7mm

2017 - 2018 SK Engineering & Construction Ltd., Laos Hydroelectric Power Xe-Pian Xe-Namnoy Hydropower - Service of PAUT for piping works for Xe-Pian Xe-Namnoy Hydropower

2016* Saipem Indonesia, PT TOTAL Jangkrik FPU Project Offshore / Kalimantan - - MT,PT,UT Inspection as per AWS D1.1 2010

2016 Profab Indonesia, PT (NOV) UOP-HONEYWELL JN 1204 - Pertamina Cilacap Blue Sky Project 800 mm 20 mm Supply of RT, MT, PT, UT Inspection as per ASME VIII Div. 1

2015-18 Heerema/PTL Shell Appomattox 10.75",16" 68 Miles UTScan Inspection as per API 1104 with different thickness 28.0mm, 43.4mm, 45mm
8.625", 10.75", UTScan Inspection as per API 1104 with different thickness 17mm, 21mm, 22mm, 20.6mm 29mm,
2015-17 Subsea 7 Hess Stampede 65 Miles
12.75" 30mm, 36mm,
UTScan Inspection as per API 1104 with different thickness
2015-16 Technip Deep Gulf Energy Odd Job 8", 8.625",12.75" 14.4 Miles
15.9mm,16.3mm,22.7mm,22.8mm,23mm,23.7mm,24.5mm,24.7mm,28.7mm,28.8mm,30.3mm
2015-16 McDermott LLOG Otis 7.625" 15 Miles UTScan Inspection as per API 1104 with different thickness 22.2mm, 28.9mm

2015-16 Technip-USA BP Thunderhorse South Expansion 10.75" 4 Miles UTScan Inspection as per API 1104 with thickness 37mm

2015-16 Technip-USA BP Juniper 26" 10 Miles UTScan Inspection as per API 1104 with thickness 15.8mm

2015-16 Technip - USA Chevron Blind Faith 2 6" 5 Miles UTScan Inspection as per API 1104 with thickness 31.1mm
MT/PT/UT/AUT/PAUT, RT Crawlers, Ferrite Testing/PMI/Eddy Current Inspection as per client
2015* McDermott Indonesia, PT McDermott Indonesia, PT Master Services Aggrement / Batu Ampar / Batam - -
requirements

8 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2015* Citra Tubindo Engineering, PT Citra Tubindo Engineering, PT Master Services Aggrement / Kabil / Batam - - MT/PT/UT/PAUT, RT Crawlers, Ferrite Testing/PMI/Eddy Current Inspection and PWHT by Furnace
2015 8.625",6.625",10
Technip-USA Murphy Thunderbird 44 Miles UTScan Inspection as per API 1104 with different thickness 31.8mm, 19.05", 18.3mm
(Cancelled .75"
2015 - 2016 McConnell Indonesia, PT Chevron Australia Pty Ltd Wheatstone Project / Sagulung / Batam - - MT/PT/RT/UT Inspection as per ASME B31.3 and Material Control
CSA Z662 / Wall Thicknesses: 6.6mm, 7.0mm, 7.4mm, 8.1mm, 9.5mm, 11.2mm, 11.8mm, 12.7mm,
2014-2018 Ledcor TransCanada Pipelines Grand Rapids Pipeline Project (GRP) / 8 Spreads 20"/36" 460km
14.5mm, 15.7mm, 19.0mm, 19.7mm on pipeline
2014–2015 Gunanusa Utama Fabricators, PT Petronas Grillage Sea Fastening Petronas – Bukit Tua Project / Jakarta / Indonesia - - MT/PT/UT/RT Inspection as per client specification

2014-2015 Australian Skill Training, PT M&O Indonesia Huet Module - - MT/PT Inspection as per AWS D1.1

2014-2015 McDermott Indonesia, PT Chevron Australia Pty Ltd Gorgon Project Barrow Island LNG Plant – PARS (R3363) /Batu Ampar/Batam/Indonesia - - MT/PT/UT Inspection as per client specification

2014-2015 McConnell Indonesia, PT Chevron Australia Pty Ltd Wheatstone Project LNG Plant Sagulung/Batam - - UT/MT/PT/RT Inspection as per AWS D1.1 2010, ASME V

2013-2014 Surerus TransCanada Pipelines Leming Lake Sales Lateral Loop 20" 37km CSA Z662 / Wall Thicknesses: 6.8mm, 8.7mm, 12.7mm

2013-2014 Surerus TransCanada Pipelines Chuinchaga Lateral Loop 48" 33km CSA Z662 / Wall Thicknesses: 12.4mm, 13.3mm, 13.4mm, 15.7mm, 17.8mm

2013-2014 Citra Tubindo Engineering, PT GPS Fabrication 2 inlet separator for santos CIEP Project (A083) /kabil/Batam/indonesia ø 2280mm - Heat Treatment on Pressure Vessel

2012-2015 Citra Tubindo Engineering, PT - Various Project / Kabil / Batam - - Provision of Welding Inspector

2012-2013 SRS Industrial Cenovus, Snamprogretti SRS / Call Out Work (Prior to Contract) / Edmonton, AB / Canada - - Provide conventional UT shear wave examinations on CSA W59 structural steel and MPI on lifting lugs

2011-2012 Cessco Fabrication & Engineering Ltd Cessco Fabrication & Engineering Ltd Cessco Job 44118 / Canada - - PAUT Examinations

2011-2012 NACG TransCanada Pipelines Cutbank Area Expansion & Cheecham/Kettle River Area / / Canada 36" 35km AUT Inspection

2011-2012 Williams TransCanada Pipelines Horn River Mainline (Komie East Section) / / Canada 36" 77km AUT Inspection

2011-2012 Williams TransCanada Pipelines Horn River Mainline (cabin Section) / / Canada 36" 72 km AUT Inspection

2011-2012 KBR KBR KBR / Fabrication Facility / Edmonton / Canada - - PAUT Examinations

2011-2012 Jacobs Canada Limited TransAlta TransAlta Keephills Unit 2 Maintenance Outage / Keephills AB / Canada - - PAUT of Boiler Plant Piping

2011-2012 KNM - KNM fab Shop / Tofield, AB / Canada - - PAUT Examinations

2011-2012 Technip USA Chevron Ceasar Tonga Offshore / G.O.M / USA - - AUT Inspection

2011-2012 Nacap and PPS Eon Ruhrgas NEL project; Inspecion 120km 56" 22,3mm pipeline / Germany - - Inspection approx. 7500 welds 56" extension Northstream pipeline from Hamburg to Bremen.

2011-2012 Qualitech Engineering & Contsruction Co. Ltd - IRPC Piping GHU Revamp Project / Rayong / Thailand - - ASME Piping 2" to 10" dia. Thickness range from 3.91mm to 15mm.
PAUT system to scan 9000 weld spots on 56 tanks with different thickness from
2010-2012 Tome Petrobras PetroBras Recife / Ipojuca / Brazil - -
40mm,38mm,28,5mm,22,4mm,16mm,9,5mm according to API 650 code
2010-2011 - SaskPower SaskPower In / Situ Metallography / Boundary Dam, SK / Canada - - on 2 - 8" Sch. xxs butt welds, on all four Steam Gens, each steam gen will be shut down,

2010-2011 Cessco Fabrication & Engineering Ltd Cessco Febrication & Engineering Ltd Cessco Vessel 3996 / / Canada - - Complete NDE on vessel V3996

2010-2011 KBR KBR KBR / Edmonton Fabrication Fability / Spectra Project / Edmonton, AB / Canada - - PAUT Inspection

2010-2011 Jacobs Canada Limited Shell Shell MRM Flare System Upgrade Project / Alberta / Canada - - PAUT Inspection
PAUT system to scan 9000 spots on 11 tanks 98 meters, 64 meter and different thickness from
2010-2011 Techip Petrobras PetroBras Recife / Ipojuca / Brazil - -
40mm,38mm,28,5mm,22,4mm,16mm,9,5mm according to API 650 code
PAUT system to scan 414 meters of a pressure vessel and different thickness from 32mm, 42mm
2010-2011 Agtech Petrobras PetroBras Salvador / salvador / Brazil - -
according to CC-2235-9 Code.
Validation AUT system for Dutch Gasunion, Open Grid Europe and Fluxys Belgium. / AUT validation at Gas transport pipelines, including Technical Justification and scanning 14 welds with
2010-2011 TNO (Dutch research centre) Dutch Gasunion, Fliuxys and Eon Ruhrgas - -
Groningen / The Netherlands 2 diameters and approx. 360 artificial flaws.
PAUT & AUT System to scan different thickness from 11,9mm, 14,7mm, 15,9mm accourding to API
2009-2010 Camargo Correa Petrobras PetroBras Caraguatatuba -Taubate / Sao Jose dos Campos/ Brazil 20” 78km
1104 code
UT SCAN-M examination to ASME B31 CC181, CC2235-9, RT/UT/MT/PT Inspection (onshore &
2009 – 2011 Gunanusa Utama Fabricators, PT HESS AUP-CPP & WHUT SCAN M Modification HESS / Cilegon - -
offshore) for various thickness from 3.91mm to 38 mm
MHS-Redevelopment Phase II ICP-R Platform Project, UT Structural as per API RP2X , MT/PT structural
2009 - 2011 Gunanusa ONGC ONGC Gunanusa - -
as per AWS D 1 1 , Piping as per ANSI B31.3
PAUT as per AWS D1.1 and ASME B31.3, UT Structural as per API RP2X , MT/PT structural as per AWS
2009 - 2011 Gunanusa Utama Fabricators, PT ONGC MHS-Redevelopment Phase II ICP-R Platform Project - -
D 1 1 , Piping as per ANSI B31.3

9 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2009 – 2010 VME Utraco VME (Jubilee) - - UT/RT/MT/PT inspection for structural as per client specification

2009 – 2010 Wahana Various Clients PKU (Wahana) - - UT/RT/MT/PT inspection for structural work and process piping as per client requirements

2009 – 2010 KRS Various Clients PKU/KRS - - UT/RT/MT/PT inspection for structural work and process piping as per client requirements

2009 – 2010 Multi, PT Various Clients PKU/Multi - - UT/RT/MT/PT inspection for structural work and process piping as per client requirements

2009 – 2010 McDermott Indonesia, PT Maersk MaerskPeregrinoFPSO Topside Facilities - - Lo-Rad Close Proximity Radiography

2009 – 2010 Pertamina PT Pertamina (Persero) ROPP/Balongan - - PAUT, manual UT, and MT Inspection as per client specifications

2009 – 2010 Gunanusa Utama Fabricators, PT ONGC ONGC TG Module Boiler – Cilegon - - RT and PT on boiler refurbishment

PAUT examination to ASME B31.1 and ASME I for weld quality control. Stainless Steel, Chrome Alloy
and Carbon Steel tubing welds for thicknesses 0.130 thru 0.965 inches and diameters from 1.25 thru
2008 -2010 - EPCOR Epcor / KeepHills, AB / Canada - - 7.5 inch. Carbon steel and P91 high energy piping welds. High temperature in-process examinations
(up to 400°F) performed on P91 welding at 1/3 and 2/3 fill and final completed welds. Piping
thicknesses 0.486 thru 3.031 inches and diameters from 3.5 thru 38.0 inch.
AUT system to scan and different thickness from9.8, 13.1, 15.8, 11.1, 14.8 mm according to CSAZ662
2008 -2009 Ledcor TransCanada Pipelines Keystone / Canada 30”, 34” 400 km
code
Qualification of pipeline of diameter of 42" and different thickness from 14.1, 18.8, 22.6 mm
2008 -2009 Welded Kinder Morgan Rockies East Spread 1 / USA 42” -
according to API 1104 code
2008 -2009 HC Price Kinder Morgan Rex East Spread C & F-1 / USA 42” 70 miles AUT system to scan different thickness from 12.3, 18.8, 22.6 mm according to API 1104 code

2008 -2009 Gregory Cook Kinder Morgan Rex East Spread B & F-2 / USA 42” 84 miles AUT system to scan different thickness from12.3,14.1, 18.8, 22.6 mm according to API 1104 code

2008 -2009 Welded Kinder Morgan Rex East Spread A-1 & A-2 / USA 42” 140 miles AUT system to scan different thickness from 12.3, 18.8, 22.6mm according to API 1104 code

2008 -2009 Kalpatru GAIL Vijaipur to Dadri Pipeline / India 48” 500 km AUT system to scan different thickness from 17.5, 20.7, 25.0 mm onn pipeline

2008 -2009 Nacap Epic Energy QSN Link, Ballera QLD / Australia 16” 189 km AUT System to scan different thickness from 8.1mm & 9.7mm according to AS2885.2 code

2008 – 2010 Drydock GTI L-201, 202, 203, 204 - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2008 - 2010 McConnell Indonesia, PT ExxonMobil Singapore Parallel Train (SPT) Project / Batam / Indonesia - - NDT Service (UT,RT,MT,PT) & Heat Treatment on Piping
PAUT examination to ASME B31.3 CC181 on new pipe butt welds of various diameter and thickness
2007 - 2008 Cessco Fabrication Oilsand Cessco Fabrication / Long Lake, AB - -
for new construction of Oilsands Upgrader.
PAUT examination to ASME B31.3 CC181 on several hundred new pipe spiral butt welds of different
2007 - 2008 N/A Kiewit Industrial Kiewit Industrial (MEG Energy) (Fab/Yard) / Edmonton, AB / Canada - -
diameter and thickness for pipe mill quality verification.
2007 - 2008 Camargo Correa + Klanska Petrobras PetroBras B2 – Spread 3 – Amazonas / Brazil 20” 190Km PAUT & AUT system to scan different thickness from 9.30, 11.10, & 12.70 mm according to API 1104

2006/2007 Kalpataru DUPL/GAIL Panuel to Dhabol / India 30” 78km AUT system to scan different thickness from 11.9, 13.9 & 19.1mm

2006/ 2008 Essar GAIL Dahej to Uran / India 30” 150Km AUT system to scan different thickness from 11.9, 13.9 & 19.1mm

2006/ 2007 Louisbourg Union Gas Trafalgar / Canada 48” 36km AUT system to scan different thickness from 11.7mm & 13.7mm according to CSAZ662 code

2006/ 2007 Nacap/KT Joint Venture Alinta Network Services DBNG-Stage 4 Expansion - Northern Looping / Australia 26” 194km AUT System to scan different thickness from 8.7mm & 11.7mm according to AS2885.2 code

2019 Enbridge Enbridge Vito Tapered Stress Joints and Buckle Arrestors 10.75", 14" & 19"
6.625"
2019 McDermott Anadarko Lucius / Onshore Gulfport Spoolbase (Spoolbase Services) 7.5KM
8.625"
2018 TechnipFMC LLOG Buckskin 8.625" 10KM

2018 TechnipFMC LLOG Neidermeyer 6.625"

2018 Associated/Price Gregory/H&M/Snelson/ Welded Columbia Pipeline Group Mountaineer Xpress (MXP) / 8 spreads (WV) 36" 171 Miles API 1104 / Wall Thicknesses: 9.5mm, 12.7mm, 13.1mm, 15.7mm, 19.0mm

2018 NPS Engineering Company Ltd. IRPC Cond. into WW-E5503(3100126819) 3" - Phased Array Examination for CS Piping 3 Inch Dia., 5.49 mm Thickness, Single V Butt Weld.

2018 Bangchak Corporation Public Company Limited BCP RBI Plant #2 P2-U3700-Loop 022 (Q-01254) 6.14" - Phased Array Examination for CS Piping 6, 14 Inch Dia., 10.97 mm Thickness, Single V Butt Weld.

2018 Bangchak Corporation Public Company Limited BCP RBI Unit 100 & 4000 (Q-01253) - - PAUT for RBI Unit 100 & 4000 (Q-01253), Piping works

2018 Thaioil Public Company Limited TOP Injection Point of C-2202 - UTM for Injection Point Of C-2202

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Cut and Change of Flange Corrosion 20" 1.20" - PAUT Phased Array Examination for CS Piping 1, 20 Inch Dia.,

10 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018 NPS Engineering Company Ltd. IRPC 34 LCP - PT for 34 LCP works

2018 DAE Engineering Co., Ltd. EGAT Equipment Development of Training Center 6.16" - PAUT Phased Array Examination for CS Piping 6, 16 Inch Dia.

2018 - 2019 Thaioil Public Company Limited TOP UTM overdue Inspection of Unit 2250/9500 - UTM Overdue inspection UNIT 9500

2018 HTE Service & Supply Co., Ltd. IRPC Yearly Contract 2.4: - Phased Array Examination for CS Piping 2, 4 Inch Dia

2018 - 2019 Techasia Co., Ltd. PTT Install Pressure Control 1&2 D70104 - PT for for CS piping works

2018 NPS Engineering Company Ltd. IRPC Repair 61 T 072 B - PT for c?s plate works

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Install Spectacle Blind For Isolation at WHRU #1, #2 1" - PAUT for for CS Piping 1 Inch Dia.,

2018 Bangchak Corporation Public Company Limited BCP MPI for inspection of Column T-950 - MT for inspection of Column T-950

2018 HTE Service & Supply Co., Ltd. IRPC Work Order 10445162 4" - PAUT for for CS Piping 4 Inch Dia

2018 - 2019 HTE Service & Supply Co., Ltd. IRPC UHV Product Valve Added - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Modify Spent Hot Oil DAU to Diesel Pool - PT for C/S piping works

2018 Thaioil Public Company Limited TOP UTM for Dead End TOC 4 - UTM for Dead End TOC 4

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Install Chemical Filter and Instrument Air Compressor - PAUT for C/s and S/S piping works

2018 NPS Engineering Company Ltd. IRPC WO 10427923 (AYC61337) - PAUT for S/S piping works

2018 Thaioil Public Company Limited TOP Expansion Loop GT-85056 - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Modify Facility for VDU block out (EPC piping system and civil works) - PAUT and PT for C/S piping works

2018 The Nine Engineering & Construction Co., Ltd. S and L Specialty Polymers GPSC / Improvement Control Valve - PAUT for C/S, A/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC 10443721 - PAUT for C/S piping works

2018 Thai Paraxylene Company Limited TPX Dead End U-7500, 7600, 7650 - UTM for Dead end U-7500, 7600 and 7650

2018 - 2019 Sriracha Construction Public Company Limited TOP TOP Crude Tank - PAUT for mechanical and piping works for crude tank

2018 Thai Paraxylene Company Limited TPX C-7502 - UTM for column
Change of PSV-430203 for support ADU2 Capacity at 170KBD (CAP-05-10-18-413-
2018 NPS Engineering Company Ltd. IRPC - PAUT, PT for C/S piping works
231200)
2018 Thai Lube Base Public Company Limited Thai Lube UTM for Piping Injection Point - UTM for C/S piping works

2018 Rayong Intania Co., Ltd. PTT Install Safety Valve Thermal for Line Off Spec. Stabilizer - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Piping Work for Install of Emergency Shut off Valve H2 Rich Gas Main Line PW - PAUT for C/S piping works

2018 - 2019 Techasia Co., Ltd. PTT Install Pressure Control 1&2 D70104 - MT for C/S structure works and PAUT for C/S piping works

2018 S. Tapong Engineering Ltd. Part Air Liquid Shut Down - PAUT for piping works shut downworks

2018 HTE Service & Supply Co., Ltd. IRPC 10329000F-004 - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Install pipe Transfer 06T017 to 06T010-BTX - PAUT for C/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC Piping Work for UHV Product Value Added IP side - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Cut Change of 6"-P-6767-AA1 (WO10439433) (AYC61345) - PAUT for C/S piping Wworks

2018 NPS Engineering Company Ltd. IRPC 8"-WP From RD to SAN P-61034 - PAUT for C/S piping Wworks

2018 - 2019 Rayong Intania Co., Ltd. PTT Installation Fisca Metering Skid for LPG Product and NGL - PAUT for C/S piping works

2018 Rayong Intania Co., Ltd. PTT Safety Valve Thermal Expansion Line off -Spec Stabilizer # 2 - UTM for Safety Valve Thermal Expansion Line off -Spec Stabilizer # 2

2018 JLLT Company Limited SMPC SMPC Replacement Heat Exchanger - PAUT, PT for C/S piping works

2018 Thaioil Public Company Limited TOP UTM Overdue Inspection - UTM Overdue Inspection

11 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018 Thaioil Public Company Limited TOP MPI Cat Change Inspection for R-9412A - MT for Cat Change Inspection for R-9412A

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Check Valve and Isolate System Ethane Cooling Compressor Turn Around GSP #3 - PAUT for C/S, S/S piping works

2018 Bangchak Corporation Public Company Limited BCP Slop Line From Plant 2 - UTM for slop line C/S pipe from plant 2

2018 Rayong Intania Co., Ltd. Linde (Thailand) Relocation 8" Manual Valve PGO-001-3C3-8" - PAUT for C/S piping works

2018 Bangchak Corporation Public Company Limited BCP Fire Water - UTM for fire water pipe

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Fuel Gas Optimization at PTT ESP, GSP 2and 3 - PAUT for C/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC TFPP Operation Improvement - PAUT for C/S piping works

2018 - 2019 Chaiwatthana Engineering Co., Ltd. IRPC Increase Capacity LPG Truck Loading LDDR - PAUT for C/S, S/S piping works

2018 - 2019 TRC Construction Public Co., Ltd. SCG NPP Redundant Naphtha & PYGAS Pipeline (J18-301) - PAUT for C/S piping works

2018 Labix Company Limited Labix UTM 2018 - UTM for year 2018

2018 Rayong Intania Co., Ltd. PTT Install Isolation Valve at Sales Gas Pipe GSP#3 Behind Meter Tube - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC WO.10432356 (AYC61263) - PAUT for C/S piping works

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Modify WHRU 1 and 2 ESP - PAUT for S/S piping works

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Install Spectacle Blind and Drain WHRU #1 and 2 ESP - PAUT for C/S piping works

2018 TRC Construction Public Co., Ltd. PTT RDCC Catalyst Cooler - PT for C/S piping works and PAUT, MT for C/S. S/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC TFPP Operation Improvement - PAUT for TFPP Operation Improvement for C/s piping works

2018 Haseulla International & Services Ltd. PTT Regenerative Thermal Oxidizer RTO System for GSP 5 - PAUT for Regenerative Thermal Oxidizer RTO System for GSP 5 for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Piping & Instrument for Minimize Flare During UHV Startup and S/D Unit 53&58 - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC SAN 1&2 Process Improvement for Plant Reliability - PAUT for C/S, S/S piping works

2018 Thaioil Public Company Limited TOP OVHD C-1101 - UTM for column

2018 M.K.N Engineering and Service Co., Ltd. Mitr Phol Yearly Inspection Boiler BL-11-12 Block 1 (2018) - PAUT for Yearly Inspection Boiler BL-11-12 Block 1 (2018) for A/S tubes

2018 Chaiwatthana Engineering Co., Ltd. IRPC E4E-UHV-RCH-RCHR-52X005 Slop Reduction - PAUT for C/S, S/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC Improving Ship Loading MO Line for Whaef 2A and 5 - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC WO-10437181 (AYC61268) - PAUT for A/S piping works

2018 NPS Engineering Company Ltd. IRPC CAP-02-10-18-097-210000 - PT for C/S piping works

2018 GS Engineering & Construction Corp. Bahrain GSP LNG Sea Fastening MT Inspection for GPS Bahrain LNG Import Terminal - MT for seafastening
Phased Array 0 Degree Scan Thickness Examination for CS Piping 3 Inch Dia., 5.49 mm. Thickness
2018 Thaioil Public Company Limited TOP APU-D New SRV and Replacement 3" -
Scan Area: (X)300mm x (Y)300mm
2018 Boonyanuch Engineering Company Ltd. PTT POLYETHYLENE Header Box (Tube Bundles) - PAUT for Header Box C/S shell plates

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Future Tie-in Sampling GSP#3, Repair N2 line at water heat recovery GSP plant #3 - PAUT for C/S piping works

2018 Chaiwatthana Engineering Co., Ltd. IRPC HUV Product Valve Added -Heavy Oilgomer to Diesel - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Tank 61T038A - PT for Tank 61T038A

2018 HTE Service & Supply Co., Ltd. IRPC Valve 10" HGO-Discharge 69P114 A-B - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC WO 10423351 AYC 61206 - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Modify Facility for VDU Block Out-CAP-05-10-18-409-251300 - PAUT for C/S piping works

2018 Rayong Intania Co., Ltd. Map Ta Phut Olefins Piping PCV Gen GPS #5 - PAUT for C/S piping works

2018 Rayong Intania Co., Ltd. Map Ta Phut Olefins Piping PCV Gen GPS #5 - PAUT for C/S, A/S piping works

12 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018 HTE Service & Supply Co., Ltd. IRPC Valve 10" HGO-Discharge 69P114 A-B - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC AYC 61219 - PAUT for C/S piping works

2018 Bangchak Corporation Public Company Limited BCP UTM for RBI-LTL - UTM for RBI works additional

2018 HTE Service & Supply Co., Ltd. IRPC Slope Line to 77T007A RCHU Plant - PAUT for Slope Line to 77T007A RCHU Plant for C/S

2018 Bangchak Corporation Public Company Limited BCP PAUT for Line 8" Slop P-901G Plant #3 (01169) - PAUT for Line 8" Slop P-901G Plant #3 (01169)

2018 Bangchak Corporation Public Company Limited BCP PAUT for Mini Shutdown Piping Unit 300CRU Plant #2 (01168) - PAUT for mini shut down piping unit 300 RCU plant #2

2018 Sunstar Supply and Service Co., Ltd. Gardian Repair Water Bath Vaporizer Unit 1/2 - PAUT, PT, UTM and Hydrostatic for repaier boiler 2 units for C/S

2018 NPS Engineering Company Ltd. IRPC WO 30057941-AYC61177 - PAUT for C/S piping works

2018 Thaioil Public Company Limited TOP UTM for LRUT at Flare TOC-1/TOC-2 - UTM comfirm LRUT at flare TOC-1/TOC-2

2018 Thaioil Public Company Limited TOP DE-Bottom Line Tank No.T-3052 & T-3053 - UTM for C/S piping works

2018 Thaioil Public Company Limited TOP UTM Points Unit 9650 - UTM for Grid Scan for 24''-P96068-11060Y-H90

2018 Rayong Intania Co., Ltd. PTT Piping PCV Gen GPS #5 - PAUT for C/S piping works

2018 Boonyanuch Engineering Company Ltd. THAI POLYETHYLENE TPE-HD4 PE-Wax Filtration Unit - PAUT for TPE tank C/S plates and C/S piping works

2018 NPS Engineering Company Ltd. IRPC Renew acid scrubbing Syatem of PTK Plant - PT for C/S piping works

2018 Thaioil Public Company Limited TOP DE-Bottom Line Tank No.T-3052 & T-3053 - Phased Array 0 Degree Scan Thickness Examination

2018 TPT Petrochemical Public Company Limitted TPT Tube Superheat Boiler #A - PAUT for tube super boiler A for A/S tubes

2018 Rayong Intania Co., Ltd. TPC VCM 2 Improve Heads Column Seal Pot M-SPI1301 - PAUT for C/S piping works

2018 K999 Engineering & Construction Co., Ltd. N/A 10" Hot Induction Bending Project - UT, MT inspectiob for C/S 10" Hot Induction Bending

2018 Bangchak Corporation Public Company Limited BCP UTM for T-966B - UTM for T-966B for C/S roof, bottom plates
Manpower & Equipment for Phased Array Ultrasonic Testing (PAUT) of Pipe Spools at
2018 GS Engineering & Construction Corp. Bahrain GSP LNG - PAUT inspection of piping works for LNG platform at Bahrain for C/S, S/S piping works
offshore Bahrain
2018 NPS Engineering Company Ltd. IRPC Replace Line CPH T-100 (30063226 AYC61155) - PT for Replace Line CPH T-100 (30063226 AYC61155)

2018 Boonyanuch Engineering Company Ltd. TPC Fire Water Spray for Vacuum Distillation Product Pumps - PAUT for tank nozzle C/S

2018 NPS Engineering Company Ltd. IRPC Replace Line CPH T-100 - PAUT for Replace Line CPH T-100

2018 Bangchak Corporation Public Company Limited BCP RBI Piping Plant # 4 - UTM for RBI Plant #4, C/S piping works

2018 Poseidon Engineering Co., Ltd. TPT Underground Pipeline from Gas Station to Pipe Rack - - PAUT for Underground Pipeline from Gas Station to Pipe Rack

2018 Unoin Construction & Supply Co., Ltd. Singha Singha Beverage Project - PAUT for C/S piping works

2018 PAE Technical Service Public Company Limited BCP Man Power Supply for PAE Technical for Project of BCP-TA2018 - supply manpower of Piping , ME, E&I supervisors for TAM 2018

2018 Rayong Intania Co., Ltd. PTT Modify Line Amine for AGRU GSP#5 and Welder test - PAUT for C/S, S/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC Maximize UHV's Fuel Gas at Lube and Refinery - PAUT for C/S piping works

2018 Techasia Co., Ltd. PTT Install Degassing Pot for Pump - PAUT for Degassing Pot for Pump, C/S piping works

2018 NPS Engineering Company Ltd. IRPC Piping for ADU2 Underground Line Improvement - PAUT, PT for C/S piping works

2018 TPT Petrochemical Public Company Limitted TPT Tube Superheat Boiler #B - PAUT for tube superheater Boiler unit B for A/S tubes

2018 Thaioil Public Company Limited TOP TCU MTA 2018 - PAUT and UTM for A/S piping works

2018 NPS Engineering Company Ltd. IRPC Riser Pipe MLA 61H032 W2A, 10430669 (AYC61118) - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC 30057614 (A61112) and 10425786 (A61071) - PT for C/s Piping works

2018 Labix Company Limited Labix UTM Monitoring Unit 58100 - UTM Monittoring Unit 58100

13 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018 Bangchak Corporation Public Company Limited BCP Outlet PSA Piping & Drum 4D-4111 - PAUT for Outlet PSA Piping & Drum 4D-4111, C/S piping works

2018 NPS Engineering Company Ltd. IRPC SAN 1 & 2 Process Improvement For Plant Reliability - PT for C/S piping works

2018 Bangchak Corporation Public Company Limited BCP TAM 2018 CRU-300 P#2 - PAUT Tam 2018 for RCU 300 plant #2

2018 BCP - PAUT for C/S, A/S piping works

2018 Bangchak Corporation Public Company Limited BCP Line CRU Effluent 3E-303 to 3A-301 - PAUT for RCU effluent 3A-301, 3E-303, C/S piping works

2018 Bangchak Corporation Public Company Limited BCP TA BCP 2018, Holiday Test for 4T-4102 - - Holiday test for TA BCP 2018, Holiday Test for 4T-4102

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Install Line N2 for Prove Meter - PAUT for C/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC Piping for Improving Steam Line 25 Bars TFPP - PAUT for C/S piping works

2018 NPS Engineering Company Ltd. IRPC Bottom 22T002 Leakage - PT for C/s Plates

2018 Thaioil Public Company Limited TOP P-6235 A/B/C - UTM for P-6235 A/B/C, C/S piping works

2018 Bangchak Corporation Public Company Limited BCP TAM 2018 - PT TAM 2018 for C/S structures

2018 NPS Engineering Company Ltd. IRPC RIR 2 -WB-18322302 SRU - PAUT for C/S piping works

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Elevation Heat Exchanger 5590-E-004 - PAUT for C/S, S/S piping works

2018 Rayong Intania Co., Ltd. PTT New Pipiline INCT - PAUT for C/S piping works

2018 HTE Service & Supply Co., Ltd. IRPC Repair Pipe as per List budget ID 2016 - PAUT for C/S piping works

2018 Bangchak Corporation Public Company Limited BCP TAM 2018 (01117) - PAUT TAM 2018 for Phased Array Examination for CS Shell Plate Reactor

2018 - 2019 TRC Construction Public Co., Ltd. SCG NPP Redundant Naphtha & PVGAS Pineline - PAUT for SCG pipe lines

2018 Thai Paraxylene Company Limited TPX UTM for C-7501 - UTM for Unit 7500

2018 Thaioil Public Company Limited TOP Line Suction and Discharge Bio Feed Pump - PAUT for Line Suction and Discharge Bio Feed Pump

2018 NPS Engineering Company Ltd. IRPC Modification Line from WWT3 to Permeate - PT for Modification Line from WWT3 to Permeate

2018 Bangchak Corporation Public Company Limited BCP TA 2018 - PAUT for replace recycle piping TAM 2018

2018 Wiztech International Co., Ltd. TOP Wiztech Work Shop - PAUT for air cooler

2018 Boonyanuch Engineering Company Ltd. PTT Fabrication Header Box E-0402 A/B - PAUT for header box

2018 NPS Engineering Company Ltd. IRPC Repair Common Lube - PT for Repair Common Lube

2018 Future Development & Construction Co., Ltd. GSPC Piping Tie-In work for GPSC - PAUT for piping works for tie-inGSPC

2018 Thaioil Public Company Limited TOP R-9413 MT at Weld Internal - MT for R-9413 MT at Weld Internal

2018 Bangchak Corporation Public Company Limited BCP Major Overhaul 2K-3701/02A Compressor - PT for Major Overhaul 2K-3701/02A Compressor

2018 CUEL Co., Ltd Bahrain GSP LNG GPS Bahrain LNG Import Terminal - PAUT for C/S, S/S piping works

2018 Techasia Co., Ltd. PTT New Main Lube Oil Cooler for Generator Unit C - PT for New Main Lube Oil Cooler for Generator Unit C

2018 SCC Maintenance Services Company Limited TPT Repair Shell and Cone of FGD-A - MT for repair shell and cone of FGD A

2018 TRC Construction Public Co., Ltd. PTT RGC-Sales Gas GPS 6 Mixing Header - PAUT for RGC-Sales Gas GPS 6 Mixing Header

2018 Chaiwatthana Engineering Co., Ltd. IRPC Renew Hydrogen Compressor of PP Plant - PAUT for C/S piping works

2018 Thaioil Public Company Limited TOP UTM - UTM for grid scan for C-9520

2018 Labix Company Limited Labix UTM Report Unit 58100 - UTM for UTM Report Unit 58100

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Install of sensing line at 789 D001 - PAUT for Install of sensing line at 789 D001

2018 Chatr Kanchang Leamchabang Co., Ltd. PTT Install piping N2 instead of Steam at waste heat recovery unit GSP #2 - PAUT for Install piping N2 instead of Steam at waste heat recovery unit GSP #2

14 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018 Bangchak Corporation Public Company Limited BCP Slope - UTM for slop pipes

2018 Thaioil Public Company Limited TOP CUI+UTM Survey before TOC-1 S/D - UTM for CUI+UTM Survey before TOC-1 S/D

2018 Bangchak Corporation Public Company Limited BCP UTM for RBI JP1 - UTM for JP1

2018 Bangchak Corporation Public Company Limited BCP RBI Unit # 100 & Unit # 2400 - PAUT for RBI unit 100 and 2400

2018 Thaioil Public Company Limited TOP Debottom line T-3089 new project - UTM for Debottom line T-3089 new project

2018 NPS Engineering Company Ltd. IRPC Piping for install automatic sprinkler system at WH 39 - PAUT for Piping for install automatic sprinkler system at WH 39

2018 Thaioil Public Company Limited TOP Flare line to TOC1/2 - UTM for Flare line to TOC1/2

2018 Bangchak Corporation Public Company Limited BCP Mini Shut Down - PT for repair T-987

2018 Bangchak Corporation Public Company Limited BCP Mini Shut Down - UTM for RBI Plant #2

2018 Chaiwatthana Engineering Co., Ltd. IRPC Extract Loading WHARF#2A - PAUT for Oil-piping improvement at jetty

2018 Chaiwatthana Engineering Co., Ltd. IRPC Relocate Mal 61H032 for TDAE - PAUT for Relocate Mal 61H032 for TDAE/Extract Loading WHARF#2A

2018 Thaioil Public Company Limited TOP Vessel S-3920 - PAUT, UTM, MT for Vessel S-3920

2018 Thaioil Public Company Limited TOP UTM for B-4017 - UTM for B-4017

2018 NPS Engineering Company Ltd. IRPC 10413557 (AYC61019) - PAUT for piping works

2018 Thaioil Public Company Limited TOP De-Bottom Line Tank T-3089 - UTM for De-Bottom Line Tank T-3089

2018 NPS Engineering Company Ltd. IRPC 10422344 (AYC 61046) - PAUT for piping works

2018 Rayong Intania Co., Ltd. RGC Modify Drain Suction Scrubber 1st Satge Stabilizer #2 to RGC - PAUT for Modify Drain Suction Scrubber 1st Satge Stabilizer #2 to RGC

2018 Bangchak Corporation Public Company Limited BCP 4" Line Modify Kerosene Plant 2 to Coalescer - PAUT for 4" Line Modify Kerosene Plant 2 to Coalescer

2018 Thaioil Public Company Limited TOP Shut Down HDS-3 - PAUT, UTM for Shut Down HDS-3

2018 TPT Petrochemical Public Company Limitted TPT TPT Shut Down 2018 - PAUT for shut down 2018

2018 Bangchak Corporation Public Company Limited BCP Mini Shut Down P#3 - PAUT for minishut down Plant #3

2018 NPS Engineering Company Ltd. IRPC Modify Line 61T076 B for Inspection 61T001 - PAUT for Modify Line 61T076 B for Inspection 61T001

2018 Poseidon Engineering Co., Ltd. TPT TPT Shutdown - PAUT for LP absober modification pipes

2018 Unoin Construction & Supply Co., Ltd. TPT TPT Shutdown - PAUT for refrigeration system

2018 Techasia Co., Ltd. PTT Modification Platform GSP #2 for E-78701 and E-78702 - PT, MT for modification of platform

2018 NPS Engineering Company Ltd. IRPC Piping for Install Atomatic Sprinkler System At WH 39 - PT for Piping for Install Atomatic Sprinkler System At WH 39

2018 Rayong Intania Co., Ltd. PTT MOC FG Hydraulic Improvement - PAUT for MOC FG Hydraulic Improvement

2018 NPS Engineering Company Ltd. IRPC Repair Tank 2017 TFLL Plant - PT for repair tank TFLL plant

2018 Bangchak Corporation Public Company Limited BCP Manifold 4F 4101 - PAUT for manifold 4F-4101

2018 NPS Engineering Company Ltd. IRPC Modify Line 2" Propane - PAUT for Modify Line 2" Propane

2018 Thaioil Public Company Limited TOP By Pass Line E9424 P94019 - UTM for Site Survey HDS-3

2018 NPS Engineering Company Ltd. IRPC 10524182 IRPC - PT for 10524182 IRPC

2018 Det Norske Veritas Pte. Ltd - Rental of UT Equipment - - Supply of UT Equiopment with probes

2018 Greatways Engineering Services, PT - Supply of NDT Inspection - DNV Approved - - MT/PT Inspection as per AWS D1.1 2015

2018 GTA Construction - Supply of Eddy Current Services - - Eddy Current Inspection as per client specification

2018 Dwi Sumber Arca Waja, PT SANTOS Meliwis Project - - RT/UT/MT/PT Inspection as per AWS D1.1 2010 and ASME B31.3

15 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2018 Dialog Sistemindo, PT PT Pertamina (Persero) Pitstop Project - - MT/UT Inspection

2018 Flo-Bend Indonesia, PT - Supply of PMI Services - - PMI Inspection as per client specification

2018 Cladtek BI Metal Manufacturing, PT - CT-474 Project - - RT Inspection as per ASME B31.3

2018 BW Offshore TSB Invest, PT BW Offshore Joko Tole Project - - UTM Inspection

2018 ASL Shipyard Indonesia, PT - Neptune Floating Dock II - - UTM Inspection as per Lloyds Class

2018 Toyo Kanetsu Indonesia, PT Chandra Asri Petrochemical EC/Korea Chandra Asri Project - - PAUT Inspection on spherical tank as per ASME VIII Div. 1

