Plan (denah)

C
L
785
62.00

780

32.50 29.51
775 15.00
2.50 30.00 2.50 12.00

Concrete K -125 I Concrete K -125


770 Concrete K -175 Concrete K -175
t = 0.30 m For detail stair and maintanance step t = 0.30 m
+ 766.80 please refer to page WO D-09/09 Concrete K -225 + 766.80
2.00
765 5.00 Hwl + 764.00 5.00
3.00 + 761.80 114°

2.00

760 3.00 3.00

3.00 3.00 9.00 Concrete K -175

5.00

755 3.00 3.00


+ 752.80 + 752.80
Concrete K -175 0.50

19.50 19.50 0.50


750
1.50 1.50 1.50 1.50 9.00
1.50 1.50 1.50 2.50
5.00 1.50 1.00 39.00
+ 745.00 m I 1.001.0
10.00
775.00
774.00
773.00
772.00
771.00
768.00
767.00
766.00
765.00

764.00
763.00
762.00
761.00

760.00
759.00

758.00
757.00
756.00

756.00

761.00
762.00

763.00

764.00

765.00

766.00

767.00
768.00
769.00
770.00
771.00

772.00

773.00

774.00

775.00
OUND LEVEL 9.20
Concrete K -125

Concrete K -125

5.35 6.33 7.39


)
Penampang maindam-subdam

2.023
0.68
1.30
2.12
0.88
1.13
1.47
1.68
1.47

1.55
1.89
1.24
2.33

1.58

3.52
0.59
1.55

2.03
0.89

3.29

2.52

1.07
1.75

1.53
2.13

2.55

1.97
1.23
2.34

1.81
Tampak Maindam - Subdam

UNIVERSITAS MPU TANTULAR

MATA KULIAH SABO


LAYOUT OF ENGINEERING
SABO DAM DW : SCALE :

LAYOUT OF MAIN DAM - Varied


SUB DAM
Scale :
0 4 8 12 16 20.00 m

DATE :
FRANCISCO SUKIYOTO
NIM 183124731127001 DOSEN July - 2019