Kepada :

05/08/2019
Yth. Customer PENETAPAN KAPAL DI TERMINAL BERLIAN
13:05:33

Container Yard LAGOA MAS (bdj) MERATUS KALABAHI TANTO SIAP MERATUS KUPANG
ETB/ETD : 05/16 - 06/15 ETB/ETD : 06/24 - 08/07 ETB/ETD : 06/24 - 07/14 ETB/ETD : 06/01 - 07/08
HMC B04 600 - 472 (128) 439 - 310 (129) 298 - 168 (130) 149 - 20 (129)
B/M = 354/344 B/M = 490/450 B/M = 0/425 B/M = 445/500
L&M MASA : 23 JAM MASA : 31 JAM MASA : 14 JAM MASA : 31 JAM

690 660 630 600 570 540 510 480 450 420 390 360 330 300 270 240 210 180 150 120 90 60 30 0

HPC B11 LHM 07 HMC B03 LHM 10 HMC B14 HMC B05 HMC B19 LHM 09 HMC B16 HMC B13 LHM 08 HMC B10 HMC B17
MITRA
B TANTO
Container Yard I Container Yard F Container Yard C PROGRESS III
HANDAL
07 TB/ETD :
Container Yard B ETB/ETD :
Container Yard H Container Yard E 05/08.57-
06/16 - 06/24
05/20.57
Container Yard G Container Yard D Container Yard A B 118 - 20 (98)
10 - 110 (100)
B/M = 0/250
18 B/M = 350/0
GR 09 HMC B06 HMC B08 G 10 HMC B09 HMC B20 HMC B15 MASA : 8 JAM
LHM 05 LHM 06 MASA : 12 JAM

0 30 60 90 120 150 180 210 240 270 300 330 360 390 420 450 480 510 540 570 600 630 660 690 720 750 780

KABONGA BARU MERATUS BANJAR I (bdj) MERATUS GORONTALO SPIL NINGSIH


ETB/ETD : 05/16 - ETB/ETD : 06/12 - 07/07 ETB/ETD : 05/24 - 07/09 ETB/ETD : 05/16 - 06/08
05/23 227 - 357 (130) 369 - 527 (158) 562 - 770 (208)
110 - 184 (74) B/M = 300/270 B/M = 500/500 B/M = 500/0
B/M = 55/60 MASA : 19 JAM MASA : 33 JAM MASA : 16 JAM
K MASA : 7 JAM
a
d
TANTO HARMONI SPIL CAYA
e
ETB/ETD : 06/13 - 06/21 ETB/ETD : 07/03 - 07/23
110 - 208 (98) 539 - 770 (231)
B/M = 228/0 B/M = 550/50
MASA : 8 JAM MASA : 20 JAM

KETERANGAN :

KAPAL BERANGKAT AGEN BERTHING DEPARTURE KODE HMC ESTIMASI START ESTIMASI FINISH KETERANGAN
Um = Umum

AKTIFITAS REPAIR

STANDBY OFF

Posisi alat sewaktu-waktu dapat berubah