2018 GTA Construction PT Pertamina (Persero) Supply of PAUT and PT Services at Balongan for RU VI Balongan Project - - PAUT and PT Inspection on piping as per ASME B31.3

2018 Citra Tubindo Engineering, PT - A136 Project - - RT/MT/PT/UT Inspection as per AWS D1.1 and ASME B31.3

2018 McDermott Indonesia, PT - BMB - Barzan Project - - RT Inspection as per DNV

2018 Cladtek BI Metal Manufacturing, PT Exxon Nigeria CT 493 Project - - RT Inspection as per ASME

2018 Era Bangun Jaya, PT Tanjung Power Indonesia Boiler 2 - Power Plant 2x100MW - Tanjung Tabalong Project - - PAUT Inspection on boiler as per ASME B31.3

2018 Transalindo Eka Persada, PT - OBSL TDAE Processing Plant Project - - MT, PT, UT Inspection as per AWS D1.1 2015

2018 Mitra Karya Sarana, PT British Petroleum (BP) Berau Ltd Tangguh Expansion Project - - RT, MT, PT Inspection as per AWS D1.1 2015

2018 Formshore Group Limited, PT - Various Project - - MT Inspection for 20ft Container as per AWS D1.1 2015

2018 Efshipping Co SA - MV Vlazakis I - - UTM Inspection as per Lloyds Class

2018 Wilmax Control System, PT - WHCP Project - - PT Inspection as per AWS D1.1 2015

2018 Wilmax Control System, PT British Petroleum (BP) Berau Ltd Tangguh Expansion Project - - PMI and PT Inspection as per AWS D1.1 2015

2018 Profab Indonesia, PT (NOV) FJORDS Processing Mad Dog Phase 2 Project - - PAUT Inspection as per ASME VIII Div. 1

2018 Citra Tubindo Engineering, PT - Supply Dimension Control for Bouyancy Tank Project - - Supply of Dimension Survey

2018 McDermott Indonesia, PT - BMB - Abakatun - Ayatsil C Project - - RT Inspection as per AWS D1.1 2015

2018 PT Citra Tubindo Engineering British Petroleum (BP) Berau Ltd A137 – Tangguh Expansion Project / Kabil / Batam - - MT Inspection as per AWS D1.1 2015 on fabrication buoyancy tank

2018 Dwi Sumber Arca Waja, PT Saipem Indonesia Rolling Shell for Bouyance Tank / Kabil / Batam - - MT/UT Inspection as per AWS D1.1 2015

2018 Mitra Bahtera Segara Sejati (MBSS), PT - TB E Star Project / Cilegon - - UTM Inspection as per RINA Class

2018 Dua Utama Jaya, PT - PQR/WQT for Various Project / Batam - - MT/PT/RT Inspection as per AWS D1.1

2018 Smart Steel Solution, PT - Supply of Welding Inspector and NDE Services for Britinya Project - - WI/MT/RT Inspectionas per AS 1554.1 : 2014

2018 Sathaar Engineering & Sourcing Services - NATA Project - - MT Inspection as per AS 1554.1 (NATA)

2018 Singatac Bintan, PT - Great Western Flank - S17172-F-Project - - MT/PT/UT Inspection as per AWS D1.1

2018 Gunanusa Utama Fabricators, PT ONGC Additional for NDE (3rd Shipment) Daman Phased 3 Project - - PAUT Inspection on Pile and Conductor as per ASME B31.3

2018 Dwi Sumber Arca Waja, PT Dwi Sumber Arca Waja, PT Lifting Accecories Inspection - - MT Inspection as per AWS D1.1

2018 PT Citra Tubindo Engineering PT. Enerco RPO International A134 – Pressure Vessel for OSBL TDAE Plant Project / Kabil / Batam - - RT/MT Inspection as per AWS D1.1

2018 PT Citra Tubindo Engineering PT. Enerco RPO International A132 – Small Scale Production Unit (SSPU) Project/ Kabil / Batam - - MT Inspection as per AWS D1.1

2018 Era Bangun Jaya, PT Tanjung Power Indonesia Power Plant 2 x 100MW Tanjung Tabalong Project / Kalimantan - - PAUT and PMI Inspection as per ASME B31.3

2018 Cladtek BI Metal Manufacturing, PT - CT 483 Piping Spool Project / Batu Ampar / Batam - - RT Inspection on spool as per NATA

2018 Cladtek BI Metal Manufacturing, PT - CT 492 Qualification / Batu Ampar / Batam - - RT Inspection on spool as per NATA

2018 Gunanusa Utama Fabricators, PT ONGC Extension PAUT Team for Daman II Project / Cilegon - - PAUT Inspection as per on Pile and Conductor as per ASME B31.3

2017 Bannister Pipelines TransCanada Pipelines Pelican Lake 30" 55.6km CSA Z662 / Wall Thicknesses: 9.8mm, 13.1mm, 19.1mm, 19.7mm

16 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 OJ Pipelines TransCanada Pipelines Bear Canyon North Section - NWML Loop No. 2 36" 26.2km CSA Z662 / Wall Thicknesses: 11.8mm, 13.7mm, 15.7mm, 16.0mm

2017 Pipeline Technological Ltd 2h/Chevron 20M 10"

2017 TechnipFMC SHELL Kaikias 8.625" 18KM

2017 Acute Technological Services SHELL Stones Stress Joints 10"

2017 TechnipFMC Anadarko Constellation 11.752" 100.71 KM

2017 TechnipFMC LLOG Crown and Anchor 6.625" 41,620 FT


Penn State Deep #6 Redevelopment / Onshore Gulfport Spoolbase (Full Service including
2017 McDermott HESS 8.625" 5,189 FT
Spoolbase management and set-up)
2017 Associated/Price Gregory/H&M/Snelson/ Welded Columbia Pipeline Group Leach Xpress Pipeline (LXP) / 5 spreads (OH, WV) 36" 160 Miles API 1104 / Wall Thicknesses: 11.8mm, 14.5mm, 15.7mm, 15.9mm, 19.7mm on pipeline

2017 Thai First Engineering Ltd. Ajinomoto Co., (Thailand) Ltd. Steam Distribution Piping System - PAUT for steam distribution piping system

2017 Union Construction & Supply Co., Ltd. IRPC SPENT CAUSTIC TREATMENT UNIT - PAUT for piping works

2017 Techasia Co., Ltd. PTT GSP Odor Removal Unit for LPG Aerosol - PAUT for Odor Removal Unit for Aerosol

2017 Thaioil Public Company Limited TOP Bypass Line E9424 P94019 SS-316L - PAUT for By Pass Line E9424 P94019

2017 NPS Engineering Company Ltd. IRPC Valve Main Soot 4 Pcs - PT for Valve Main Soot 4 Pcs

2017 NPS Engineering Company Ltd. IRPC Repair Tank 61T023B - PT for Repair Tank 61T023B

2017 NPS Engineering Company Ltd. IRPC Alteration of Support Steam Trap - PT for Alteration of Support Steam Trap

2017 Thai Oil Public Company Limited TOP HCU-2 Catalyst Replacement S/D (E-9503A/B Shell Scaning), PAUT - PAUT, UTM for HCU-2 Catalyst Replacement S/D (E-9503A/B Shell Scaning)

2017 NPS Engineering Company Ltd. IRPC Preheat Naphtha Feed Using Quench Water - PAUT, PT for Preheat Naphtha Feed Using Quench Water

2017 NPS Engineering Company Ltd. IRPC Modification Buffle Plate of 02 R001 & 02 R 002 for UHM - PT for Modification Baffle Plate 02R001 & 02R002 for UHM

2017 NPS Engineering Company Ltd. IRPC Repair Line WF ware house 40 - PT for Repair Line WF Warehouse 40

2017 HTE Service & Supply Co., Ltd. IRPC Addition Piping C9 Export Max Gasoline TF 2 for Polt - PAUT for Additional piping C9 Export Max Gasoline TF 2 for POLT

2017 NPS Engineering Company Ltd. IRPC Renew Line Suction Discharge 30 P002 C (VGO) - PAUT for Modification Outlet D5B 14D001

2017 Thai Oil Public Company Limited TOP E-402A Inlet Line Cleaning - PAUT for E-402A Inlet Line Cleaning

2017 HTE Service & Supply Co., Ltd. IRPC Utilized Loine C9 for Export Gasoline at TF 2 - PAUT Utilized Line C9 For Export Gasoline at TF2

2017 NPS Engineering Company Ltd. IRPC Repair Leak Line 24" CR at Wharf 2B - PAUT for Repair Leak Line 24" CR at Wharf 2B

2017 NPS Engineering Company Ltd. IRPC Supply Manpower for Piping - PAUT for Supply Manpower for Piping

2017 Bangchak Biofuel Company Limited BBF Cleaning of Internal Tubes of Condenser, Bang Pa-in, Ayuttaya - Cleaning of Condensers tubes

2017 Chaiwatthana Engineering Co.,Ltd IRPC Modify Benzene Rich Cut to 69T005 A/B for Feed ETP - PAUT for Modify Benzene Rich Cut to 69T005 A/B for Feed ETP

2017 Labix Company Limited Labix UTM Unit 5810 - UTM for unit 58100

2017 Thaioil Public Company Limited TOP S-3919, Pressure Vesels UTM, Paut and MPI - UTM service

2017 Thaioil Public Company Limited TOP B 4015 - UTM service

2017 - 2019 TRC Construction PLC. PTT GSP PTT GSP, Revamp - PAUT for revamp piping

2017 Chaiwatthana Engineering Co.,Ltd IRPC IRPC, Install Condensate Collecting Drum System - PAUT for Install Condensate Collecting Drum System

2017 Thai Oil Public Company Limited TOP UTM, SRU 4 - UTM-SRU-4

2017 NPS Engineering Company Ltd. IRPC IRPC TF2 - PT for Repair Tank 69 T0 50G
Vendor Inspection at THAN, Sole Gas Development - Orbost Gas Plant Upgrade (Cooling
2017 Fulkrum Technical Resources (FTR) Worley Parson, Australia - - Inspection of Cooling Water Package
Water Package)
2017 SCC Maintenance Service Co., Ltd. (SMS) TPT Shut Down, VMP3 (TPT Plant) - PAUT for TPT Capex Project VMP 3

17 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 Erawan Power Ltd. Erawan Power Plant Shut down at Nongbua Lamphu - PAUT for repair tube main header super boiler 300 tons

2017 Alliance Service Company Ltd. PTT GC PTTGC , Modification of Existing Pipes at Fire Pump House - PAUT for Modification Existing Pipe line at fire Pump House

2017 KHow-How Tranfer Co.,Ltd IRPC IRPC, Repair Tank 61T0768 B - UT for Repair Tank 61T076B

2017 Chaiwatthana Engineering Co.,Ltd IRPC TFLT Direct Slope From HUV to Crude Tanks - PAUT for TFLT Direct Slop From UHV to Crude Tank

2017 Chaiwatthana Engineering Co.,Ltd IRPC IRPC, Siesel Blending Improvement - PAUT for Disel Blending Improvement

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP PTTGSP , PAUT Fuel Gas Optimization GSP #2 and 3 - PAUT for Fuel Gas Optimization PTT ESP GSP # 2 and 3

2017 Labix Labix UTM - UTM for RBI for union finning

2017 NPS Engineering Company Ltd. IRPC IRPC, PT Patch Plate for Tank 61T024A - PT for Repairing Bottom Plates for Tank 61T024A

2017 TPT Indorama Petrochemicals PCL. TPT PAUT - PAUT for hydrogen line

2017 ACE Engineering & Construction Co.,Ltd PTT GC PTTGC 2, PAUT - PAUT for Fire Water 2nd Line & Portable Water Works

2017 Thai Oil Public Company Limited TOP UTM - UTM for B-84051 TOP SPP

2017 Techasia Co., Ltd. PTT GSP GSP # 5, Tie In CS Pipe - PAUT for tie-in pipes

2017 NPS Engineering Company Ltd. IRPC Piping for chang type of Mechanical seal plan at PP Pla - PT for Piping for change type of mechanical seal plan at PP plant

2017 HTE Service & Supply Co., Ltd. IRPC Relocate pipeline 40 inchs at WP Bungbut box Culvert - PAUT for Relocate Pipe Kine 40" -WP at Bongkot Box Culvert CAP

2017 NPS Engineering Company Ltd. IRPC Alternative H2 Dsource for PL & VGOHT - PAUT for Alternative H2 Source for PL & VGOHT

2017 Fufute Development & Construction Co., Ltd. TPP Changing the Produce at Riser in Saraburi Terminal - PAUT for changing produce riser

2017 Bangchak Corporation Public Company Limited BCP Piping, Hydrogen Loop (U4000 Plant#4) - PAUT for hydrogen loop pipes for U4000 Plant #4

2017 Chaiwatthana Engineering Co.,Ltd IRPC Install Condensate Collecting Drum System Tank 06T024 - PAUT for Install Condensate Colecting Grum System (Tank 06T024)

2017 NPS Engineering Company Ltd. IRPC IRPC , Alternative H2 Source for PL & VGOHT - PT for Repairing of Bottom Plate (22T003)

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP GSP #4 Khanom - PAUT for Chamber GPS #4

2017 NPS Engineering Company Ltd. IRPC Alternative H2 Dsource for PC & VGOHT - PT for Alternative H2 Source for PL & VGOHT

2017 NPS Engineering Company Ltd. IRPC IRPC, TF1 Relocation truck loading Station - PT for Alternative H2 Source for PL & VGOHT

2017 NPS Engineering Company Ltd. IRPC IRPC, Install New Condensate unitfor PP1 & PP2 - PAUT, PT for Installation New Condensing Unit for PP1 & PP2

2017 NPS Engineering Company Ltd. IRPC IRPC, Repair pipe Extra 6122006-A15 - PAUT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC IRPC, Repair pipe IP Side Extra 6125002 A15 - PAUT for Chamber for GPS #4

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP Modification platform and Pipe Support GSP #6 - PAUT for Modification platform and Pipe Support GSP #6

2017 Pekdee Engineering Co., Ltd. PTT GSP Installation of Pipe Shoe TA GSP#6 - PAUT for S/S piping works

2017 EGCO Ajinomoto Co., (Thailand) Ltd. Coil Boiler - PAUT examination for Alloy Tubing

2017 NPS Engineering Company Ltd. IRPC Repair Tank 61T033A - PT for C/S piping works

2017 Rayong Intania Co., Ltd. PTT GSP Heat Recovery Design For Dehydration System of GSP#5(HRD2) - PAUT, MT and UTM for C/S piping works

2017 NPS Engineering Company Ltd. IRPC Repair Tank 2017 14T001B - PAUT, PT for Repair Tank 2017 14T001B

2017 Techasia Co., Ltd. PTT GSP Increase Size Thermowell GSP#6. - PAUT for C/S piping works

2017 Techasia Co., Ltd. PTT GSP Replacement for Strainer from Cone Type to Basket Type. - PAUT for S/S piping works

2017 EGCO Mitr Phol Supanburi, Annual Preventive Maintenance Boiler Block 1 - PAUT for Annual Preventive Maintenance Boiler Block 1, Tubes

2017 Growth Winson Co., Ltd. (Tech Asia) PTT GSP Shut Down PTT GSP and Tech Asia Work Shop - PAUT for Modification Piping GSP # 6

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP GSP 6, Modification Piping WHRU GSP#6 - PAUT for Modification Piping WHRU GSP#6

18 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 Chaiwatthana Engineering Co., Ltd IRPC Diesel Blending Improvement - PAUT for Diesel Blending Improvement

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP Modification Line Return Cooling Water GPS#3 - PAUT for Modification Line Return Cooling Water GPS#3

2017 NPS Engineering Company Ltd. IRPC A60028 Project - PT for OSBL of PNU & Prime G

2017 Alliance Service Company Ltd. PTT GC Fire Water 2nd Line & Portable Water work - PAUT for Fire Water 2nd Line & Portable Water Work

2017 NPS Engineering Company Ltd. IRPC OSBL of PNU & Prime G Project - PT for OSBL of PNU & Prime G

2017 Thai Oil Public Company Limited TOP TML TCR Loop Unit 2100 - UTM for TML TCR Loop Unit 2100

2017 Future Development & Construction Co., Ltd. GPSC Steam Isolation Valve GPSC Cup1 to Cup3 - PAUT for C/S piping works

2017 Thai Oil Public Company Limited TOP UTM for Monitoring Mixing Point of TPX Plant - UTM for Monitoring Mixing Point of TPX Plant

2017 Thai Oil Public Company Limited TOP Claus Reactor I & II External Condition Monitor of SRU-4 - UTM for Claus Reactor I & II External Condition Monitor of SRU-4

2017 Rayong Intania Co., Ltd. Polytechnology Co., Ltd. Pipe Rack Level 3 - MT for Pipe Rack Level 3

2017 NPS Engineering Company Ltd. IRPC OSBL of PNU & Prime G Project - PAUT for OSBL of PNU & Prime G

2017 NPS Engineering Company Ltd. IRPC Spent Caustic Treatment for HUV Plant, CAP-90-10-11-902-93300 - PAUT for Spent Caustic Treatment for HUV Plant, CAP-90-10-11-902-93300

2017 NPS Engineering Company Ltd. ESP IRPC, EPS Green Thermal Insulation Expansion of EPS - PT for EPS Green Thermal Insulation Expansion of EPS Plant

2017 Unoin Construction & Supply Co., Ltd. TOP PX loading System - PT for PX loading System

2017 HTE Service & Supply Co., Ltd. IRPC IRPC OSBL, Plant Side - PAUT for OSBL of PNU & Prime G off Rack

2017 Chaiwatthana Engineering Co., Ltd IRPC IRPC OSBL Sea Side - PAUT for OSBL PNU& Prime G

2017 Thai Oil Public Company Limited TOP UTM, Dead Lag TOC 4 - UTM for Dead Lag TOC 4

2017 Rayong Intania Co., Ltd. PTT GSP Maintenance and Installation of Pipe Gusset AGRU 1&2 at PTTPLC - PAUT for Maintenance and Installation of Pipe Gusset AGRU 1&2 at PTTPLC

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP Amine Stripper Column Crack 3501-1-T004 - PAUT for Amine Stripper Column Crack 3501-1-T004

2017 NPS Engineering Company Ltd. IRPC IRPC Jetty, Improvement Wharl - PAUT for Improvement Wharf 2B/F# for diesel (CAP 04-10-16-123-272300), P59031.1

2017 NPS Engineering Company Ltd. IRPC IRPC, Tank Repair - PAUT, PT Repair Tank 14 T001A, 14 T005A, 14 T001B, 14 T 007B (J 60033)

2017 NPS Engineering Company Ltd. IRPC Ovehault Chiller Pakage - PT for Overhault Chiler Package 14A 001A and 14A 001B

2017 Rayong Intania Co., Ltd. PTT GSP Heat Recovery Design for Dehydration System of GSP 5 - PAUT for Heat Recovery Design for Dehydration System of GSP 5

2017 NPS Engineering Company Ltd. EPS EPS Grren Thermal insulation Expansion, Piping - PT for EPS Green Thermal Insulation Expansion of EPS

2017 Thai Oil Public Company Limited TOP UTM U 1800 (B-18020) - UTM for Unit 1800 (10" B-18020)

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP Raw Water GSP #5 - PAUT Raw Water GSP 5

2017 Thaioil Public Company Limited TOP PAUT - PAUT for 4" P22956 Slope Line Deformation at of Support

2017 NPS Engineering Company Ltd. IRPC IRPC Projects, UHV Pipe Racks - PT for IRPC Projects, UHV Pipe Racks

2017 NPS Engineering Company Ltd. IRPC Repair Convection Coils 01B001 B - PAUT for Repair Convection Coils 01B001 B

2017 NPS Engineering Company Ltd. IRPC Refurbish Side Wall Exhaust Gas Turbine GTG 13 - PT for Refurbish Side Wall Exhaust Gas Turbine GTG 13

2017 Thaioil Public Company Limited TOP B-84052 TOP SPP - UTM for B-84052 TOP SPP

2017 HTE Service & Supply Co., Ltd. IRPC Modify Discharge 69P066a/b for transfer THN 69TO66 to LS HSD - PAUT for Modify Discharge 69P066a/b for transfer THN 69TO66 to LS HSD

2017 Rayong Intania Co., Ltd. PTT GSP Residue Gas GSP1 , ESP to RGT - PAUT for Residue Gas GSP1 , ESP to RGT

2017 Rayong Intania Co., Ltd. PTT GC Pipeline 4" Transfer CRS LR T-5293 4" - PAUT for Pipeline 4" Transfer CRS LR T-5293

2017 MACS Co.,Ltd. IRPC Reduce Na Hyyahi Feed (Improv) - PAUT for Reduce Na Hyyahi Feed (Improv)

2017 NPS Engineering Company., Ltd. IRPC Increasing CCR in DCC Feed From 2.3% To 3.0% - PT for C/S piping and piping support

19 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 Rayong Intania Co., Ltd. PTT PE O-P3 Utility Expansion for LLH - MT for C/S piping works and PAUT for C/S, A/S piping works

2017 ThaiOil Public Company Limited. TOP On Stream Inspection of E-9503 A/B - UTM for On stream inspection of E-9503 A/B

2017 Chatr Kanchang Leamchabang Co., Ltd. Eastern Engineer Enterprise Co., Ltd. Chamber for GSP#4 - PAUT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC 21128053-AYC60137 - PAUT for C/S piping works

2017 ThaiOil Public Company Limited. TOP Piping Inspetion Dead End of U-9200 - UTM for Piping Inspection Dead end of U-9200

2017 ThaiOil Public Company Limited. TOP SRU-5 Statutory S/D - PAUT fir C/S piping works

2017 NPS Engineering Company Ltd. IRPC Pipe for Ethylene Purification Unit (EPU) at ETP - PAUT for C/S piping works
PAUT, PT for CS Nozzle 44 Inch Dia., 16.0 mm Thickness, Single V Butt Weld (Weld preparation after
2017 TPT Indorama Petrochemicals PCL. TPT Repair Crak for D1202C Nozzle P1 44" -
crack repairing)
2017 Rayong Intania Co., Ltd. SCG C2 Pipeline Replacement (RPL ) - PAUT for S/S piping works

2017 ThaiOil Public Company Limited. TOP UTM@TOP - UTM for UTM Points of SRU-5 Statutory Shut Down

2017 ACE Engineering & Construction Co.,Ltd Bangkok Industrial Gas TPC_2 Blanketing for EDC Tank at BTF - PAUT for C/S piping works

2017 ThaiOil Public Company Limited. TOP B-84053 - UTM for C/S piping works

2017 NPS Engineering Company Ltd. IRPC Jetty Pipe 5" - PAUT for C/S piping works

2017 ACE Engineering & Construction Co.,Ltd IRPC IRPC Polypropylene Compound and Specialties (PPC) - PAUT for low temp C/S piping works

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP Modify Line C2 to Sale Gas at D70401 GSP#1 - PAUT for C/S piping works

2017 Rayong Intania Co.,Ltd. MOC C2 Pipeline Replacement (RPL Portion) - PAUT, PT for C/S piping works

2017 TPT Indorama Petrochemicals PCL. TPT Boiler #A Tube Replacement - PAUT for C/S, A/S tubes

2017 Thai Oil Public Company Limited. TOP UTM Monitoring of U-2200 (HVU-2) - UTM Monitoring of mechanical equipment

2017 K999 Engineering & Construction Co., Ltd CUEL-Chevron Hot Induction Bending project - UT for C/S piping works

2017 Macs Company Limited IRPC TA2017@IRPC - PAUT for C/S piping works

2017 PEG Intertech Company Limited. IRPC Ethylene Purification Unit Project. - PAUT for C/S piping works

2017 Thai Oil Public Company Limited. TOP UTM for Unit 9500 - UTM Monitoring of mechanical equipment

2017 Future Development & Construction Co., Ltd. Thai Petroleum Pipeline Co., Ltd. Modify line ULG 20” & GB2 16” - PAUT for C/S piping works

2017 Chatr Kanchang Leamchabang Co., Ltd. PTT GSP Replace Burner Runner 3208-F-002 - PAUT for S/S piping works

2017 Macs Company Limited IRPC TA2017@IRPC - PAUT for C/S piping works

2017 Khow-How Tranfer Co.,Ltd CUEL-Chevron Hot Induction Bending project - UT for Hot Induction Bending

2017 Macs Company Limited IRPC TA2017@IRPC - PAUT for C/S pipining and S/S piping and Al tubes

2017 Rayong Intania Co.Ltd ROC Q-Max Rayong Olefins Co.,Ltd - PAUT for C/S piping works

2017 Union Construction & Supply Co.,Ltd TOP Punch list HVU-3 - PAUT for C/S piping works

2017 Union Construction & Supply Co.,Ltd TOP Deep Bed Installation at HCU-2 - PAUT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC IRPC Turn Around 2017 Project - PAUT, PT for S/S, C/S ping and UTM for C/S piping works

2017 Qualitech Engineering Co.,Ltd IRPC DCC Coventor / Package 3 & 5 - PAUT for C/S, S/S and AL piping works

2017 SCC Maintenance Service Co., Ltd Indorama Petrochem Limited. Shutdown IRPL 2017 - PAUT for S/S piping works

2017 Chaiwatthana Engineering Co.,Ltd (New Client) IRPC TA2017@IRPC - PAUT for C/S, AL piping works

2017 Kabinburi Glass Industrial Co., Ltd KGI KBI Float Glass - PAUT for BG Exit Lip Installation

2017 ThaiOil Public Company Limited. TOP HDS2 MTA Shut Down - PAUT, UTM forC/S piping works

20 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 NPS Engineering Company Ltd. IRPC TA2017@IRPC - PT for C/S piping works

2017 TPT Petrochemicals Public Co.,Ltd TPT Boiler B Water Wall Tube - PAUT for C/S tubes

2017 H.T.E Engineering Co.,Ltd IRPC Renew Burner Boiler A&B UT4 Plant - PAUT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC F0301 (ETP) - PT for C/S piping works

2017 Union Construction & Supply Co.,Ltd Styrolution Project Styrolution - PAUT for Styrolution MPPU Infranstructure for C/S and S/S piping works

2017 Thai oil Public Company Limited. TOP TML HVU-3 Corrosion Monitoring - UTM for C/S piping works

2017 NPS Engineering Company Ltd. IRPC Demolish Install & Fabrication 06T012 - PAUT for C/S piping and shell plate

2017 Thaioil Public Company Limited TOP TML CDU-3 - UTM for TML CDU-3

2017 NPS Engineering Company Ltd. IRPC CAP-01-10-15-084-272300 - Service of PAUT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC Demolish Install & Fabrication 06T012 and Renew Tank 06T012 EBSM Plant. - PT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC INCREASE PRESSURE OF CHAMBER OF PP LINE1 EXTRUD - PT for C/S piping works

2017 NPS Engineering Company Ltd. IRPC F0301 ETP @IRPC - PT for C/s Plates

2017 Unoin Construction & Supply Co., Ltd. TOP Deep Bed Installation at HCU-2 - PAUT for Deep Bed Installation at HCU-2 for C/S piping works

2017 Agon Pacific Co., Ltd Elite Kraft Paper Co., Ltd. 1666-S Replacement Submerges Tube - PAUT for C/S piping works

2017 Union Construction & Supply Co.,Ltd Thai Beverage, Singha Sinha Boiler Plant - PAUT for CNG C/S piping works

2017 Sriracha Construction Public Co., Ltd. IRPC IRPC Polypropylene III Expansion - PAUT for C/S piping works

2017 Labix Public Co.,Ltd Labix UTM for Unit 7500 - UTM for Unit 7500

2017 Vatana Phaisal Engineering Co.,Ltd TOP Sasol LCCP LDPE - PAUT for Deep Bed Installation at HCU-2

2017 PT Citra Tubindo Engineering PT. Enerco RPO International A131 – Storage Tank – OSBL TDAE Processing Plants / Kabil / Batam - - UT Inspection as per AWS D1.1

2017 PT Citra Tubindo Engineering PT. Enerco RPO International A130 – 18 Units Tote Tanks – OSBL TDAE Plans Project / Kabil / Batam - - MT/PT Inspection as per AWS D1.1

2017 PT Citra Tubindo Engineering PT Waagner Biro Indonesia A133 - Sea Fastening / Kabil / Batam - - MT/PT Inspection as per AWS D1.1

2017 McDermott Indonesia, PT - Saudi Aramco 9COMS Audit / Batu Ampar / Batam - - MT/RT Inspection as per ASME B31.3

2017 McDermott Indonesia, PT - BMB - Inhouse - - RT Inspection


PAUT Inspection, Magnetic Particle, Ultrasonic Testing and Radiogarphy Testing as per API 1104 and
2017 Indo Kaya Energi, PT - Ophir Project - -
ASME VIII
2017 Gunanusa Utama Fabricators, PT ONGC Additional 3rd and 4th PAUT Team for Daman Project - - PAUT Inspection as per on Pile and Conductor as per ASME B31.3

2017 ASL Shipyard Indonesia, PT - MT Gamkonora Project - - Supply of Hardness Testing Services for MT Gamkonora

2017 Gunanusa Utama Fabricators, PT ONGC Additional 2nd PAUT Team for Daman Project - - PAUT Inspection as per on Pile and Conductor as per ASME B31.3
23.8; 30.2;
2017 Dwi Sumber Arca Waja, PT PGAS Solution ENI Muara Bakau / Batam 40", 20" UTScan/UT/MT/RT Inspection as per API 5L
17.5
18"; 20"; 30"; 11.89 ;19.05;
2017 Dwi Sumber Arca Waja, PT Traxys North America Traxys North America / Kabil / Batam UTScan/UT/MT Inspection as per API 5L
36" 15.88; 25.4
2017 Dwi Sumber Arca Waja, PT - Sea Fastening / Kabil / Batam - - UT Inspection as per ISO 19902 / API 2B

2017 Cladtek BI Metal Manufacturing, PT - CT 478 Project / Batu Ampar / Batam - - RT Validation as per DNV Specification on CRA Overlay Weld
Angores Surface Facilities and Pipeline (CT-443 Piping Spools) Project / Batu Ampar /
2017 Cladtek BI Metal Manufacturing, PT ExxonMobil - - NATA PT Inspection as per AS 1554.1 (NATA) on piping spool
Batam
Angores Surface Facilities and Pipeline (CT-443 Piping Spools) Project / Batu Ampar /
2017 Cladtek BI Metal Manufacturing, PT ExxonMobil - - NATA RT Inspection as per AS 1554.1 (NATA) on piping spool
Batam
2017 McDermott Indonesia, PT British Petroleum (BP) Berau Ltd Batam Marine Base – BP Angelin Project / Batu Merah/Batam - - MT/UT/RT Inspection as per API 1104 on dia 26’ and thickness 15.9mm
Supply of PAUT Inspection, Ultrasonic Testing, Dye Penetrant Testing and Magnetic Particle Testing as
2017 Rekayasa Industri, PT PT Pertamina (Persero) Refinery Unit VI Balongan Project / Balongan / West Java - -
per ASME B31.3 & API 1104
2017 PT Wasco Engineering - Various Project / Batam Centre - - Supply of Hardness Testing

21 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 PT Smart Steel Solution - Makuri Project / Batam Centre - - RT Inspection for WPS as per AS 1554.1

2017 PT Servotech Indonesia - Various Project / Batam Centre - - Supply of Holiday Test Detector

2017 PT Wilmax Control System - Bundled 2 Phase Bongkot Project / Batam - - PMI Inspection as per client specification

2017 PT Wadi Daya Sakti, PT - Various Project / Batam - - Supply of Hardness Testing

2017 Dwi Sumber Arca Waja, PT Edgan Murray Casing Pipe for Ophir Project / Kabil / Batam 30" 25.4 AUT/UT/RT/MT Inspection as per API 5L annex K

2017 PT Perusahaan Pelayaran Equinox Golar LNG Partners LP Nusantara Regas Satu Project Offshore / Jakarta - - Rope Access, UT/MT/PT Inspection on LNG Cago Tank CT No. 2 as per ASME

2017 Pioneer Engineering Sdn Bhd Petronas Refinery and Petrochemical Integrated Development (RAPID) Project / Malaysia - - PAUT Inspection on Piping, Vessels, Spheres as per ASME B31.3

2017 PT Citra Tubindo Engineering Fox Offshore Pte Ltd Fabrication of Huisman Main Block Cradle (A125) Project / Batam - - MT/UT Inspection as per AWS D1.1 2015

2017 PT Tomoe Valve Batam - Supply of PT and PMI Services / Batam - - Supply of DPT/PMI as per AWS D1.1

2017 PT Bukaka Teknik Utama Tbk PT Jasa Marga (Persero) Jakarta Cikampek Elevated Highway Project / Cilengsi / Bogor - - Supply of Radigraphic Testing as per AWS D1.1

2017 PT Bukaka Teknik Utama Tbk PT Jasa Marga (Persero) Jakarta Cikampek Elevated Highway Project / Cilengsi / Bogor - - Supply of Manual Ultrasonic Testing as per AWS D1.1

2017 PT Bukaka Teknik Utama Tbk PT Jasa Marga (Persero) Jakarta Cikampek Elevated Highway Project / Cilengsi / Bogor - - Supply of PAUT Inspection as per AWS D1.5 2015

2017 Transalindo Eka Persada, PT - Supply of PMI & Ferrite Testing - - Supply of PMI & Ferrite Testing Inspection as per client requirements

2017 Cameron System, PT - Rental of UV Light Equipment - - Supply of UV Light Equipment

2017 Det Norske Veritas Pte. Ltd DNV GL Validation Program for Pipe Dia. 2" 2" - PAUT, RT, and MT Inspection as per DNV

2017 Det Norske Veritas Pte. Ltd DNV GL Validation Program for Pipe Dia. 14" & 12" 14", 12" - RT, MT, UT Inspection as per DNV

2017 Dwi Sumber Arca Waja, PT PT Pertamina Hulu Energi Edgan Murray for Pertamina PHE ONWJ Project 30" 25.4 UTScan Inspection as per API 5L
Procurement of Mast and Sub Structural for 2 units rig CN M1 4PI00002A (A104) Project
2017 Citra Tubindo Engineering, PT PT Pertamina Drilling Services Indonesia (PDSI) - - MT/UT Inspection as per AWS D1.1 2010
at Pertamina, Bengkulu Field, South Sumatera
2017 Gunanusa Utama Fabricators, PT ONGC Daman Development Project Phase II - - PAUT/UT/MT/PT/RT Inspection on Pile and Conductor as per AWS D1.1, ASME B31.3, API RP2X

2017 All Lifting Engineering, PT - Supply of MPI Services (NATA) - - MT Inspection as per AS 1554.1 (NATA) on Pad Eyes

2017 Wilmax Control System, PT Carigali-PTTEPI Operating Company (CPOC) JDA Block B17-01 Development Project - - PT Inspection as per ASME B31.3

2017 BW Offshore Singapore Pte Ltd BW Offshore Provision of Advanced Rigging for Joko Tole Project - - Provision of Advanced Rigging

2017 Citra Tubindo Engineering, PT Saipem Indonesia A122 - Fabrication of Catwalk, Gangway and Sea Water intake Platform - - MT/UT Inspection as per AWS D1.1 2015

2017 Pioneeer Engineering Sdn Bhd Petronas Rapid Project on Piping , Vessel, Spheres - - PAUT Inspection as per ASME B31.3 on various diameter and thickness

2017 Dwi Sumber Arca Waja, PT - A122 Fabrication of Catwalk Project - - MT/UT Inspection as per AWS D1.1 2010
Procurement of Mast and Sub Structural for 2 units rig CN M1 4PI00002A (A104) Project /
2017 PT Citra Tubindo Engineering PT Pertamina Drilling Services Indonesia (PDSI) - - MT Inspection as per AWS D1.1 2010
Bunyu Island / Kalimantan
2017 PT Surya Sarana Hidup Jaya (SSHJ) - Crude Oil Export Facility Reconstruction ( COEFRP) - - MT/UT Inspection for PQR as per AWS D1.1 2010

2017 Dwi Sumber Arca Waja, PT British Petroleum (BP) Berau Ltd BP Tangguh Intergrade Drailling Program – Edgan Murray Project / Kabil / Batam Centre - - MT/PT/UT/RT Inspection as per API 5L
MT/PT/UT/RT Inspection for seeded defect BSP Project as per AWS D1.1 2010 on dia 12’ and various
2017 McDermott Indonesia, PT - (R3649) Batam Marine Base – BSP Project / Batu Merah/Batam - -
thickness 12.7mm, 15.9mm
2017 McDermott Indonesia, PT - (R3458) GWF - Greater Western Flank – WQT Project / Batu Merah / Batam - - RT Inspection for WQT on dia 10” and thickness 27.2mm

2017 Steel Point Ltd. - Park Hyatt Project - - MT Inspection as per AS 1554.1 (NATA)

2017 STC JO (Saipem Tripatra Chiyoda Joint Operation) ENI Jangkrik FPU Offshore Campaign Stage 2 - - RT/UT/MT/PT Inspection as per DNV

2017 Profab Indonesia, PT (NOV) - Film Digitization - - Film Digitization

2017 Dwi Sumber Arca Waja, PT - Stenaris Project - - MT/PT/UT Inspection as per AWS D1.1

2017 PT Citra Tubindo Engineering - Hardness Testing for A104 Project - - Hardness Testing

2017 Wilmax Control System, PT - Various Project - - PMI Inspection

22 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2017 H-Tech Oilfield Equipment, PT ( NOV) - Various Project / Kabil / Batam - - RT/UT/MT Inspection as per ASME VIII

2016 Somerville TransCanada Pipelines Simonnette Lateral Loop 24" 21.7km CSA Z662 / Wall Thicknesses: 7.9mm, 8.9mm, 9.2mm, 12.7mm
8", 8.625" &
2016 TechnIp Deep Gulf Energy South Santa Cruz 23KM
12.75"
2016 McDermott Anadarko Caesar Tonga Phase II 12.13", 7.69" 2.9 Miles UTScan Inspection as per API 1104 with different thickness 15.2mm, 32.5mm

2016 McDermott EOG Resources Sercan 14", 12" 2 Miles UTScan Inspection as per API 1104 with different thickness 19mm, 12.7mm

2016 PT Cladtek BI Metal Manufacturing Petronas Carigali Myanmar Limited (PCML) CT361 Yetagun Phase 4 Development / Batam - - PAUT Inspection as per ASME VIII Div. I

2016 PT Persada Palembang Raya British Petroleum (BP) Berau Ltd BP Tangguh / Sorong / Papua New Guinea - - UT/MT Inspection on Forks, Mask/Carriage and Boom

2016 McDermott Indonesia, PT - Batam Marine Base – GWF2 Project / Batu Merah/Batam - - RT Inspection on Trial Welds as per AWS D1.1 2010

2016 PT Citra Tubindo Engineering - Petronas Rapid Project Pangerang Package 3 (A120) Project / Kabil /Batam - - RT Inspection on WQT as per ASME B31.3
Procurement of Mast and Sub Structural for 2 units rig CN M1 4PI00002A (A104) Project /
2016 PT Citra Tubindo Engineering - - - Supply of Dimension Survey
Kabil /Batam
2016 BW Offshore Singapore Pte Ltd BW Offshore M4396 Ruche Dussafu / Azurite Project / Galang, Batam - - Rope Access, UT Thickness Measurement and Close up Survey as per DNV

