You are on page 1of 1

X-535784.

9978
ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE STATED Y-2490676.5716 DETAIL 'B' & 'C'
'A2' R12.00
X-535815.6567 N PROVISIONAL
2.00
'B' R12.00 0.37 ROAD
8.00 Y-2490634.0696 WATER TANK &
X-535652.13
Y-2490664.41
ROAD
R-48 TABLE-431 TABLE-432 X-535841.7343
RS- 485CABLE PUMPING STATION
E
ROAD
RAILWAY
STOPAGE
R-47 TABLE-428 TABLE-429 TABLE-430

3.77
Y-2490638.8135
W
R-46 TABLE-423 TABLE-424 TABLE-425 TABLE-426 TABLE-427 R12.00
1.73 RS- 485CABLE SMB-1

R-45 TABLE-417 TABLE-418 TABLE-419 TABLE-420 TABLE-421 TABLE-422 A - ISSUED FOR INFORMATION
1.00
SMB-2

R-44

S
TABLE-410 TABLE-411 TABLE-412 TABLE-413 TABLE-414 TABLE-415 TABLE-416 5.64
4.000
TABLE-402 TABLE-403 TABLE-404 405 406 407 408 409
B - ISSUED FOR APPROVAL
SMB-3

ROAD
R-42 TABLE-393 TABLE-394 TABLE-395 396 397
SMB-4
398
RS- 485CABLE
399
RS- 485CABLE
400
SMB-10
401
C - ISSUED FOR CONSTRUCTION 1.00
R-41 TABLE-384 TABLE-385 TABLE-386 387 388 389 390 391 392

R-40 TABLE-375 TABLE-376 TABLE-377 378 379 380 381 382 383 D - AS BUILT

RO
R-39 TABLE-368 TABLE-369 TABLE-370 TABLE-371 TABLE-372 TABLE-373 TABLE-374 5.75 MTR. WIDTH ROAD 5.00

AD
RS- 485CABLE
SMB-5

R-38 TABLE-360 TABLE-361 TABLE-362 TABLE-363 364 365 366 367


4.027
R-37 TABLE-350 TABLE-351 TABLE-352 353 354 355 356 357 358 359 DRAIN

RAILWAY
STOPAGE
TABLE-340 TABLE-341 342
SMB-7
343 344 345
SMB-6
346 347
SMB-9

348
SMB-8
349
SECURITY CABIN DETAIL DETAIL 'D'
TABLE-330 TABLE-331 332 333 334 335 336 337 338 339

TABLE-320 TABLE-321 322 323 324 325 326 327 328 329 MAIN GATE ALL SECURITY CABIN
SECURITY CABIN 'A1', 'A2' & 'A3'
SMB-21
ROAD

TABLE-310 TABLE-311 312 313 314 315 316 317 318 319 762
SMB-20 SMB-22

299 300 301 302 303 304 305 306 307 308 309

288 289 290 291 292 293 294 295 296 297 298 SECURITY

RO
SMB-23
CABIN 762
STRUCTURE 2X10 2339X2897

AD
277 278 279 280 281 282 283 284 285 286 287 TABLE No.-34

SMB-25 SMB-24

STRUCTURE 2X10
266 267 268 269 270 271 272 273 274 275 276 TABLE No.-33 SECURITY
CABIN
SMB-26
TFT FOR
STRUCTURE 2X10 2134X2134
255 256 257 258 259 260 261 262 263 264 265 TABLE No.-32
CCTV
49.01 SQ. FT.
SMB-27 254
STRUCTURE 2X10
1.51
243 244 245 246 247 248 249 250 251 252 253 TABLE No.-31
HUME PIPE SHALL BE CONSIDER IF
SMB-28
CROSSING CABLE FROM RAMP
R-26 231 232 233 234 235 236 237 238 239 240 241 242
WATCH TOWER

RO
SMB-31

R-25 TABLE-221 TABLE-222 223 224 225 226 227 228 229 230

AD
R-24 STRUCTURE 2X10 211 212 213 214 215 216 217 218 TABLE-219 TABLE-220
1.69 TABLE No.-H23

R-23 TABLE
STRUCTURE 2X10
TABLE-200 201 202 203 204 205 206 207 208 209 210
No.-H22

'A1'

RO
SMB-30
4.001 SMB-39

STRUCTURE 2X10
R-22 TABLE TABLE-189 190 191 192 193 194 195 196 197 198 199 762 277 915 265 762 277 915

A
No.-H21

D
R-21 STRUCTURE 2X10
TABLE-179 STRUCTURE 2X10
180 181 182 183 184 185 186 187 188
STRUCTURE 2X10 2339 2134
TABLE No.-H18 TABLE No.-19 TABLE No.-20

