Construction of High Level Bridge across Betwa River in km 7/2 on Basoda Sironj Road Distt.
PROJECT
Vidisha
BH LOCATION Pkg 1A Vidisha Division km 7/2
CLIENT NAME : Madhav Infra Projects Ltd.
BORE LOG NO. : A-1 RL 99.045
Date of Testing( Starting) 25-2-19 Completion 2/3/2019
% of Core Recovery
ɸ Value of Soil (0)
UCS(Kg/cm²)
C Value (kg/cm2)
Silt + Clay (%)
MC (%)
Gravel (%)
Sand (%)
LL (%)
PL(%)
PI(%)
From To
Filled up
0.00 0.50 Soil with 0.50 0.50 1.662 9.2 13 10 77 37 19 18 _ _ _ _ _ _ _ _
gravels
0.50 1.50 1.00 1.50 1.668 8.8 25 18 57 19.3 NP 0.16 19.3 26.5 _ _ _ _ _
Soil with
1.50 3.00 1.50 3.00 1.675 9.0 31 15 54 21.1 NP _ _ _ _ _ _ _ _
boulders
3.00 4.50 1.50 4.50 1.682 9.5 24 12 64 34 20 14 0.20 24.1 28.3 _ _ _ _
% of Core Recovery
ɸ Value of Soil (0)
UCS(Kg/cm²)
C Value (kg/cm2)
Silt + Clay (%)
MC (%)
Gravel (%)
Sand (%)
LL (%)
PL(%)
PI(%)
From To
Soil with
0.00 0.50 0.50 0.50 1.67 9.7 16 10 74 35 21 14 _ _ _ _ _ _ _ _ _
gravels
3.00 4.50 1.50 4.50 1.548 7.6 12 55 33 20.1 NP 0.00 32.70 25.8 _ _ _ _ _ _
Sand
4.50 6.00 1.50 6.00 1.553 8.5 11 49 40 21.2 NP _ _ _ _ _ _ _ _ _
6.00 7.50 1.50 7.50 1.557 8.2 12 57 31 19.7 NP 0.00 32.1 27.4 _ _ _ _ _ _
7.50 9.00 1.50 9.00 1.560 7.7 13 55 32 19.0 NP _ _ _ _ _ _ _ _ _
9.00 10.50 Boulders 1.50 10.50 2.646 _ NA _ _ _ 43.8 _ 150.8 35% _ _
10.50 12.00 1.50 12.00 2.762 _ NA _ _ _ 83.0 1578.0 _ 76% 422.7 171.8
Hard Rock
12.00 13.50 1.50 13.50 2.770 _ NA _ _ _ 88.7 1628.0 _ 85% 459.1 190.2
Lab Results
PROJECT Construction of High Level Bridge across Betwa River in km 7/2 on Sironj Road Distt. Vidisha .
BH LOCATION Pkg 1A Vidisha Division km 7/2
CLIENT NAME : Madhav Infra Projects Ltd.
BORE LOG NO. P-1 RL 96.045
% of Core Recovery
ɸ Value of Soil (0)
UCS(Kg/cm²)
C Value (kg/cm2)
Silt + Clay (%)
MC (%)
Gravel (%)
Sand (%)
LL (%)
PL(%)
PI(%)
From To
Brownish
0.00 0.50 clay sandy 0.50 0.50 1.612 9.12 12 8 80 39 20 19 _ _ _ _ _ _ _ _ _
silt
Sandy silt
0.50 1.50 with mix 1.00 1.50 1.576 7.6 10 40 50 19.5 NP 0.00 33 27.2 _ _ _ _ _ _
fine
Gravel
1.50 3.00 with 1.50 3.00 1.582 _ NA _ _ _ 37.2 _ 126.3 31% _ _
boulder
3.00 4.50 1.50 4.50 2.712 _ NA _ _ _ 39.6 _ 135.4 43% _ _
% of Core Recovery
ɸ Value of Soil ( )
0
UCS(Kg/cm²)
C Value (kg/cm2)
Silt + Clay (%)
MC (%)
Gravel (%)
Sand (%)
LL (%)
PL(%)
PI(%)
From To
Filled up
0.00 0.50 Soil with 0.50 0.50 1.662 8.2 10 14 76 42 22 20 _ _ _ _ _ _ _ _ _
gravels
0.50 1.50 1.00 1.50 1.552 7.3 8 51 41 18.2 NP 0.00 33 26.3 _ _ _ _ _ _
Sand
1.50 3.00 1.50 3.00 1.563 7.6 10 55 35 19.0 NP _ _ _ _ _ _ _ _ _
3.00 4.50 1.50 4.50 1.555 8.1 12 49 39 21.1 NP 0.00 32.2 28.5 _ _ _ _ _ _
6.00 7.50 1.50 7.50 1.570 8.2 10 55 35 18.6 NP 0.00 32.8 28.8 _ _ _ _ _ _
Sand with
7.50 9.00 Boulder 1.50 9.00 1.577 8.5 14 56 30 19.0 NP _ _ _ _ _ _ _ _ _
9.00 10.50 1.50 10.50 1.580 7.6 12 50 38 22.1 NP 0.00 32.5 27.1 _ _ _ _ _ _
10.50 12.00 1.50 12.00 1.583 7.8 11 64 25 20.1 NP _ _ _ _ _ _ _ _ _
12.00 13.50 1.50 13.50 1.591 7.7 16 48 36 20.4 NP 0.00 33 29.1 _ _ _ _ _ _
13.50 15.00 Boulders 1.50 15.00 2.635 _ NA _ _ _ 40.1 _ 98.52 35% _ _
15.00 16.50 1.50 16.50 2.657 _ NA _ _ _ 80.0 1572.0 _ 78% 460.7 183.20
Hard Rock
16.50 17.00 0.5 17.0 2.669 _ NA _ _ _ 83.9 1688.0 _ 85% 504.1 202.50