2016 BW Offshore Singapore Pte Ltd BW Offshore Joko Tole Project / Banyuwangi Warehouse - - RT/PT/UT Inspection for 6 joints elbow and flanges as per ASME B31.1

2016 BW Offshore Singapore Pte Ltd BW Offshore Joko Tole Project / Banyuwangi Warehouse - - RT/PT/UT Inspection for 2 pipe spools as per ASME B31.1

2016 Singatac Engineering Pte Ltd Total Angola Kaombo Project / Bintan - - MT/PT/UT Inspection as per AWS D1.1

2016 Dwi Sumber Arca Waja, PT - Bouyancy Support for Amrun Project - - MT/PT/UT Inspection as per AWS D1.1

2016 McConnell Dowell Services, PT - Diesel Tank 3500 Ltr Project - - MT Inspection as per AWS D1.1 2010

2016 Citra Tubindo Engineering, PT - Procurement of Mast and Sub Structural for 2 units rig CN M1 4PI00002A (A104) Project - - MT/PT/UT Inspection as per AWS D1.1 2010

2016 BW Offshore Singapore Pte Ltd - BW Azurite Project - - Supply of Scaffolding Material for Purchase or Rental

2016 BW Offshore Singapore Pte Ltd - BW Azurite Project - - Supply of Painting / Tradesman

2016 BW Offshore Singapore Pte Ltd - BW Azurite Project - - General Labour Supply (Cleaner)

2016 BW Offshore Singapore Pte Ltd - BW Azurite Project - - Supply of Watchman

2016 Perusahaan Pelayaran Equinox, PT Golar LNG Partners LP UT & PT on LNG Cargo Tank CT No. 3 for Nusantara Ragas Satu Project Offshore - - UT/PT Inspection as per ASME

2016 Sertco Quality, PT PT Medco E&P Indonesia Medco Project - - RT/MT/PT/UT Inspection and Holiday Test as per ASME V & IX and API 1104

2016 Wasco Engineering Indonesia, PT Wasco Engineering Indoesia, PT Various Project - - Supply of UT Equiopment with probes and calibration bloks

2016 GTA Construction PT Panca Amara Utama Banggai Amnomia Plant Project - - RT Inspection as per ASME B31.3

2016 ALE - Heavy Lift ALE - Heavy Lift Provision of NDT Inspection for 4 jacks - - UT/MT/PT Inspection as per AWS D1.1

2016 Alstom Power Energy System Indonesia, PT Indonesia Power, PT Retubing HRSG Project at Tambak Lorok - - PAUT / PT Inspection as per ASME B31.3 Section 1

2016 BW Offshore Singapore Pte Ltd - Supply of Advanced Rigger - - Supply of Advanced Rigger

2016 Perusahaan Pelayaran Equinox, PT Golar LNG Partners LP UT & PT on LNG Cargo Tank CT No. 5 for Nusantara Ragas Satu Project Offshore - - UT/PT Inspection as per ASME

2016 Alstom Power Energy System Indonesia, PT PT Pertamina (Persero) Pertamina Plaju Project - - RT Inspection as per ASME B31.3

2016 McConnell Dowell Services, PT McConnell Dowell South Asia Pte Ltd Fabrication of Spreader Bar Trestle Pipe Rack Project - - MT/UT Inspection as per ASME VIII Div. I

2016 Perusahaan Pelayaran Equinox, PT Golar LNG Partners LP LNG Cargo Tank UT and NDT Testing on Nusantara Ragas Satu Project Offshore - - UT/PT Inspection as per ASME

2016 Perusahaan Pelayaran Equinox, PT Golar LNG Partners LP Provision of Rope Access NDT for Nusantara Ragas Satu Project Offshore - - UT/PT Inspection as per ASME

2016 Smart Steel Solution, PT - Britanya Project - - Supply of Welding Inspector

2016 Nippon Steel & Sumikin Engineering Co.Ltd - CH1KS/K1 Vessel Maintenance Project - - MT/UT Inspection as per AWS D1.1 2015

2016 IFC - Camau Basket Strainer Project - - RT/MT Inspection as per ASME VIII

23 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2016 IFC - F039 Repeat Order B16-397 Project - - RT/PT Inspection as per ASME B31.3

2016 Cameron System, PT Saudi Aramco Aramco Project / Batam - - PMI Inspection as per client specification

2016 Profab Indonesia, PT (NOV) PT Pertamina (Persero) JN1204 – Pertamina Cilacap Blue Sky Project - - MT/PT/UT/RT Inspection as per AWS D1.1 and ASME B31.3

2016 Profab Indonesia, PT (NOV) Wood Group PSN JN1231 – Angore Surface Facilities and Pipelines Project 14" - MT/PT/UT/RT Inspection as per ASME B31.3 for pipe dia. 14", thk. 57.15mm

2016 BW Offshore Singapore Pte Ltd BW Offshore Joko Tole Project Offshore - - Rope Access, MT/PT/UT/RT, PAUT, HT,Eddy Current

2016 Wilmax Control System, PT - Over Head Crane Project - - UT/MT Inspection as per AWS D1.1 2010

2016 Wilmax Control System, PT ENI Jangkrik Complex Project - - RT/PT Inspection as per ASME B31.3

2016 Gunanusa Utama Fabricators, PT PT Pertamina Hulu Energi EPCI-1; PHE-12, PHE-24 and CPP2 Platform and Pipeline - - PAUT Inspection as per ASME B31.3 and UT/MT Inspection as per AWS D1.1 2010

2016 Rekayasa Industri, PT PT Panca Amara Utama Banggai Amnomia Plant Project - - PAUT, RT and PT Inspection as per ASME B31.3

2016 Citra Tubindo Engineering, PT CTE and Drillmac A111 – Internal Project / Kabil / Batam - - RT/MT/PT/UT Inspection as per AWS D1.1 2010

2016 McDermott Indonesia, PT - Batam Marine Base – Sercan Project - - UT/MT Inspection as per ISO 17640 and ISO 17638

2016 McDermott Indonesia, PT - Batam Marine Base – Inpex Project - - RT Inspection as per AWS D1.1 2010

2016 McDermott Indonesia, PT - Batam Marine Base – Ichthys Project - - RT Inspection as per AWS D1.1 2010

2016 McDermott Indonesia, PT - Batam Marine Base – Vashista Project - - RT Inspection as per AWS D1.1 2010

2016 McDermott Indonesia, PT Saudi Aramco D6688 -SC03 - Saudi Aramco Project - - MT/PT/UT/RT/PAUT Inspection as per client AWS D1.1 2010

2016 McDermott Indonesia, PT Saudi Aramco D6688 - Saudi Aramco Project (WQT) - - MT/PT/UT/RT/PAUT Inspection as per AWS D1.1 for WQT & PQR

2016 Dwi Sumber Arca Waja, PT Maersk Culzean Field Development Project / Kabil/ Batam - - UT/MT Inspection as per ISO 17640 and ISO 17638

2016 Dwi Sumber Arca Waja, PT Edgan Murray Conductor Pipe Project / Kabil / Batam 30" 25.4 AUT/RT/UT Inspection as per API 5L

2016 Citra Tubindo Engineering, PT Total E & P Angola A118 – WQT Kaombo Project / Kabil / Batam - - RT Inspection as per AWS D1.1 2010

2016 Citra Tubindo Engineering, PT - A114 – Vessel Separator Upgradation Project / Kabil / Batam - - RT/MT Inspection as per ASME VIII DIV 1 2015

2016 BW Offshore Singapore Pte Ltd Oil Terminal "Belokamenka" L.L.C FPSO Belokamenka Project / Batam - - Rental Chart Recorder

2016 Tunas Karya Bahari Indonesia, PT Swissco Offshore Pte Ltd UT Barge TW33 Project / Sagulung / Batam - - UT Thickness as per DNV GL

2016 H-Tech Oilfield Equipment, PT ( NOV) HESS Hess Malaysia Project / Kabil / Batam - - RT/UT/MT Inspection as per ASME VIII

2016 H-Tech Oilfield Equipment, PT ( NOV) BP Global BP Exploration Delta / Kabil / Batam - - RT/UT Inspection as per ASME VIII

2016 Saipem Indonesia, PT ENI Integration Jangkrik Complex Project / Karimun - - MT/UT Inspection as per DNV 402B

2016 OKI Pulp & Mills, PT Sinar Mas Provision of PAUT Services / Palembang - - PAUT Inspection

2016 IFC PT Pertamina EP Pakugajah Development Project / Batam - - PMI Inspection

2016 Freundenberg Oil & Gas Technologies ENI Jangkrik Complex Project - FMC Project / Johor / Malaysia - - UT Lamination Check

2016 BW Offshore Singapore Pte Ltd Oil Terminal "Belokamenka" L.L.C FPSO Belokamenka Project / Batam - - Calibration Equipment and Supply Step Wedge

2016 Det Norske Veritas Pte. Ltd DNV GL Various Project / Batam - - Supply UT Equipment
A096 - Design & Fabrication of 1 unit choke & kill stand pipe & cement manifold / Kabil /
2016 Citra Tubindo Engineering, PT Shanghai Zhenhua Heavy Industrie Co.Ltd - - RT/MT Inspection as per API 6A & API 16C
Batam
2016 Citra Tubindo Engineering, PT Yara Pilbara Nitrates Pty.Ltd A116 – Tan Burrup Project / Kabil / Batam - - RT/PT/PMI Inspection as per ASME B31.3 – Edition 2015

2016 UT Quality Inc. Technip Geoproduction (M) Sdn. Bhd Support BP Juniper Project / Johor, Malaysia - - UTScan System for various thickness

2016 Freundenberg Oil & Gas Technologies ENI Jangkrik Complex Project / Tanjung Uban, Bintan - - UT Lamination Check

2016 Citra Tubindo Engineering, PT TOTAL E & P Indonesie A113 - Total E & P Angola Block 32 Project / Kabil/Batam - - RT Inspection as per AWS D1.1 2010

2016 BW Offshore Singapore Pte Ltd BW Offshore FPSO Project Offshore - - Rope Access, MT/PT/UT/RT, HT,Eddy Current

24 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2016 Saipem Indonesia, PT TOTAL Supply of LoRAD Equipment / Karimun - - RT Inspection as per ASME B31.3 using LoRAD

2016 McConnell Indonesia, PT Heerema Walkway Lifting Lug Project / Sagulung / Batam - - MT Inspection as per AWS D1.1

2016 EPC-M Fabricators Perkasa, PT ENI Jangkrik Project / Karimun - - RT Inspection as per ASME B31.3

2016 Wilmax Control System, PT GAZPROM Neft Badra BV (GPNB) CPF PH II Plant Project / Batam - - PMI Inspection

2016 IFC Lewa Group Lewa B16-02-068 Project / Batam Centre - - RT/MT Inspection as per ASME B31.3 and PMI Inspection

2016 IFC PT Pertamina (Persero) Pertamina Avtur Cilacap Project / Batam Centre - - RT/MT Inspection as per ASME VIII Div. I 2013

2016 Technip Indonesia, PT ENI Jangkrik Project / Batam Indonesia - - RT/MT/PT/UT Inspection as per ASME B31.3

2016 IFC TOTAL E & P Indonesie Meindo B15-637 Project / Batam Centre - - RT/PT Inspection as per ASME B31.3

2016 IFC Chevron Australia Pty Ltd Bangka Topside EPCI B15-487 Project / Batam Centre - - RT/MT Inspection as per ASME B31.3

2016 IFC HCML Husky-CNOOC Madura Limited VME B15-556 Project / Batam Centre - - RT/MT/PT Inspection as per ASME B31.3

2016 Nacap Esso Australia Resources Pty Ltd Esso Project / Victoria / Australia 12" 185km AUT Inspection

2016 Dwi Sumber Arca Waja, PT Edgan Murray Conductor Pipes – Saka Project / Kabil / Batam 30" 25.4 UTScan / RT/MT/PT/UT Inspection as per API -5L

2016 McDermott Indonesia, PT Yamgaz LNG Additional Yamal Train 1 Project / Batu Merah / Batam - - MT/PT/UT/RT Inspection for Piping and Structural work

2016 Citra Tubindo Engineering, PT Drillmec (Trevi Group) A111 Land Rig 1500 HP AC Project / Kabil/Batam - - MT/PT/UT Inspection on pad eyes
2”,4”,6”8”,10”,12
2016 Gunanusa Utama Fabricators, PT ONGC Daman Project /Cilegon - PAUT For Piping as per ASME B31.3 and Structural as per AWS D1.1
”,18”24”, 28”
2016 The Bangchak Petroleum Public Company Limited. The Bangchak Petroleum Public Company Limited. Shutdown Yearly2016/Bangchak Petroleum Refinery Plant, Bangkok 6" - PAUT for CS Piping 7.11 mm Thickness. Single V Butt Weld.
Bangchak Petroleum Refinery Plant, Bangkok,
2016 Thai Belltech (2006) Company limited. Pre Drain Crude (Phase II)/Bangchak Petroleum Refinery Plant, Bangkok 6" - PAUT for for CS Piping 7.11 mm Thickness. Single V Butt Weld.
Thailand.
2016 NPS Engineering Co., Ltd. IRPC Public Company Limited. 30013285(A59035)/IRPC Plant, Rayong, 6" - PAUT for CS Piping 7.11 mm Thickness. Single V Butt Weld.

2016 Know-How Transfer Company Limited. IRPC HDPE Plant, Rayong, Thailand. Remove And Reinstall No.4-15 Condenser. /IRPC HDPE Plant, Rayong, 4" - CS Piping 6.02 mm Thickness. Single V Butt Weld.

2016 Know How Transfer Co., Ltd (KHT). TTCL-Public Company Limited (TTCL). CHP II Project Phase II./IRPC Power Plant,Rayong, - - UT for H-Beam Structural Steel,28.0 mm Thickness, Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Company Limited. Remaining Gas Treatment Unit/Fabrication shop at CKC., Map Ta Phut, 0.75" - CS Piping 3.91 mm Thickness, Socket Weld.

2016 SK Engineering Company Limied. SK Engineering Company Limied. Welding Coupon Visual Inspection and PAUT Test./Xe-Pian Xe-Namnoy, Lao 6" - PAUT for SS Piping 7.11 mm thickness, Single V Butt Weld.

2016 NPS Engineering Co., Ltd. IRPC Public Company Limited. 100339965(A59019)/IRPC ADU1 Plant, Rayong 2" - CS Piping 5.54 mm Thickness. Single V Butt Weld.
Revamp Convention Coil Module Waste Heat Recovery Unit Tag No. 3208-F-001 ESP/PTT
2016 Chatr Karnchang Laemchabang Co.,Ltd PTT Public Company Limited. 18" - PAUT for for CS Piping 7.92 mm Thickness. Single V Butt Weld.
GSP, Map Ta Phut, Rayong,
2016 THAI OIL PUBLIC CO.,LTD THAI OIL PUBLIC CO.,LTD Gridlines UTM Line No. 24” P11011-150-21-PP/THAI OIL Sriracha Laemchabang Chonburi 24" - UTM Pipeline NO.24"P11011-150-21-PP
Map ta Phut Flow Improvement(BV562)/Thai Petroleum Pipeline Co., Ltd., Pattaya,
2016 Future Development & Construction Co., Ltd. Thai Petroleum Pipeline Co., Ltd. 14" - PAUT for CS Piping 27.8 mm Thickness. Single V Butt Weld.
Chonburi,
2016 Union Construction & Supply Co., Ltd. THAI OIL PUBLIC CO.,LTD New HPNA Vessel Installation Project./Thai Oil Refinery (TOC-5), Laemchabang, Chunburi, 10" - PAUT for CS Piping 6.35 mm Thickness. Single V Butt Weld.

2016 The Bangchak Petroleum Public Company Limited. The Bangchak Petroleum Public Company Limited. Piping TAM 2016. /Bangchak Petroleum Refinery Plant, Bangkok, 6" - PAUT for CS Piping 7.11 mm Thickness. Single V Butt Weld.

2016 MACS Company Ltd. IRPC Public Company Limited. Repair Shell Tank 69T073B/IRPC TFLT Plant, Rayong, - - PAUT for CS Shell Plate 8.0 mm Connect to Plate 6.0 mm. Thickness. Single V Butt

2016 Rayong Intania Co.,Ltd IRPC Public Company Limited. Tie-In Work LPG Recovery Project./IRPC TFLT Plant, Rayong, 2" - PAUT for CS Piping 3.91 mm Thickness. Fillet Weld
Repair pipe line tank 45T001 for line 150-CAR , 80-PYRL/Fabrication shop at NPS, Map Ta
2016 NPS Engineering company limited. IRPC Public Company Limited. 1" - PAUT for CS Piping 4.55 mm Thickness, Single V Butt Weld.
Phut, Rayong,
2016 NPS Engineering company limited. IRPC Public Company Limited. Repair Bottom Plate tank no.63T002/IRPC Public Company Limited. Rayong - - PT for CS Plate, 5.00 mm Thickness. Fillet Weld.
Clarifide Water Pipeline Replacement for TPAC & TPCC Groups/Glow SPP3 (OSBL Pipe
2016 ACE Engineering & Construction Company Limited. TPAC & TPCC Groups - - PT for H-Beam Thickness 8 mm Length 222 x 84 mm.
Rack EFT) Map Ta Phut, Rayong,
Utility Piping Mahachai./CPF (Thailand) Public Company Limited, Mahachai,
2016 Union Construction and Supply Company Limited. CPF (Thailand) Public Company Limited, 1.5" - PAUT for CS Piping 3.68 mm Thickness. Single V Butt Weld.
Samutsakorn,
2016 NPS Engineering Company Limited. IRPC Public Company Limited. Repair 3”-SL-6981002-A13-50W-G9-A14/IRPC Jetty, Rayong, 3" - PAUT for CS Piping 5.49 mm thickness, Single V Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP (Map Ta Phut) Rayong. Modify Line For Test Run LP Fuel at ESP./PTT GSP (Map Ta Phut) Rayong. 1" - PAUT for CS Piping 4.55 mm Thickness. Fillet Weld.

25 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2016 Union Construction & Supply Co., Ltd. THAI OIL PUBLIC CO.,LTD Installation CL Guard CCR1&2 Project./Thai Oil Refinery, Laemchabang, Chunburi, 8" - PAUT for CS Piping 8.18 mm Thickness. Single V Butt Weld.

2016 Rayong Intania Co.,Ltd PTT GC11 (Map Ta Phut) Rayong. Excess Steam Utilization./PTT GC11 (Map Ta Phut) Rayong. 12" - PAUT for AL Piping 14.27 mm Thickness. Single V Butt Weld

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP (Map Ta Phut) Rayong. PTT Direct (Shut Down ESP)/PTT GSP (Map Ta Phut) Rayong. 2" - PAUT for for CS Piping 8.74 mm Thickness, Single V Butt Weld.

2016 NPS Engineering Co., Ltd. IRPC Public Company Limited. 20986795(A59088)/IRPC Power Plant, Rayong, 14" - PAUT for CS Piping 11.13 mm Thickness. Single V Butt Weld.

2016 NPS Engineering Co., Ltd. IRPC Public Company Limited. 30015746(A59093)/IRPC Refinery Plant, Rayong, 4" - PAUT for CS Piping 6.02 mm Thickness, Single V Butt Weld.
CS Exchanger Shell Plate, 106 mm Thickness. Manual Scan 100% for Finding the Disbonding of
2016 Thai Oil Public Company Limited. THAI OIL PUBLIC CO.,LTD HUC-1 Minor S/D-E-2501-A1/B1/Thai Oil Refinery,Laemchabang, Chunburi, - -
Stainless Steel Cladding and Cracking in Shell Plate.Shell plate area is L4580mm x Circ3680mm.
2016 NPC Safety and Environmental Service Co., Ltd. NPC Safety and Environmental Service Co., Ltd. Oil & Gas System for Ground Training./NPC-S&E Map Ta Phut Rayong 3" - UTM for CS piping Thickness 5.49 mm.

2016 MACS Company Limited., IRPC Public Company Limited. Renew Coil Convection Tube F0101-F0601./IRPC EPT Plant, Rayong, 4" - PAUT for CS Piping 6.02 mm Thickness. Single V Butt Weld.

2016 H.T.E. Service & Supply Co., Ltd. H.T.E. Service & Supply Co., Ltd. Modify 40”-WP-BANKHAI/Field at Bankhai, Rayong, 40" - PAUT for CS Piping 12.7 mm Thickness, Single V Butt Weld.
Clarifide Water Pipeline Replacement For TPAC & YPCC Groups./low SPP3 Plant, Map Ta
2016 ACE engineering & construction co. Ltd TPAC & YPCC Groups. - - PT forCS Piping Slip on Flange.
Phut,Rayong,
2016 NPS Engineering Co., Ltd. IRPC Public Company Limited. Construct Utilities Line for Blending Silos Bldg. UHMWPE/IRPC HDPE Plant, Rayong, 6" - PAUT for CS Piping 7.11 mm Thickness, Single V Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP (Map Ta Phut) Rayong. Addition Flange Valve at Passing CHP Boiler./PTT GSP (Map Ta Phut) Rayong. 1" - PAUT for CS Piping 4.55 mm Thickness, Single V Butt Weld.

2016 NPS Engineering Company Limited. IRPC Public Company Limited. 10356171 (A59095) ADU 2./IRPC Public Company Limited. 1" - PAUT for for SS Piping 3.38 mm Thickness. Socket Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP#5 (Map Ta Phut) Rayong. GSP#5-Cut Line 24” Orific for Refacing/PTT GSP#5 (Map Ta Phut) Rayong. 24" - PAUT for CS Piping 9.53 mm Thickness, Single V Butt Weld.

2016 Vatana Phaisal Engineering Co.Ltd Vatana Phaisal Engineering Co.Ltd Sasol Lake Charles Chemical /VPE Shop 2 Nongborn Rayong, 6" - PAUT for CS Piping 7.11 mm thickness, Single V Butt Weld.

2016 Thaioil Public Company Limited. Thaioil Public Company Limited. V 2901 PAUT& Grid UTM Check external./Thaioil , Sriracha, Chonburi, - - PAUT for for CS Shell Plate 10.0 mm Connect to Shell Plate 10.0 mm. Thickness. Single V Butt Weld

2016 Rayong Intania Co., Ltd. Thai Plastic and Chemicals Public Company Limited. VCM1 ERPFLEX/TPC Plant, Maptaput Industrial Estate, Rayong 6" - PAUT for for CS Piping 10.97 mm Thickness. Single V Butt Weld.

2016 Rayong Intania Co., Ltd. PTT Asahi Chemical Company Limited. MOC Work (AN&MMA) During Turnaround 2016./PTT AC Plant, Map Ta Phut, Rayong 4" - PAUT for for CS Piping 6.02 mm Thickness. Single V Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Company Limited. Plan Tie-In Work CO2 Membrane GSP#6 Phase II/PTT GSP#6, Map Ta Phut, Rayong. 1" - PAUT for for CS Piping 4.55 mm Thickness, Single V Butt Weld.

2016 Rayong Intania Co.,Ltd PTT Public Company Limited. Installation Gate Valve 18” at WHRU GSP#6./PTT GSP Plant#6, Map Ta Phut, Rayong 18" - PAUT for for CS Piping 14.27 mm Thickness. Single V Butt Weld.

2016 FUTURE DEVELOPMENT & CONSTRUCTION CO., LTD. S and L SPECIALTY POLYMERS CO., LTD. Steam Pipeline Distribution Package to S&L Project./S and L Map Ta Phut, Rayong 2" - PAUT for CS Piping 5.54 mm Thickness, Single V Butt Weld.
Thai Oil Public Company Limited. HVU3 Reliability Improvement Project./Thai Oil Refinery, Sriracha, Laemchabang,
2016 Union Construction & Supply Co., Ltd. 6" - PAUT for For CS Piping 7.11 mm Thickness. Single V Butt Weld.
Chunburi
2016 Rayong Intania Co., Ltd. PTT Public Company Limited. Replace Control Valve./Rayong Intania Fabrication Shop, Rayong. 20" - PAUT for for CS Piping 15.09 mm Thickness. Single V Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Company Limited. Modify Mass Flow ISO Pentane to ROC/PTT (GSP#6),Map Ta Phut, Rayong 1" - PAUT for for CS Piping 4.55 mm Thickness, Single V Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Company Limited. Modification Spool AGRU GSP#6 Project/CKC Shop Map Ta Phut, Rayong 24" - PAUT for for SS Piping 17.48 mm Thickness, Single V Butt Weld.

2016 Union Construction & Supply Co., Ltd. Styrolution (Thailand) Co., Ltd. GALA Project./Styrolution Map Ta Phut Plant, Rayong 4" - PAUT for for SS Piping 8.56 mm Thickness, Single V Butt Weld.

2016 H.T.E Service & Supply Co., Ltd. IRPC Public Company Limited. Repair Piping Budget CUI 2016./IRPC Refinery Plant (Jetty), Rayong, Thailand 4" - PAUT for for CS Piping 6.02 mm Thickness, Single V Butt Weld.

2016 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Company Limited. Addition Flange at Valve Passing WHB E72301/PTT GSP#6, Map Ta Phut, Rayong 3/4" - PAUT for for CS Piping 3.91 mm Thickness, Single V Butt Weld.
13 Offshore
2015 Technip - USA Anadarko Petroleum K2 Riser Base Gas Lift - Marco Polo 6", 7" UTScan Inspection as per API 1104 with thickness 26.2mm
Jumper Tie-ins
2015 Thai Woo Ree Engineering Co., Ltd. IRPC Public Company Limited. UHV Plant Project (IRPC)./ IRPC Refinery Plant (UHV), Rayong 8" - PAUT for CS Piping 8.18 mm Thickness. Single V Butt Weld.

2015 EGCO Engineering & Service Co., Ltd. EGCO Engineering & Service Co., Ltd. HRSG11 HP DESUPERHEATER/Egco Cogen Power Plant (Boiler), Rayong , - - PAUT for examination for CS piping (Mat’l : A335 Gr.P22) ASME BPVC Section VIII Div.1 (App.12)

2015 ACE ENGINEERING & CONSTRUCTION CO., LTD. Glow Energy Public Co., Ltd. Soot Blower Valve Replacement. /(OUTAGE 2015)/GHECO-One Power Plant. 2.5" - CS Piping 5.16 mm Thickness. Single V Butt Weld.

2015 ACE ENGINEERING & CONSTRUCTION CO., LTD. Bangkok Industrial Gas Company Limited N2 Back up to DOW (I4)/DOW MTP (I4) 4" - PAUT for examination for CS Piping 6.02 mm Thickness. Single V Butt Weld.

2015 SUNGDO THAI Engineering & Construction Co., Ltd. IRPC Public Company Limited. UHV Plant Project./ IRPC Refinery Plant (UHV), Rayong 12" - Alloy Piping 17.48 mm Thickness. Single V Butt Weld.
GHECO-ONE OUTAGE DURING 1 JAN TO 6 FEB 2015/CFB3, Glow SPP3 Company
2015 Agon Pacific Co., Ltd. Glow Energy Public Co., Ltd. 12" - CS piping 10.31 mm Thickness. Single V Butt Weld.
Limited., Rayong ,
2015 Universal Engineering Technology Co., Ltd. Cosmos brewery (Thailand) Co., Ltd. Replacement Ammonia Pipe/Cosmos brewery (Thailand) Co., Ltd., Ayuthaya, 1.5" - CS Piping 3.68 mm Thickness. Single V Butt Weld.

26 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2015 Repair Crack For Stream Pipe 8”. Indorama Ventures Public Co., Ltd. Repair Crack For Stream Pipe 8”/ Indorama Plant (Tuntex), Rayong , Thailand 8" - SS 321 Piping 12.7 mm Thickness. Single V Butt Weld

2015 NPS Engineering company limited. IRPC Public Company Limited. Carrier Gas Unit (12 Line)/Fabrication shop at NPS 2" - CS Piping 3.91 mm Thickness. Single V Butt Weld.

2015 NPS Engineering Company Limited. IRPC Public Company Limited. Replacement roof of slop oil tank no.61T074/IRPC Public Company Limited. - - ASME Sec. VIII, Appendix 8, Paragraph 8.3&8.4

2015 ACE Engineering & Construction co.,Ltd. Bangkok Industrial Gas Co., Ltd. PTT-OCS 3”-N-UNDERGROUND PIPING/Bangkok Industrial Gas Co., Ltd. 3" - PAUT for examination for CS piping 5.49 mm Thickness. Single V Butt Weld.

2015 Future Development & Construction Co., Ltd. THAI PETROLEUM PIPELINE CO.,LTD. Replacement Temporary Jet A-1 Piping//Thappline Lumlukka, Pathumtani - - PAUT examination for CS piping 10” Dia., 7.8 mm Thickness. Single V Butt Weld.

2015 ACE Engineering & Construction co.,Ltd. Glow SPP11 Company Limited. Install Fire Water Line From GSPP11 to New Gas Engine./Glow SPP11 Company Limited. 3/4" - CS Piping 2.87 mm thickness, Branch connection Weld.

2015 EGCO Engineering & Service Co., Ltd. Global Power Synergy Public Company Ltd. Valve Overhaul MOV / Global Power Synergy Public Company Limited. 2" - PAUT for examination for CS piping 5.54 mm Thickness. Single V Butt Weld.

2015 H.T.E. SERVICE & SUPPLY Co.,Ltd. IRPC Public Company Limited. FAB., WELD & INSTALL PLATE FORM /AT POWER PLANT IRPC 4" - PAUT for examination for SS (A316L) Piping 6.02 mm Thickness. Single V Butt Weld.

2015 VATANA PHAISAL ENGINEERING CO., LTD. VATANA PHAISAL ENGINEERING CO., LTD. Thai oil SPP Utility Improvement/Thai oil SPP 3" - PAUT for examination for pipe 15.24 mm thickness. Single V Butt Weld.

2015 CTCI (Thailand) Company Limited. Thai Oil Public Company Limited. Small Power Producer Project./Thai Oil Public Company Limited. - - UT Thickness Measurement for CS piping (Tie-In)
Waste Water Transfer System & Internal Piping For WWT 3/2 /IRPC Public Company
2015 H.T.E Service & Supply Company Limited. IRPC Public Company Limited. 14" - PAUT for CS piping 7.92 mm Thickness. Single V Butt Weld.
Limited.
2015 Union Construction & Supply Company Limited. Thai Oil Public Company Limited. Hydrogen Recovery Project.//Thai Oil Refinery, Sriracha 4" - PAUT for CS Piping 6.02 mm Thickness. Single V Butt Weld.
NEW DEMINERALIZED AND CLARIFIED WATER TRANSFER SYSTEM BETWEEN GLOW
2015 ACE Engineering & Construction co.,Ltd. Glow SPP11 Company Limited. 4" - PAUT for examination for SS Piping 3.05 mm Thickness. Single V Butt Weld.
SPP11 PLANT 1 AND PLANT 2/Glow SPP11
2015 Rayong Intania Co.,Ltd. Bangkok Industrial Gas Co,. Ltd. BIG-N2 Pipeline /PTT Phenol. 6" - PAUT for CS piping 7.11 mm Thickness. Single V Butt Weld.
CS Piping 2.5 Inch Dia., 5.16 mm Thickness. Single V Butt Weld/SINGHA BEVERAGE CO.,
2015 UNION CONSTRUCTION & SUPPLY CO., LTD. SINGHA BEVERAGE CO., LTD. 2.5" - CS Piping 5.16 mm Thickness. Single V Butt Weld.
LTD
2015 Thai Woo Ree Engineering Co., Ltd. IRPC Public Company Limited. IRPC / UHV / GSK JV / WE/TWRE Work Shop Rayong, Thailand. 6" - CS piping 7.11 mm. Thickness. Single V Butt Weld

2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. (GSP , Tank Farm) PTT Public Co., Ltd. (GSP , Tank Farm)/PTT Public Co., Ltd. (GSP , Tank Farm) 6" - CS Piping 8.3 mm. thickness. Single V Butt weld.

2015 ACE ENGINEERING & CONSTRUCTION CO., LTD. PTT GLOBAL CHEMICAL PUBLIC Co.,Ltd CUT CHANGE LINE 1-1/2” / PTTGC#3 (I4)/PTT GLOBAL CHEMICAL PUBLIC Co.,Ltd 6" - CS Piping 7.11 mm Thickness. Single V Butt Weld.

2015 ACE ENGINEERING & CONSTRUCTION CO., LTD. GLOW SPP3 COMPANY LIMITED. CPSA-ACV-149/GLOW SPP3 COMPANY LIMITED Rayong 2" - PT for CS Piping 5.54 mm Thickness, Socket Weld.

2015 TPT Petrochemicals PCL. TPT Petrochemicals PCL. Centrifuge Screw/TPT Petrochemicals PCL., Rayong , Thailand. - - SS plate 7.8 mm thickness. Single V Butt Weld. (PT)

2015 LAEMCHABANG MAINTENANCE COMPANY LIMITED ITALIAN –THAI PTT/KHAO BO YA PROJECT. / LAEMCHABANG /LMC Shop Laemchabang - - Piping Handrail 40 mm Dia., 3.20 mm Thickness, Fillet Weld. (PT)
CS Piping 8 Inch Dia., 6.35 mm Thickness connect to main pipe dia. 12” , thickness 6.35 mm.
2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. Modified and Install Safety Valve for T/A 11 Period GSP#1 / PTT Public Co., Ltd. 8", 12" -
(Branch joint)
2015 EGCO Engineering & Service Co., Ltd. BLCP Power Limited. Replaced Tube 1ry RH for Boiler Unit#2//BLCP Power Limited Rayong - - Mat’l : SA-213-T22 Ø63.5 x t3.5) 2” Dia., 3.5 mm Thickness. Single V Butt Weld.
Cut and Weld Fitting of Steam Condensate at GSP#1/CKC Fabrication Shop, Map Ta Phut,
2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. 3" - SS Piping 5.49 mm Thickness, Single V Butt Weld.
Rayong, Thailand
NG System For IRPC Process Heater EBSM Plant (Piping Work/IRPC Refinery Plant
2015 NPS Engineering Company limited. IRPC Public Company Limited. 8" - AL Piping 8.18 mm Thickness. Single V Butt Weld.
(EBSM), Rayong, Thailand.
2015 Qualitech Engineering & Construction Co., Ltd. Sunkyoung Engineering and Construction Company UHV Plant Project. (JOB NO. 120340)/IRPC-UHV Plant, Rayong, Thailand. 20" - SS316L Piping 5.54 mm Thickness. Single V Butt Weld.

2015 Union Construction & Supply Company Limited Thai Oil Public Company Limited. CDU2-REVAMP PROJECT.//Thai Oil Refinery, Sriracha 1.5" - CS Piping 5.08 mm Thickness. Single V Butt Weld.

2015 The Bangchak Petroleum Company Limited The Bangchak Petroleum Company Limited LPG/The Bangchak Petroleum Refinery Plant, Bangkok, 4" - for CS Piping 6.02 mm Thickness. Single V Butt Weld.

2015 Bangkok Industrial Boilers Co., Ltd. Advance Energy Development Co., Ltd Biomass Power Plant 9.9 Mwe /For Alliance Clean Power. 8" - AL P22 pipe 18.26 mm thickness. Single V Butt Weld.
CS Piping 2” Dia., 5.56 mm. thickness connect to main pipe 8” Dia., 8.18 mm thickness.
2015 Sriracha S Shop Company Limited. PTT Public Co., Ltd. CORROSION CLASS A/PTT Public Co., Ltd. 2", 8" - (Branch Joint)

2015 Union Construction & Supply Co., Ltd Thaioil Public Company Limited. CDU2-REVAMP PROJECT//Thaioil Public Company Limited. 4" - CS Piping 6.02 mm Thickness. Single V Butt Weld.
REPAIR PAINTING PIPE LINE TANK 45T001 AT TFPP PLANT/ IRPC Public Company
2015 NPS Engineering company limited. IRPC Public Company Limited. 2" - CS Piping 3.91 mm Thickness. Single V Butt Weld.
Limited.
Repair joint for FV-001 GSP#1/PTT Public Co., Ltd. (GSP#1) , Map Ta Phut , Rayong , CS Piping 6.35 mm. thickness. Single V Butt weld.
2015 PTT Public Co., Ltd. PTT Public Co., Ltd. 8" -
Thailand
2015 Union Comstruction & Supply Co.,Ltd CPF (INDIA) PVT LTD. Chittoor Food Processing Plant./Chittoor Food Processing Plant, Chittoor, India. 2.5" - CS Piping 5.16 mm Thickness. Single V Butt Weld.

2015 Thaioil Public Company Limited. Thaioil Public Company Limited. TOP SPP Project./Thaioil Public Company Limited (TR4), Sriracha, Chonburi, Thailand. 16" - AL Piping 40.49 mm Thickness. Single V Butt Weld.

2015 NPS Engineering company limited. IRPC Public Company Limited. 10326978(A58198)/IRPC Public Company Limited. (JETTY) 8" - for CS Piping 7.04 mm Thickness. Single V Butt Weld.

27 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

THAILAND PTA PROJECT TUNTEX PETROCHEMICALS INC. /TPT Petrochemicals PCL.,


2015 TPT Petrochemicals PCL. TPT Petrochemicals PCL 8" - SS Piping 8.18 mm thickness. Single V Butt Weld.
Rayong , Thailand
Repair SH1 Tube Leakage/Global Power Synergy Public Company Limited. (CUP 2),
2015 EGCO Engineering & Service Co., Ltd. Global Power Synergy Public Company Limited. 8" - CS piping 5.0 mm Thickness. Single V Butt Weld.
Rayong , Thailand
2015 Rayong Intania Co., Ltd. PTT Global Chemical Public Co., Ltd. Aromatic II Debottlenecking / PTT Global Chemical Public Co., Ltd. (PTTGC5) 4" - CS Piping 6.02 mm Thickness. Single V Butt Weld.
PAUTRecovery Boiler Replacement And SCP./Siam Cellulos Plant , Wangsala ,
2015 MACS COMPANY LTD. Siam Cellulos Plant , Wangsala - - PAUT for for Nozzle Connect CS Shell Plate 24.0 mm Thickness. Butt Weld (Branch Joint).
Kanchanaburi CS Nozzle 16 mm Thickness connect to CS Shell Plate 20mm Thickness,
Fabrication Shell Heat Exchanger Tag No. 3501-2-E-01L/Phoenix Engineering and
2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. 18" - Branch Connection.
Construction Co., Ltd. Fabrication Shop, Rayong, Thailand
PTT GC AEDB (Phased Array Ultrasonic Test ) Job No.15001EECAZ/ PTT Global Chemical
2015 CAZ (Thailand) Co.,Ltd PTT Global Chemical Public Co., Ltd. 12" - PAUT for CS Piping 9.53 mm Thickness. Single V Butt Weld.
Public Co., Ltd. (PTTGC5)
2015 Thai Rotary Engineering Public Company Limited. Thai Lube Base Public Company Limited New Wax Tank Project./Thai Lube Base Plant, Sriracha, Leamchabang, Chunburi, 6" - CS Piping 7.11 mm Thickness. Single V Butt Weld.

2015 NPS Engineering company limited. IRPC Public Company Limited. 10338587 (AYC58012)/IRPC Refinery Plant (IP), Rayong 4" - CS Piping 8.56 mm Thickness. Single V Butt Weld.

2015 H.T.E IRPC Public Company Limited. IRPC/DLN1-Lot#6/IRPC Plant Rayong 2" - SS piping 3.91 mm Thickness. Single V Butt Weld.