R-20 SMB-35 SMB-32 1.39


1.59 TABLE-170
STRUCTURE 2X10
TABLE No.-16 171 172 173 174 175 176 177 178
STRUCTURE 2X10
TABLE No.-17
SMB-33

R-19 159 160 161 162 163 164 165 166 167 168 169

R-18 TABLE-147 148 149 150 151 152 153 154 155 156 157 158
SMB-38 SMB-34

R-17 STRUCTURE 2X10


136 137 138 139 140 141 142 143 144 145 146
TABLE No.-H 15

2.29 ROAD
R-16 STRUCTURE 2X10
TABLE No.-H-14 TABLE-125 126 127 128 129 130 131 132 133 134 135
RO

SMB-37 SMB-36

STRUCTURE 2X10
R-15 TABLE-114 115 116 117 118 119 120 121 122 123 124
AD

TABLE No.-13

RO
SMB-40 SMB-41

AD
R-14 TABLE-103 104 105 106 107 108 109 110 111 112 113
STRUCTURE 2X10
TABLE No.-12

R-13 TABLE-92 93 94 95 96 97 98 99 100 101 102


1.28 OUTER
WALL AREA
SMB-42

R-12 STRUCTURE 2X10


TABLE No.-11 81 82 83 84 85 86 87 88 89 90 91

STREET 17.885
1.51 R-11STRUCTURE 2X10
TABLE No.-10 70 71 72 73 74 75 76 77 78 79 80
LIGHT
R-10 60 61 62 63 64 65 66 67 68 69
0.84
R-9 STRUCTURE 2X10
TABLE-51 54 55
SMB-47

57
3.18
TABLE No.-50 52 53 56 58 59 7.240
'A3' SMB-43 SMB-44
SMB-46
RO

STRUCTURE 2X10
R-8 TABLE No.-8 TABLE-42 TABLE-43 44 45 46 47 48 49 50
AD

PROVISIONAL WATER
TANK & PUMPING STATION 0.81 X-535868.4515 1.500 3.450 3.450

R-7 TABLE-32 33 34 35 36 37 38 TABLE-39 TABLE-40 TABLE-41 7.000


RS- 485CABLE
SMB-30
Y-2490272.2542 8.980
R-6 STRUCTURE 2X10
TABLE No.-6 TABLE-24 TABLE-25 TABLE-26 TABLE-27 STRUCTURE 2X10
TABLE No.-H7 TABLE-28 TABLE-29 TABLE-30 TABLE-31

STRUCTURE 2X10 STRUCTURE 2X10


R-5 TABLE No.-16 TABLE-17 TABLE-18 TABLE-19 TABLE-20 TABLE-21 TABLE-22 TABLE-23
TABLE No.-H 5
Communication cable Layout 26.02.2018
'A'
SMB-45

R-4 TABLE-9 TABLE-10 TABLE-11 TABLE-12 TABLE-13 RO TABLE-14 TABLE-15 Change due to piling details & Gate details R4 V.K.V C.H R5 04.01.2016
AD
MODULE DETAIL

RO
R-3 STRUCTURE 2X10
TABLE-5 TABLE-6 TABLE-7 RS- 485CABLE STRUCTURE 2X10
TABLE-8 Change Based on comments received R3 V.K.V S.K.V R4 16.12.2015
D

AD
TABLE No.-3 TABLE No.-14
ROA

R-2 STRUCTURE 2X10


3.04 0.39 RO STRUCTURE 2X10
Change Based on comments received R2 V.K.V S.K.V R3 04.12.2015
TABLE No.-1 TABLE-3 TABLE-4 ROA AD TABLE No.-2

RO TBM 3 D 41.400 Change due to Inverter and Transformer Location R1 V.K.V S.K.V R2 30.11.2015
AD R-1 TABLE-1 TABLE-2 99.876 1.78
RO 0.960 Change due to Transformer & Storage Tank Location R0 V.K.V B.G R1 26.11.2015
AD
ROAD 6.250
20.220 20.220 NATURE OF REVISION & DESCRIPTION DRAWN CHECKED REV. DATE
PYRANOMETER R12.00 0.020 0.020
PYRANOMETER
5.077
7.05
15.000
RS- 485CABLE
7.100
5.354
ROA
D PROJECT TITLE :
3.924
11.354
1.745
OCL BENGAL CEMENT WORKS 5.5 MWp
17.00
2.470
2.460
1.012
0.33 3.506 7.430 PV SOLAR POWER PLANT
1.155

TBM 2
97.015
TBM 1
99.986
WAGON TIPPLER END DWG. TITLE :
1.952
17.10
0.020
0.992 CLIENT :
PLAN VIEW
OCL BENGAL CEMENT WORKS
WAGON
UNLOADING (A UNIT OF OCL INDIA LIMITED)
EXISTING DRAIN PLATFORM
MEDINIPUR
EPC CONTRACTOR:
PYRANOMETER
'D' X-535868.4515 RAYS POWER EXPERTS PVT. LTD.
Y-2490272.2542 Unit No. 114, Rectangle One, ABW Tower,
District Centre, Saket,
10 RS- 485CABLE Delhi, India
DRAWN BY : VIVEK.K.V SCALE : 1:1
REVIEWED BY : P.G DATE : 26.02.2018
SIDE VIEW SIDE VIEW APPROVED BY: B.G SHEET : 01
DRAWING NO.
REV.
R5
LAND AREA = 1,34,795.76 SQ. METER