Professional Documents
Culture Documents
PROFILE SNAPSHOT
10 Years of experience in Quality Assurance & Quality Control field in Oil & Gas Construction Project, In-Service
Live Plant & Heavy Engineering Manufacturing Sector.
ACADEMIC QUALIFICATION
TECHNICAL QUALIFICATION
TRAINING ATTENDED
Successfully completed the Bureau Veritas in house training and site training in
(Piping, Pressure vessel, Heat Exchanger, Storage Tank, Cladding, structural,
fabrication, NDE, qualification of PQR, WPS, WQT).
Successfully completed training for Root cause Analysis.
Basic H2S Training (QP approved).
Confined space training.
LANGUAGE & DEGREE OF PROFECIENCY
ENGLISH : Read/Write/Oral
HINDI : Read/Write/Oral
MALAYALAM : Read/Oral
WORK EXPERIENCE
Saudi
Saudi AramcoJazan, Saudi April -2018 to
GSW Aramco, Saudi Arabia
Aramco Rastanura, Maaden, De- Jan-2021
Sabic, SWCC
Salination Plant - Al Jubail.
EMPLOYMENT RECORD
Preparation & Submission of QC Package (ITP, WELD MAP & TEST PLAN, Applicable WPS, NDT
Procedures, hydro test procedures, Repair Procedures, Pneumatic Procedures, PWHT Procedures, Painting &
Blasting Procedures, Packing & Preservation procedures) for Static Equipment& Above ground Storage Tanks
projects.
Leading a team of Procurement QC, Welding QC, Mechanical QC & Material QC.
Monitoring the progress & effectiveness of Quality management system. Recommend & implement improvement
when required.
Perform, issues and review of the Project Quality control plan for all new projects.
Followed any and all repairs assuring code requirements are being met.
Maintained inspection records monitoring data input.
Handled ISO Audits & ASME U & R Stamp audit.
Identifying Non-Conformance trends and resolving the appropriate issue reasonably.
Preparation & submission of WPS as per job requirement with proper PQR record for client approval.
Review & Approval of procurement orders to ensure the Quality requirements & Engineering requirements have
been addressed completely.
Review & approval of Supplier inspection documents & personnel qualifications.
Coordination with Engineering team & Client for the resolution of technical discrepancies.
Supervision of inspection activities for Storage Tank, Pipeline & Static Equipments Projects.
Organizing Pre-Inspection meeting with client/End User to discuss & finalize the ITP for In-Process activities and
Inspection stages as per material requisition and applicable Client Specification.
Worked with contract personnel during shutdowns performing safety inspections to assure all work is being
completed in a safe manner.
Performed external and internal inspection of AST, pressure vessels, heat exchangers & pipelines.
Facilitated resolution of issues generated from reviews, inspections & incident investigations.
Witnessing Hydro testing of piping circuits, pressure vessels & heat exchangers.
Supervision and preparation for leak test, Nitrogen purging and Pneumatic test for equipment and piping.
Witnessing pressure relief valves testing & calibration.
Performing visual on stream inspection and shop/overhaul inspection for gate, globe, check, ball and safety valves
as per related code.
Handled Shutdown Projects. Inspects plant stationary equipment by entering into vessels, tanks and towers,
during shutdowns/ Turn around, to check condition of equipment. Includes noting observations on cracks, pits,
thinning and any other pattern of erosion, corrosion and other interior failure. Makes interpretations of findings,
analyses for failure, prepares report and issues recommendation.
Acquainted in working as per ASME, API, ISO, EN, Shell DEP and Qatar Petroleum Codes.
JOB RESPONSIBILITY
Preparation & Submission of QC Package (ITP, WELD MAP & TEST PLAN, Applicable WPS, NDT
Procedures, hydro test procedures, Repair Procedures, Pneumatic Procedures, PWHT Procedures, Painting &
Blasting Procedures, Packing & Preservation procedures) for Heat Exchangers, Pressure Vessels, Columns, Skids,
Cladding &Above ground Storage Tanks Projects.