2015 NPS Engineering company limited IRPC Public Company Limited. 10338698 (AYC58028)/IRPC Refinery Plant (H37 HDPE), Rayong, Thailand. 2" - CS Piping 3.91 mm Thickness. Single V Butt Weld.
CS Wall Tube 3.5mm Thickness (STB340S-H OD.76.2x3.5 mm. thk.)
Installation for Wall Tube of Boiler No.3/Mitr Phol Bio-Power (Phu Viang) Plant (Boiler
2015 Mitr Phol Bio-Power (Phu Viang) Co., Ltd. Mitr Phol Bio-Power (Phu Viang) Co., Ltd. 3" - Single V Butt Weld.
No.3), Nong Ruea, Khon Kaen,
2015 Mind Joint Engineering Company Limited. Bangkok Industrial Gas Company Limited MIGP TIE-IN Project./MIGP Plant, Map Ta Phut, Rayong, Thailand. 8" - CS Piping 8.18 mm Thickness, Single V Butt Weld

2015 The Siam United Steel (1995) Co., Ltd. The Siam United Steel (1995) Co., Ltd. Modify Skid Coil./MRP Engineering CO., Ltd. (Fabrication Shop) , Chonburi , Thailand - - CS Beam Plate, 15.5 mm Thickness. T-Joint

2015 NPS Engineering company limited. IRPC Public Company Limited. 10337714 (AYC58017)/IRPC Refinery Plant (ADU1), Rayong, Thailand. 2" - CS Piping 5.54 mm Thickness. Single V Butt Weld.

2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. LP Flash Gas Recovery./CKC Workshop, Map Ta Phut, Rayong, Thailand. 14" - CS Piping 7.92 mm Thickness, Y Joint, Branch Connection.
PTT LOOPING 36" AT GSP PROJECT/PTT Public Company Limited. (GSP Plant) , Rayong ,
2015 RCI TESTING INSPECTION & CONSULTING CO.,LTD. PTT Public Company Limited. 36" - PIPE 36" Dia. Thickness 12.7 mm., Single V Butt Weld.
Thailand.
2015 NPS Engineering company limited. IRPC Public Company Limited. Renew Pipe Line Tank 45T001 at TFPP/IRPC Refinery Plant, Rayong, Thailand. 2" - CS Piping 3.91 mm Thickness. Single V Butt Weld.

2015 Mind Joint Engineering Company Limited. Bangkok Industrial Gas Company Limited. MIGP TIE-IN Project./MIGP Plant, Map Ta Phut, Rayong, Thailand. 8" - CS Piping 8.18 mm Thickness, Single V Butt Weld.
Install End Plate For Super Heater PB10 /Siam Kraft Power Plant, Wangsala,
2015 MACS Co., Ltd Siam Kraft Industry Co., Ltd. 4" - CS Piping 13.5 mm Thickness. Single V Butt Weld.
Kanchanaburi,
2015 NPS Engineering company limited. IRPC Public Company Limited. REPAIR CARRIER GAS PHASE 2/IRPC Public Company Limited. (TFPP Plant), Rayong 4" - SS Piping 3.05 mm Thickness, Single V Butt Weld.
Modification HP Pipe Line at HP OTC/Eastern Power and Electric Co., Ltd., Bang Bo ,
2015 Amec Foster Wheeler Service (Thailand) Limited. Eastern Power and Electric Co., Ltd. 4" - AL (SA335 P91) Piping 17.2 mm Thickness, Single V Butt Weld.
Samutprakarn ,
2015 NPS Engineering company limited. IRPC Public Company Limited. 4”-P-1518003-A17-25S/IRPC Refinery Plant, Rayong, Thailand. 4" - CS Piping 6.02 mm Thickness. Single V Butt Weld.

2015 EGCO Engineering & Service Co., Ltd. EGCO Engineering & Service Co., Ltd. Boiler Bank Tube./TAE Fabrication Shop, Ban Chang, Rayong, 2" - CS Tube 3.7 mm Thickness. Single V Butt Weld.

2015 N.P.S. Engineering company limited. IRPC Public Company Limited. Line 125-By TOMLA 69H007/IRPC Public Company Limited. (Jetty) 5" - CS Piping 6.55 mm Thickness. Single V Butt Weld.
Aromatic II Debottlenecking Project/PTT Global Chemical Public Co., Ltd. (PTT GC5),
2015 ACE ENGINEERING & CONSTRUCTION CO., LTD. PTT Global Chemical Public Co., Ltd. 8" - CS Piping 8.18 mm Thickness, Single V Butt Welds.
Rayong
2015 Future Development & Construction Co., Ltd. Global Power Synergy Public Company Limited. AddItion MP Steam Valve./GPSC CUP#2, Map Ta Phut, Rayong, 2" - CS Piping 3.91 mm Thickness. Single V Butt Weld.

2015 Global Power Synergy Public Company Limited. Global Power Synergy Public Company Limited. SHUT DOW CUP#2/GPSC CUP#2, Map Ta Phut, Rayong, - - CS Shell Plate, 15mm Thickness, Single V Butt Weld.
Repairing for weld of H.P. Steam Drum SD10, Nozzle MK’D. “12”/GPSC Sriracha Plant,
2015 Laemchabang Maintenance Company Limited. Global Power Synergy Public Company Limited. - - CS Shell Plate 160 mm Thickness, Partial Penetration Weld.
Sriracha, Chonburi, Thailand.
2015 NPS Engineering company limited. IRPC Public Company Limited. Modify Line 6”-P-1508004-A44-50W/IRPC Public Company Limited. , Rayong, 10" - CS Piping 15.09 mm Thickness. Single V Butt Weld.
CS Piping 3.91 mm Thickness. Single V Butt Weld.
2015 NPS Engineering Company Limited. IRPC Public Company Limited. Repair Painting Pipe Line Tank 45T001 at TFPP Plant./IRPC Public Company Limited. 2" -
PRE DRAIN CRUDE FEED TANK PHASE I/The Bangchak Petroleum Public Company
2015 The Companion Corporation Co., Ltd. The Bangchak Petroleum Public Company Limited. 6" - CS Piping 7.11 mm Thickness. Single V Butt Weld.
Limited. , Bangkok,
Installation U-Bend Economizer Boiler No.1 & 2/Mitr Phol Bio-Power (Phu Viang) Boiler
2015 MITR PHOL SUGAR CORP., LTD. MITR PHOL SUGAR CORP., LTD. - - CS Tube & U-Bend 50.8 mm. OD Dia., 4.0 mm thickness. Single V Butt Weld.
No.3 Nong Ruen Khon Kaen
U Modify Line 6” Diesel to 2” SL 01P001/5 U Modify Line 6” Diesel to 3” Start up./NPS
2015 NPS Engineering company limited. IRPC Public Company Limited. 3" - CS Piping 5.49 mm Thickness. Single V Butt Weld.
Fabrication Shop, Rayong, Thailand.
2015 Global Power Synergy Public Company Limited. Global Power Synergy Public Company Limited. AB33 Yearly Inspection./GPSC CUP#3, Map Ta Phut, Rayong, Thailand. 2" - CS Tube 3.73 mm Thickness. Single V Butt Weld.

2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Company Limited. Repair and Replace Strainer Benfield GSP#1/PTT GSP#1, Map Ta Phut, Rayong, Thailand. 24" - CS Piping 9.53 mm Thickness. Single V Butt Weld.

2015 NPS Engineering Company Limited. IRPC Public Company Limited. 4”-WF-A1-CAGP/NPS Fabrication Shop, Rayong, Thailand - - PT for CS Piping Weld

28 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

CO2 Membrane GSP#6 Phase II/PTT Public Co., Ltd. (GSP#6), Map Ta Phut, Rayong,
2015 Chatr Karnchang Laemchabang Co.,ltd PTT Public Co., Ltd. 2", 18" - CS Piping 2” Dia., 3.91 mm thickness connect to main pipe 18” Dia., 14.27 mm. (Branch joint)
Thailand.
2015 IRPC Public Company Limited. IRPC Public Company Limited. 10334769(AYC58120)/ IRPC Public Company Limited. (JETTY), Rayong, Thailand. 10" - CS Piping 6.35 mm Thickness. Single V Butt Weld.

2015 ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED. PTT PUBLIC CO.,LTD. PTT ELK Project/NEW JETTY PTT, LAEMCHABANG, THAILAND. 16" - CS Piping 12 mm Thickness, Single V Butt Weld.
Replace 4” Shot Pipe of Main Stem Safety Valve. /Siam Kraft Power Plant (PB#14),
2015 MACS Co., Ltd Siam Kraft Industry Co., Ltd. 4" - CS Tube 25 mm Thickness. Butt Weld (Branch Joint).
Wangsala, Kanchanaburi, Thailand
2015 MACS company limited. IRPC Public Company Limited. Repair Convertor 31D002/ IRPC Public Company Limited. (DCC), Rayong, 2" - PAUT for SS Piping 5.54 mm Thickness. Single V Butt Weld.

2015 Union Construction & Supply Co., Ltd. Styrolution (Thailand) Co., Ltd. Styrolution MPPU Infrastructure Project/Styrolution Map Ta Phut Plant, Rayong, Thailand. 4" - PAUT for CS Piping 6.02 mm Thickness, Single V Butt Weld.

2015 NPS Engineering company limited. IRPC Public Company Limited. 24”-CR(A58223)/IRPC Public Company Limited. (JETTY), Rayong, 24" - PAUT for CS Piping 14.27 mm Thickness. Single V Butt Weld.

2015 The Siam United Steel (1995) Co., Ltd. The Siam United Steel (1995) Co., Ltd. Modify Skid Coil./ MRP Engineering CO., Ltd. (Fabrication Shop) , Chonburi . - - PAUT for CS Beam Plate, 15.5 mm Thickness. T-Joint
New HPNA Vessel Installation Project (Shutdown)/Thaioil Public Company Limited,
2015 Union Construction & Supply Co., Ltd. Thaioil Public Company Limited. 6" - PAUT for CS Piping 10.97 mm Thickness. Single V Butt Weld.
Sriracha, Chonburi,
2015 Know-How Transfer Company Limited. IRPC Public Company Limited. IRPC HDPE Plant, Rayong, Thailand./Remove And Relnstall Condenser N7-15 4" - PAUT for CS Piping 6.02 mm Thickness. Single V Butt Weld.
MAPTAPHUT FLOW IMPROVEMENT/THAI PETROLEUM PIPELINE CO.,LTD., Map Ta
2015 Future Development & Construction Co., Ltd. THAI PETROLEUM PIPELINE CO.,LTD. 12" - PAUT for CS Piping 25.4 mm Thickness, Single V Butt Weld.
Phut Plant, Rayong.
2015 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. Benfield Column Project (Shutdown)/PTT Public Co., Ltd. (Gas Separation Plant ) 14" - PAUT for CS Piping 11.13 mm Thickness. Single V Butt Weld.

2015 NPS Engineering Company Limited. IRPC Public Company Limited. Tank no.61T072/IRPC Public Company Limited. - - PT forCS CUI on shell, 6.00 mm Thickness, Fillet Weld.

2015 Union Construction & Supply Co., Ltd. Utility Pipeing Mahachai. Mahachai Plant, Samut Sakhon, Thailand./Mahachai Plant, Samut Sakhon, Thailand. 6" - PAUT for CS Piping .11 mm Thickness. Single V Butt Weld.

2015 EGCO Engineering & Service Co.,Ltd Global Power Synergy Public Company Limited. EGCO Engineering & Service Co.,Ltd - - PAUT for AL Pipe 8 Inch Dia., 15.0 mm Thickness. Single V Butt Weld.

2015 The Bangchak Petroleum Public Company Limited. The Bangchak Petroleum Public Company Limited. The Bangchak Petroleum Public Company Limited. - - PAUT for CS Piping 6 Inch Dia., 7.11 mm Thickness. Single V Butt Weld.

2015 IFC Conval Inc. Conval B15-550 Project / Batam Centre - - RT/MT/PT/PMI Inspection as per ASME B31.3

2015 IFC Wartsila Inc Wasco B15-406 Project / Batam Centre - - Ferrite Testing, RT/PT/PMI Inspection as per ASME B31.3

2015 IFC PT Pertamina EP Matindok B15_445/ Batam - - RT/PT/PMI Inspection as per ASME B31.3

2015 Rekayasa Industri, PT PT Pertamina Geothermal Energy Ulubelu Unit 3 & 4 Geothermal Power Project/ Lampung 12”-42” 30KM RT/PT Inspection as per ASME B31.3

2015 Cameron System, PT Saudi Aramco Aramco Project / Batam - - PMI Inspection as per client specification

2015 APMS Indonesia, PT APMS Indonesia, PT MPI on Frame Welds / Batam - - MPI Inspection as per AWS D1.1 2010

2015 H-Tech Oilfield Equipment, PT ( NOV) Total Brunei Various Project / Kabil / Batam - RT Inspection as per ASME VIII Dev.1 UW 51-2013 for thickness 15.88mm

2015 JO. Consortium of PCS / COOEC Indonesia, PT Husky–CNOOC Madura Ltd. Madura BD Field Development EPCI Project Project Offshore / Madura Strait East Java - - MT/PT/UT Inspection as per API RP2X
EPCI-1; PHE-12, PHE-24 and CPP2 Platform and Pipeline – PHE WMO Project / Cilegon/
2015 Gunanusa Utama Fabricators, PT PT Pertamina Hulu Energi - - MT/PT/UT/RT Inspection as per AWS D1.1 2010 and API RP2X
Banten
2015 Celup Raya, PT ENI WQT Jangkrik Eni Project Hafar / Batam Centre - - RT Inspection as per client requirements

2015 Labroy Shipbuilding Engineering, PT Labroy Shipbuilding Engineering, PT H004-70M Supply Vessel Project / Tanjung Uncang / Batam - - RT/MT/UT Inspection as per AWS D1.1 2010

2015 Dwisatu Mustika Bumi, PT PT Kaltim Prima Coal Pipeline 20” Sangata Project / Kalimantan 12” 15.9 RT Crawler Inspection for thickness 15.9mm on pipeline as per API 1104

2015 McDermott Indonesia, PT Yamgaz LNG R3553 – Yamal LNG Project / Batu Ampar / Batam - - RT/MT/PT/UT Inspection as per AWS D1.1 2010 on structural and Piping and ASME for PQR

2015 Citra Tubindo Engineering, PT PT Jinfindo Fabrication Structural Umbilical Skid (A108) Project / Kabil / Batam - - MT/PT/RT/UT Inspection as per AWS D1.1

2015 IFC Conval Inc. Conval B15-09-443 Project / Batam Centre - - RT/PT/PMI Inspection as per ASME B31.3

2015 Wilmax Control System, PT - MB Platform & Pipeline Project / Batam - - PMI Inspection as per client specification

2015 Jinfindo, PT - MP4 Jacket Floading System Project / Batam - - RT Inspection as per ASME IX 2010 and MT/PT Inspection for ASME B31.3

2015 Formshore Indonesia, PT - MPI on 7 Tone DMH Structures Project / Batam - - MPI Inspection as per AWS D1.1 2010

2015 McDermott Indonesia, PT Hydro Marine Service Inc. R3226-280075 (Calibration Block) / Batam - - Provide Calibration Block Machining

2015 McConnell Indonesia, PT - Bird Cage Project / Sagulung / Batam - - MT Inspection as per ASME VIII

29 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2015 Citra Tubindo Engineering, PT - Dimension Survey Requirement / Kabil/ Batam - - Dimension Control

2015 Saipem Indonesia, PT ENI DNV Project / Karimun - - Mock Up DNV Personnel for MT/PT/UT

2015 McDermott Indonesia, PT PC Muriah Ltd Kepodang Gas Development Project Offshore and Onshore / Surabaya - - RT/PT Inspection as per ASME V 2010

2015 Shamira Sdn Bhd SapuraKencana TL Offshore Sdn Bhd AUT Sevice for Talisman Project / Pasir Gudang, Johor/ Malaysia 24" - AUT System and PAUT to scan different thickness

2015 SapuraKencana TL Offshore Sdn Bhd PT Kalimantan Jawa Gas Offshore Spool Installation for Kepodang Project / Semarang / Indonesia - - RT Inspection
Project Development and Operation of Transmission Segment Kalija I (Kepodang –
2015 Onasis Indonesia, PT PT Kalimantan Jawa Gas 14" - PAUT Inspection on pipeline as per API 1104
Tambak Lorok) / Cikarang
2015 Formshore Indonesia, PT - Pad Eye Project / Batam - - MT/UT Inspection as per AWS D1.1 2010

2015 Biglift Shipping B.V. Biglift Shipping B.V. Happy Star Voyage 4 / Batam - - MT Inspection

2015 Austin Engineering, PT - Various Project / Kabil / Batam - - MT/PT/UT Inspection as per AS 2207

2015 Austin Engineering, PT - PWHT Works / Kabil / Batam - - Heat Treatment on Gantry

2015 McDermott Indonesia, PT McDermott Indonesia, PT Marine Project / Batu Ampar / Batam - - RT/MT/UT/PT Inspection on structural and piping as per client requirements

2015 McDermott Indonesia, PT Chevron Australia Pty Ltd Gorgon SCRD Project / Batu Ampar / Batam - - RT/MT/UT/PT Inspection on structural and piping as per client requirements

2015 IFC Modec Modec Ten Dev B14-358 Project / Batam Centre - - RT/MT/UT Inspection as per ASME B31.3

2015 IFC Oval Asia Pacific Pte Ltd Oval Asia B15_250 Project / Batam Centre - - RT/MT Inspection as per ASME VIII Div. 1 2013

2015 IFC - Haison Project / Batam Centre - - RT/MT Inspection as per ASME B31.3
Design and Fabrication of 1 unit choke – kill, standpipe & Cement Manifold Project (A096) MT/UT Inspection on Structural as per AWS D1.1-2010 and MT/PT/UT/RT Inspection on piping as
2015 Citra Tubindo Engineering, PT Shanghai Zhenhus Heavy Industry Co. Ltd. - -
/ Kabil / Batam per API 6A-16C for High Pressure
2015 Hanjung Indonesia, PT - Jurong Project / Lampung - - RT Inspection as per client requirements

2015 Sigur Ros Indonesia, PT Petronas Bukit Tua Ketapang Project Offshore - - PAUT Inspection on pipelineas per API 1104

2015 Rekayasa Industri, PT PT Pupuk Sriwijaya PUSRI IIB Project / Palembang / Batam - - PAUT / RT Inspection as per ASME B31.3

2015 Petrus Indonesia, PT Petrus Indonesia, PT Main Shaft & Engine Project / Batam - - MT Inspection as per as per ASME B31.3

2015 IFC PT Donggi Senoro LNG Donggi Project / Batam Centre - - RT/MT/PT/PMI Inspection as per ASME B31.3

2015 IFC Oval Asia Pacific Pte Ltd Oval Asia B15_186 Project / Batam Centre - - RT/MT Inspection as per ASME VIII Div. 1 2013

2015 IFC Oval Asia Pacific Pte Ltd Oval Asia B15_213 Project / Batam Centre - - RT/MT Inspection as per ASME VIII Div. 1 2013

2015 McConnell Dowell South East Asia Pte Ltd - Various Project / Sagulung / Batam - - Provision of QC Inspector

2015 Dua Utama Jaya, PT Total E & P Angola WQT Kaombo Project / Bengkong / Batam - - RT Inspection as per AWS D1.1 2010
Project Development and Operation of Transmission Segment Kalija I (Kepodang –
2015 Onasis Indonesia, PT PT Kalimantan Jawa Gas - - RT/MT/UT Inspection as per DNV and API
Tambak Lorok) / Cikarang
2015 Dwi Sumber Arca Waja, PT PT Pertamina Gas (Pertagas) Wika Gresik-Semarang Line Pipe Project / Kabil / Batam 28" 9.11 AUT System and PAUT Inspection as per API 5L on Seams Weld for thickness 9.11 mm

2015 Alstom Power Energy System Indonesia, PT Chevron Geothermal Indonesia Rehabilitate a power plant project / Duri/Pekanbaru - - RT Inspection as per ASME I

2015 IFC Sapura Kencana Petroleum Berhad Sapura Kencana B15_099 Project / Batam Centre - - Additional PMI Inspection as per ASME B31.3

2015 Citra Tubindo Engineering, PT Eni Muara Bakau B.V Fabrication 12 Unit Scrubber Bottle Project (A093) / Kabil / Batam - - MT/UT Inspection as per ASME B31.3

2015 Citra Tubindo Engineering, PT Citra Tubindo Engineering, PT Project CX-X11 (Internal Project) / Kabil / Batam - - MT/UT Inspection as per ASME B31.3

2015 Hanjung Indonesia, PT - Oregon Project / Lampung - - RT Inspection as per client requirements

2015 Hanjung Indonesia, PT Taif - NK PSC Taif EP Project / Lampung - - RT Inspection as per client requirements

2015 CV Harmony Energy Semesta Petronas Bukit Tua Development Project / Surabaya - - RT Inspection as per ASME B31.3

2015 Arthabumi Sinarindo, PT - RT on Casting Project / Batam - - RT Inspection as per client requirements

2015 McDermott Indonesia, PT McDermott Indonesia, PT Inhouse CTC Project / Batu Ampar / Batam - - RT Inspection as per AWS D1.1 2000

30 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2015 McDermott Indonesia, PT McDermott Indonesia, PT PQR DLV 2000 Stinger Project / Batu Ampar / Batam - - RT Inspection as per client specification

2015 Tripatra Engineers and Constructors, PT ExxonMobil Banyu Urip Project / Bojonegoro - - PAUT Inpection as per ASME B31.3 for various thickness from 7.11mm to 38.89mm

2015 IFC Sapura Kencana Petroleum Berhad Sapura Kencana Project / Batam Centre - - RT/PT Inspection as per ASME B31.3 and PMI Inspection

2015 IFC PT Donggi Senoro LNG Donggi Project / Batam Centre - - RT/MT Inspection as per ASME B31.3 and PMI Inspection

2015 IFC PT Pupuk Sriwijaya Pusri Project / Batam Centre - - PMI Inspection as per client specification

2015 IFC Conval Mega Perkasa, PT Conval Mega Perkasa B14_797 Project / Batam - - RT/PT Inspection as per ASME VIII Div. 1 2013

2015 IFC Techmac Engineering Work Techmac B15_011 Project / Batam Centre - - RT/MT Inspection as per ASME B31.3

2015 IFC - Mavain B14_748 Project / Batam Centre - - RT/PT Inspection as per ASME B31.3 and PMI Inspection

2015 Wartsila Wartsila UT Cross check Powergen Module at Wasco Yard/Kabil/Batam - - UT Inspection as per EEMUA 158

2015 MCCS International Sdn. Bhd. Petronas Bukit Tua Project Offshore/Java Sea/ - - PAUT Inspection as per ASME B31.3 for various thickness from 7.11mm to 12.7mm

2015 McDermott Indonesia, PT ENI FMC Jangkrik Project (R3478) /Batu Ampar/Batam - - RT/MT/PT/UT Inspection on structural and piping as per client requirements

2015 McDermott Indonesia, PT McDermott Indonesia, PT Stinger Project/Batu Ampar/Batam - - RT Inspection as per client requirements

2015 IFC Oakwell Inc. Oakwell B15_021 Project/Batu Ampar/Batam - - PT Inspection as per ASME B16.34

2015 IFC GEC ALSTHOM Power Generation Ltd. Bang Poo B14_864 Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3

2015 IFC Petronas Bukit Tua – UT on valve and Flange Manifold Project / Batu Ampar / Batam - - UT Inspection as per ASME B16.34

2015 IFC Emerson Electric Company Emmerson B14-759 Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII Div. 1 2013

2015 Saipem Indonesia, PT Total E & P Angola South and North Kaombo Project/Karimun - - RT Inspection as per ASME B31.3

2015 SMOE Indonesia, PT Chevron Australia Pty Ltd Wheatstone Project LNG Plant / Kabil / Batam - - MT/PT/UT/Ferrite Testing/PMI/Eddy Current /Heat Treatment Inspection as per client requirements

2014 NACG TransCanada Pipelines Grand Rapids / / Canada 24”; 42” 500km AUT Inspection

2014 Williams TransCanada Pipelines Keystone Phase IV / / Canada 36” 253km AUT Inspection

2014 Willbros NetStream LLC Net Mexico - Santa Elena, Texas 42", 48" 120 Miles UTScan Inspection as per API 1104 with different thickness 15.7mm, 17.9mm, 18.8mm, 22.9mm

2014 Technip – USA ExxonMobil Julia Project / USA - - WPQ Support


6.625, 8.625”,
2014 Technip – USA LLOG Delta House –Offshore Project / USA 200km AUT system to scan different thickness from 19.1mm, 24.6mm, 28.6mm as per API 1104
12.75”
2014 Technip – USA Anadarko Lucius – Offshore Project / USA 16” 26mi AUT system to scan different thickness from 22.2mm and 23.2mm as per API 1104

2014 Technip – USA Shell Stones – Offshore Project / USA 8.625” - AUT system of 4000 welds for different thickness from 21.2mm and 35.4mm as per API 1104

2014 Technip – USA Williams Tubular Bells – Offshore Project / USA 12.75”; 28mi AUT system to scan different thickness from 17.5mm and 20.6mm as per API 1104

2014 McConnell Indonesia, PT ASL Marine Holding Jetty ASL 3 Project / Tanjung Uncang / Batam - - RT/UT Inspection as per AWS D1.1 2010

2014 IFC - Tupi 8 (B14-818) Project / Batu Ampar / Batam - - RT/PT Inspection as per ASME B31.3

2014 IFC Emerson Electric Company Emmerson B14-673 Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII Div. 1 2013

2014 IFC INPEX Corporation Ichthys B14-446 Project / Batu Ampar / Batam - - RT/MT/PMI Inspection as per ASME B31.3

2014 IFC Oval Asia Pacific Pte Ltd B14-755 Oval Asia Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII Div 1 2013

2014 IFC Rockfin Rockfin Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2014 Austin Engineering, PT - Manufacturing BIS Project / Kabil / Batam - - MT/PT/UT Inspection as per AWS D1.1 2010

2014 Gunanusa Utama Fabricators, PT Total E & P Myanmar SIP-Taketha Project / Cilegon - - RT Inspection as per client requirements

2014 Citra Tubindo Engineering, PT JO PDSI A09 Rig Moving and Site Modification Project (A097) / Kabil / Batam - - UT/MT Inspection as per AWS D1.1 2010

2014 Citra Tubindo Engineering, PT Global Process System Pte Ltd Electrostatic Coalascer For okoro Field Development Project (A099) / Kabil / Batam - - MT/PT/UT/RT /PMI Inspection as per ASME B31.3

31 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2014 Citra Tubindo Engineering, PT Global Process System Pte Ltd Pressure Vessel For okoro Field Development Project (A092) / Kabil / Batam - - MT/PT/UT/RT Inspection as per ASME B31.3

JO of PT Pertamina Hulu Energi, PT Medco LNG


2014 Tripatra Engineers and Constructors, PT Senoro LNG Project / Luwuk / Central Sulawesi - - PAUT Inspection as per ASME B31.3 for various thickness from 7.11 to 38 mm
Indonesia, Sulawesi LNG Development Ltd.

2014 Citra Tubindo Engineering, PT Global Process System Sdn Bhd Fabriation of 3 units ss lube reversor tank (A095) Project / Kabil / Batam - - RT/PT Inspection as per ASME B31.3

2014 Citra Tubindo Engineering, PT Seatrucks Group Fabrication of 145M Stringer for Jackson – 18 (A098) Project / Kabil / Batam - - PAUT, MT/PT Inspection as per AWS DI.I 2010; UT Inspection as per API RP 2X

2014 Heat Exchangers Indonesia, PT Total Oil & Gas Venezuela Yucal Placer Phase 300 Project / Kabil/Batam - - PAUT Inspection as per ASME VIII Div 1

2014 SMOE Indonesia, PT Chevron Australia Pty Ltd WQT – Wheatstone Project / Kabil / Batam - - RT Inspection as per AWS D1.1 2010

2014 Wilmax Control System, PT - MB Platform and Pipe Line Project / Batam - - PMI Inspection

2014 IFC PT Kranindo Prima Kranindo Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2014 IFC GE Oil & Gas GE – Additional (B14-309) Project / Batu Ampar / Batam - - MT Inspection as per ASME B16.34 & B16.35

2014 IFC Shell Offshore Inc. Shell Stones B14-471 Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII Div 1 2013

2014 IFC Modec Ten Project B14-358 / Batu Ampar / Batam - - RT/MT Inspecction as per ASME B31.3

2014 Saipem Indonesia, PT ENI Jangkrik Complex Project / Karimun - - RT/UT Inspection as per ASME B31.3

2014 TWI Technology (S.E.Asia) Lundin Petroleum AB Base Line Survey – FPSO Bertam Project / Batam - - UT Thickness Inspection as per ASME V Art. 5

2014 IFC - ODS Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME VIII Div 1 2013

2014 IFC PT JGC Indonesia JGC Project / Batu Ampar / Batam - - RT/PT Inspecction as per ASME B31.3

2014 IFC TOTAL E & P Indonesie SMK3 Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B16.34 & B16.35

2014 IFC GE Oil & Gas GE Project / Batu Ampar / Batam - - MT Inspection as per ASME B16.34 & B16.35

2014 IFC Emerson Electric Company Emerson Ten Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME VIII Div 1 2013

2014 IFC Emerson Electric Company Emerson B14-472 Project / Batu Ampar / Batam - - RT/PT/MT/PMI Inspection as per ASME VIII Div 1 2013

2014 Citra Tubindo Engineering, PT Global Process System Pte Ltd Fabrication of 18 unit tubular module support stools (A091) Project / Kabil / Batam - - MT/PT/UT Inspection as per AWS DI.I 2010

2014 Citra Tubindo Engineering, PT Global Process System Pte Ltd PWHT on 3x Separator Unit SR2496 (A087) Project / Kabil / Batam - - Heat Treatment

2014 IFC Techtronic Industries Co.Ltd Techtronic Demco Project / Batu Ampar / Batam - - MT/RT Inspection as per ASME VIII Div 1 2013

2014 IFC - Mavain Project B14_444 / Batu Ampar / Batam - - MT/PT/RT Inspection as per ASME VIII Div 1 2013

2014 IFC Shell Offshore Inc. Shell Stones Project B13_639 / Batu Ampar / Batam - - PT/RT Inspection as per ASME B31.3

2014 IFC Shell Offshore Inc. Shell Stones Project B13_658 / Batu Ampar / Batam - - PT/RT Inspection as per ASME B31.3

2014 IFC Mubadala Petroleum TNS-Nong Yao Project / Batu Ampar / Batam - - MT/PT/RT Inspection as per ASME VIII Div 1 2013

2014 Offshore Joint Sevices TOTAL E & P Indonesie South Mahakam Phase 3 Project / Batam - - Provision of QC Inspector

2014 Strategic Energy Services Indonesia, PT Strategic Energy Services Indonesia, PT WQT/Sekupang/Batam/Indonesia - - RT Inspection as per ASME IX 2010

2014 Tobacon, PT Tobacon, PT Structural Drawing of Gangway and Turret Project / Tanjung Uncang/Batam/Indonesia - - UT/MT Inspection for finding crack only

2014 Alstom Power Energy System Indonesia, PT Thai Oil Plc. Thai Oil Project/Surabaya/Indonesia - - RT Inspection as per client specification

2014 Alstom Power Energy System Indonesia, PT KMI Project Solution Inc. KMI Project/Surabaya/Indonesia - - MT/PT/RT Inspection as per client specification

2014 Gunanusa Utama Fabricators, PT ENI FMC ENI Project / Cilegon/Indonesia - - MT/PT/UT/RT Inspection as per client specification. RT using Selenium 75.

2014 IFC - Mavain Project / Batu Ampar / Batam - - RT/PT Inspection as per ASME B31.3

2014 IFC GE Oil & Gas GE Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2014 IFC Emerson Electric Company Emerson P235 Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII Div. 1 2013

2014 Citra Tubindo Engineering, PT PT Pertamina (Persero) 2 Unit Mobile Rig (A089) /Kabil/Batam/indonesia - - MT/PMI/HT Inspection as per AWS D1.1 2010

32 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2014 IFC Shell Offshore Inc. Shellstone DB SDSS Project/Batu Ampar/Batam - - RT/PT Inspection as per ASME VIII

2014 Titis Sampurna, PT PT Pertamina Hulu Energi GG Pipeline PHE Pertamina Project/Jakarta/Indonesia - - UT Scan Inspection on pipeline as per API 1104

2014 IFC Emerson Electric Company Emerson 1 Project/ Batu Ampar/Batam - - MT/RT Inspection as per ASME B31.3

2014 Alstom Power Energy System Indonesia, PT PT SSP General Engineering & Construction Muara Karang Project/Surabaya/Indonesia - - PT Inspection as per client specification

2014 Citra Tubindo Engineering, PT Spliethoff Supply & Fabrication of 1 Unit Gangway Project (A088) /kabil/Batam/indonesia - - UT/MT Inspection as per AWS D1.1 2010

2014 Wilmax Control System, PT Emerson Process Management Gazprom Badra CPF PH II Plant Project / Batam - - PMI Inspection

2014 Louis Alain, PT Saipem Leighton Consortium WQT-Gorgon LNG Project / Batam - - RT Inspection on aluminum as per AWS D1.2 2008

2014 Profab Indonesia, PT (NOV) Worley Parsons Services Pty Limited Kipper Mercury Removal Project / Batam - - PAUT Inspection on Nozzle as per ASME VIII Div 1

2014 IFC Shell Offshore Inc. Shell stones Bulk Y Strainers Project / Batu Ampar/Batam - - MT/PT/RT Inspection as per ASME B31.3

2014 IFC IFC YDLNG Project / Batu Ampar / Batam - - MT/PT/RT Inspection as per ASME B31.3

2014 IFC IFC Transwater Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII

2014 IFC IFC Darwin HNLNG Project / Batu Ampar / Batam - - PT Inspection as per ASME B31.3

2014 Urawa Rekayasa Mandiri China National Offshore Oil Corporation CNOOC Project Offshore / Java Sea - - MT/PT/UT/RT Inspection as per client specification

2014 McConnell Indonesia, PT PT McConnell Dowell Gantry Crane (Maintenance) Project / Sagulung/Batam - - MT Inspection as per AWS D1.1 2010

2014 McConnell Indonesia, PT Heerema Marine Exxon Neftegas ltd. Arkuntun Dagi Project / Sagulung/Batam - - MT/UT Inspection as per ASME V

2014 Swiber Indonesia, PT TOTAL E & P Indonesie Sisinubi Project / Jakarta / Indonesia - - MT/PT/UT/RT Inspection as per client specification

2014 Alstom Power Energy System Indonesia, PT Linkou Power Linkou #2 Project/ Surabaya / Indonesia - - RT Inspection as per client requirements

2014 SMOE Indonesia, PT - IAC Project / Kabil/Batam - - UT/RT Inspection as per client specification

2014 Hanjung Indonesia, PT Furnace Engineering Pusri Project / Lampung - - RT Inspection as per ASME VIII on stainless steel piping

2014 Hanjung Indonesia, PT NEM San Gabriel Project/Lampung - - RT Inspection as per AWS D1.1 2010

2014 Hanjung Indonesia, PT Furnace Engineering ARL Upgradation Project/Lampung - - RT Inspection as per ASME VIII on stainless steel piping

2014 Citra Tubindo Engineering, PT Global Process System 3 Inlett Separator for Santos – A087 Project/Kabil/ Batam - - UT Lamination Material

2014 Batamec, PT SLC Gorgon Gangways Project / Tanjung Uncang/Batam - - RT/MT Inspection as per AWS D1.1 2010

2014 Citra Tubindo Engineering, PT JO PDSI – AOS Supply and Fabrication of 2 Kill Line Section Project (A086) /kabil/Batam/indonesia - - RT/MT Inspection as per ASME B31.3 on piping

2014 IFC PETRONAS Bukit Tua Project / Batu Ampar/Batam - - UT/MT/PT/RT Inspection as per ASME B31.3

2014 IFC INPEX Corporation Ichthys Project/ Batu Ampar / Batam - - RT/PT Inspection as per ASME B31.3 and PMI

2014 Austin Engineering, PT Bechtel Corporation Structural Work Package – Bechtel Project / Kabil / Batam - - RT/MT/UT Inspection as per AWS D1.1 2010 on carbon steel structure

2014 IFC SBM Cidade de Marica and Saquarema / Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3 on carbon steel piping

2014 McConnell Indonesia, PT Oil Tanking Singapore Ltd Marine Facility & Jetty Oil Tanking / Sagulung / Batam - - MT/PT/UT/RT Inspection as per AWS D1.1 2010

2014 IFC - KE 38 Project/ Batu Ampar/ Batam - - RT Inspection as per ASME VIII Div. 1 on carbon steel piping

2014 IFC Shell Offshore Inc. Shell stones Project/ Batu Ampar - - RT/MT Inspection as per ASME B31.3 on carbon steel piping

2014 IFC Petronas National Berhad SSGP Project / Batu Ampar / Batam - - RT Inspection as per B31.8 on carbon steel piping

2014 IFC - E-Plant Project / Batu Ampar/Batam - - RT/MT Inspection as per ASME VIII Div. 1 on carbon steel piping

2014 Profab Indonesia, PT (NOV) FMC Chevron Wheatstone WCS Project / Batam - - RT/UT/MT/PT Inspection as per AWS D1.1 2010

2014 Edaran Profab, PT Chevron Australia Pty Ltd Gorgon LNG Project / Batam - - RT Inspection as per AWS D1.2 on aluminum class 1 structure

2014 Austin Engineering, PT - Pre-Heat and Hydrogent Relase/De-gas / Kabil/Batam - - Heat Treatment

33 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2014 Saipem Indonesia, PT Inpex Corporation Ichthys Project / Karimun - - RT Inspection as per AWS D1.1 2010 on structure

2014 ACE Engineering&Construction Co., Ltd. PTT Global Chemical PCL 14”underground pipeline (GAN-ring loop-2) Project / Rayong CS 14” - PAUT / Code API 1104 (UTQ-T-NDT-005) on pipeline

2014 Know-How Transfer Co., Ltd. IRPC Public Company Limited. IRPC Tank 16T001A rapairing Project / Rayong - - PAUT / Code API650/653
CS 36” 24” 1”
2014 TRC Construction Public Company Limited PTT GSP TRC_CO2 membrane Project / Rayong - PAUT / Code ASME B31.3 CC181-2
3/4” 2” 4” 6” 10”
SS400,54”
2014 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP New duct supply to stack Project/ Rayong - PAUT / Code ASME B31.3 CC181-2
(10mm)
2014 Rayong intania Co., Ltd. EFT RIC-EFT-6” Project / Rayong CS 6” - PAUT / Code ASME B31.3 CC181-2

2014 Foster Wheeler Service Foster Wheeler Service Alloy P91 14” Project / Samutprakarn 14” - PAUT / Code ASME B31.3

2014 Rayong Maintenance & Contracting Co., Ltd. PTT Global Chemical PCL RMC-PTT GC I1 shutdown Project / Rayong - - PAUT,PT,MT

2014 Kikuchi Industry (Thailand) Co., Ltd. Air Liquide (Thailand) Limited. Kikuchi-Pipe 2-6” Project / Rayong 2-4” - PAUT / Code ASME B31.3 CC181-2

2014 PTT Global Chemical PCL PTT Global Chemical PCL Tie-in Line Tempo Cooling Tower / Rayong 3” 4” - PAUT / Code ASME B31.3 CC181-2

2014 Alliance Service Co., Ltd. Alliance Service Co., Ltd. BPE pipe Project / Rayong 8” 10” 12” - PAUT / Code ASME B31.3

2014 VAP Service (1997) Co., Ltd. VAP Service (1997) Co., Ltd. Utility-CB3 Steam to AR1 Project / Rayong 3” - PAUT / Code ASME B31.3 CC181-2

2014 Agon Pacific Co., Ltd. Agon Pacific Co., Ltd. Utility Project / Rayong 3” 4” - PAUT / Code ASME B31.3

2014 Rayong intania Co., Ltd. Linde Linde/Construction work CO2 Feed Gas Pipine Project / Rayong 24” - PAUT / Code ASME B31.3 CC181-2

2014 Pllin Project Co., Ltd. Bangchak Petroluem Public Company Limited New bottom plate T-972-PL5703 Project / Rayong 10 mm - PAUT / API 650

2014 ACE Engineering&Construction Co., Ltd. Bangkok Industrial Gas Co., Ltd. Tie-in 4” Project / Rayong 4” - 67-416 / PAUT / Code ASME B31.3 CC181-2
2” 3” 4” 6” 8” 10”
2014 ACE Engineering&Construction Co., Ltd. Thai Plastic Chemicals Public Co., Ltd. VCM#1 Equipment Replacement Project / Rayong - 67-417 / PAUT / Code ASME B31.3 CC181-2
12”
2014 CMI Thai Services Co., Ltd. IRPC Public Company Limited. CS 2” Project / Rayong 2” - 67-418 / PAUT / Code ASME B31.3

2014 EGCO Engineering & Service Co., Ltd. EGCO Engineering & Service Co., Ltd. CS 1.5” SCH80 Project / Rayong 1.5” - PAUT / Code ASME B31.3

2014 Rayong intania Co., Ltd. PTT GSP SS304L 36” long seam Project / Rayong 36” - PAUT / Code ASME B31.3 CC181-2

2014 ACE Engineering&Construction Co., Ltd. PTT Global Chemical PCL (I-1) Repair Pipe Header Treated Water HDPE 2 Project / Rayong 8” - 67-421 / PAUT / Code ASME B31.3 CC181-2

2014 Rayong intania Co., Ltd. Praxair (Thailand) Co., Ltd. PTTGSP – SS304 48” Project / Rayong 48” 1” ¾” - 67-423 / PAUT / Code ASME B31.3 CC181-2

2014 Deeline Construction Co., Ltd SCG Map Ta Phut OleFfins Deeline-A537-2-S5-28mm Project / Rayong - - 67-424 / PAUT / ASME Sec VIII

2014 Future Development & Construction Co., Ltd. PTT Phenol Company Limited. PTT Phenol pipe Project / Rayong 6” 12” 20” - PAUT / Code ASME B31.3 CC181-2

2014 TPT Petrochemicals Public Company Limited. TPT Petrochemicals Public Co. Ltd. TPT Project / Rayong 2” 3” 6” 8” 20” - PAUT / Code ASME B31.3 CC181-2

2014 Maintenance and Construction Services Co., Ltd. IRPC Public Co. Ltd MACS-IRPC shutdown 2014 Project / Rayong 2” 3” 4” 6” - PAUT / Code ASME B31.3 CC181-2

2014 Air Liquid (Thailand) Ltd. Air Liquid (Thailand) Ltd. Air Liquid (Thailand) Ltd. Project / Rayong 0.5” 1.5” 2” 3” - PAUT / Code ASME B31.3 CC181-2

2014 N.P.S Engineering Co., Ltd. IRPC Public Co. Ltd Repair piping(UT SCAN M and PT) Project / Rayong - - PAUT / Code ASME B31.3 CC181-2

2014 Pilin Project Co., Ltd. Bangchak Petroleum Public Company Limited Annular tank 9 mm, CS 12” SCH10 / Bangkok 12” - PAUT / Code ASME B31.3 CC181-2

2014 EGCO Engineering & Service Co., Ltd. Ayinomoto Ayinomoto Project / Pathumthani 2” - 67-419 / PAUT / Code ASME B31.3 Case 189

2014 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP Modify line NGL tank farm GSP#5 Project / Rayong 3/4-6” - PAUT / Code ASME B31.3 CC181-2

2014 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP Modify NGL Pipeline SML Project / Chonburi 4” - PAUT / Code ASME B31.3 CC181-2
2” 3” 4” 6” 8” 10”
2014 ACE Engineering&Construction Co., Ltd. Bangchak Petroluem Public Company Limited ACE-Tie in at BCP Project / Bangkok - PAUT / Code ASME B31.3 CC181-2
12” 36”
Heerema Marine Project – Fabrication of Gangway Landing Platform & Gangway Support
2014 McConnell Indonesia, PT Heerema Marine Contractors Australia Pty Ltd. - - MT/PT/UT Inspection as per ASME VIII
on Barge / Sagulung / Batam
2014 IRPC Public Co. Ltd IRPC Public Co. Ltd IRPC Shutdown 2014 Project / Rayong - - PAUT / Code ASME B31.3 CC181-2

2013 NACG TransCanada Pipelines Grand Rapids / / Canada 20”, 36” 500km AUT Inspection

34 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2013 NACG TransCanada Pipelines Chinchaga Lateral Loop / / Canada 48” 33km AUT Inspection

2013 Williams TransCanada Pipelines Leming Lake Sales Lateral Loop / / Canada 20” 37km AUT Inspection

2013 Macro Pipelines Macro Pipelines C2 Conversion / / Canada 48” - AUT System to scan 36 welds

2013 Technip – USA Shell Delta House / / USA - - AUT Sytem to scan WPQ support

2013 Technip – USA Shell Stones / / USA 8.65” - AUT System to scan 3800 welds

2013 Technip – USA Anadarko Anadarko Lucius / / USA 16” - AUT System to scan WPQ trials for SCR welds

2013 Technip – USA Williams G1200 Auditing / / USA - - AUT System to Auditing onboard G1200 vessel

2013 Technip – USA Shell Princess / / USA 10.75" 15mi UTScan of 1980 welds, code API 1104

2013 Spectra Energy Spectra New Jersey / New York Expansion / / USA 42” - AUT System to scan 22 miles

2013 IFC - Bugscreen Project/ Batu Ampar / Batam - - MT/UT/RT Inspection as per ASME B31.3 on carbon steel piping

2013 IFC Petroleo Brasileiro S. A Valfact (for TUPI 7) / Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3 on carbon steel piping

2013 IFC China National Offshore Oil Corporation CNOOC Project/ Batu Ampar/ Batam - - RT Inspection as per B16.34 on stainless steel casting

2013 Top Great Engineering, PT PT Pertamina (Persero) Pertamina Tank Project / Tanjung Uncang / Batam - - RT/MT/PT/UT Inspection as per AWS D1.1 2010

2013 McConnell Indonesia, PT Hancock Prospecting Pty Ltd Roy Hill Iron Ore Project / Sagulung / Batam - - MT/PT/UT Inspection as per AWS D1.1 2010 on structure

2013 Hanjung Indonesia, PT Furnace Engineering Train9 Project / Lampung / Indonesia - - RT Inspection as per ASME VIII on carbon steel piping

2013 Technip Indonesia, PT Petronas Technip Project / Lampung / Indonesia - - UT Inspection as per AWS D1.1 2010

2013 Citra Tubindo Engineering, PT PT Pertamina (Persero) Pertamina Rig DS-10 Project (A080) / Kabil / Batam - - MT/PT/UT/RT/HT inspection as per AWS D1.1 2010 on structure and as per ASME B31.3 on piping

2013 Citra Tubindo Engineering, PT Krohne Oil and Gas Custodi Transfer Metering System Project (A085) / Kabil / Batam - - MT/PT/UT/RT inspection as per AWS D1.1 2010 on structure and as per ASME B31.3 on piping

2013 Biglift Shipping B.V. Biglift Shipping B.V. Sea Fastening on board Happy Buccaneer/ Kabil/Batam - - MT/UT Inspection as per AWS D1.1 2010

2013 Gunanusa Utama Fabricators, PT TOTAL E & P Indonesie Sisi Nubi Offshore Project / Kalimantan - - MT/PT/UT/RT Inspection as per ASME B31.3

2013 Alstom Power ESI Alstom Power ESI North Bangkok Project/Surabaya - - MT/PT/RT/PMI/HT Inspection as per client requirements

2013 McConnell Indonesia, PT PT Oiltanking Nusantara Persada Proposed Marine Facilities for PT Oiltanking Project / Karimun - - RT/MT Inspection as per AWS D1.1 2010

2013 IFC IFC TTCL Lot 4 (Myanmar) Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3

2013 IFC Hunsky Hunsky (SK Engineering & Construction) Project /Batu Ampar/Batam - - MT Inspection as per ASME B16.34

2013 IFC SBM TUPI 7 Marica Monaco & TUPI 8 Saquarema Monaco Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2013 Citra Tubindo Engineering, PT Peerlees Asia Pasific Kapodang Gas Development Project (A078) /kabil/Batam/indonesia - - MT/PT/UT/RT inspection on vessel as per ASME VIII

2013 APMS Indonesia, PT Gryphon Energy Group Crane Boom-Gryphon Energy Project / Batam - - MT Inspection as per ASME

2013 Pratiwi Putri Sulung, PT PGN Gas Jakarta Distribution/Jakarta/Indonesia - - PAUT Inspection

2013 IFC IFC UT on Butterfly Valves Project /Batu Ampar/Batam - - UT Inspection as per ASME B16.34

2013 IFC TECHNIP Technip – Milton Roy Project /Batu Ampar/Batam - - RT/MT Inspection as per ASME VIII

2013 IFC IFC Xicomba Project /Batu Ampar/Batam - - RT/MT/UT Inspection as per ASME VIII Div 1 2010

2013 IFC IFC Marica Netherland Project /Batu Ampar/Batam - - RT/MT/PT Inspection as per ASME B31.3

2013 IFC SBM Saquarema Netherland Project /Batu Ampar/Batam - - RT/MT/PT Inspection as per ASME B31.3

2013 IFC Wartsila Inc Wasco Project /Batu Ampar/Batam - - RT/MT Inspection as per ASME VIII Div I 2010

2013 IFC IFC TTCL Lot 2 Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3

2013 IFC IFC TUPI 4 Add B13-582 Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3

35 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

P221 Fabrication for migas metering system at grisik Project (A082)


2013 Citra Tubindo Engineering, PT Emerson Process Management - - MT/PT/UT/RT inspection as per AWS D1.1 2010 on structure and as per ASME B31.3 on piping
/kabil/Batam/indonesia
2013 Citra Tubindo Engineering, PT GPS Fabrication 2 inlet separator for santos CIEP Project (A083) /kabil/Batam/indonesia - - MT/PT/UT/RT inspection as per ASME VIII Div. 1 on vessel

2013 Citra Tubindo Engineering, PT Emerson Process Management Senoro Gas Development Project (A084) /kabil/Batam/indonesia - - MT/PT/RT inspection as per ASME B31.3 on piping

2013 Citra Tubindo Engineering, PT GlobalTech Systems Engineering Sagar Samrat Conversion Project (A072) /kabil/Batam/indonesia - - MT/PT/UT/RT inspection as per ASME B31.3 , AWS D1.1 2010, API RP 2X

2013 Australian Skill Training, PT - Overhead Crane hook and the HUET module ring for cracks/Batu Ampar/Batam - - MT/PT Inspection as per AWS D1.1 2010

2013 Hanjung Indonesia, PT Furnace Engineering Taif Project/Lampung - - RT Inspection as per ASME VIII on stainless steel piping

2013 IFC IFC Tupi 6 Project /Batu Ampar/Batam - - RT/MT/PT Inspection as per ASME VIII Div I 2010

2013 McConnell Indonesia, PT - 4” Laydown Head Pig and 12” Swivel Ring Project / Sagulung/Batam - - MT/RT Inspection as per AWS D1.1 2010

2013 Formshore Indonesia, PT Formshore Indonesia, PT Dead Man Anchor Project/Surabaya - - MT Inspection as per ASME VIII

2013 Alstom Power Energy System Indonesia, PT Alstom Power ESI Tallawara Project/Surabaya - - MT/PT/RT Inspection as per client specification

2013 Alstom Power Energy System Indonesia, PT Alstom Power ESI Tanjung Bin Project/Surabaya - - MT/PT/RT Inspection as per client specification

2013 IFC IFC Hydrolic Power Unit/Batu Ampar/Batam - - MT Inspection as per ASME VIII

2013 IFC IFC FPSO Cidade de Ilhabela / Tupi 4 Add/Batu Ampar/Batam - - RT/PT Inspection as per ASME B31.3

2013 IFC Conoco Phillips South Belut Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME B31.3

2013 IFC IFC Perenco Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME VIII Div. 1 2010

2013 IFC Shell Offshore Inc. Shell Stones Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME VIII Div. 1 2010

2013 IFC IFC Hainan Project/Batu Ampar/Batam - - RT/PT/PMI Inspection as per ASME B31.3

2013 McConnell Indonesia, PT Apache Energy Ltd Gorgon Sea Fastening Project / Sagulung/Batam - - MT/PT/UT Inspection

2013 Technics Offshore Jaya, PT - Fabrication of 1 unit Walter Filter / Sekupang/Batam - - UT/MT/PT/RT/HT Inspection as per ASME VIII Div. 1

2013 Nippon Steel & Sumikin Engineering Co.Ltd Yara Pilbara Nitrates Pty.Ltd Tan Burrup Project / Tanjung Uncang / Batam - - PMI

2013 IFC IFC Cast Y Strainer Assembly Project/Batu Ampar/Batam - - RT/MT Inspection as per ASME B16.34

2013 IFC TOTAL E & P Indonesie Sisinubi Project/Batu Ampar/Batam - - MT/RT Inspection as per ASME B31.3

2013 Citra Tubindo Engineering, PT Cairn Energy India Pty Limited Gas Lift Pressure Upgradation Project (A075) /Kabil/Batam/indonesia ø 800mm - Heat Treatment on Pressure Vessel

2013 Citra Tubindo Engineering, PT Cairn Energy India Pty Limited Gas Lift Pressure Upgradation Project (A075/A076) /Kabil/Batam/indonesia - - MT/PT/UT/RT HS inspection for on vessel as per ASME VIII

2013 Alstom Power Energy System Indonesia, PT Alstom Power ESI Brunswick Project/Surabaya - - MT/PT/RT Inspection as per specification

2013 Alstom Power Energy System Indonesia, PT Linkou Power Linkou Project/Surabaya - - RT Inspection as per client specification

2013 Titis Sampurna, PT PT Pertamina EP LRUT Pertamina Tanjung Project/ Kalimantan - - LRUT/UT Inspection
Zawtika ZPQ Platform T & 1 PROJECT - Myanmar Floatover Campaign/ Batu Ampar/
2013 Saipem Singapore Pte. Ltd. Myanmar Oil & Gas Enterprise (MOGE) - - Welding Inspector
Batam
2013 IFC IFC Diamond Project/ Batu Ampar/ Batam - - MT/PT/RT Inspection as per ASME VIII Div. 1, 2010

2013 IFC IFC TUPI 4 Add 1 Project/ Batu Ampar/ Batam - - MT/RT Inspection as per ASME VIII Div. 1, 2010

2013 IFC IFC Control System Project/ Batu Ampar/ Batam - - MT/RT Inspection as per ASME VIII Div. 1, 2010

2013 IFC IFC Kamelia II Project/ Batu Ampar/ Batam - - PT/RT Inspection as per ASME B31.3

2013 IFC IFC OKHA Project/ Batu Ampar/ Batam - - PT/RT Inspection as per ASME B31.3

2013 IFC IFC TUPI 4 B12-370 Project / Batu Ampar/ Batam - - MT/RT Inspection as per ASME B31.3

2013 IFC IFC Tecmach Project / Batu Ampar / Batam - - MT/PT/RT Inspection as per ASME B31.3

2013 Rekayasa Industri, PT Conoco Phillips Grisik & Dayung Project / Palembang - - MT/PT/RT/UT Scan-M Inspection as per ASME B31.3 for various thickness from 5.54to 38.1 mm

36 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2013 Banua Citra Instrumindo, PT PT Gunanusa Utama Fabricator Sisinubi Project / Jakarta - - MT/RT Inspection as per client specifications

2013 Citra Tubindo Engineering, PT - Spreader Bar Fabrication (50 ton SWL) S1&S2 Project (A069) /kabil/Batam/indonesia - - MT/UT inspection as per AWS D1.1 2010 on structural

2013 Citra Tubindo Engineering, PT Premier Oil Timas – Anoa Phase 4 Project (A073) /kabil/Batam/indonesia - - MT/PT/RT/PMI/HT inspection as per ASME B31.3 on carbon steel piping

2013 Citra Tubindo Engineering, PT Global Tech System Engineering Nitrogen Air Compressor Package Project (A070) /kabil/Batam/indonesia - - MT/UT/PT/RT inspection as per ASME B31.3 on piping

2013 Citra Tubindo Engineering, PT Peerless Asia Pacific Pte Ltd Banuawati Gas Compressor Platform (A067) /kabil/Batam/indonesia - - RT/HT/MT/PMI inspection as per ASME B31.3 on piping

2013 McConnell Indonesia, PT Apache Energy Ltd Apache Jumilar Development / Sagulung / Batam - - MT/PT/UT/RT Inspection as per ASME V
MT/PT/UT/RT/UT Scan-M Inspection as per AWS D1.1 2010 for various thickness from 3.91mm to
2013 Hanjung Indonesia, PT Petronas Bukit Tua Project / Lampung - -
38 mm
2013 Citra Tubindo Engineering, PT FMC Technologies Shipping Skid For Daewoo (A071) - - UT/MT inspection for on structural as per AWS D1.1

2013 Leighton Contractor Indonesia, PT Catterpilar Indonesia Caterpillar Project / Batam - - PT/MT/UT Inspection on structure welds as per AWS D1.1

2013 IFC IFC Rubi Tie-In Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2013 IFC IFC Oval Asia Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2013 IFC IFC Camelia Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2013 IFC IFC Ruby Filter Project / Batu Ampar / Batam - - RT/UT/PT Inspection as per ASME VIII Div 1, 2010

2013 McDermott Indonesia, PT Vetcogray CCTV Inspection Service - - CCTV Inspection

2013 CRC Evans Gasunie Weld Qualification / / Holland - - 9 x 48”welds

2013 Nacap APLNG Western Tranche / / Australia 24”, 18” 102km AUT Inspection

2013 Comargo Correa Petrobras Ethanol Duto / / Brazil 20” 140km AUT Inspection

2013 McConnell Dowell QCLNG QCLNG Export Pipelines / / Australia 42” 120km AUT Inspection on pipeline

2013 PPS Open Grid Europe Midal Pipeline / / Germany - - Weld procedure support
24” 3” 2” 1.5”
2013 Know-How Transfer Co., Ltd. Know-How Transfer Co., Ltd. TMMA Pipe Project / Rayong - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev 1.2)
3/4” 1/2”
2013 Bangkok Industrial Gas Co., Ltd. Bangkok Industrial Gas Co., Ltd. TOC Glycol of o2 1” supply to L CO2 Project / Rayong 1” 4” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)
4” 6” 8” 1” 1.5”
2013 Chatr Karnchang Laemchabang Co., Ltd. Chatr Karnchang Laemchabang Co., Ltd. Sale Gas GPS#1 to MP Fuel Drum GPS#2 for Soler Trbine Project / Rayong - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)
2” 3/4” 24” 16”
2013 PTT Global Chemical PCL PTT Global Chemical PCL PSA I-4 Project / Rayong - - PAUT / Code ASME Section 8 (PA-P-010)

2013 Sriracha S Shop Co., Ltd. Sriracha S Shop Co., Ltd. CS 16” SCH40 Project / Rayong 16” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev 1.2)

2013 Rayong Maintenance & Contracting Co., Ltd. Rayong Maintenance & Contracting Co., Ltd RMC-MOC Pipe Rack Project / Rayong 4” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)
1” 2” 3” 4” 6” 8”
2013 Thai Oil Public Company Limited Rayong Maintenance & Contracting Co.,Ltd. 67-00309 Project / Rayong - PAUT / Code ASME B31.3 CC181-2
10”
2013 Rayong Maintenance & Contracting Co., Ltd. PTT Global Chemical PCL PTT GC Utitlity Pipe Project / Rayong 6” - PAUT / Code ASME B31.3 CC181-2

2013 Rayong intania Co., Ltd. Rayong intania Co., Ltd. SAK-CS 4” SCH40 Project / Rayong 4” - PAUT / Code ASME B31.3 CC181-2

2013 Chatr Karnchang Laemchabang Co., Ltd. Chatr Karnchang Laemchabang Co., Ltd. Modified Line Treated Gas From ESP to GSP#1 2” 6” - PAUT / Code ASME B31.3 CC181-1

2013 CMI Thai Services Co., Ltd. CMI Thai Services Co., Ltd. BCC-CS SA335 P22, 12”,45 mm thickness, elbow pipe Project / Rayong 12” - PAUT / Code ASME B31.3 CC181-2

2013 Union Construction & Supply Co., Ltd. Union Construction & Supply Co., Ltd. UCS-TOP unit 3600 lorry loading system to Sulphur Storage Tank Project / Rayong 3/4” 1/2” 2” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev 3.2)

2013 Renew Coils Engineering & Supply Co., Ltd. PTT Global Chemical PCL Piping Hot & Cold Work & R151 Weld Reduction Zone Project / Rayong 10” 6” 24” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 Bangchak Petroleum Public Co., Ltd. Bangchak Petroluem Public Company Limited BCP Pipe 4’ SCH40 A335 P9 Project / Bangkok 4” - PAUT / Code ASME B31.3 CC181-2

2013 Laemchabang Maintenance Co., Ltd. Thai Oil Public Company Limited 67-00318 Project / Laemchabang Chonburi 10” 12” 24” - PAUT / Code ASME B31.3 CC181-2

2013 Thai Oil Public Company Limited Thai Oil Public Company Limited TOP Vessel V-9433 Project / Laemchabang Chonburi - - PAUT / Code ASME BPVC CC2235-9

2013 Union Construction & Supply Co., Ltd. Union Construction & Supply Co., Ltd. USC-HMC Project / Rayong 4” 6” 8” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

37 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2013 Rayong intania Co., Ltd. PTT Global Chemical PCL PTTGSP OCS3 longseam, CS 36” dia, 32 mm thickness Project / Rayong 36” - PAUT / Code API1104

2013 Thai Oil Public Company Limited Thai Oil Public Company Limited TOP Alloy A335 P5(Shutdown May 2013) Project / Laemchabang Chonburi 8” 6” 1.5” - PAUT / Code ASME B31.3

2013 Bangchak Petroluem Public Company Limited Bangchak Petroluem Public Company Limited Bangchak Yearly Contract 2013 Project / Bangkok 1” - PAUT / Code ASME B31.3 CC181-2 ASME Section I Art.8

2013 PTT Global Chemical PCL PTT Global Chemical PCL PTT GC CS Shell Plate of Heat Exchanger Project / Rayong - - PAUT / Code ASME BVPC Section VIII (App.12) and Client specitfcation

2013 Rayong intania Co., Ltd. PTT Global Chemical PCL Piping Hot & Cold Work & R151 Weld Reduction Zone Project / Rayong 2” 3” 4” 6” 12” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 Union Construction & Supply Co., Ltd. Thai Oil Public Company Limited Furnance A335 Project / Sriracha Chonburi 1” 1.5” 2” - PAUT / Code ASME 2235

2013 The Siam United Steel (1995) Co., Ltd. The Siam United Steel (1995) Co.,Ltd. Install New Alkaline Tank Pipe Project / Rayong 2” 2.5” 1.5” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 EGCO Engineering & Service Co., Ltd. Rot Et Green Energy Rot Et Superheatyer tube Project / Rot Et - - PAUT / Code ASME 2235-10 (PA-P-021)

2013 Renew Coils Engineering & Supply Co., Ltd. PTT Asahi Chemical Co., Ltd. PTT Asahi, Project / Royong 16” 6” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 Thai Oil Public Company Limited Thai Oil Public Company Limited 1 RY SH Outlet Header Project / Laemchabang Chonburi 1.5” 10” - PAUT / Code ASME

2013 Thai Oil Public Company Limited Thai Oil Public Company Limited 1 RY SH Outlet Header Project / Laemchabang Chonburi 1.5” 10” - PAUT / Code ASME

2013 Siam Mitsui Co., Ltd. Siam Mitsui Co.,Ltd. SMPC Project / Rayong 8” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. lastest)

2013 Know-How Transfer Co., Ltd. IRPC Public Company. IRPC-EBSM Project / Rayong 72” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 Chatr Karnchang Laemchabang Co., Ltd. Chatr Karnchang Laemchabang Co., Ltd. Modified Line Treated Gas From ESP to GSP#1 / Rayong 2” 6” 20” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

2013 Union Construction & Supply Co., Ltd. Thai Oil Public Company Limited Pipe R11110326C Project / Laemchabang Chonburi 1.5” 3/4” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

2013 Agon Pacific Co., Ltd. Glow Glow 4”, Thickness 10 mm Project / Rayong 4” - PAUT / Code ASME B31.3

2013 Intact Engineering Co., Ltd. PTT Global Chemical PCL PTT GSP CS 24” 28” 48” Project / Rayong 24” 28 “ 48” 40” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 EGCO Engineering & Service Co., Ltd. EGCO Engineering & Service Co., Ltd. Phuvieng Chaiyaphoom-Header and Tube Project / Chaiyaphoom - - PAUT / Code ASME Section V Article 4

2013 Rayong intania Co., Ltd. PTT Global Chemical PCL CS 6” (7.11 mm thickness) Project / Rayong 6” - PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

2013 Thai Oil Public Company Limited Thai Oil Public Company Limited CS 10” (6.35 mm thickness) Project / Laemchabang Chonburi 10” PAUT / Code ASME B31.3 CC181-2 and Client specification (PA-P-118 Rev. 0.3)

2013 Sriracha S Shop Co., Ltd. PTT Global Chemical PCL 3S-PTT GSP-UT SCAN M &PT Project / Rayong 4” PAUT PT / Code ASME B31.3 CC181-2

2013 Rayong intania Co., Ltd. Rayong intania Co., Ltd. C2-PTT GC-4I Project / Rayong 20” 14” PAUT / Code ASME B31.3 CC181-2 (PA-P-016 Rev. 0.1)

2013 Know-How Transfer Co., Ltd. UBE UBE API 650 Tank SS316 Project / Rayong - PAUT / Code API650

2013 N.P.S Engineering Co., Ltd. IRPC Public Company. NTU-A335-P11 Project / Rayong 6” 16 “ 24” PAUT / Code ASME B31.3 CC181-2
SiamKraft-sampling check for crack sizing on surface of waterwall tube Project /
2013 SiamKraft Industry Co., Ltd. SiamKraft Industry Co., Ltd. - PAUT / Code ASME Boiler tube + Client spec.
Karnjanaburi
2013 CMI Thai Services Co., Ltd. CMI Thai Services Co., Ltd. 2013BCC-CS SA335 P22, 12” ,45 mm thickness Project / Rayong 12” 3.5” PAUT / Code ASME B31.3

2013 ACE Engineering&Construction Co., Ltd. ACE Engineering and Construction Co., Ltd ACE CS 10” SCH40 Project / Rayong 10” PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

2013 PAE Technical Service Co., Ltd. PTT Gas PAE – KHN-CS 12” sch 40 Project / Khanom Nakhon Si Thammarat 12” PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

2013 ACE Engineering&Construction Co., Ltd. ACE Engineering and Construction Co., Ltd ACE – BPE modify pipe 18” Project / Rayong 18” PAUT / Code ASME B31.3 CC181-2 (PA-P-016)

2013 Maintenance and Construction Service Co., Ltd. Maintenance and Construction Service Co., Ltd. MACS-BLP-superheated tube1-1.25” (3.5mm thick.)Project / Bangkok 1-1.25” PAUT / Code ASME B31.3

2013 Doweltech (Thailand) Co., Ltd. Doweltech (Thailand) Co., Ltd. Doweltech-rotor sleeve-check bonding Project / Rayong - PAUT Inspection / Code Client specification

2013 Chatr Karnchang Laemchabang Co., Ltd. PTT GSP PTT GSP-SS304 22mm vessel and pipe Project / Rayong 3/4” 4” 16” PAUT / Code ASME section 8 (PA-P-010), ASME B31.3 CC181-2 (PA-P-016)

2013 PAE Technical Service Co., Ltd. SPRC SPRC sphere Project / Rayong - PAUT / Code ASME B31.3 CC181-2

2013 EGCO Engineering & Service Co., Ltd. Green Energy EIROT Boiler tube replacement 38.1 mm Project / Roi Et - PAUT / Code ASME 2235-10 (PA-P-021 Rev. 0.1)

2013 The Companion Maintenance Co., Ltd. Bangchak Petroleum Public Company Limited TCM-BCP pipe 3” 4” 6” Project / Bangkok 1.5” 2” 3” 6” PAUT / Code ASME B31.3 CC181-2

2013 Agon Pacific Co., Ltd. Agon Pacific Co., Ltd. Agon-Gheco I_pipie 14” Project / Rayong 14” PAUT / Code ASME B31.3

38 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2013 ACE Engineering&Construction Co., Ltd. EFT ACE-EFT pipe Project / Rayong 3” 8” PAUT / Code ASME B31.3 CC181

2013 EGCO Engineering & Service Co., Ltd. EGCO Engineering & Service Co., Ltd. BLCP outage 2013 Project/ Rayong - PAUT / Code ASME B31.1, etc.

2013 PTT Global Chemical PCL PTT Global Chemical PCL PTTGC-Rotor gas turbine-check for crack Project / Rayong - -

2013 Know-How Transfer Co., Ltd. UBE UBE Modify column 213-c1 Project / Rayong - PAUT / Code ASME 2235-10 (ASME Section 8 DIVI,+Client specification)

2013 EGCO Engineering & Service Co., Ltd. EGCO Engineering & Service Co., Ltd. EGCO-bottom&top header Project / Rayong - PAUT / Code ASME B31.1

2013 Bangkok Synthetics Co., Ltd. Bangkok Synthetics Co., Ltd. BST-Shaft inspection X-6603 Project / Rayong - PAUT / Code ASME + Client spec.

2013 Maintenance and Construction Service Co., Ltd. Maintenance and Construction Service Co., Ltd. MACS-boiler tube 2.5” sch40 Project / Rayong 2.5” PAUT / Code ASME section I Boiler + Client spec.

2012 Louisbourg TransCanada Pipelines Cranberry / Timberwolf 48” 88km CSA Z662 / Wall Thicknesses: 12.4mm, 13.4mm, 17.7mm, 17.8mm, 23.5mm

2012 NACG TransCanada Pipelines Tanghe Creek Pipelines / / Canada 48” 32km AUT Inspection on pipeline

2012 NACG TransCanada Pipelines Parkway Loop Pipeline / / Canada 42” 13km AUT Inspection on pipeline
4”,6”,9”,
2012 AltaGas AltaGAs Alta Gas Pipeline and Facility NDE Proposal / Gordondale AB / Canada 20km PAUT examination to Z662 for new pipeline of diameter of 4,6,9, 12, 16 and 18" over 20Km
12”,16”,18"
Ongoing NDE callout for G. Wright's Welding. They are a subcontractor for SRS industrial as
2012 G. Wrights Wleding Ltd. Callout RT G Wrights Welding / Call Out NDE / Edmonton, AB / Canada - -
fabricators.
2012 Capital Power Corporation Capital Power Capital Power G2 Turnaround / Genesee, AB / Canada - - Genesee Unit G2 Boiler Maintenance Outage
boiler rebuild/maintenance at CNRL Horizon site. PAUT on 2 1/2 " OD x 280" MWT + 1 tube at 2" OD x
2012 Cessco Fabrication & Engineering Ltd Cessco Fabrication & Engineering Ltd Cessco CNRL Work / Fort McMurray AB / Canada 2 1/2 ", 2", 12" -
.165" MWT. PAUT on (4) 12" OD x SCH 140 (1 1/4") MWT pipe. B&W MT and PT will be required. RT
RT to be performed on 2" spool welds on Saturday at MISI shop. Mark Sych to coordinate with Helder
2012 Cessco Fabrication & Engineering Ltd Cessco Fabrication & Engineering Ltd Cessco Edmonton Call Out Rate Schedule / Edmonton, AB / Canada - -
from Cessco
2012 Cessco Fabrication & Engineering Ltd Cessco Fabrication & Engineering Ltd Cessco Fabrication / Vessel V5027A & V5027B / Edmonton, AB / Canada - - Complete NDE on vessel V5027

2012 Cessco Fabrication & Engineering Ltd Cessco Fabrication & Engineering Ltd Cessco Vessels 5027A/B and 5029 / / Canada - - Complete NDE on vessel V5027A/B and V5029

2012 ES Fox ES Fox Bruce Power Nuclear Tube Refurbishment / Canada - - PAUT Examinations
Completed UT thickness survey on domestic water tank heater in the Hilton Garden Inn Hotel in
2012 Blackstone Mechanical Hilton Garden Inn Hotel Blackstone Mechanical / Domestic Water Tank UT Survey / Edmonton, AB / Canada - -
Edmonton, AB
2012 KBR KBR KBR / Dawson Creek Shear Wave UT Examinations / Dawson Creek AB / Canada - - Provide UT Shear wave examinations on CSA W59/W476.1 structural steel welding.

2012 KBR Edmonton KBR Edmonton KBR / D054 Cat Reactor project at the Strathcona Refinery / Strathcona AB / Canada - - PAUT Examinations

2012 Spectra Energy Spectra Energy ERW / Regina, SK / Canada - - Perform PAUT on ERW Seam welds as per previous project 10-020
Acuren Group Inc. Academy/TCPL Lamincation/Shear Wave Examinations / Onoway, AB UT lamination and shear wave examinations as required for Acuren on the TCPL/Academy facility in
2012 Acuren Group Inc. Suncor - -
/ Canada Onoway, AB.
PAUT examination on 2 Ni-cool injection points. Flawspec to manufacture cal blocks. Quote price is
2012 Suncor Energy Products Partnership Inc. Suncor / Petro-Canada Nicool Injection Points / Edmonton AB / Canada - -
$4700.
2012 Jacobs Canada Limited TransAlta TransALta Keephills Unit 1 Maintenance Outage / Keephills AB / Canada - - To provide PAUT services on the KH1 boiler outage.
PAUT Examination on six flanges 12” – 2500, the material is 321 stainless steel, diameter 3’ 10”, the
2012 Suncor Energy Products Partnership Inc. Suncor / Petro-Canada RTJ Flange & Exchanger UT SCAN M Examination / Edmonton Ab / Canada 3", 10" -
overlay material is 309L and 347 SS, total overlay thickness is 0.315”. The base material is A336/F22
2012 Jacobs Canada Limited TransAlta TRansAlta Sundance Unit 3 2012 Outage / Sundance AB / Canada - - PAUT for Sundance Unit 3 scheduled outage.