Handled Saudi Aramco, SABIC, SWCC & SASREF Projects.
Managing leading the team of Material Inspector, Welding Inspector & Mechanical Inspector for Storage tank
Projects, Pressure vessel & Heat Exchanger projects.
Perform Vendor Audit & provide approval to include vendor for procurement for raw material or for service
functions.
Monitoring the progress & effectiveness of Quality management system. Recommend & implement improvement
when required.
Review & Approval of procurement orders to ensure the Quality requirements & Engineering requirements have
been addressed completely.
Organizing Pre-Inspection meeting with client/End User to discuss & finalize the ITP for In-Process activities and
Inspection stages as per material requisition and applicable Aramco Specification.
Organizing for Kick Off Meeting (KOM) and preparing the Points of discussion with respect to the KOM.
Identifying Non-Conformance trends and resolving the appropriate issue reasonably.
DESIGNATION - SURVEYOR
ORGANIZATION - BUREAU VERITAS
PERIOD - March 2015 to March 2018
JOB PROFILE - THIRD& SECOND PARTY INSPECTION
JOB RESPONSIBILITY
MECHANICAL EQUIPMENT such as Pump, compressor, Centrifuge, Blower stage wise inspection.
Pressure Vessel & Heat Exchanger Stage wise inspection.
Aboveground Storage Tank stage wise inspection.
Pipe & Pipe fittings stage wise inspection.
Handled Shutdown Projects & Construction Projects.
Interpretation & witness of NDT (MT, PT, UT, RT ,VT, Hydra, Pneumatic, Leak Test, Vaccum Test, ET) Results
for Weld Joints Sections.
JOB RESPONSIBILITY
Erection of Static & Rotary Equipment’s.
Construction of Above ground atmospheric pressure Storage tank.
Preparing the schedule and assign the resources for the job.
Track and record the developments in the project.
Daily monitoring of site activities highlighting delays and advising recovery actions.
Erecting, aligning and commissioning the equipment with assistance from the vendor as per the erection priorities
and SOP guidelines.
Assisting the QC inspector to complete test pack( inspection stages like: chipping & padding, centering,
Alignment & grouting)
Preparing and submitting the weekly progress reports to the construction manager.
Maintaining the non-conformity response with corrective action & preventive action (CAPA).
JOB PROFILE - Working as a Field Maintenance Engineer at Gujarat Refinery (IOCL), Vadodara through
M/S Kalpana Construction Company at DHDT, HGU-3, SRU-3, ISOM, DCU Unit .
JOB RESPONSIBILITY
Supervision of Repair works of Static & Rotary Equipment’s.
Maintenance & Repair works of Static & Rotary Equipment’s during Shut Down Projects.
Assist in preparation of project procedures and develop work processes.
Carrying out routine maintenance of Rotary Equipments (PM, PdM, etc).
Preparing the schedule for preventive maintenance and assign the resources for the job.
Maintenance of Reciprocating Compressor, Centrifugal compressor, Screw Compressor
Maintenance of multistage centrifugal pump (horizontal / vertical).
Maintenance of Reciprocating pump (Dosing pump) & Sundune pump.
Maintenance of FD fan, ID fan, and Air fin cooler &cooling tower fan.
Leading a team of technicians to handle maintenance of Rotary & Static Equipments.
Preparing checklist of materials which are required for maintenance process.
Inspection & procurement of bought out items for Pumps/compressor/fan.
Re tubing of heat exchangers
PERSONAL DETAILS
Nationality : Indian
Date of Birth : 21 January 1990
Passport No : Z2781855
Martial Status : Married
Permanent Address : 3/777A, Near Chittamveedu Temple Road, Pooladikunnu, Eranhikka PO.