2012 Jacobs Canada Limited TransAlta TransAlta Sundance Emergency Outage Rate Schedule / Sundance AB / Canada - - RT Inspection on two 2” welds

2012 TransAlta Utilities Corp TransAlta Utilities Corp TAU Sundance Unit 3 Emergency Leak Repair / Alberta / Canada - - NDT Inspection as per client specification

2012 Allerion Oil Field Services - Allerion Oilfield Services 2012 Callout NDE / Drayton Valley, AB / Canada - - UT thickness survey's on Tank's

2012 Matcon - Maticon HDPE Inspection / / Canada - - PAUT

2012 Cessco Fabrication & Engineering Ltd - Methanex / Callout RT / / Canada - - RT Inspection on boiler components.

2012 Technip-USA Williams Williams Tubular Bells / Spoolbase / Offshore/ USA - - AUT inspection

2012 Technip-USA HESS Hess tubular Bells Offshore / USA - - AUT inspection

2012 Technip-USA Petrobras Cascade 2B Offshore / USA - - AUT inspection

2012 Technip-USA ATP Oil & Gas Corp ATP Clipper Offshore / USA - - AUT inspection

39 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2012 Technip-USA Enbridge Offshore Facilities, LLC Enbridge Export Offshore / USA - - AUT inspection

2012 Technip USA HESS Hess Assembly Welds / / USA - - AUT procedures and drawings
6.625", 8.625",
2012 Technip USA Shell Cardamom / / USA - UTScan of 1050 welds, Pipe in Pipe and different thickness from 17.6mm, 28.4mm, 31.6mm
12.75"
2012 Technip USA Chevron Hadrian South / / USA - - Offshore spool base

2012 Inermoor Petrobras Papa terra / / USA 36” - Conductor casing welds

2012 aptech - Intertek/Power Group - Exelon UT SCAN M Qualification / Baltimore, MD / USA - - Perform PAUT proficiency test

2012 IFC Asia Pacific - ODS Project / / USA - - 10% RT on Butt Welds, 10% MT on Fillet Welds

2012 IFC IFC Cidade Ihlabela Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2012 SMOE Indonesia, PT Bechtel APLNG Project - - MT/PT/UT/RT/HT/PMI/Ferrite Tester Inspection

2012 McConnell Dowel JV QCLNG QCLNG Pipeline Project / Australia - - AUT inspection of QCLNG pipeline project

2012 McConnell Dowel JV APLNG APLNG Pipeline Project / Australia - - AUT inspection of APLNG pipeline project

2012 Internusa Perkasa Teknik, PT PT Pertamina Gas (Pertagas) LRUT SKG Tegal Gede Project - - Long Range UT Inspection

2012 McConnell Indonesia, PT Jurong Aromatic Corporation Ship Unloader for Jurong Port / Sagulung / Batam - - RT/MT/PT/UT Inspection on piping materials

2012 IFC Emerson Electric Company Emerson Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2012 IFC IFC Toyobo Vylon Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2012 IFC VME VME Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2012 IFC Modec MODEC TUPI 5 Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2012 IFC SBM Malaysia SBM Malaysia Project / Batu Ampar / Batam - - RT/MT/PT Inspection as per ASME B31.3

2012 Active Marine, PT Active Marine CEMENT SILO Project - - MT/PT/UT Inspection as per AWS D1.1

2012 Bangun Bejana Baja, PT PT Surya Besindo Sakti Bosowa Project / Makassar - - PAUT Inspection as per ASME VIII Div 2, 2010 Edition

2012 Alstom Power Energy System Indonesia, PT Alstom Power ESI Ombilin Shut Down Project - - RT Inspection

2012 Citra Tubindo Engineering, PT FMC Technologies Shallow Water Shipping Skid (A066)/kabil/Batam/Indonesia - - UT/MT inspection for on structural as per AWS D1.1

2012 Citra Tubindo Engineering, PT Citra Tubindo engineering Bridge & Spreader Bar Fabrication (A065)/kabil/Batam/Indonesia - - UT/MT inspection for on structural as per AWS D1.1

2012 Citra Tubindo Engineering, PT GPS Malaysia Bibiyan Drilling & CV Plant Upgrade Project (A064)/kabil/Batam/Indonesia - - MT/PT inspection for on pressure vessel as per ASME VIII
Fabrication of HP Scrubber, HP Separator & MP Separator Field Prabumulih
2012 Citra Tubindo Engineering, PT PT Pertamina EP - - UT/MT inspection for on piping, structural and pressure vessel as per ASME VIII
(A060)/Kabil/Batam/Indonesia
2012 Citra Tubindo Engineering, PT Citra Tubindo engineering Tha Long & Dong Do Field Development Project (A058)/kabil/Batam/Indonesia - - UT/MT/PT/RT inspection for on pressure vessel as per ASME VIII
UT/MT/RT inspection for on piping, structural and pressure vessel as per ASME VIII/ ASME
2012 Citra Tubindo Engineering, PT Citra Tubindo engineering MOR (RIG Require re-NDT) Project (A005)/kabil/Batam/Indonesia - -
B31.3/AWS D1.1
2012 McConnell Indonesia, PT Saipem SLC Project - - MT/UT Inspection as per AWS D1.1

2012 McConnell Indonesia, PT Marathon Marathon Project - - RT/MT inspection as per ASME B31.3

2012 Cladtek BI Metal Manufacturing, PT Allied International Allied International (CT-203) - - UT/MT/PT inspection as per client specifications

2012 Hanjung Indonesia, PT Chiyoda Baiji PJT Project/Hanjung/Lampung/Indonesia - - RT inspection as per ASME VIII

2012 Gunanusa Utama Fabricators, PT TOTAL E & P Myanmar PQR Yadana Project / Cilegon - - MT/PT/UT/RT Inspection as per client specifications

2012 Gunanusa Utama Fabricators, PT TOTAL E & P Myanmar Yadana Onshore Project / Cilegon - - MT/PT/UT/RT Inspection as per client specifications

2012 Gunanusa Utama Fabricators TOTAL E & P Myanmar Yadana Onshore & Offshore Project / Myanmar - - MT/PT/UT/RT Inspection as per client specifications

2012 Heat Exchangers Indonesia, PT Meindo Elang Indah Ruby Field Development Project - - RT/MT/PT/UT/PAUT Inspection as per client specification

2012 Gunanusa Utama Fabricators, PT TOTAL E & P Indonesie Sisi Nubi Onshore / Cilegon - - MT/PT/UT/RT Inspection as per ASME B31.3

40 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2012 Bangun Bejana Baja, PT PT Pertamina (Persero) LPG Terminal Tanjung Priok - Spherical Tank Project / Jakarta - - PAUT / MT Inspection as per ASME VIII Div 2, 2010 Edition

2012 Edaran Profab, PT Edaran Asia RT on Weld / Batu Ampar /Batam - - RT Inspection

2012 Winteco Indonesia, PT Winteco Chandra Asri Anyer Project/ Batu Ampar /Batam - - PAUT /RT Inspection as per ASME VIII on spherical tank

2012 Gunung Raja paksi Gunung Raja Paksi Hay Point Expansion Phase 3 Marine work/ Bekasi / Indonesia - - MT/PT/UT on plate materials as per AWS D1.1

2012 Active Marine, PT Gorgon Gorgon NATA Project - - MT/PT/UT/RT Inspection as per AS 1554.1 (NATA)

2012 QOS- Brunei Brunei Shell UT SCAN M for OSI Brunei Shell - - PAUT and Rope Access

nd
2012 Cladtek BI Metal Manufacturing, PT Cladtek CT-77- 2 MTO /Cladtek - - UT/MT/PT inspection as per client specifications

2012 Hanjung Indonesia, PT NCIG NCIG Project - - RT Inspection as per AWS D1.1 2010

2012 Hanjung Indonesia, PT APLNG APLNG Project - - MT/PT/UT Inspection as per AWS D1.1 2010

2012 Cladtek BI Metal Manufacturing, PT Hyundai SHA Gas Gathering Project (CT-140) - - UT/MT/PT inspection as per client specifications

2012 Cladtek BI Metal Manufacturing, PT Hyundai Barzan 3 Project (CT-153) - - UT Lamination, disbonding and thickness, PT Clad weld overlay

2012 Cladtek BI Metal Manufacturing, PT Hyundai Barzan Project (CT-141) - - UT/MT/PT inspection as per client specifications

2012 Cladtek BI Metal Manufacturing, PT CARDON IV Perla Project (CT-156) - - UT/MT/PT inspection as per client specifications

2012 Cladtek BI Metal Manufacturing, PT Gorgon Upstream Gorgon Project ( CT-119) - - UT/PT Inspection as per client specification

2012 Cladtek Tenaris Global Services Perla 2 Tenaris (CT-157) - - UT/MT/PT inspection as per client specifications

2012 Cladtek BI Metal Manufacturing, PT TK Bend TK Bend Cooperation (CT-173) - - UT/MT/PT inspection as per client specifications

2012 IFC LEWA LEWA Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII Div. 1 2010

2012 IFC Asahi Mas Asahi Mas Project / Batu Ampar / Batam - - RT Inspection as per ASME B31.3

2012 IFC HESS HESS Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2012 IFC IFC WPS-PQR Project / Batu Ampar / Batam - - RT/PT Inspection as per ASME B31.3

2012 IFC MODEC MODEC Y Strainer Project / Batu Ampar /Batam - - RT/MT Inspection as per ASME B31.3

2012 IFC SBM SBM OSX2 Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2012 IFC Pertagas Pertagas Project / Batu Ampar / Batam - - RT/PT Inspection as per ASME B31.3

2012 IFC IFC Ruby Field Project / Batu Ampar / Batam - - RT/MT Inspection on strainer as per ASME B31.3

2012 IFC IFC Ulu Belu Project / Batu Ampar / Batam - - RT Inspection as per ASME B31.3

2012 IFC IFC Hasanudin Project / Batu Ampar / Batam - - RT On Critical Areas as directed on casting and MT on Fillet Weld as per ASME B16.34

2012 IFC Ningbo Ningbo Project / Batu Ampar / Batam - - RT/PT Inspection ons strainer as per ASME B31.3

2012 IFC IFC AII Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2012 IFC IFC AII Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME B31.3

2012 IFC ODS ODS Project / Batu Ampar / Batam - - RT/MT Inspection as per ASME VIII

2012 Alstom Power Energy System Indonesia, PT Alstom Power ESI Warren County Project/Surabaya/Indonesia - - RT/MT/PT/PMI/HT Inspection as per client specifications

2012 Alstom Power Energy System Indonesia, PT Alstom Power ESI Yermaras Project/Surabaya/Indonesia - - RT Inspection as per client requirements

2012 Alstom Power Energy System Indonesia, PT Alstom Power ESI Banyan Project / Surabaya/ Indonesia - - RT/MT/PT/PMI/HT/WI Inspection as per client specifications

2012 Alstom Power Energy System Indonesia, PT Alstom Power Stuttgart Sostanj#6/Alstom/Surabaya/Indonesia - - X-Ray tube panel pipe size OD 35mm thick 7,1mm

2012 Citra Tubindo Engineering, PT Saipem Saipem Project (A055) - - Welder Test Qualification
JO of PT Pertamina Drilling Services Indonesia
2012 Citra Tubindo Engineering, PT Engine Skid Fabrication for Rig DS8&DS9 (A054) - - UT/MT/PT inspection for on Structural works as per AWS D1.1 table 6.1& 6.2
(PDSI)-AOS

41 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

JO of PT Pertamina Drilling Services Indonesia UT/MT/PT/RT inspection for on structural work as ASME V code sec VIII div.1. art 7 & 6 Table /
2012 Citra Tubindo Engineering, PT Pig laucher,receiver and gas scrubber-WMO - -
(PDSI)-AOS 341.3.2 /VIII div 1 UW 51
2012 Citra Tubindo Engineering, PT Globaltech system engineering PLE LTD Gmr energy 2x400MW ccp (A052)/kabil/batam/indonesia - - UT/MT/PT/RT inspection for on structural work as per AWS D1.1 Table 6.1 & 6.2/ASME V

2012 Citra Tubindo Engineering, PT petrofac E&C Sdn Bhd Leg Extension fabrication-west desaru mopu epcic (A053)/kabil/batam/indonesia - - UT/MT/RT inspection for on structural work as per AWS D1.1 Table 6.1 and 6.2 /ASTM E709
JO of PT Pertamina Drilling Services Indonesia
2012 Citra Tubindo Engineering, PT Miscellaneous steel fabrication-rig operation (A050)/kabil/Batam/indonesia - - UT/MT/RT inspection for on structural work as per AWS D1.1 Table 6.1 & 6.2 /ASTM E709
(PDSI)-AOS
2012 Citra Tubindo Engineering, PT Ruby Thailand Ruby Thai (A056) - - RT Inspection as per client specification
JO of PT Pertamina Drilling Services Indonesia
2012 Citra Tubindo Engineering, PT Manufucture 2 units rig (A043) for Exxon Mobile/Kabil/batam/indonesia - - UT/MT/PT inspection for on Structural works as per AWS D1.1 table 6.1 & 6.2
(PDSI)-AOS
2012 Citra Tubindo Engineering, PT Globaltech system engineering PLE LTD Cip & Cpp skid fabrication - Zawtika (A051) kabil/batam/indonesia - - MT/PT inspection for on structural work as per AWS D1.1 Table 6.1

2012 Citra Tubindo Engineering, PT MODEC Untility air compressor skid & piping (A047) kabil/batam/indonesia - - UT/MT/PT/RT inspection for on structural work as per AWS D1.1 Table 6.1 & 6.2/ASME V

2012 Citra Tubindo Engineering, PT Techlam Chiraq Oil Floatover DMR Structure (A039) CTE/Batam/Indonesia - - UT/MT/RT inspection for on structural work as per AWS D1.1 Table 6.1 and 6.2 /ASTM E709
JO of PT Pertamina Drilling Services Indonesia 2 units x 1500 HP (horse power) Land Rig (A0100) for Exxon Mobile
2012 Citra Tubindo Engineering, PT - - UT/MT/DPT inspection for structural work as per AWS D1.1 table 6.1 and 6.2
(PDSI)-AOS /CTE/Batam/Indonesia
2012 Citra Tubindo Engineering, PT FMC Technologies Singapore Pte Ltd Xmas tree and running tool skid (A046)/CTE/Batam/Indonesia - - UT /MT inspection for on Structural works as per AWS D1.1 table 6.1 and 6.2

2012 Citra Tubindo Engineering, PT Techlam LMU arkutun-dagi sakhalin 1 (A045)/CTE/Batam/Indonesia - - UT/MT/RT inspection for on structural work as per AWS D1.1 /ASTM E709 and API RP-2X lev A and C

2012 McConnell Indonesia, PT FMG Port AP4 &AP5 BERTH DHOLPINS TYPE 1,2,3, &4 - - UT/ MT Inspection

2012 McConnell Indonesia, PT SKM RGP CLOF - Pile Caps And Headstock - - UT / MT Inspection

2012 McConnell Indonesia, PT VOUT SCAN M K Vopak Steel Fabrication Pump Platform - - UT / MT Inspection

2012 McConnell Indonesia, PT GE Ibau hamburg/McConnell/Batam/Indonesia - - UT/ MT /RT Inspection

2012 Saipem Indonesia, PT Foster Wheeler - ICOEEP Iraq project/Saipem/Karimun/indonesia RT Inspection as per AWS D1.1 2010 on structure

2012 Austin Engineering, PT Austin Engineering, PT Inspection of fabricated Buckets and Lifting items MT/UT inspection as per AWS D1.1 2010

2012 PHE ONWJ Incoray Resp, PT PT Pertamina Hulu Energi Mike Mike TAR & APN Golden Weld Project (Onshore & Offshore) - - PAUT Inspection as per ASME B31.3
PAUT Long Seam, UT Lamination Check, UT Thickness, UT Flaw Long Seam, Radiography, MT
2012 Cladtek BI Metal Manufacturing, PT Gorgon CT 100 - Gorgon Upstream UT SCAN M Project/Cladtek - -
inspection for Full Body (Shear Wave) as per API 5L
2012 Cladtek BI Metal Manufacturing, PT Abu Dhabi Gas CT-138-Shah Gas/Cladtek/Batam/Indonesia - - UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping

2012 Vorwerk Open Grid Europe LSR Pipeline / / Germany 40” - AUT Inspection for 4300 welds on pipeline

2012 PPS Open Grid Europe OGE Megal Pipeline / / Germany 42” 72km AUT Inspection on pipeline

2012 BST Elastomers Co., Ltd BST Elastomers Co., Ltd BST Alloy Shaft / Rayong / Thailand 6.5” - To determine any defect inside material of alloy shaft 17-4PH STSTL with 165.1 mm thickness.
Modify flare GSP#5; SS Pipe 44" dia., 9 mm thickness / Modify ERU dry out gas GSP#6; CS 4" dia.,
2012 Chatr Kamchang Laemchabang (CKC) Chatr Kamchang Laemchabang (CKC) Modified Refrigeration Line/Modify Flare / PTT GSP / Rayong / Thailand - -
6.02 mm thickness / Modify future tie-in turnaround GSP#6; CS 8" dia., 8.18 mm thickness.
2012 Foster Wheeler Service Foster Wheeler Service Pipe 14" / Borwin, Chonburi / Thailand - - Repair HRSG steam stop valve CS 14" dia., 32 mm thickness.

2012 McConnell Indonesia, PT McConnell Dowell Creative Construction FMG 2nd Outloading Circut Project / Cokarang Barat, Bekasi West Java / Indonesia - - MT/PT/UT for structural materials

2012 Chatr Kamchang Laemchabang (CKC) PTT Public Co., Ltd. Modify line hot oil PTT GSP#6 / Rayong / Thailand - - Modify line hot oil of CS pip 10", 12" dia. (9.27-10.31 mm thickness)

2012 Chatr Kamchang Laemchabang (CKC) PTT Public Co., Ltd. Modify Refrigeration line GSP2&GSP3 to DPCU / Rayong / Thailand - - Modify CS pipe 6" dia. 7.11 mm thickness.

2012 PTT Public Co., Ltd. PTT Public Co., Ltd. PTT GSP CO2 Membrane / Rayong / Thailand - - New construction of CS piping 3/4", 12", 16", 18", 24", 36" diameter with thickness 3.91mm-22.3 mm.
Installation blind to improve Butane unit; CS pipe 3" dia. (5.49 mm thickness), 4" dia (6.02 mm
2012 Rayong Intania Co., Ltd. Rayong Intania Co., Ltd. Blind Plate Butane / Rayong / Thailand - -
thickness)
2012 Rayong Intania Co., Ltd. Rayong Intania Co., Ltd. Modify Turnaround GSP#1 / Rayong / Thailand - - Pipe CS, SCH40, 3", 6", 8", 12" ; Pipe CS, SCH80, 0.5", 3/4"; Pipe SS, SCH40S, 2"; Pipe SS SCH10S, 6"

2012 Rayong Intania Co., Ltd. Rayong Intania Co., Ltd. PTTPE Pipe / Rayong / Thailand - - Repair SS pipe 3" dia. (5.45 mm thick.) and SS pipe 4" dia. (6.02 mm thick.)

2012 Shamira SDN Bhd Shamira SDN Bhd Bintulu Tank Inspection / Asia - - PAUT Examinations

2012 Union Construction & Supply Co. Ltd - 36" Pipe / Laemchabang / Thailand - - Gloden weld, 36", sch10, CS,Main pipe 36", STD, CS

2012 The Companion Maintenance Co. Ltd - Bangchak Piping / Rayong / Thailand - - CS/SS Diameter 3/4"-16"

42 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2012 LCB Corporation Limited - BIG C02 Plant:Sphere CS 56 / 60 mm thickness / Rayong / Thailand - - CS, 56-62 mm thickness, BW, Double V

2012 EGCO Enginerring & Service Co. Ltd - Boiler Tube 2", 4 MM, STB241 / Khonkaen / Thailand - - 2" Diameter, 4 mm thickness, STB241

2012 Agon Pacific Co. Ltd - CS P22 6" / Rayong / Thailand - - PAUT (Advanced UT, PA, TOFD)

2012 Adesso Valve CV - Dye Penetrant Testing 2 valves / Dordrecht / Netherlands - - CS P22, 6" 21.95 mm
Stub tube A192, Diameter 38.1 mm, thickness 3.5 mmx 320 tube/unit 8" SCH40, CSA106; 6" SCH40,
2012 EGCO Engineering & Service Co Ltd. - EGCO / Amata Unit #1 / Chonburi / Thailand - -
CSA106 ; 5" SCH40, CSA106
CS STB35, 38.1 mm diameter, Butt weld, 3.5 mm thickness, CS STB33, 76.2 mm diameter, Butt weld,
2012 EGCO Engineering & Service CO. Ltd - EGCO / Teijin repair work / Pathumtanee / Thailand - -
3.2 mm thickness, CS SA192, 50.8 mm diameter, 3.5 mm thickness, Clearance 1", Change to Header
2012 Thermo Ex Co. Ltd - Column 21 mm Thickness / Rayong / Thailand - - Column A516 P-1 Grade 70, Thickness 21 mm, BW 60 degree

2012 Chatr Kamchang Laemchabang (CKC) - Flashing Shroud 3201 / 1 / 1 / 004 ESP Project / Rayong / Thailand - - SS304, 10 mm thickness, BW Pipe SS304 2", SCH40, Fillet, pipe to plate

2012 Foster Wheeler Service - Glow 6", 22 mm / Rayong / Thailand - - 6" diameter, 22 mm thickness, Alloy P-22

2012 Foster Wheeler Services - GLOW HRSG Valve 14" / Rayong / Thailand - - Valve pipe alloy-P11, 14" diameter, 33 mm thickness

2012 N.P.S Engineering Co., Ltd - GLOW Pipe / Rayong / Thailand - - 24" Alloy P-22, SCH120, CS 14" SCH80, CS 10" SCH80

2012 Rayong Intania Co., Ltd. - GLOW Tie / In / Rayong / Thailand - - Pipe 16" SCH60, Alloy A335-P11; Pipe CS 8" diameter, SCH40 ; Pipe CS 10" diameter, SCH40
Heat Exchanger, diameter 2 meter, Pipe to pipe with below, 22" diameter, 10 mm thickness, SS321,
2012 CMI Thai Services Co. Ltd - IRPC Benlow Pipe 22" and 18" / Rayong / Thailand - -
Pipe to pipe with below, 18" diameter, 10 mm thickness, SS321
2012 Thai Woo Ree Engineering - ITT Spa Header 6" / Rayong / Thailand - - 6", S347-P11, SCH80, Header, 6", A106, SCH80, Header

2012 Chatr Kamchang Laemchabang (CKC) - Line Bypass LP Flash Column 3201 / 2 / T / 003 / Rayong / Thailand - - SS304 / SS316 2", 3.91 mm thickness

2012 MIG Production Zco. Ltd - MIG 32" CS Pipe` / Rayong / Thailand - - CS 32", 8 mm and 9.5 mm

2012 Momentive Performance Material (Thialand) Limited - Momentive Heat Exchanger E / 205 / Rayong / Thailand - - Expansion joint of heat exchanger shell, SS304, 4 mm thickness.

2012 Rayong Intania Co., Ltd. - Pipe 14" / Rayong / Thailand - - Pipe CS 14" SCH40

2012 Future Development & Construction Co. Ltd - Pipe CS 16" STD / Rayong / Thailand - - CS 16" X 9.5 mm thick, BW, Single V, CS 6" SCH40
3/4" sch80, Alloy P11, Alloy P22, 2", SCH80, SCH40, Alloy P11, Alloy P22, 6", SCH80, SCH40, Alloy P11,
2012 Pilin Project Co. Ltd - Piping / Rayong / Thailand - -
P22
2012 Rayong Intania Co., Ltd. - PTTPE Pipe / Rayong / Thailand - - Pipe 304SS 2" SCH40, 3" SCH40, 4"SCH40

2012 McConnell Indonesia, PT Jurong Port Pte Ltd PWHT / Ship Unloader for Jurong Project / / - - Post Heat Treatment on 3.7m x 3.4m x 130mm thick Ring Section

2012 Chatr Kamchang Laemchabang (CKC) - Repair Benfield Column 1T / 70102 / Rayong / Thailand - - CS 16 mm thickness, BW, plate, CS 12", sch80

2012 N.P.S Engineering Co., Ltd - Repaire Tank Bottom Plate 8mm; IRPC / Rayong / Thailand - - Bottom plate of tank, CS 8 mm thk., BW

2012 Chatr Kamchang Laemchabang (CKC) - Shutdown ESP / Rayong / Thailand - - Pipe 2" sch40, ss304

2012 EGCO Engineering & Service Co. Ltd - Tejin CS 6", 10.97 mm / Pathumtanee / Thailand - - CS 6", 10.97 mm thickness
Vessel nozzle 44" diameter, CS, Fillet, double V ; Pipe Alloy 2", thk. 5 mm ; Pipe Carbon 2", thk. 4 mm ;
2012 TPT Petrochemicals Public Company Limited - TPT Shutdown 2012 / Rayong / Thailand - -
Pipe Carbon 38 mm, thk. 4.5 mm ; Pipe Alloy 4", thk.13 mm ; Pipe Carbon 4", thk 13 mm ; Pipe
2012 Petrobras - PlataformaP / 55 / / South America - - Inspection of 23 nodes

2012 IFC Asia Pacific - RFQ Q399 / Batam / Indonesia - - RT and MT

2012 Siam Mitsui PTA CO., Ltd. - SMPC Hastelloy Thickness / Rayong / Thailand - - Hastelloy 4267, Thickness 35-40 mm, Temp. 150-170 celcius

2012 Union Construction & Supply Co. Ltd - TPX Expansion Phase II / Chonburi / Thailand - - CS/SS Tee joint 3/4" dia.
Vessel shell-Cap, CS 400, 2450 mm diameter, 5 mm thickness, BW, Single V, 30 degree bevel
2012 Know-How Transfer Co., Ltd. - Vessel Shell / Cap / Rayong / Thailand - -
angle.Vessel shell-Cap, SS 304, 2450 mm diameter, 6 mm thickness, BW, Single V, 30 degree bevel
2012 VAP Service (1997) Co. Ltd - TOL Pipe 6" SCH 10S SS304 / Rayong / Thailand - - Piping inspection SS304, 6" SCH10S, 3" SCH40, SS304, 2", SCH40, SS304

2012 Cladtek BI Metal Manufacturing, PT TK Bend Cooperation CT-166-TK Bend/Cladtek/Batam/Indonesia - - UT Lamination Check, UT Thickness, PT Solvent inspection on fitting

2012 McConnell Indonesia, PT McConnell Dowell Vale - Project (WQT) - - RT Inspection as per ASME IX

2011 Ledcor Pipeline Ltd Ledcor Pipeline Ltd TransCanada Pipelines Kearl Lake Extension / Alberta / Canada - - AUT Inspection pipeline inspection

43 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2011 North American Construction Group Spectra Energy Stewart Lake / N4L2 /Canada 36” 43.8km AUT System with different thickness from 9.2mm to 11.0mm

2011 Louisbourg Pipelines TransCanada Pipelines Saturn / Dawson Creek / Canada 36” 23.8km AUT System with different thickness from 11.8mm/12.7mm/15.7mm
UT thickness examination services on various items for All Pro Production Testing at the Calmar truck
2011 - All Pro Production All Pro Production Testing / Calmar, AB / Canada - -
yard
Alstom Power Sundance Unit 6 SH5 Stub Replacements / Sundance Generating Station,
2011 - Alstom Power - - PAUT examinations on the TransAlta 2011 Sundance unit 6 outage
AB / Canada
B&W Syncrude Mildred Lake Stopple Connection Examination / Fort McMurray, AB /
2011 - B&W - - UT examination services/equipment for the examination of the stopple connection project
Canada
2011 - Bruce Power ES FOX / Bruce Power Nuclear Tube Refurbishment / Kincardine, ON / Canada - - Provide Magnetic Particle and Visual Examinations as required for the Bruce

2011 - Capital Power Capital Power Genesee Unit 2 / 2011 / Genesee, AB / Canada - - PAUT of Butt weld examination on approximately 40 boiler tubes.

2011 Cessco Fabrication & Engineering Ltd Cessco Cessco Vessel 5002 / Edmonton, AB / Canada - - NDT on Vessel 5002

2011 - Cessco Cessco Callout work 2011 / Edmonton, AB / Canada - - PAUT Examination

2011 Cessco Fabrication & Engineering Ltd Cessco Fabrication & Engineering Ltd Cessco Job 5010 / / Canada - - Complete NDE on vessel V5010

2011 - Conocco Phillips Surmont Project ConoccoPhillips / Edmonton, AB / Canada - - NDT Inspection as per client specification

2011 - Conocco Phillips Surmont Project ConoccoPhillips / Edmonton, AB / Canada - - NDT Inspection as per client specification
Provide an ECA to Dyna Torque for the Alcoo Duto project (41-00014) in Brazil, API1104 option #1,
2011 - Dyna Torque Numax eca / Alcool duto / Edmonton, AB / Canada - -
Pipe is: 24" x 8.9mm
2011 - EMCEERT EMCEE RT Callout / Sundance Generating Station, AB / Canada - - NDT Inspection as per client specification

2011 - Enbridge Enbridge MT Survey / / Canada - - MT survey on branch connection welds as requested by Enbridge

2011 - Endevaour Endeavour NDT / Fort Mackay, AB / Canada - - Provide phased array examination services to complete 1 30” SCH STD

2011 - Kiewit Kiewit Fab Shop - - NDT Inspection as per client specification

2011 - TransAlta TransAlta Keephills Generating Station / KeepHills, AB / Canada - - To provide phased array examinations on Keephills Unit 2 Outage

2011 Jacobs Canada Limited TransALta TransAlta Sunadance Unit 3 Emergency Leak Repair / Sundance AB / Canada - - NDT Inspection

2011 - TransAlta TransAlta Sundance Unit 6 / KeepHills, AB / Canada - - provide phased array examinations on Sundance Unit 6

2011 - TransAlta TransAlta Sundance Unit1,Unit3, Unit4, Unit 5 / Sundance , AB / Canada - - NDT Inspection

2011 TransAlta Utilities Corp TransAlta Utilities Corp Site Energy / NDT (Christina Lake) / Alberta / Canada - - PAUT Examination

2011 TransAlta Utilities Corp TransAlta Utilities Corp TAU Sundance Callout RT / Nov 2011 / Alberta / Canada - - PAUT Examination

2011 - TransAlta TransAlta Utilities / Wabamun, AB / Canada - - PAUT Inspection on the boiler tube membranes

2011 - - Myshak Crane & Rigging / O.J. Pipeline Acheson / Canada - - NDT Inspection

2011 RAE Engineering and Inspection Ltd. - UT Thickness Survey / Callout / Canada - - Conventional UT thickness survey

2011 Endeavour NDT Endeavour NDT Endeavor Inspections / Fort MacKay Callout Work / Fort McMurray, Alberta / Canada - - PAUT Inspection

2011 Kiewit Energy Canada Corp. Kiewit Energy Canada Corp. Kiewit / Enmax Shepard Power Project / Alberta / Canada - - NDT Inspection

2011 Technip - USA BHP Billiton Petroleum Shenzi Water Injection (SCR) Offshore/ USA 6", 8", 10" - AUT Inspection with different thickness from 18.5, 25.4, 26.2, 29.5 mm according to API 1104 code

2011 Technip - USA Chevron Jack & St. Malo Project Offshore/ USA 10.75" - AUT Inspection with different thickness from 31.8mm and 38.1 mm according to API 1104 code

2011 Technip - USA Enbridge Offshore Facilities, LLC Walker Ridge Gathering System - SCR Offshore/ USA of 8.625", 10.75" - AUT Inspection with different thickness from 21.2mm, 25.4mm according to API 1104 code

2011 Technip - USA Noble Energy Noble Alen Project Offshore / USA 10.75" - AUT pipeline with thickness 17.5mm according to API 1104 code

2011 Technip Enbridge Jack & St Malo / / USA - - AUT Inspection of mainline Production and stack rack
UT Scan of pipeline of diameter of 7.625" and different thickness from 33.4 mm according to API
2011 Technip - USA Anadarko Petroleum Caesar Tonga / Subsea Development (SCR) / / USA 7.625" -
1104 code
2011 Babcock & Wilcox USA Babcock & Wilcox USA Local 502 / / USA - - PAUT Examination

2011 - Dominion Power HEP / Chesterfield / / USA - - PAUT Examination

44 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2011 Exelon Energy - 2011 FAC / USA - - PAUT Examination


UT Scanning long seam piping for LOP in weld develope process and provide on site training to
2011 Bristol Metal - Bristol Metals long seam piping project / Bristol, TN / USA - -
management as to the process Initial scope will include 3 months of on site full time scanning in union
2011 Stress Engineering Services - CWLP / USA - - NDT Inspection

2011 Conoco Phillips Company-WR - Flange Cracking Inspection / USA - - PAUT Inspection on flanges

2011 Naes Power Contractors - Local 500 / USA - - NDT Inspection

2011 Stress Engineering Services - Martin Lake #3 / / USA - - NDT Inspection

2011 aptech - Intertek/Power Group - MEC / Walter Scott Energy Center 4 / Council Bluffs, Iowa / USA - - Perform manual PA inspection of 2 welded laterals

2011 JF Ahern - Piping Project / USA - - PAUT Inspection

2011 Valero Texas City - NDE Support / / USA - - Perform Advanced NDE support on ongoing basis for various projects

2011 Marathon Petroleum Company - Offsite Piping / USA - - NDT Inspection

2011 Valero Texas City - Sphere 438 &439 / USA - - NDT Inspection

2011 Aportland General Electric - Spring Outage / USA - - PAUT Inspection

2011 Babcock & Wilcox USA Babcock & Wilcox USA Local 500 / USA - - PAUT Inspection

2011 ConocoPhillips Pipeline ConocoPhillips Pipeline Inspection Support / USA - - NDT Inspection as per client specification

2011 Stress Engineering Services Stress Engineering Services Monticello #2 / / USA - - NDT Inspection as per client specification

2011 Consórcio AG-Tech Consórcio AG-Tech Impementacão das unidades HDT / U37 / / Salvador 2'' -8''. - PAUT system inspecting pipe of 2'' -8''.

2011 JF Ahern - Piping Spools / USA - - PAUT Inspection

2011 Camargo Correa Camargo Correa Alcool duto / Campinas – Rio / Brazil - 200km 200km ethanol pipeline, 2 Ut Scan for 6 months and 2 PAUT s for 10 months
9.1, 10.8 to
2011 Nacap Epic Energy QSN3 Pipeline Extension / Australia 960km AUT Inspection according to AS2885.2 code on pipeline
12.7mm
AUT system to scan70 Km of pipeline of diameter of 56” and different thickness from 13.9mm
2011 RHM Saudi Aramco Aramco Othmaniya / Saudi Arabia 56” 70km
according to API 1104 code
2011 CAT Saudi Aramco Aramco Pipeline Rehabilitation Phase V Project / Saudi Arabia 46” 67km AUT system with different thickness from 12.7mm according to API 1104 code on pipeline

2011 McConnell Indonesia, PT McConnell Dowell Hay Point Expansion Project /McConnell/Batam/Indonesia - - UT / MT Inspection

2011 Saipem Indonesia, PT ABS Rules FDS2/Saipem/Karimun/Indonesia - - RT inspection on Structural works as per AWS D1.1

2011 McConnell Indonesia, PT Alstom Alstom - Keppel Merilmau Gogen II A & B/McConnell/Batam/Indonesia - - RT/MT/PT on Structural and piping materials as per ASME B31.3 and AWS D1.1 and PMI Inspection

2011 Saipem Indonesia, PT Chevron Gorgon barrow island LNG project/Saipem/Karimun/Indonesia - - MT/PT/RT/PMI Inspection
UT/RT/MT/PT inspection for piping and structural as per ASME B31.3, ASME B31.8, DNV OS-F101,
2011 McDermott Indonesia, PT Chevron Gorgon Upstream - Vetcogray/PTMI/Batam/Indonesia - -
AWS D1.1
UT Lamination Check, UT Thickness, RADIOGRAPHY, RT/MT/PT Solvent, and PT Water Washable
2011 Cladtek BI Metal Manufacturing, PT Chevron CT 100 - Gorgon project/Cladtek/Batam/Indonesia - -
inspection for piping work as per ASTM E 797, ASME V, DNV-OS-F101, ASTM E 709
2011 Citra Tubindo Engineering, PT Wilmax Control System Indonesia 3 unit solar array frame (A038-1,2,3)/CTE/Batam/Indonesia - - DPT inspection for on structural work as per table 6.1 of AWS D1.1-2010

2011 Citra Tubindo Engineering, PT Sandvik Asia PVT LTD Sabah oil & gas terminal (A041)/CTE/Batam/Indonesia - - UT/MT/DPT/RT inspection for on structural work as per ASME SEC VIII DIV 1.2010

2011 Citra Tubindo Engineering, PT Global Process System Teg unit refurbishment package (A035-1, 3, 4, 5 A036-1, 2A, 2B)/CTE/Batam/Indonesia - - UT/MT/DPT/RT inspection for on structural work as per ASME SEC VIII DIV 1.2010

2011 Saipem Indonesia, PT Saudi Aramco Al-Wasit project/Saipem/Karimun/Indonesia - - RT inspection on Structural works as per AWS D1.1

2011 Shamira Dialog Group Berhad EPCC of the new condensate tank T3357/Shamira/Bintulu/Malaysia - - PAUT Inspection on Storage Tanks to API 650

2011 Hanjung G. Steel NCIG - - RT inspection for WQT CSN structural material

2011 Utraco IFC Utraco IFC (Kinabalu) - - PMI Inspection

2011 Utraco IFC Utraco IFC (UJ 11037) - - RT/PT/MT Inspection as per ASME B31.3

2011 Utraco IFC Utraco IFC (UJ 11038) - - RT/PT Inspection as per ASME B31.3

45 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2011 Utraco IFC Utraco IFC (UJ 11040) - - RT/PT Inspection as per ASME B31.3

2011 Utraco IFC Utraco IFC (BIN) - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2011 Utraco IFC Utraco/IFC (SBM) - - UT/RT/MT/PT inspection for structural work as per ASME B31.3
Provision of Hook Up commissioning for Tangga Barat Centralised Platform A Project for
2011 Shamira Dayang Enterprise Sdn Bhd - - PAUT and manual UT Inspection as per client specifications
PCSB Offshore Project
2011 Cladtek BI Metal Manufacturing, PT Gorgon / Chevron CT-124 (upstream project) - - PT/UT clad pipe materials

2011 Grand Kartech N/A Grand Kartech /Jakarta - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2011 Alstom Power Energy System Indonesia, PT Alstom Fabrication Support / Alstom Surabaya - - RT inspection as per client specifications, using X-Ray directional

2011 UT Quality Inc. IFC IFC/China - - RT inspection and Heat Treatment for Elbow as per ASME

2011 Translindo Eka Persada, PT Transalindo Transalindo/Batam - - PAUT and manual UT Inspection as per client specifications

2011 Indrabas PERTAMINA Indrabas /Presure Vessel/Balikpapan - - PAUT and MPI Inspection on Spherical Tanks

2011 Besmindo Besmindo Besmindo Balikpapan - - PAUT , manual UT, and MT Inspection as per client specifications

2011 RHM Saudi Aramco Othmaniya / Saudi 56” 70km 13.9mm to API 1104

2011 CAT Saudi Aramco Pipeline Rehabilitation Phase V Project / Saudi 46” 67km 12.7mm to API 1104 on pipeline

2011 Palaran Indah Lestari, PT PERTAMINA Palaran/Samarinda/Indonesia - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2011 MPS MPS Mega Petro Synergy / WQT / Batam / Indonesia - - UT/RT/MT/PT inspection for structural work as per client requirements

2011 Kaefer Kaefer Kaefer/Singapore - - Positive Material Indentification for raw material prior to production

2011 Weatherford ConocoPhillips 42" Hole opener repair work - - PAUT , manual UT, and MT Inspection as per client specifications

2011 Bayer Thai CO., Ltd Bayer Thai CO., Ltd Bayer pipe 4" / Rayong / Thailand - - Modify phosgene condenser of CS pipe 100 mm dia. 5.6 mm thick.
Replacement and repair piping SS 2"-4" dia., 4.6-6.2 mm thickness and CS pipe 6" and 8" dia., 6.3-6.8
2011 Bayer Thai CO., Ltd Bayer Thai CO., Ltd Bayer Shutdown 2011 / Rayong / Thailand - -
mm thickness
Bayer Thai Co., Ltd / Fabricated new vessel (dia.8210 mm) according to ASME U / STAMP PAUT examination to ASME CC2235 U-Stamp of new construction of Pressure Vessel Butt welds
2011 - Bayer Thai Co., Ltd. - -
by UNIMIT Engineering PCL. in June 2011. / Rayong / Thailand Stainless Steel for thickness 13 mm to 22 mm.
2011 Bayer Thai CO., Ltd Bayer Thai CO., Ltd Bayer shutdown 2011 (additional) / Rayong / Thailand - - Replacement and repaire piping SS 2"dia., 4.6 mm thickness

2011 - BST Elastomers Co., Ltd. BST Elastomers Co., Ltd. / Alloy Shaft inspection / Rayong / Thailand 6" - PAUT examination to Client requirement on Alloy shaft 6" diameter and 165 thickness.
Double A (1991) / Feeding pipe of CS Plate 14 mm thickness in March 2011. / Prachinburi PAUT examination to ASME CC2235-9 and Client specification on Carbon Steel pipe for thickness 14
2011 - Double A (1991) Public Co., Ltd. - -
/ Thailand mm.
2011 EGCO Engineering & Service Co., Ltd EGCO Engineering & Service Co., Ltd EGCO Boiler tube 3.5 mm thickness / Kalasin / Kalasin / Thailand - - Replacement of economizer tube of boiler unit #5 and #6; CS 2" diameter, 3.6 mm thickness
Replacement of hydrogenation tube; CS 1.5" dia. (8.0 mm thick.), 2" dia. (5.5 mm thick.), 4" dia.(11.0
2011 EGCO Engineering & Service Co., Ltd EGCO Engineering & Service Co., Ltd EGCO Valve 4", 2" / Chaiyapoom / Chaiyapoom / Thailand - -
mm thick), 38mm dia.(4.57 mm thick.)
EGCO Engineering & Service Co., Ltd. / Boiler tube replacement of tube OD 38mm PAUT examination to ASME CC2235 of Boiler tube butt welds replacement for Carbon Steel of 38
2011 - EGCO Engineering & Service Co., Ltd. 1.5" -
thickness 4.57 mm in June 2011. / Chaiyaphum / mm diameter and 4.57 mm thickness.
2011 Hitachi Eon Benelux Inspection few hundred 2" tubing at Eon MPP3 / Maasvlakte / The Netherlands - - Inspection few hundred welds T24 material 2" 4mm up to 8mm at the new MPP3 plant.
Glow plant inspection for WELDOLET of pipe CS 10" dia./ 12.7mm thickness connect to PAUT examination to ASME B31.3 welds on Carbon Steel weld let piping butt welds 10" thickness
2011 Rayong Intania Co., Ltd. Glow 10" -
Weldolet 31 mm thickness in August 2011. / Rayong / Thailand 12.70 mm connect to weld let 31 mm thickness.
PAUT examination ASME B31.3, ASME CC2235, ASME Section 8 welds on Carbon Steel, Stainless and
2011 - IRPC Public Co., Ltd. IRPC PCL / Lube Group I Specialty, Turn Around 2011 / Rayong / Thailand 3/4"-24" -
Alloy piping, nozzle and equipment butt welds 3/4"-24" diameter, and Sch.20, 30, 40, 60, 160, XS and
2011 IRPC Public Company Limited IRPC Public Company Limited IRPC / HDPE plant / Rayong / Thailand - - Improve hexane distillation unit of HDU/DCC plant

2011 Know-How Transfer Co., Ltd. Know-How Transfer Co., Ltd. UBE vessel 1310 / R2 / Rayong / Thailand - - New construction pressure vessel of SS shell plate 6 mm thickness

2011 Know-How Transfer Co., Ltd. Know-How Transfer Co., Ltd. Vinythai Tank inspection (below 10 mm) / Rayong / Thailand - - New construction API tank at CS plate 8 mm and 6 mm thickness
Repair and replacement CS pipe 2"-16" dia. (3.91 mm-42 mm thick.) and SS pipe 10" dia. (14.2 mm
2011 N.P.S Engineering Co., Ltd N.P.S Engineering Co., Ltd IRPC pipe / Rayong / Thailand - -
thick.)
Inspection Thermo corner welds at Vattenfal/ NUON Power / Amsterdam / The
2011 Stork Nuon (Vattenfall) - - UT scan approx. 40 corner welds at thermo-probes.
Netherlands
PAUT examination to ASME B31.3 CC181 and Client specification on Boiler Carbon Steel Pipe butt
2011 - National Power Plant 5 Co., Ltd. Pipe header (10" dia, sch120, CS SA335) / Prachinburi / Thailand 8", 10", 12" -
welds for 8", 10", 12" diameter and thickness 18.26 mm, 20.62 mm and 25.4 mm during shutdown.
2011 Plus Industrial Plant Service Co., Ltd. Plus Industrial Plant Service Co., Ltd. IRPC weld 6" and 8" flare / Rayong / Thailand - - Flare pipe CS 6" and 8" diameter

46 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2011 PT. Cladtek PT. Cladtek CT - 121 / Singapore - - NDT Inspection as per client specification
3", 4", 12", 16" PAUT examination to ASME B31.1 welds on Carbon Steel piping butt welds diameter 3", 4", 12", 16"
2011 CMI-THAI SERVICES CO., LTD. PTT GSP Plant CMI / THAI Service / PTT GSP Plant #5 / Rayong / Thailand -
and 18" and 18" and thickness 5.49 mm to 14.3 mm.
PTT Maintenance and Engineering Co., Ltd. & TOC PAUT examination on ASME B31.3 CC181 welds for High Temperature 120°C during weld process
2011 - TOC Glycol Plant shutdown in June 2011 / Rayong / Thailand 3", 24" -
Glycol CO., Ltd and at completion of weld for Carbon Steel Pipe 24 inch diameter and 31 mm thickness and for for
PTT PE Co., LTD. PTT Maintenance and Engineering 8", 10", 16" and PAUT examination to ASME B31.3 CC181 welds on Carbon Steel piping butt welds 8", 10", 16" and
2011 Rayong Intania Co., Ltd. PTT PE plant shutdown in July and August 2011 / Rayong / Thailand -
Co., Ltd. 24" 24" diameter and 6.35mm, to 17.48 mm thickness.
2011 YTC CORPORATION Limted PTT Public Co., Ltd. PTT GSP modified min.flow/FV / 008 / Rayong / Thailand - - Modify min. flow of CS/SS pipe 1"-40"dia. (3.91 mm -12.7 mm thick.)

2011 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. PTT GSP Pipe 44" / Rayong / Thailand - - New construction SS pipe 44" dia. (9.5 mm thick.)

2011 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. PTT GSP / Column / Rayong / Thailand - - Replacement column part of CS plate thickness 12 mm, ID 48000 mm.
Installation warm up CS pipe to ESP unit; CS 4" dia.(6.02mm thick.) and 6" dia.(7.11 mm thick.) and
2011 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. PTT GSP Shutdown 2011 / Rayong / Thailand - -
Installation of add sampling point to ESP unit; CS 20"dia.(20.6 mm thick.) with branch 1" fillet.
2011 Rayong Intania Co., Ltd. PTT Public Co., Ltd. PTT PE piping 8 / 24 inch / Rayong / Thailand - - Repair and replacement of SS pipe 8", 10", 16", 24" diameter (6.35-17.48 mm thickness)
PAUT examination ASME B31.3 and ASME Section 8 welds on Carbon Steel, Stainless and Alloy
2011 Qualitech Engineering and Construction Co., Ltd Qualitech Engineering and Construction Co.Ltd IRPC GHU Revamp Project, Turn Around 2011 / Rayong / Thailand - -
piping butt welds.
2011 PTT Public Co., Ltd. PTT Public Co., Ltd. PTTGSP SS304, 10mm / Rayong / Thailand - - PAUT on pipe rack

2011 Rayong Intania Co., Ltd. PTT Public Co., Ltd. PTT PE piping 8 / 24 inch / Rayong / Thailand - - Repair and replacement of SS pipe 8", 10", 16", 24" diameter (6.35-17.48 mm thickness)

2011 Rayong Intania Co., Ltd. PTT Public Co., Ltd. PTT PE piping 8 / 24 inch / Rayong / Thailand - - Repair and replacement of SS pipe 8", 10", 16", 24" diameter (6.35-17.48 mm thickness)

2011 Rayong Intania Co., Ltd. Rayong Intania Co., Ltd. Improvement Butane Header to Suction line of D70502 / Rayong / Thailand - - Repair CS pipe 1"dia. (4.55 mm thickness), 4" dia. (6.02 mm thickness)
PAUT examination to client requirement on base metal of Stainless steel pipe 3" and 4" diameter and
2011 - Siam Mitsui PTA Co., Ltd. Siam Mitsui PTA / Plant Maintenance in August 2011 / Rayong / Thailand 3" ,4", 10" -
5.48 mm and 3.05mm thickness and CS Pipe 10" square weld with 8.2 mm thickness.
PAUT examination to client requirement on base metal inspection of SS316L with thickness 3.1 mm
2011 - Siam Mitsui PTA Co., Ltd. Siam Mitsuit PTA / Plant Maintenance in September 2011 / Rayong / Thailand 3" and 4" -
to 5.5 mm.
2011 - Siam Mitsui PTA Co., Ltd. Siam Mitsuit PTA / Plant Maintenance in September 2011 / Rayong / Thailand 8” - PAUT examination ASME B31.3 CC 181 on Carbon Steel butt welds 8.18 mm to 18.3 mm thickness.

2011 Siam Mitsui PTA CO., Ltd. Siam Mitsui PTA CO., Ltd. SMPC Pipe 8" SS304L / Rayong / Thailand - - Checking Transfer pipe SS 8" dia. (18.3 mm thick.) in shutdown.

2011 Siam Mitsui PTA CO., Ltd. Siam Mitsui PTA CO., Ltd. SMPC SS316 L pipe under support / Rayong / Thailand - - To determine any defect under pipe support of SS pipe 3" dia. base metal with 5.5mm thickness.

2011 Siam Mitsui PTA CO., Ltd. Siam Mitsui PTA CO., Ltd. SMPC Transfer pipe 8" / Rayong / Thailand - - Checking Transfer pipe SS 8" dia. (18.3 mm thick.) in shutdown.
Inspection of in / service crack on Shaft of Thai Cane Paper plant in May 2011. / PAUT examination to Client specification of in-service cracks on Shaft Carbon Steel for 180 mm
2011 Doweltech (Thailand) Co., Ltd. Thai Cane Paper Co., Ltd. 7" -
Prachinburi / Thailand diameter.
PAUT examination to ASME B31.3 CC181 welds on Carbon Steel piping butt welds 2" diameter and
2011 MEC Contractor Co., Ltd. Thai Oleochemicals Co., Ltd. Thai Oleochemicals Co., Ltd. (TOL) plant shutdown in July 2011 / Rayong / Thailand 2" -
3.91 mm thickness.
Bangchak Petroleum Co. ,Ltd / Refinery plant of Column and Piping inspection at Turn PAUT examination on ASME B31.3 CC181 and Client specification on Carbon and Stainless Steel
2011 - The Bangchak Petroleum Public Co., Ltd. 3/4", 3", 6", 14" -
Around in February and March 2011 / Bangkok / Thailand piping butt welds diameter 3/4", 3", 6", 14" and 3.91 mm to 36 mm thickness during Shutdown. PAUT
To determine any defect under pipe support of SS pipe 3" dia. base metal with 5.5mm thickness. /
2011 Siam Mitsui PTA CO., Ltd. Siam Mitsui PTA CO., Ltd. SMPC tube 10" and SS316 L pipe under support / Rayong / Thailand - -
Repair tube CS 10" diameter with 8.2 mm thickness.
PAUT examination to ASME B31.3 CC181 welds on Carbon Steel piping butt welds 2" diameter and
2011 MEC Contractor Co., Ltd. Thai Oleochemicals Co., Ltd. Thai Oleochemicals Co., Ltd. (TOL) plant shutdown in July 2011 / Rayong / Thailand 2" -
3.91 mm thickness.
Bangchak Petroleum Co., Ltd / Sphere tank of CS (dia.16, 350mm), at suspected weld
2011 - The Bangchak Petroleum Public Co., Ltd. - - PAUT examination on Sphere Tank of Carbon Steel Butt welds and 25 mm thickness.
area in June 2011. / Bangkok / Thailand
PAUT examination to ASME B31.3 CC181 welds on stainless Steel piping butt welds diameter 48" and
2011 Rayong Intania Co., Ltd. TOC Glycol Co. ,Ltd. TOC Glycol Plant shutdown in June 2011 / Rayong / Thailand 48" -
thickness 12.70 mm.
2011 Rayong Intania Co., Ltd. TOC Glycol Co., Ltd. Pipe 48" SS304 / Rayong / Thailand - - Replacement of new oxygen mixing line; SS 48" diameter with 12.70 mm thickness.
Replacement SS pipe 3" dia.and greater with 5.49 mm thickness and greater. / High temp. 120
2011 PTT Maintenance and Enginnering Co., Ltd. TOC Glycol Co., Ltd. PTT ME (TOCGC) / PIPE preheatand PWHT / Rayong / Thailand - -
celsius weld process and at completion weld CS pipe 24" diameter with 31 mm thickness.
2011 YTC Corporation Ltd. YTC Corporation Ltd. Saudi / Manpower / Saudi Arabia - - PAUT Examination

2011 Citra Tubindo Engineering, PT Chaight OiL Field A039 / Techlam Chirag Oil / Kabil Industrial Estate, Batam / Indonesia - - Heat Treatment

2011 Cladtek BI Metal Manufacturing, PT TK Bend CT- 99 Gorgon Upstream Project/TK Bend / Batam / Indonesia - - General NDT

2011 SCG-DOW Group - Dow Lex Project / Maptaphut, Rayong / Thailand - - ASME piping carbon steel 2"dia. 3.91mm thk. and 3" dia. 5.5mm thk.

2011 Hanjung Indonesia, PT Gorgon Gorgon WQT / Tanggerang / Indonesia - - RT Inspection as per client specification
12", 14", 36" &
2011 Valentine Maritime Saudi Aramco Manifa Offshore project for Valentine Maritime / / Saudi Arabia 70km AUT offshore derrick lay barge
42"
Checking 1150 plates with dimension 11 x 4 meter on Wall thickness and grinded spots by qualified
2011 Moody International B.V. - Moody / Intertek Support plate check / Netherlands - -
inspector (our Fons v.d. Boom).

47 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2011 Guna Teguh Abadi, PT PERTAMINA Pertamina Balikpapan Refinery Expansion for Fabrication / Balikpapan / Indonesia - - RT/PT/PAUT Inspection as per ASME

2011 - - Saudi / Training / Saudi Arabia - - PAUT Inspection

2011 Electrabel Netherlands - Support Electrabel / Dampfkesselbau Meerane / Netherlands - - Proof our PAUT system at Hitachi Europe - Meerane.

2011 Gunanusa Utama Fabricators, PT HESS Ujung Pangkah WHP-B Offshore Installation / Offshore Java Sea / Indonesia - - RT/UT SCAN-M Inspection for various thickness from 3.91mm to 38 mm

2011 Thai Rotary Engineering Thai Rotary Engineering PTT Amonia Tank piping B31.3 / Map Ta Phut / Thailand - - New construction CS piping 2"-6"diamter with thickness 3.91 mm-7.11 mm.
UT SCAN M UT SCAN M Inspection on T282B Truck's Rear Wheel Hub / Sangatta,
2011 Liebherr Indonesia Perkasa, PT PT. Liebherr Indonesia Perkasa - - MT/PT/UT for truck gear maintenance project
Kalimantan / Indonesia
2011 TRC Construction Public Co. Ltd. TRC Construction Public Co. Ltd. Mixed Feed Gas / PTT GSP / Map Ta Phut / Thailand - - New construction CS piping 3/4" diameter and greater with thickness 3.91 mm and greater.

2011 TRC Construction Public Co. Ltd. TRC Construction Public Co. Ltd. TRC / Dow Asia project / Map Ta Phut / Thailand - - New construction CS piping 4"-6" diameter with thickness 3.4 mm-7.1 mm

2011 MEC Contractor Co., Ltd MEC Contractor Co., Ltd Pipe 2 inch / Rayong / Thailand - - Modify CS piping 2" diameter with 3.91 mm thickness.

2011 Nuon Energy, a Vattenfall company Nuon Energy, a Vattenfall company NUON examination welds Thermo holders / Amsterdam / The Netherlands - - PAUT check Thermo wells
New construction and shutdown of CS and Chromium piping 2"-32" diameter with thickness 3.91 mm -
2011 Esso (Thailand) Public Company Limited Esso (Thailand) Public Co. Ltd Sriracha Clean Fuels Project / Sriracha / Thailand - -
25 mm.
PAUT examination to ASME B31 CC181 on several hundred new Carbon and Stainless Steel pipe
2010 - KBR KBR / Edmonton, AB / Canada - -
spiral butt welds of different diameter and thickness for pipe mill weld quality verification.
2010 - Bruce Power ES Fox Ltd. Bruce PowerNuclear Station / Kincardine, ON / Canada - - Rigging Summer Works 2009
PAUT examinations to ASME VIII CC 2235-9 on heavy wall pressure vessel circ & long seam butt
2010 - Cessco CESSCO / Edmonton, AB / Canada - -
welds.
2010 - Jacobs Jacobs / Shell Albian Site, AB / Canada - - PAUT examinations on ASME B31.3 process piping butt welds in accordance with code case 181-1

2010 - Plain Midstream Plains Midstream / Regina, SK / Canada - - To provide phased array examination services on internal piping ERW long seams.
AUT system to scan 77 Km of pipeline of diameter of 36" and different thickness from 12.7mm,
2010 TransCanada TransCanada Groundbirch Pipeline project / Canada 36” 77km
15.7mm, 22.2mm according to CSAZ662 code
2010 - Abraxus Fabrication Jacobs Abraxus Fabrication Shop / Edmonton, AB / Canada - - Piping spool welds, B31.1

2010 - Abraxus Group Abraxus Group / Edmonton, AB / Canada - - PAUT examinations on ASME B31.1 power piping butt welds.

2010 - Abraxus Group Abraxus Group / Edmonton, AB / Canada - - PAUT examinations on ASME B31.1 high energy piping for Sask power Canada Ltd.

2010 - Allerion Allerion Oilfield Services / Fort McMurray, AB / Canada - - NDE services for Allerion Oilfield Services for the Fort McMurray tank inspection project

2010 - Allerion Oilfield Services Allerion Oilfield Services / Drayton Valley Tank Inspection / Drayton Valley, AB / Canada - - Callout NDE services for Allerion Oilfield Services.

2010 - ATCO ATCO Battle River June 2010 / Battle River, AB / Canada - - PAUT examinations on the June 2010 Battle River boiler outage

2010 - ATCO ATCO Battle River Leak / Battle River, AB / Canada - - PAUT examinations on for an emergency outage due to economizer tube leak
PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds. PAUT
2010 - ATCO ATCO Boiler Outage / Battle River, SK / Canada - -
examinations on ASME B31.1 power piping butt welds.
To provide visual inspectors as required for Babcock & Wilcox Canada on the Celgar Pulp & Paper
2010 - B&W B&W / Castlegar Boiler Outage / Castlegar, BC / Canada - -
boiler maintenance outage
NDE & VT/QC services as required for Babcock & Wilcox Canada on the Sync rude May 2010 power
2010 Babcock & Wilcox B&W B&W Syncurde May 2010 Power Boiler Outage / Fort McMurray, Alberta / Canada - -
boiler maintenance outage
To provide QC services as required for Babcock & Wilcox Canada on the Syncrude Mildred Lake 50 lb
2010 Babcock & Wilcox Babcock & Wilcox B&W Syncrude 50lb Boiler Repairs / Fort McMurray, AB / Canada - -
Boiler Repairs
2010 - Aluma Aluma / Edmonton, AB / Canada - - To provide MT services

2010 - Babcock & Wilcox Babcock & Wilcox Canada Syncrude CO1 / Fort McMurray, AB / Canada - - one each week for the month of October.
PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds. PAUT
2010 - Babcock & Wilcox Babcocks & Wilcox / Syncrude Site, / Canada - -
examinations on ASME B31.1 power piping butt welds. PAUT examinations on ASME B31.3 process
2010 - AECON AECON / / Canada - - NDE services for AECON
To provide UT, MT & PT services as required for CWWHT on the Alliance Pipeline simulation program
2010 - CanadaWide Welding & hot Tapping CanadaWide Welding & Hot Tapping / Edmonton, AB / Canada - -
taking place at the ZRP fabrication facility
2010 - Capital Power Capital Power Boiler Outage / Gennesse Power Station, AB / Canada - - PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds.

2010 - Capital Power Capital Power / Genesee / Genesee, AB / Canada - - PAUT services required on Genesee Unit 3 2010 outage

2010 - Capital Power Capital Power Genesee Unit 2 / Genesee, AB / Canada - - NDT Inspection as per client specification

48 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2010 - Cenovus Cenovus Module Yard/Nisku Mod Yard, AB/Canada - - NDT Inspection as per client specification
To provide thickness readings in a grid pattern on Booster Pumps and Manifolds on the BD6 Feed
2010 - Enbridge Enbridge Booster pumps and Manifold Inspection / Fort McMurray, AB / Canada - -
water Heater 6 Replacement
2010 - Ganotec Ganotec Firebag tank project / Suncor Firebag Project Site / Canada - - NDE services for API 650 Clarifier Tank Project at Suncor Fire bag

2010 - Graham Graham / BD6 Feedwater Heater 6 Replacement / Regina, SK / Canada - - PAUT examinations on the BD6 Feed water Heater 6 Replacement
PAUT examinations on ASME B31.1 power piping butt welds. High temperature (400°F) in process
2010 - Graham Graham Industrial Sask Power Boundary Dam Outage / Estevan, SK / Canada - -
weld examinations.
2010 - Jacobs Jacobs / Edmonton, AB / Canada - - Provide NDE services for fabrication facilities in Edmonton region.
PAUT examination to ASME B31 Case 181-1 and Suncor specific phased specification on new
2010 - Ledcor Ledcor Projects / Suncor Firebag Site / Canada - -
construction piping butt welds for thicknesses 5.49 thru 44.45 mm and diameters from 3 thru 42 inch.
PAUT examinations to ASME VIII CC 2235-9 on heavy wall pressure vessel circ & long seam butt
2010 - PCL Industrial PCL CCRL Refinery / Regina, SK / Canada - -
welds.
2010 - Ledcor Ledcor Firebag Stg 3/Fort MacMurray, AB / Canada - - NDT Inspection for the Suncor Fire bag Stage 3: Steel and Rigging

2010 - PCL Industrial PCL Industrial COOP Regina Refinery / Regina, SK / Canada - - PAUT validation & qualification for examinations on ASME VIII CC 2235-9 vessel.

2010 - Plains Midstream Plains Midstream Regina pipe mill project / Alberta / Canada - - NDE services as required in western Canada for Plains Midstream Canada.

2010 - Revcon Revcon StatOil SagD Facility / Conklin, AB / Canada - - PAUT examinations on ASME B31.3 & CSA Z662 carbon steel piping butt welds.

2010 - Rae Engineering Rae Engineering MEG Project / / Canada - - NDT Inspection as per client specification

2010 - Rodwel Construction RobWel Construction / Meadow Lake, Sask / Canada - - NDT Inspection as per client specification

2010 - SaskPower Sask Power / Estevan, SK / Canada - - PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds.

2010 - SaskPower Sask Power BD4 Boiler Outage / Estevan, SK / Canada - - PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds.

2010 - SaskPower SaskPower / Regina, SK / Canada - - PAUT examinations to ASME Section 1 on carbon steel tubing welds.

2010 - SaskPower SaskPower Boundary Dam Unit 4 / Boundary Dam, SK / Canada - - To provide PAUT services for the Boundary Dam unit 4 maintenance outage

2010 - Shell Shell Scotford / Shell Scotford / Canada - - NDE services for Shell Scot ford Facility
PAUT thickness survey on in-service amine re-boilers. Inspection performed at high temperature for
2010 - Shell Shell Scotford Refinery / Fort Saskatchewan, AB / Canada - -
corrosion investigation.
2010 - Spectra Energy Spectra Energy / Regina, SK / Canada - - PAUT Assessment on excavated ERW seam

2010 - Spectra Energy Spectra Energy / Regina, SK / Canada - - PAUT examinations on ASME B31.3 ERW seam on 6” diameter line.

2010 - Stoke Energy Stoke Energy / Canada - - Callout NDE services for Stoke Energy

2010 - Suncor Suncor Montreal Plant Vessel Nozzle Examination / Montreal, QC / Canada - - examine nozzle N2 on high pressure separator F-4302 with PAUT at Suncor’s plant in Montreal, QC

2010 - Suncor Suncor Energy/Firebag /Fort McMurray,AB/Canada - - NDT Inspection as per client specification

2010 - Suncor Suncor Energy Lockerbie & Hole 30" piping weld a / Firebag, AB / Canada - - PAUT fit for service examinations on furnace tube butt welds to API.
PAUT weld examination on Plant 91 steam generator check valves, on 2 - 8" Sch. xxs butt welds, on
2010 - Suncor Suncor Firebag Mine Site / Fort McMurray, Alberta / Canada - -
all four Steam Gens, each steam gen will be shut down,
2010 - Suncor Suncor Energy / Firebag, AB / Canada 30" 95km UTScan of Pipeline

2010 - Team TEAM / Cambridge Bay, Nunavut / Canada - - PAUT examinations on ASME B31.3 process piping butt welds.

2010 - TransAlta TAU Sundance Boiler Outage / Wabamun, AB / Canada - - PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds.

2010 - TransAlta TAU Sundance Unit 6 / Sundance Generating Station, AB / Canada - - PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds.
PAUT examinations to ASME Section 1 on for chrome alloy, carbon steel and stainless steel tubing
2010 - TransAlta TransAlta Sundance Power Station / Wabamun, AB / Canada - -
welds for quality control.
2010 - TransAlta Transalta Utilites / Sundance Generating Station, AB / Canada - - PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing butt welds.

2010 ES Fox ES Fox Bruce Power Nuclear Facility / Validation / Canada - - PAUT Validation

2010 Team Industrial Inc. Team Industrial Inc. Mosher Engineering / Nunavut Project / Nunavut / Canada - - PAUT Examinations

2010 Worley Parsons Worley Parsons Worley Parsons Audit / Canada - - New Construction of PAUT

49 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2010 Shell Canada Limited Shell Canada Ltd. Baseline Inspection for Shell / Canada - - PAUT

2010 Breton NDE Breton NDE Breton NDE Support / / Canada - - NDT Inspection as per client specification

2010 Technip USA HESS Shenzi Water Injection Offshore/ USA - - AUT inspection
AUT system to scan 205 Welds of pipeline of diameter of 6.625" and thickness 15.90 mm according
2010 Serimax North America Anadarko Petroleum Nansen Subsea Tie Back (with Offshore Tie Ins) / USA 6.625” 205 Welds
to API 1104 code
AUT system to scan different thickness from 8.2, 8.5, 9.8, 10.2, 12.2, 15.3 mm according to API 1104
2010 SICIM TransCanada Guadalajara Pipeline Project / Mexico 24, 30” 300km
code on pipeline
2010 Serimax North America Anadarko Petroleum Caesar Tonga – Subsea Development (with Offshore Tie Ins) / USA 7.680”, 12.130 “ 7500 Welds AUT system to scan different thickness from 15.24, 30.80, 32.51 mm according to API 1104 code

2010 Serimax North America Marathon Oil Company Ozona Feed (with Offshore Tie Ins) / USA 6.625”, 10.75” 1500 Welds AUT system to scan different thickness from 11.91, 23.50 mm according to API 1104 code

2010 Technip Technip Jubilee Deepwater Development-Offshore Tie Ins Ghana / USA 10.75”, 12.75” 40 Welds AUT system to scan different thickness from 15.9, 20.6, 23.6 mm according to API 1104 code

2010 ConocoPhillips Company-WR ConocoPhillips Company-WR RAU Heater / USA - - NDT Inspection as per client specification

2010 ConocoPhillips Company-WR ConocoPhillips Company-WR Spring 2010 T/A / Roxana, IL / USA - - PAUT Examinations

2010 Wachs Subsea LLC. Wachs Subsea LLC. Offshore Baskets / USA - - NDT Inspection as per client specification

2010 BASF Freeport BASF Freeport PSA Vessel / / USA - - NDT Inspection as per client specification

2010 BASF Freeport BASF Freeport Salt Cooler / / USA - - PAUT Examinations

2010 Dow Chemical Dow Chemical Corrosion Screening / / USA - - PAUT Examinations

2010 ConocoPhillips Pipeline ConocoPhillips Pipeline T / 1501 / St.louis / USA - - NDT Inspection as per client specification

2010 Production Services Network U.S. Inc Production Services Network U.S. Inc Martin Lake PEC / / USA - - Auditing TKY joints by MUT.

2010 RBG Trinidad RBG Trinidad BGTT Project / Dolphin Island, Beachfield, Hibiscus /USA - - NDT Inspection as per client specification

2010 ConocoPhillips Trainer ConocoPhillips Trainer GUL Support / Trainer, PA / USA - - NDT Inspection as per client specification

2010 Marathon Petroleum Company Marathon Petroleum Co. Piping Corrosion Assesment / USA - - NDT Inspection as per client specification

2010 ConocoPhillips Trainer ConocoPhillips Trainer Outage Support / UT SCAN M / Trainer, PA / USA - - NDT Inspection as per client specification

2010 Dominion Transmission Inc. Dominion Transmission Inc. Chesterfield Support / UT SCAN M / UT SCAN M / TOFD / Chesterfield / USA - - PAUT

2010 McDermott Indonesia, PT Chevron Gorgon pars/PTMI/Batam/Indonesia - - UT/MT/PT inspection for structural work as per AWS D1.1 and API RP-2X

2010 Hanjung Indonesia, PT Chevron Gorgon Barrow Island LNG Project/Hanjung/Lampung/Indonesia ø10" ~ ø66" - RT and UT inspection on Structural works as per AWS D1.1 and API RP-2X
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT Chevron CT-77/Cladtek/Batam/Indonesia - -
per ASME B31.3
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT Chevron CT-92 Gorgon Project/Cladtek/Batam/Indonesia - -
per ASTM E 797, ASME V
2010 Petrochina Petrochina Maintenance/Petrochina/Jambi/Indonesia - - RT, UT thickness, UT flow, MT, PT
PAUT & AUT system to scan different thickness from 11,9mm,14,7mm,15,9mm according to API
2010 GDK Petrobras PetroBras UGTS tunel /Caraguatatuba/ Brazil 20” 5km
1104 Code.
2010 Hanjung Indonesia, PT PERTAMINA Hanjung/Lampung - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 Gunanusa Utama Fabricators, PT HESS Hess_Offshore /Gresik - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 Rekayasa Industri, PT PERTAMINA Lampung - - PAUT and MPI Inspection on Spherical Tanks

2010 Rekayasa Industri, PT PERTAMINA Lampung - - RT and PT Inspection on Piping works

2010 Liebherr Indonesia Perkasa, PT Liebherr Balikpapan - - PAUT and MT Inspection on Crankshafts

2010 Sertco Quality PetroChina PetroChina – Jambi - - Maintenance Contract for all forms of NDT on trunk lines, Bridge and Wharf Piles
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT Cladtek CT 106 / Cladtek / Batam - -
per ASME B31.3
2010 Cladtek BI Metal Manufacturing, PT Gorgon CT-100 (upstream project) - - UT/MT/PT inspection as per client specifications

2010 Hyundai Saudi Aramco Karan Gas Facilities Tien-in (Hyundai)/Saudi - - Supply of PAUT and PCN UT Operators

50 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2010 Pertamina PERTAMINA Returbing Furnance F-1-01A & B/Balikpapan/Indonesia - - PAUT , manual UT, and MT Inspection as per client specifications

2010 Tomoe N/A Tomoe Batam/PMI/TanjungUncang/Batam - - PMI Inspection as per client specifications
Provision of Hook-up &Comissioning for Resak Host Tie-in for Tangga Barat
2010 Dayang Enterprise Sdn.Bhd N/A - - PAUT examination to ASME B31.3
Project/Malaysia
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT N/A Harweell Project - -
per ASME B31.3
2010 Global Process Systems, PT N/A Prosafe Project - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 Global Process Systems, PT N/A Beta Project - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 BBS BBS BBS Project /Bekasi/Indonesia - - PAUT and MPI Inspection on Spherical Tanks

2010 N/A SSB SSB/Jakarta/Indonesia - - PAUT and MPI Inspection on Spherical Tanks

2010 Profab Indonesia, PT (NOV) Profab Various Projects - - PAUT , manual UT, and PT Fluorescent Inspection as per client specifications

2010 PRG Various Clients PKU(PRG) - - UT/RT/MT/PT inspection for structural work as per client requirements

2010 Global Process Systems, PT N/A GPS(Murphy) - - UT/RT/MT/PT inspection for structural work as per client requirements

2010 Global Process Systems, PT N/A GPS (multiple inhouse projects) - - UT/RT/MT/PT inspection for structural work as per client requirements

2010 Global Process Systems, PT RAPP RAPP (RB 5 Project) - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 Chuck Engineering, PT Chuck Engineering, PT Chuck Eng /Indonesia - - PAUT and MPI Inspection various items as per client requirements

2010 BBS BBS BBS Project/Bekasi - - PAUT and MPI Inspection on Spherical Tanks
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT Cladtek Package 4 (coker unit) for Jubail Export Refinery Project (CT-103) - -
per ASME B31.3
2010 Barata Indonesia, PT Talisman JOB Jambi Merang / Jambi - - PAUT and MPI Inspection on Spherical Tanks

2010 Sangatta Sangatta Sangatta/Kalimantan/Indonesia - - PAUT and MPI Inspection various items as per client requirements

2010 Bakrie Construction, PT HESS Cilegon Oil Tanking - - PAUT and MPI Inspection on Spherical Tanks

2010 Mandala Prima Mandiri, PT PERTAMINA Mandala/Lampung/Indonesia - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 Gunanusa Utama Fabricators, PT Lloyd Register INA Surabaya - - PAUT and MPI Inspection on Structural works

2010 UTQuality Inc. N/A Ambatovy Project/Madagascar Facilities - - PAUT UT examination to API 650, Appendix U on storage tank circ& long seam butt welds.

2010 Gunanusa Utama Fabricators, PT ONGC WHRU / Chilegon - - Positive Material Identification for piping as per client requirements

2010 McConnell Indonesia, PT Makira Makira / McDow / Batam, Indonesia - - UT/MT/PT inspection for structural work as per AWS D1.1

2010 Kaefer McDermott Indonesia Kaefer / Batam - - PMI inspection on Heat Treated coating material

2010 McConnell Indonesia, PT Coniambo Coniambo / McDow / Batam, Indonesia - - UT/MT/PT inspection for structural work as per AWS D1.1

2010 CUDD Energy CUDD Energy CUDD Energy / Batam, Indonesia - - Surface Examination using UT/MT/PT methods on Jack Assembly units to AWS D1.1

2010 Modec Modec Modec / Angola - - Conducting Visual Inspection and verification as per client specification
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT Inox CT-92 Inox / Cladtek / Batam - -
per ASME B31.3
2010 McConnell Indonesia, PT FAST JV RGP-6 – McDow (JN8345) / Batam, Indonesia - - UT/MT/PT inspection for structural work as per AWS D1.1
UT Lamination Check, UT Thickness, PT Solvent, PT Water Washable, and RT inspection for piping
2010 Cladtek BI Metal Manufacturing, PT -tba- CT-82 / Cladtek / Batam - -
work as per ASME B31.3
2010 Utraco Islip Flow Control Inc. Sabah Sarawak Gas Pipeline / Utraco / Batam, Indonesia - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2010 Steel Pipe Industry Indonesia,PT (SPINDO) McConnell Dowell RGP-6 for Port Hedland (JN8344) - - 3rd party inspection on piling tubular using MT & UT as per AS 1554.1 (NATA) requirements
General NDT examination on piping and structural according to Australian Standard, as per AS 1554.1
2010 McConnell Indonesia, PT BHP Billiton RGP-5 – Macdow /Batam - -
NATA requirements
2010 Cladtek BI Metal Manufacturing, PT Sadra CT-62 Reshadat Renovation And Development - - NDT services (Manual UT, Dye Penetrant, and PT Water Washable)
UT SCAN-M examination to ASME B31 CC181, CC2235-9, RT/UT/MT/PT Inspection (onshore &
2010 Gunanusa Utama Fabricators, PT HESS HESS Offshore – Merak - -
offshore) for various thickness from 3.91 to 38 mm

51 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2010 Cladtek BI Metal Manufacturing, PT Vetcogray Pte. Ltd. CT-84 GE Oil & Gas Drilling and Prod. System - - NDT inspection using Radiography method

2010 Cladtek BI Metal Manufacturing, PT Chevron Australia CT-68 Wheatstone Upstream - - NDT services (Manual UT, Magnetic particle, and Radiography)

2010 Cladtek BI Metal Manufacturing, PT Tenaris CT-65 Tenaris Heavy Wall Test Program - - NDT services (Manual UT, PT Water Washable, and Radiography)

2010 Cladtek BI Metal Manufacturing, PT Tenaris CT-64 TenarisPetrobras - - NDT services (Manual UT, PT Water Washable, Magnetic particle, and Radiography)

2010 Cladtek BI Metal Manufacturing, PT PTMI CT-79 Galperti Engineering - - NDT service using Dye Penetrant method

2010 Cladtek BI Metal Manufacturing, PT YeowHwa CT-75 YeowHwa - - NDT services (Manual UT and PT Water Washable)

2010 Utraco IFC Inhouse Strainer Inspections - - RT, MT and PT on strainers


PAUT and UT corrosion examination to ASME Sec. V, Art. V on Boiler Tubes / Waterwalls /
2010 Thiess Indonesia, PT PT. Thiess Indonesia PT. Thiess Indonesia / Tabang, Kalimantan 2” -
Economisers / Superheaters WT 2, 3, 3.5, 4, 5.5mm
General NDT examination on piping with various methods, including PAUT , manual UT, MT, PT,
2010 Bakrie Construction, PT HESS WHP-B Stage 2 Mods Offshore - -
radiography, Hardness Testing, and Heat Treatment
2010 Wolsong1 Wolsong1 Nuclear Power Plant maintenance project - - PAUT examination on Feeder Welds

2010 Cladtek BI Metal Manufacturing, PT DNV CT-70 DNV JIP Phase 3 - - NDT services (Manual UT and Radiography)

2010 Cladtek BI Metal Manufacturing, PT Technip CT-66 Reel Lay Bend Test - - Inspection on Piping using RT & UT

2010 Cladtek BI Metal Manufacturing, PT Profab CT-69 JSL - - Inspection on Piping using DPT Water Washable

2010 Cladtek BI Metal Manufacturing, PT Inpex Browse Ltd. CT-63 IchThys Gas Field Development - - NDT services (Manual UT, Dye Penetrant, and Radiography)

2010 Global Process Systems, PT Halliburton Batam / Indonesia - - Inspection on Piping & Structural using RT & MT
12.75”, 16”, 36”, AUT system to scan different thickness from12.7, 14.3, 25.4, 31.8 mm according to API 1104 code on
2010 Valentine Maritime Saudi Aramco Manifa Offshore Crude and Water Injection Pipelines / Saudi 69km
42” pipeline
2010 Heat Exchangers Indonesia, PT HEI Batam / Indonesia - - PAUT examination on piping

2010 Heat Exchangers Indonesia, PT HEI Batam / Indonesia - - PAUT examination on piping

2010 BBS PERTAMINA BBS Project, PrabuMulih - - PAUT examination on piping to CC181

2010 SSB SSB Pulo Gadung, Jakarta / Indonesia - - PAUT examination on vessel

2010 WWE WWE TanjungUncang / Indonesia - - Inspection on Structural using UT & MT

2010 BKI BKI Medan / Indonesia - - Radiography Testing for Pipeline


PAUT examination on CANDU Nuclear reactor tube refurbishments. Examination performed to ASME
2010 - AECL AECL – Korea / Wolsong / South Korea - -
Nuclear CC N659-2 on tubing butt welds. Carbon Steel butt welds for thicknesses 0.204 thru 0.323
2010 - Bayer Thai Co., Ltd. Bayer Thai Co., Ltd. / Column inspection in December 2010 / Rayong / Thailand - - PAUT examination of Stainless Steel Column for in-service defects.
Lloyds Validation Eon Power / Maasvlakte Power Plant No. 3 MPP3 / Maasvlakte /
2010 Hitachi Eon Benelux - - Validation project for Eon Power at T24- material boiler tubes 2" from 4 up to 8mm WT.
The Netherlands
2010 TUV Eon Ruhrgas Validation AUT system by TUV Germany / Epe / Germany - - Validation for our AUT system.
UT Lamination Check, UT Thickness, PT Solvent, and PT Water Washable inspection for piping work as
2010 Cladtek BI Metal Manufacturing, PT Inox CT 92 Inox / Batam / Indonesia - -
per ASME B31.3
PAUT system to scan 1Km of pipeline of diameter of 20'' and different thickness from 11,9mm
2010 Azevedo & Travassos Petrobras PetroBras Caraguatatuba / Caraguatatuba / Brazil - -
according to Code case ASME B31.3
PAUT & AUT system to scan different thickness from 11,9mm,14,7mm,15,9mm according to API
2010 GDK Petrobras PetroBras Caraguatatuba / Taubate / Caraguatatuba / Brazil 20” 40 tie in welds
1104 Code.
PAUT system to scan different thickness from 7,9mm, 9,3mm, 11, & 13mm according to API 1104
2010 Carioca Petrobras PetroBras Caxias / Caxias / Brazil 8'',10'',12'', & 16'' 21km
code
PAUT system to scan different thickness from 3.9mm,4.7mm,5.5mm,7.8mm according to Code case
2010 Techint Petrobras PetroBras Cubatao / Cubatao / Brazil 2'',3'',4'',6'',8'' 752 welds
B31.1
PAUT system to scan different thickness from 3.9mm,4.7mm,5.5mm, & 7.8mm according to Code
2010 Toyo Petrobras PetroBras Sao Jose Dos Campos / Sao Jose dos Campos / Brazil 2'',3'',4'', & 6'' 800 welds
case B31.1 code
Rayong Purifier plant / Above Ground Storage Tank inspection at suspect weld of shell PAUT examination of Above Ground Storage Tank for detection of possible defects arising from Tank
2010 - Rayong Purifier Public Co., Ltd. - -
plate 6 mm thickness in Nov.2010 / Rayong / Thailand Shell damage.
PAUT examinations to EN norms for quality control. Examinations on chrome alloy and carbon steel
2010 - RWE RWE/Essent Clauscentrale Claus Powerstation / / The Netherlands - -
header and firewall tubing welds.
2010 - Shell Shell DMW Development - - Development of Phased Array examination procedure for in-service dissimilar metal weld.

2010 - Siam Mitsui PTA Co., Ltd. Plant Maintenance in November 2010. / Rayong / Thailand - - PAUT inspection of in-service cracking for 8" Sch. 120 piping welds.