Kozhikode, India-673303
verifies that
VINAY PACHAT
HAS MET THE ESTABLISHED AND PUBLISHED REQUIREMENTS FOR API CERTIFICATION AS AN
025
of Proficiency
BS EN ISO 17637 Non-destructive testing of welds, visual
testing of fusion-welded joints
Vinay Pachat
Date of birth 21 January 1990
Signed
SIGNATURE OF HOLDER
(Person named above) Date _ _ _ _ _ _ _ _ _ __ _ __
Issued by:
TWI Certification Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, UK
The use of the UKAS Accreditation Mark indicates accreditation In respect of those activities covered by Accrodltotlon Certlflcoto No. 025
This certificate Is the property of TWI Certification Ltd and must be surrendered on request
Created by ScannerLens
.,-.,..~ 4--AL.a.J l u ':i~L.....,u
Geoerol Contracting ( w.J.I.)
ADM-EXP-002-2022
------
12-Apri-2022
This to certify that Mr. Vmay Pachat of Indian Passport No 22781855 was employed
by us as 'QNQC Engineer from 2~February-2021 to 29-March-2022 .
During his tenure with us we found him sincere, hardworking, and honest in his duties.
He has resigned on his own accord and has been relieved from the service of the
company on 29 -March-2022 .
"\.
for Manco International General Contracting W.L.L
Authorized Signatory'
Date: 24th January 2021
This is to certify that Mr. Vinay Pachat worked as QA/QC Engineer with Gulf
Steel Works from 30th April 2018 to 23rd January 2021.
We found him responsible, dedicated, honest, and hardworking during his tenure
with our organization.
Company : Control Contracting & Trading Co. 10 Approved (Re-submission Not Required)
Item
No. QP Document No. Rev. Your ref. Description Code Due date
1 4211-5-CV-0011 1 GC19110400/PID/TN/ CV OF QC INSPECTOR (WELDING) MR. VINAY 10
2347 PACHAT (FIRE WATER TANK SUB-
CONTRACTOR M/S MANCO)
Remarks:
Condition:
Document Controller Nominated Deputy QP Representative Date
Tel: 0097440136017 Tel:
Ajayakumar Manakku, PSD28 Mitesh Ratilal Patel, PID14 Khalid Mohd Kaldari, PID 20-09-2021
If applicable, please resubmit documents before due date
This is QP system generated transmittal and therefore requires No Signature
Page 1 of 1 20-09-2021
Comments on transmitted documents
Qatar Petroleum
Document Rev.
1 PIE/5 COMMENTS Based on F2F interview, the proposed welding inspector ( VINAY PACHAT ) was accepted as Welding
inspector for the subcontractor works (M/s MANCO),,,
Page 1 of 1
EXTERNAL TRANSMITTAL NOTE
ONSHORE ENGINEERING DEPARTMENT - DUKHAN PROJECTS
Project No : 4145 Transmittal No :
Contract No : GC19101900 PND/GC19101900/EXT/TN/05737
Contract Title : EPIC FOR DUKHAN PRODUCTION FACILITIES UPGRADE (DPFU) - PHASE 1A - PACKAGE 1
Construction WLL
Item
No. QP Document No. Rev. Your ref. Description Code Due date
1 4145-5-CV-0138 0 TN/05621 CV OF LEAD QA/QC ENGINEER MR. VINAY 10
PACHAT (HIAPSENG-MANCO) FOR SITE
INSPECTION ACTIVITIES OF SETTLING TANK
Remarks:
Condition:
Document Controller Nominated Deputy QP Representative Date
Tel: 40136742 Tel:
M. Shoukethulla Khan, PSD0005C Ahmed Aboelazab, PND12 Abdulaziz Ahmed Hasan Al-Amari, PND 14-04-2021
1. REFER TO ATTACHED COMMENTS SHEET/S AND MARKED UP ATTACHMENTS, IF ANY.
2. If applicable, resubmit documents before due date.
3. This is QP system generated transmittal and hence no signature required. Please confirm the receipt through "Transmittal Inbox".
Page 1 of 1 14-04-2021