52 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2010 - Technit Techint Chilean Pipeline Construction / / Chile - - PAUT examinations on the Minera Esperanza pipeline project in accordance to API 1104.
Thai Cane Paper plant shutdown in Nov. 2010. Inspection for CS Pipe 6" dia, 14.3 mm
2010 - Thai Cane Paper Public Co., Ltd. - - PAUT examination of B31.1 and B31.3 piping welds during Shutdown.
thickness. / Prachinburi / Thailand
Thai Lube New TDAE Expansion Project in October, November and December 2010. / PAUT examination to ASME B31 Case 181-1 and Client specific requirements on new construction
2010 Boontham Intergroup Engineering & Construction Co., Ltd. Thai Lube Base Co., Ltd. - -
Chonburi / Thailand Carbon Steel piping butt welds for thicknesses 3.91 and greater and diameters from 3/4" and greater.
Vogt Power International Inc. (SAFI / LANGLEYGULCH 17445) in Sept., Oct, Nov 2010 / PAUT examination of weld per ASME Section 1 Case 2235-9, B31.1, & B31.3 B31 Case 181-1 of CS
2010 Visavakit Patana Corp., Ltd. Vogt Power International Inc. - -
Chonburi / Thailand pipe butt weld 5", 6", 8", 10", 14", 16", 18", 20" diameter and 12.7 mm to 40.49 mm thickness.
Approx. 27 different tubes/configuration needs to be validated for the new to build Power plant.
2010 E.on Power Plant Projects - E.on Validation MPP3 Plant / Maasvlakte Rotterdam / Netherlands - -
Before half October Eon wants to validate approx. 5 different pipes including Procedure and Lloyds
2010 - Technit Techint / Copiapo Mine Chile / Chile - - PAUT on rescue tube butt welds on 24” pipe.

2010 Eon Ruhrgas Eon Ruhrgas Approval / / Germany - - Approval Eon Ruhrgas generally for future pipeline jobs.

2010 SCG Chemicals (REPCO) SCG Chemicals (REPCO) SCG Chemicals / Call in 27 Jan 2010 / Map Ta Phut / Thailand - - New construction of CS pipe 18" diameter with 9.5 mm thickness
Turkiye Petrolleri A.O. (TPAO) / Turkish Petroleum Turkiye Petrolleri A.O. (TPAO) / Turkish Petroleum
2010 TPAO 4 Legged Jacket Akcokoca / / Romania - - Auditing TKY joints by MUT.
Corporation Corporation
2010 CTCI (Thailand) CTCI (Thailand) CTCI / HMC PDH Project / Map Ta Phut / Thailand - - New construction CS piping 12" diameter, thickness 9.51 mm.

2010 Thai Rotary Engineering Thai Rotary Engineering PTT Amonia Tank / Map Ta Phut / Thailand - - New construction Ammonia tank API620 CS with thickness 15 mm to 36 mm.

2010 PTT Public Co., Ltd. PTT Public Co., Ltd. YTC @ PTT Gas Sep. / Thailand - - Shutdown of PTT GSP plant for CS pipe 1", 2" and 24" diameter with 3.91 mm-18 mm thickness.

2010 Thermatest, PT PT. Thermatest Provision of UT SCAN M NDT Services & Inspection of Tubes / Indonesia - - PWHT on piping materials
High temperature at 150 degree celsius during weld passes and at completion of weld during
2010 Thai Oil Public Company Limited Thai Oil Public Company Limited Thai Oil SD May 2010 / Sriracha / Thailand - -
shutdown.
LPG Spherical Tanks (2 off) for Rembangunan Terminal LPG Pressurizes Depot Panjang
2010 Winteco Indonesia, PT PT. Winteco Indonesia - - PAUT /MT Inspection on storage tank
Lampung Project / Cilegon Banten / Indonesia
2010 Visavakit Patana Corp., Ltd. Visavakit Patana Corp., Ltd. Vogt Power / VIPCO 5 / Thai Baht / Thailand - - Auditing TKY joints by MUT.

2010 Qualitech Engineering & Construction Co., Ltd. Qualitech Engineering & Construction Co., Ltd. Thai Lube / Sriracha / Thailand - - New construction CS piping 3/4" diameter and greater with thickness 3.91 mm and greater.
Checking Transfer pipe SS 8" dia. (18.3 mm thick.) / to determine any defect under pipe support of SS
2010 Siam Mitsui PTA Co., Ltd. Siam Mitsui PTA Co., Ltd. Plant maintenance / / Thailand - -
pipe 3" dia. Base metel with 5.5 mm thickness in shutdown.
2010 TRC Construction Public Company Limited TRC Construction Public Company Limited PTT Gas Sep. Plant Liquid Thermal Oxidizer Unit / Map Ta Phut / Thailand - - New construction CS piping 3/4" diameter and greater with thickness 3.91 mm and greater.

2010 TRC Construction Public Company Limited TRC Construction Public Co., Ltd. Modification Regen Gas Pipeline From GSP#3 to GSP#5 / Thai Baht / Thailand - - New construction CS piping 3/4" diameter and greater with thickness 3.91 mm and greater.

2010 Qualitech Engineering & Construction Co., Ltd. Qualitech Engineering & Construction Co., Ltd. New TDAE Unit Project / / Thailand - - PAUT /MT on storage tank
PAUT examination on CANDU Nuclear reactor tube refurbishments. Examination performed to ASME
2009 - AECL AECL New Brunswick Power / Point Lepreau, NB / Canada - -
Nuclear CC N659-2 on tubing butt welds. Carbon Steel butt welds for thicknesses 0.204 thru 0.323
PAUT examinations to ASME Section 1 on for chrome alloy, carbon steel and stainless steel tubing
2009 - Alstom Power Alstom Power / Edmonton, AB / Canada - -
welds for quality control.
Alstom Power TransAlta Sundance Power Station Unit #2 Outage / Wabamun, AB / PAUT examinations to ASME Section 1 on for chrome alloy, carbon steel and stainless steel tubing
2009 - Alstom Power - -
Canada welds for quality control.
PAUT examination to ASME I for weld quality control. Chrome Alloy and Carbon Steel tubing welds
2009 - ATCO ATCO Power Battle River Units 3&4 / Forestburg, AB / Canada - -
for thicknesses 0.150 thru 0.340 inches and diameters from 1.5 thru 2.5 inch.
PAUT examinations to ASME Section 1 on for chrome alloy, carbon steel and stainless steel tubing
2009 - Capital Power Capitol Power GeneseeGenerating Station / Genesee, AB / Canada - -
welds for quality control.
2009 - Deltak Industries Deltak Industries / Suncor, Firebag Site / Canada - - PAUT fit for service examinations on approximately 12,000 furnace tube butt welds to API.
Research & development on the detection of porosity with PAUT in boiler tube butt welds. Research
2009 - EPRI EPRI / Charlotte, VA / Canada - -
& development on the examination of tangent locations of boiler tube butt welds with PAUT .
Performed external PAUT weld examinations to ASME VIII on two in-service 60ft diameter, 1” thick
2009 - Plains Midstream Plains Midstream / Sundre, AB Pincher Creek, AB / Canada - -
butane spheres. Examination was in lieu of internal inspection.
Performed PAUT examinations on 16” & 18” (0.500” W.T) pipeline and process piping in accordance
2009 - Rae Engineering Rae Engineering MEG Project / Christina Lake, AB / Canada - -
with CSA Z662 & ASME B31.3.
PAUT examination to ASME I for weld quality control. Chrome Alloy and Carbon Steel tubing welds
2009 - SaskPower SaskPower Boundary Dam Unit 1 / Estevan, SK / Canada - -
for thicknesses 0.150 thru 0.460 inches and diameters from 1.75 thru 3.0 inch.
PAUT examination to ASME I for weld quality control and maintenance examinations on previously in-
2009 - SaskPower SaskPower Boundary Dam Unit 3 / Estevan, SK / Canada - -
service high energy piping welds. Chrome Alloy and Carbon Steel tubing welds for thicknesses 0.150
Performed PAUT examinations on pipeline and process piping in accordance with CSA Z662 & ASME
2009 - Revcon Revcon StatOil SagD Facility / Conklin, AB / Canada - -
CC181
PAUT examinations to ASME Section 1 on for chrome alloy and carbon steel tubing welds for quality
2009 - SaskPower SaskPower Boundary Dam Unit 5 / Estevan, SK / Canada - -
control. PAUT examinations on ASME B31.1 power piping butt welds.
PAUT examination to ASME I & B31.1 HEP for weld quality control. Chrome Alloy and Carbon Steel
2009 - SaskPower Saskpower Boundary Dam, Unit 2 / Estevan, SK / Canada - -
tubing welds for thicknesses 0.150 thru 0.460 inches and diameters from 1.75 thru 3.0 inch.
PAUT examination to ASME I for weld quality control. Carbon Steel 0.180 thick x 2.5 inch diameter
2009 - SaskPower SaskPower Poplar River, Unit 1 / Coronach, SK / Canada - -
tubing welds.

53 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2009 - Paradim Inspections Paradigm Inspections / Dawson Creek, BC / Canada - - PAUT auditing for work performed in Dawson Creek, AB

2009 Suncor Suncor HRSG Weld Examinations Firebag Site / Canada - - PAUT Inspection

2009 AECL Point Lereau Nuclear Facility AECL Point Lereau Nuclear Facility Point Lapreau Tube Refurbishment / Canada - - PAUT Inspection

2009 Technip/Serimax Technip Jubilee Deepwater Development-Double Joint Fabrication / USA 12.75” 900 Welds AUT system to scan thickness 20.6 mm according to API 1104 code

2009 Serimax North America ENI Petroleum Appaloosa Development Project / USA 8”, 9.5” 2750 Welds AUT system to scan different thickness from 18.26, 27.53 mm according to API 1104 code

2009 Henkels&McKoy Kinder Morgan Rex East Spread 1 / USA 42” 29.6 miles AUT system to scan different thickness from 14.1, 18.8,22.6 mm according to API 1104 code
AUT system to scan different thickness from 12.3, 14.7, 17.7, 19.0 mm according to API 1104 code on
2009 Willbros Energy Transfer Texas Independence Pipeline / USA 42” 143km
pipeline
2009 Pumpco Energy Transfer Malone to Maypearl / USA 36” 22 miles AUT system to scan thickness from 10.5, 12.6 mm according to API 1104 code
PAUT examination to ASME CC2235-9 and ASME I for weld quality control. Chrome Alloy and Carbon
2009 - Dominion Power Dominion Power / Tacoma, WA / USA - -
Steel tubing welds for thicknesses 0.220 thru 0.863 inches and diameters from 2.0 thru 4.0 inch.
PAUT examination to ASME CC181 on process piping. Carbon Steel piping welds for thicknesses
2009 - JV Industrial JV Industrial Conoco Phillips Site / Benicia, CA / USA - -
0.237 thru 0.500 inches and diameters from 4.0 thru 18.0 inch.
PAUT examinations to ASME Section 1 on for chrome alloy, carbon steel and stainless steel tubing
2009 - Mirant Mid-Atlantic Mirant Mid / Atlantic / Dickerson Station, Maryland / USA - -
welds for quality control.
PAUT examination to ASME I for weld quality control. Carbon Steel 0.188 thick x 2.25 inch diameter
2009 - Navada Power Nevada Power / Moapa, NV / USA - -
tubing welds
PAUT examination to ASME I for weld quality control. Chrome Alloy and Carbon Steel tubing welds
2009 - Portland General Electric Portland General Electric / Boardman, OR / USA - -
for thicknesses 0.180 thru 0.479 inches and diameters from 2.0 thru 3.0 inch.
PAUT examination to ASME B31.1 and ASME I for weld quality control. Chrome Alloy and Carbon
2009 - Simpson Simpson Lumber / Tacoma, WA / USA - -
Steel tubing welds for thicknesses 0.165 thru 0.220 inches and diameters from 2.0 thru 2.5 inch.
2009 Gunanusa Utama Fabricators, PT PTTEP Bongkot Field Project - - General NDT examination on piping and structural (modules)

2009 MQS Ltd. AKER Kazakhstan - - Supply of PAUT and UT Operators

2009 Cladtek BI Metal Manufacturing, PT Cladtek Inhouse project - - General NDT examination as per client’s PQR

2009 Hyundai Saudi Aramco Global Offshore - - UT/RT/MT/PT inspection for structural as per client specification

2009 Labroy Shipbuilding Engineering, PT N/A Inhouse Verification - - UT and MT cross-checking Inspection on various items as per client requirements

2009 Pertamina PERTAMINA Sidoarjo/Indonesia - - PAUT , manual UT, and MT Inspection as per client specifications

2009 Production Testers International N/A PTI/BatuAmpar/Indonesia - - PAUT examination on piping

2009 Rotary Rotary Rotary - - PAUT , manual UT, and MT Inspection as per client specifications

2009 Pan Natuna N/A Pertalahan Offshore Natuna/Indonesia - - UT/MT/PT inspection for structural work as per AWS D1.1

2009 NDD Petronas NDD-Truba - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2009 Global Process Systems, PT N/A Montara Project - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2009 BKI BKI BKI/Medan/Indonesia - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2009 Citra Panji Manunggal, PT CPM-Pertainsana-Opsico LPG Storage Terminal Project /Semarang/Indonesia - - UT/RT/MT/PT inspection for structural work as per ASME B31.3

2009 UT Quality Inc. Modec Modec/Angola - - PAUT , manual UT, and MT Inspection as per client specifications

2009 Maspion, PT CCME Balongan / Indonesia - - PAUT on Vertical Spheres (WT 53mm)

2009 BBS PERTAMINA BBS Project, Bekasi - - PAUT examination on piping to CC181

2009 Global Process Systems, PT Petro Vietnam Dragon Project - - Inspection on Gas Compression Module using RT,UT,MT

2009 Foster Wheeler Woodside Pluto / Thailand - - PAUT UT examination to ASME B31.3 Case 181-1 on SS welds ( ≥ 4mm WT )

2009 Gunanusa Utama Fabricators, PT British Petroleum (BP) Berau Ltd BP Tangguh - - General NDT examination on PIG launcher

2009 VME Modec TUPI - - Modular construction using all NDT methods

2009 Petrosea Petrosea Petrosea - - Welder Qualification and general NDT

2009 Chuck Engineering, PT ExxonMobil Preassembled Racks (PAR's) Project - - General NDT examination on structural, as per AWS D1.1

54 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2009 TrubaJurong Chevron NDD Truba - - General NDT examination on piping, as per ASME B31.3
UT SCAN-M examination to ASME B31 CC181, MT Inspection for various thickness from 3.91mm to
2009 Rekayasa Industri, PT MIGAS ROP Project / Balongan / Indonesia - -
38 mm
UT SCAN-M to API, ASME on Storage Tanks, Piping and Furnace Tubes (CS, SS and Inconel) –UT for
2009 Rekayasa Industri, PT/MHI Brunei Methanol Co. Brunei - -
various thickness from 7.11mm to 38mm
2009 Rotary Engineering Various Batam / Indonesia - - Supply of QA/QC Inspectors

2009 VME MODEC Batam / Indonesia - - NDT Service (UT,RT,MT,PT)

2009 Cladtek BI Metal Manufacturing, PT PEC CT-03 Harweel Cluster Phase 2 - - NDT Service (PAUT , Manual UT, Dye Penetrant, and PT Water Washable) including Video Inspection

2009 Profab Indonesia, PT (NOV) MODEC Batam / Indonesia - - PAUT Inspection

2009 Global Process Systems, PT BHP Billion Batam / Indonesia - - NDT Service (UT,MT,PT) as per AS 1554.1 NATA (ISO 17025) compliance

2009 McConnell Indonesia, PT BHP Billion Batam / Indonesia - - NDT Service (UT,,MT,PT) as per AS 1554.1 NATA (ISO 17025) compliance
AUT System to scan different thickness from 9.7, 10.2, 11.2, to 12.2mm according to AS2885.2 code
2009 A.J Lucas Origin Energy Mortlake Gas Pipeline / Australia 16”, 18” 84km
on pipeline
2009 A.J Lucas Origin Energy Mortlake Gas Pipeline / Australia 16”, 20” 84 km NDT services (AUT, MUT, MT) on 9.7, 10.2, 11.2, 12.2mm to AS2885.2 on pipeline

2009 TWI Tehran Gas Refinery Tehran / Iran - - NDT services using PAUT on Reactor and Heat Exchange Nozzles as per Client specification.

2009 Cladtek BI Metal Manufacturing, PT Tipanuke Batam / Indonesia - - NDT Service (Radiography X-Ray Crawler)

2009 Cladtek BI Metal Manufacturing, PT Jambi Merang Batam / Indonesia - - NDT Service using PAUT , UT, PT, PT Water Washable & Video Inspection

2009 Cladtek BI Metal Manufacturing, PT PTGJ Batam / Indonesia - - NDT Service (Radiography X-Ray Crawler)

2009 Profab Indonesia, PT (NOV) MODEC Batam / Indonesia - - NDT Service (RT,MT Fluorescent,PT)

2009 MCC Maspion Surabaya / Indonesia - - PAUT Inspection

2009 Pec-Tech Indonesia RAPP PekanBaru / Indonesia - - PAUT Inspection

2009 Prime Petro Services Lapindo Brantas Surabaya / Indonesia - - PAUT on Pressure vessels-UT on TGA #3 Gas Production

2009 Profab Indonesia, PT (NOV) Chevron / McDermott Batam / Indonesia - - Validation & Testing of Pressure Vessels 55mm to 135mm WT using ToFD& PAUT

2009 Pertamina PT Pertamina (Persero) Balongan / Indonesia - - PAUT to ASME B31.3 -UT and Magnetic Particle

2009 Production Testers International Amarada HESS Batam / Indonesia - - PAUT on 85mm WT Pressure Vessel – UT

2009 Bangkok Industrial Gases Co., Ltd. Bangkok Industrial Gases Co., Ltd. Bangkok Industrial Gases, Thailand / Rayong / Thailand - - Replacement CS piping thickness 7.11mm and 6 inch diameter during mini Shutdown.

2009 GDK GDK Consórcio Gastau / Brazil - - AUT inspecting tie-ins for the completion of the Gastau project.

2009 Map Ta Phut Olefins Co., Ltd. Map Ta Phut Olefins Co., Ltd. SCG / Samsung / MOC / Rayong / Thailand - - New construction of carbon steel piping butt welds.
Inspection for header base material for confirmation of Eddy current results and confirmation of
2009 Technip Engineering (Thailand) Co., Ltd SCG Group Techip SCG/MOC Thailand / Rayong / Thailand - -
removal of flaws after repair.
New construction of carbon steel piping for thickness 3.91 thru 15 mm and diameters from 1 thru 18
2009 Chatr Karnchang Laemchabang Co., Ltd. PTT Public Co., Ltd. Chatr Karnchang Laemchabang/PTT Gas Sep.Plant 5 / Rayong / Thailand - -
inch.
2009 Technip Engineering (Thailand) Co., Ltd SCG Group Techip SCG/MOC / CFU Project / Rayong / Thailand - - New construction high pressure system carbon steel piping butt welds.

2009 Thai Rotary Engineering Public Companu Limited. SCG Group Thai Rotary Engineering / SCG MOC, Thailand / Rayong / Thailand - - New construction spherical tank with 55&78 mm thickness.

2009 Thai Woo Ree Co., Ltd. SCG Group Thai Woo Ree / SCG MOC Thailand / Rayong / Thailand - - New construction carbon steel piping.

2009 Siam Polyethylene Co., Ltd. Siam Polyethylene Co. , Ltd. Siam Polyethylene / Rayong / Thailand - - New construction Above ground storage tank roof butt welds.

2009 Hyundai Saudi Aramco Hyundai Global Offshore / / Saudi Arabia - - UT/RT/MT/PT inspection for structural as per client specification

2009 Sino-Thai Engineering & Construction PCL. Siam Polyethylene Co. , Ltd. Sino / Thai DOW Chemicals Thailand / Rayong / Thailand - - New construction carbon steel piping.
PAUT examination to ASME B31 Case 181-1 and Client specific requirements on new construction
2009 - STP&I STP&I Woodside Pluto Project / - -
Stainless Steel piping butt welds for thicknesses 5.49 thru 44.45 mm and diameters from 3 thru 42
2009 Techint International Constr. Corp. Techint International Constr. Corp. RNEST – Tank Lote 1 / / Brazil - - 1 PAUT inspecting 11 tanks, Duration of project 26 months

2009 MQS Ltd MQS Ltd Kashagan / D / Island Kazakhastan / Indonesia - - UT on pipe rack

55 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

PAUT examination to ASME VIII (Integrity Assessment) for pressure vessels (Bullet) circ& long seam
2008 N/A NAL Resources NAL Resources /Sylvan Lake, AB / Canada - -
butt welds.
2008 N/A ATCO Power ATCO Power / Battle River, AB / Canada - - PAUT examination to ASME I for weld quality control on several hundred new boiler tube butt welds.

2008 N/A ATCON Tank ATCON Tank Horizon Project / Fort Mac, AB / Canada - - PAUT examination to API 650, Appendix U on storage tank circ& long seam butt welds.

2008 N/A Alstom Power Alstom Power / Keephills, AB, Canada - - PAUT examination for weld quality control on structural steel components to CSA W59.
PAUT examination to ASME B31.3 CC181 on new pipe butt welds of various diameter and thickness
2008 N/A ENCANA ENCANA / Foster Creek, AB/ Canada - -
for SAGD facility.
2008 Nusco Northern Manu Horizon Nusco Northern Manu. / Horizon Site, Ft.Mac. AB. - - PAUT examination to API 650, Appendix U on storage tank circ& long seam butt welds.
PAUT examination to ASME B31 CC179 on new pipe butt welds of various diameter and thickness for
2008 - TIC Canada TIC Canada / Edmonton, AB - -
new construction of Epcor Power Plant.
2008 N/A Enbridge Enbridge / Hardisty, AB / Canada - - PAUT examination to API 650, Appendix U on storage tank circ& long seam butt welds.
PAUT examination to ASME B31.3 CC181 on new pipe butt welds of various diameter and thickness
2008 Bantrel Petro Canada Refinery Bantrel / Edmonton, AB / Canada - -
for refinery expansion for Petro-Canada Refinery
2008 Babcock & Wilcox N/A Babcock & Wilcox / Polar River, Sask / Canada - - PAUT examination to ASME I for weld quality control on several hundred new boiler tube butt welds.
PAUT examination to ASME CC 2235-9 on heavy wall pressure vessel circular & long seam butt
2008 N/A Bilton Welding & Manufacturing Bilton Welding & Manufacturing / Innisfail, AB / Canada - -
welds.
2008 Midwest / Louisbourg TransCanada Pipelines Winter 2007-08 Ft McMurray Construction Program / Canada 30”, 36” 130Km AUT system to scan different thickness from 10.3,13.8,9.8,13.1 mm according to CSAZ662 code

2008 - Integrity Testing Integrity Testing / Crossfield, AB / Canada - - PAUT examination of piping long seam for hydrogen induced cracking.
PAUT examination to ASME B31 CC181 on new Carbon and Stainless Steel pipe butt welds of various
2008 - Jacobs PetroCanada JE Jacobs (PetroCanada) / Edmonton, AB / Canada - -
diameter and thickness for refinery expansion for Petro Canada Refinery.
2008 Engineering Inspection Florida Power Boiler tube inspection for Florida Power / Florida/USA - - PAUT examination to ASME I for weld quality control on several hundred new boiler tube butt welds.

2008 N/A Nevada Power Boiler tube inspection for Nevada Power / Las Vegas, Nevada - - PAUT examination to ASME I for weld quality control on several hundred new boiler tube butt welds.
AUT system to scan different thickness from 10.7, 11.1,12.7, 13.5, 15,8 mm according to API 1104
2008 Michaels Enbridge Southern Access Stage 2, Spread 1 / USA 42” 52 miles
code
2008 Technip / Serimax Mariner Energy Geauxpher – Spoolbase and Offshore Tie-in, USA 8” 5160 welds AUT system to scan thickness 28.5 mm according to API 1104 code
AUT system to scan different thickness from 10.9, 13.1, 15.7, 19.0, 19.4 mm according to API 1104
2008 MG Dyess Energy Transfer ETC Grimes Station to Katy Station / USA 36” 53 miles
code
2008 Pumpco Energy Transfer Cleburne to Tolar / USA 36” 30 miles AUT system to scan different thickness from 13.4 mm according to API 1104 code

2008 Alstom Power Energy System Indonesia, PT Alstom Europe Surabaya / Indonesia - - NDT to EN473 and Inspectors Supply

2008 Saipem Indonesia, PT BP Papua / Indonesia - - Supply of Painters and QC Inspectors

2008 McDermott Indonesia, PT Chevron Batam / Indonesia - - PAUT on Vessels

2008 Profab Indonesia, PT (NOV) Chevron Batam / Indonesia - - PAUT on Vessels

2008 Cladtek BI Metal Manufacturing, PT Shell SerawakBerhad B11 re-development / Batam / Indonesia - - PAUT and X-Ray of Inner Liners

2008 Cladtek BI Metal Manufacturing, PT Harweel Batam / Indonesia - - NDT Service (PAUT , UT, PT, Water Washable) & Video Inspection

2008 Cladtek BI Metal Manufacturing, PT PT Pertamina Hulu Energi Jambi Merang / Batam / Indonesia - - NDT Service (Radiography X-Ray Crawler)

2008 Puspetindo TOTAL E & P Indonesie Gresik / Indonesia - - NDT Service (UT)

2008 Beta Jurong Shipyard Batam / Indonesia - - NDT Service (UT,RT,MT,PT)

2008 Amarada Hess Amarada HESS Ujung pangkah 2 / Jakarta / Indonesia - - NDT Service (PAUT ) on Vessel 135mm Thk.

2008 Excel – USA Whessoe – UK Jeddah / Saudi Arabia - - PAUT on Petro Rabigh’s Sphere Tank – 56mm thickness

2008 Excel – USA Saudi Aramco Aramco Dahran / Saudi Arabia - - PAUT on Rastanura Plant’s Boiler
AUT system to scan different thickness from 7.9, 8.7, 9.5, 10.3, 11.9, 12.7, 14.4, 15.8, 17.4 mm
2008 Consolidated Contractors Group, S.A.L Ambatovy Minerals SA Ambatovy Nickel Slurry Pipeline Project / Madagascar 24” 260 km
according to API 1104 code on pipeline
2008 Hyundai Saudi Aramco Aramco Kurais / Saudi Arabia - - PAUT on Piping Refinery (Storage Vessels and Piping) & Creep Wave Inspection

2008 Kaliraya Sari, PT TOTAL E & P Indonesie Handil Oil pipeline / Indonesia - - NDT Service (UT,RT,MT,PT) for 16 km Pipeline

2008 SCG Chemicals Group Map Ta Phut Olefins ExxonMobil SPT Olefins project - - PAUT examination to ASME CC 2235-9 on78mm WT Spheres.

56 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

2008 Global Process Systems, PT Prosafe Prosafe Project / Indonesia - - NDT Service (UT,RT,MT,PT)

2008 Wahana Karsa Swandiri, PT Chevron Duri–Indonesia - - NDT Service (UT,RT,MT,PT)

2008 Wahana Karsa Swandiri, PT Chevron Duri–Indonesia - - 32 km Pipeline (X-Ray Crawler & PAUT )

2008 Gunanusa Utama Fabricators, PT TOTAL E & P Indonesie Tunu 11 / Cilegon / Indonesia - - Supply of UT Technicians

2008 UT Quality Inc / RISS Aramco Various / Saudi Arabia - - PAUT on Piping Refinery (Storage Vessels and Piping)

2008 McConnell Indonesia, PT ExxonMobil Singapore Parallel Train (SPT) Project / Batam / Indonesia - - NDT Service (PAUT , UT, MT, PT, RT, PMI) & Heat Treatment on Piping

2008 Cladtek BI Metal Manufacturing, PT SSB B11 Project / Indonesia - - NDT Services using PAUT , UT, Conventional PT, PT Water Washable, and Video Inspection

2008 Cladtek BI Metal Manufacturing, PT Various Batam – Indonesia - - NDT Services (PAUT , AUT, Conventional UT, MT, PT, Eddy Current)

2008 Multi Structure Chevron Duri–Indonesia - - NDT Service (UT,RT,MT,PT) – Piping

2008 Kaliraya Sari, PT Chevron Duri–Indonesia - - NDT Service (UT,RT,MT,PT) – Piping

2008 Kwalita Chevron Duri–Indonesia - - NDT Service (UT,RT,MT,PT)

2008 Wahana Karsa Swandiri, PT Chevron Duri–Indonesia - - NDT Service (UT,RT,MT,PT)

2008 Saipem Indonesia, PT ENI Black Tip / Indonesia - - Supply of Senior Welding Supervisor

2008 Saipem Indonesia, PT BP Batam - Papua / Indonesia - - Supply of Welding & Coating Inspectors

2008 Global Process Systems, PT Murphy Oil Batam / Indonesia - - NDT Service (UT,RT,MT,PT) & Heat Treatment

2008 Global Process Systems, PT MOPU MOPU / Batam / Indonesia - - NDT Service (UT,RT,MT,PT) & Heat Treatment

2008 Global Process Systems, PT Premier Oil Batam / Indonesia - - NDT Service (UT,RT,MT,PT) & Heat Treatment

2008 Labroy Shipbuilding Engineering, PT Labroy Batam / Indonesia - - Providing 3rd party service for NDT Service as PCN UT Cross-checker with PCN Qualifications

2008 Batamec, PT Various Batam / Indonesia - - Positive Material Identification on Piping, Vessels and Tanks, as per client specifications

2008 Labroy Shipbuilding Engineering, PT Standard Drilling Batam / Indonesia - - Providing 3rd party service for NDT Service as PCN UT Cross-checker with PCN qualifications

2008 Whessoe Aramco Rabigh, Saudi Arabia - - PAUT examination to ASME B31 CC181 on new pipe butt welds of various diameter and thickness.

2008 N/A Saudi Aramco Saudi Aramco (Whessoe) / Rabigh/Saudi Arabia - - PAUT examination to ASME B31 CC181 on new pipe butt welds of various diameter and thickness.
PAUT examination to ASME B31.3 on new pipe butt welds of various diameter and thickness for
2008 PTT Public Co., Ltd. PTT Public Co., Ltd. PTT Gas Seperation Plant- Map Ta Phut/Rayong/ Thailand - -
refinery shutdown.
PAUT examination to ASME B31.3 on new pipe welds of various diameter and thickness for refinery
2008 Thai Oil Public Company Limited Thai Oil Public Company Limited Thai Oil /TPX-Sriracha/Chonburi /Thailand - -
revamp/upgrade.
PAUT examination to ASME B31.3 on new pipe butt welds of various diameter and thickness for
2008 Rayong Refining Co., Ltd. Rayong Refining Co., Ltd. Rayong Refining Company-Map Ta Phut, Thailand - -
refinery shut down.
2008 Punj Lloyd Reliance East West Pipeline Project / India 48” 290 km AUT system to scan different thickness from 17.2,20.7 & 25.4mm on pipeline
PAUT examination to client spec and ASME B31 CC179 on several hundred pipeline butt welds of
2007 RAE Inspection & Engineering MEG Energy RAE Inspection & Engineering /Edmonton, AB - -
various diameter and thickness for detection of planar defects (MEG Energy).
PAUT examination to ASME B31 CC181 on new Carbon and Stainless Steel pipe butt welds of various
2007 - CNRL CNRL Horizon Project / Ft. Mac, AB / Canada - -
diameter and thickness for new construction of Oilsands Upgrader.
2007 N/A Skinner Tank Co. Skinner Tank Project / Menedosa, Manitoba/ Canada - - PAUT examination to API 650, Appendix U on storage tank circ& long seam butt welds.
PAUT examination to ASME B31.3 on several hundred new pipe butt welds of various diameter and
2007 Kiewet / APEC Horizon Kiewet APEC Horizon Project / Fort MacMurray, AB/ Canada - -
thickness for new construction of Bitumen Upgrader.
PAUT examination to client spec and ASME B31.1 CC179 on several hundred pipeline butt welds of
2007 N/A MEG Energy MEG Energy / ChristinaLake, AB / Canada - -
various diameter and thickness for detection of planar defects.
PAUT examination for weld quality control on several hundred new boiler tube butt welds (TAU
2007 N/A Alstom Power Alstom Power/ Wabamun, AB / Canada - -
Sundance).
AUT system to scan different thickness from 12.3, 13.7, 14.1, 18.8, 22.6 mm according to API 1104
2007 H.C. Price Kinder Morgan Rex West Spread 3 / USA 42” 300 miles
code
AUT system to scan different thickness from 9.8, 10.2, 10.8, 11.4, 13.1, 13.6, 14.4, 15.2, 15.7, 16.3,
2007 WillBros SET / CEGT SESH Project / USA 42” / 36” 300 miles
18.3, 19.8 mm according to API 1104 code
2007 Willbros-RPI Cheniere Sabinepass / USA 42” 18 miles AUT system to scan different thickness from 15.2 & 21.9 mm according to API 1104 code

2007 MG Dyess Energy Transfer Eagle Mountain-Ponder / USA 36” 90 miles AUT system to scan different thickness from 12.62, 15.16, 16.33 mm according to API 1104 code

57 of 58
YEAR CONTRACTOR OWNER PROJECT / SCOPE OF WORK PIPE SIZE (DIA) PIPE LENGTH Description details

AUT system to scan different thickness from 12.3, 13.7, 14.1, 18.8, 22.6 mm according to API 1104
2007 Welded Kinder Morgan Rex West Spread 6, 7 / USA 42” 300 miles
code
PAUT examination for ASME I weld quality control on several hundred new recovery boiler tube butt
2007 Lott Quality Services RAPP Lott Quality Services /Pekanbaru/ Indonesia - -
welds (Pulp Mill)
2007 N/A Reliance Industries Reliance Industries / Jamnagar, India - - PAUT examination to ASME CC 2235-9 on coker pressure vessel circ butt weld

2007 Jaihind GAIL Panvel to Dhabhol (phase II) / India 30” 67Km AUT system to scan different thickness from 10.3, 11.9, 14.3mm

2007 Utraco Tanker Pacific Montara Project / Indonesia - - NDT Service (UT,RT,MT,PT)

2007 Global Process Systems, PT Tanker Pacific Montara Project / Indonesia - - NDT Service (UT,RT,MT,PT)

2007 Camargo Correa + Skanska Petrobras Petrobras B2-Spread 3-Amazonas / Manacapuru/ Brazil 3.5” 44Km PAUT system to scan different thickness from 5.5 mm according to API 1104 code

2007 Various NA BLK / Indonesia - - NDT & Welding Inspector Training

2007 Punj Lloyd GAIL Dabhol panvel Pipeline Project / India 30” 58Km AUT system to scan different thickness from 10.3, 11.9, 14.3 mm on pipeline

2007 OAS Engenharia Petrobras Petrobras A1-Amazonas State / Manacapuru/Brazil 10” 1200meters AUT system to scan different thickness from 6.4, 7.10 mm according to API 1104 code
PAUT examination to ASME B31.3 on several hundred new pipe butt welds of various diameter and
2007 N/A Bechtel Bechtel /Zotti/ Algeria - -
thickness for new construction of misible flood injection system for field.
2007 OAS Engenharia Petrobras Manacapuru / Brazil - - PAUT examination to API 1104 of several hundred pipeline new girth welds.
PAUT examination to ASME B31.3 CC181 on several hundred new pipe butt welds of various
2007 N/A AUSTNDT AUSTNDT/ Victoria/ Australia - -
diameter and thickness for fabrication modules.
2007 Techint Saudi Aramco Khursaniya / Saudi 30”, 36”,40” 284km AUT system to scan different thickness from6.4, 8.2, 9.5, 11.3, 11,9, 16.3, 17.5, 27.0 mm
PAUT examination to ASME CC 2235-9 on 20 in-service pressure vessels 30 mm and 43 mm
2007 Rayong Refining Co., Ltd. Rayong Refining Co., Ltd. Rayong Refining Company-Map Ta Phut, Thailand - -
Thickness
2006 Louisbourg TransCanada Pipelines NCC Peerless LakePhase 3 / Canada 24" 32.2km AUT system to scan different thickness from 7.8mm, 9.5mm, 10.3mm according to CSAZ662 code
PAUT examination to ASME B31.3 CC181 on several hundred new pipe butt welds of various
2006 Aecon Industrial N/A Aecon Industrial / Edmonton, AB - -
diameter and thickness for fabrication modules.
PAUT examination to ASME B31.3 CC181 on several hundred new pipe butt welds of various
2006 Various Opti-Nexen Long LakeProject, Fluor, Flint, Midwest, Ledcor, Triton, Air, LiquideFortMacMurray, AB - -
diameter and thickness for new construction of Bitumen Upgrader. Work was performed for several
2006 Louisbourg TCPL North Bay Short Cut-DeuxRivieres / Canada 42” 19km AUT system to different thickness from 10.6mm, 13.4mm & 16mm according to CSAZ663 code
AUT system to scan different thickness from 10.6mm, 13.4mm & 14.3 mm according to CSAZ664
2006 Louisbourg TCPL North Bay Short Cut-Stitsville / Canada 42” 20km
code
AUT system to scan different thickness from 24”-7.8mm,10.5mm &11.2mm / 30”-
2006 Midwest TransCanada Pipelines Fort McKay / Canada 24”& 30” 143km
9.8mm,13.1mm,14mm & 15.7mm according to CSAZ665 code
2006 Midwest TransCanada Pipelines Nevis-Gadsby Crossover / Canada 24” 80km AUT system to scan different thickness from 6.7mm, 8.9mm & 10.7mm according to CSAZ666 code
PAUT examination to ASME I for weld quality control on several hundred new Carbon and Stainless
2006 N/A EPCOR Energy EPCOR Energy / Corporate - -
Steel boiler tube butt welds.
120km +
2006 Nacap National Grid Transco Milford Haven to Aberdulais / Weals 48” AUT system to scan different thickness 22.9 mm & 15.9mm
85km
2006 H.C. Price Co. Anadarko Powder River Basin - Gillette, Wyoming / USA 24 " 83.2km AUT system to scan thickness 9.5 mm according to API 1104 code
PAUT examination to ASME B31.3 CC181 on several hundred new pipe butt welds of various
2006 N/A Reliance Industries Jamnagar, India - -
diameter and thickness for VGA Unit refinery rebuild.
2006 StroyTransGaz (STG) Reliance East West Pipeline Project / India 24”, 48” 98km AUT system to scan different thickness from 9.5, 11.9, 14.3, 17.2, 20.7, 25.4 mm on pipeline

2005 N/A TransAlta Utilities TransAlta Utilities / Corporate - - PAUT examination to ASME I for weld quality control on several hundred new boiler tube butt welds.
PAUT examination through FBE coating to BP ECA Specification & ASME Sect. B31.1.of over 200
2005 N/A BP Exploration BP Exploration / Deadhorse, Alaska/ USA - -
pipeline girth welds.
PAUT examination to ASME VIII CC2235-6 of all new butt welds and nozzles for fabrication of 17
2005 Maritime Industrial Services Aramco Maritime Industrial Services / Sharjah/ United Arab Emirates - -
heavy wall large diameter pressure vessels.
PAUT examination to ASME I on several hundred new Carbon and Stainless steel boiler tube butt
2005 N/A Alstom Power Alstom Power/Corporate - -
welds for weld quality control.
2005 Nacap PTT Rayong / Thailand 36” 110Km 16.2mm to API 1104

2005 CCDL Petrobras Rio-Campinas (spread II&III) / Brazil 28" 255km AUT system to scan different thickness from 10.3, 12.5, 15.9 mm according to API 1104 code
PAUT examination to CSA Z-662, API 1104 and CEPA for SCC on over 200 pipeline integrity
2004 N/A Suncor Energy Fort McMurray, Alberta n/a n/a
excavation locations.
2004 GDK Petrobras Rio-Campinas (spread I) / Brazil 28" 196km AUT system to scan different thickness from 10.3, 12.5, 15.9 mm according to API 1104 code

2003 Bechtel NGC San Fernando / Trinidad 56" 77km AUT system to scan different thickness from 18, 20, 24.5mm according to API 1104 code