You are on page 1of 9

Budgetary Offer

Customer Quote Details From Arin Power


Type Residential Date 21-Oct-2022 Reference Anshul
Name MANDARA HOMES LTD. Valid Upto 20-Nov-2022 Email anshul@arinpower.com
Address 101 Pytchley Road, Rugby, CV22 5NG Quote # 214 Phone 7503074000

Summary

3.36 Kwp 7786** 3,398 kWh 16% 6 Years


System capacity Total System Price Estimated Annual Solar Rate of Return in Payback Period
Generation Investment

Solar Energy System Proposal


Material Specification and Make Quantity Price
Solar Panels Trina Solar 420 W Vertex Mono PERC All Black 8
Inverters Growatt 3.0kW, 1 Ph, 2 MPPTs, LV, Hybrid Inverter 1
Mounting System Vander Val (As per Roof Design) 1 £6,386
Balance of System Reputed Suppliers 1
Installation MCS certified Installation (HEIS Insurance and DNO Apporval) 1
Battery Growatt 3.3kWh Li-Ion Solar Battery (LV) 1 £1,400
Total Price After zero vat £7,786
**excluding scaffolding charges

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Performance

How will the Roof Look Like

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Savings Calculator
The savings calculation below is based on the price assuming Zero Vat on Solar equipment and grants, if any. In
the calculation, your conditions with direction, angle, sun position and shadows are included, as well as a power
loss of 2% in cables and inverters. The calculation should be seen as an estimate and is not a guarantee of
production or savings.

Production Electricity Price


Estimated Annual Inflation on electricity price: 2% Real time consumption(%): 95 £0.35/kWh
Annual Power Degradation: 0.70% Smart Export Guarantee(%): 5 £0.15/kWh
Annual escalation in price after two years 3% Total Weighted Electricity price for two years £0.34

Year Production Weighted Tariff Price Annual Savings % Return Payback cycle
1 3398 £0.34 £1,142 14.66% -£6,644
2 3374 £0.34 £1,134 14.56% -£5,511
3 3350 £0.35 £1,159 14.89% -£4,351
4 3327 £0.36 £1,186 15.23% -£3,166
5 3303 £0.37 £1,213 15.58% -£1,953
6 3280 £0.38 £1,241 15.93% -£712
7 3257 £0.39 £1,269 16.30% £557
8 3235 £0.40 £1,298 16.67% £1,854
9 3212 £0.41 £1,327 17.05% £3,182
10 3189 £0.43 £1,358 17.44% £4,539
11 3167 £0.44 £1,388 17.83% £5,928
12 3145 £0.45 £1,420 18.24% £7,348
13 3123 £0.47 £1,452 18.65% £8,800
14 3101 £0.48 £1,486 19.08% £10,286
15 3079 £0.49 £1,519 19.51% £11,805
16 3058 £0.51 £1,554 19.96% £13,359
17 3036 £0.52 £1,589 20.41% £14,949
18 3015 £0.54 £1,626 20.88% £16,574
19 2994 £0.56 £1,663 21.36% £18,237
20 2973 £0.57 £1,701 21.84% £19,938
21 2952 £0.59 £1,739 22.34% £21,677
22 2932 £0.61 £1,779 22.85% £23,456
23 2911 £0.63 £1,820 23.37% £25,276

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Details of Budgetary offer
Cost of the System:
Total cost £7,786
Total Cost with VAT £9,343
Payable cost after VAT rebate £7,786
VAT Rebate due to Zero Vat £1,557

Payment Schedule:

Upon Supply and installtion of Panel 50% £3,893


Upon Complete Supply, Installation and start of Power Production 50% £3,893
Total £7,786

** excluding scaffolding charges

Included Scope:
● Complete transport and installation to recipient's address
● Scaffold assembly and roof safety according to the regulations
● Planning and dimensioning of facilities
● Network connection facility
● Online monitoring of the Power Production*.
*Requires internet connection to inverter in the form of WiFi.

Growatt MIN 3000-XH Hybrid Inverter


10 Years Warranty

25 Year Linear Performance Warranty


12 Year Product Warranty
Trina Solar Vertex 420W Mono PERC All

Black
Growatt 3.3kWh Solar Battery (LV)

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Terms and Conditions
Costing
● This quotation is based on us being able to install your system as described without interruption.
Should there be circumstances beyond our control which cause an interruption to the installation
process, we will discuss with you the implications of such a delay.
● Should you wish to make any changes to the agreed installation after the cooling off or cancellation
period has expired, we will prepare a new quotation for you. Still, we reserve the right to charge for
any reasonable costs we have incurred in working towards the original installation details.
● If during the installation process, we come across any unforeseen situation , for example, remedial
electrical or building work, we will discuss with you the implications and costs involved in rectifying
the problem.
● Should you request any changes after the installation process has begun that involves additional
Costs, the rate that would apply would be £50 per hour or £400 per day.

Contract Terms
Should you wish to enter the contract, kindly sign and approve this offer digitally, it will automatically convert
into a valid contract.

Timetable for Works


● If you decide to accept our quotation, we will contact you and arrange a mutually agreeable date to
begin the installation which we will confirm in writing.
● The installation will commence within 4-6 weeks of receiving your order, subject to workload and
availability of materials. We will contact you at the earliest opportunity should there be any delay in
obtaining the goods or services required.
● Estimated time of installation: 3-4 days including the erection and removal of scaffolding.

Cancellation Rights
Your cancellation rights will vary depending on the site of the contract agreement.
● If the contact was agreed at our trade premises, your cancellation rights are as set out in the
Consumer Contracts (Information, Cancellation and Additional Charges) Regulations. These
regulations give you the right to cancel the contract within fourteen days of delivery of the goods.
● If the contract was agreed at your own home, you will be given a 14-day cancellation period from the
date of signing the contract.
● If you want to cancel this contract after the Cancellation Period for any reason then you may have to
pay costs and we may retain all or part of your deposit and further advanced payments, if made, as a
contribution

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
● If you wish us to begin work within the cancellation period you must give us a clear statement by
letter sent by post, fax or email. You may do so by contacting us or sending us this form (You do not
have to use this form):
NAME:
ADDRESS:

I/We (delete as appropriate) hereby give notice that I/we wish to cancel my/our contract dated:
SIGNED: DATE:

Payment Terms
You will pay for the Goods and Services as follows:
● Once the Goods have been manufactured they will be assigned to You and You will pay
us a further staged payment [amount equivalent to the value of the goods].
● On completion of the installation, You will pay the balance of any sums due within [7]
days.

We accept payment by cash, [cheque, bank transfer, debit or credit card]. .

Late Payment
If you fail to pay the amount specified in an invoice by the due date then we may charge interest until the full
amount is paid. The interest rate we charge will be 3% above the base rate set by the Bank of England.

Planning Considerations
Planning permission may be needed if:
● The property where the installation is to take place is within a Conservation Area, National Park, or an
Area of Outstanding Beauty.
● If the property is a Listed Building
In any of these circumstances we would strongly suggest you contact your local planning authority.
Whilst we will assist you in gaining any permission, it will be your responsibility to ensure these permissions
are in place. We cannot be held responsible for any installations carried out where planning permission was
required but not obtained, and no refunds will be offered.

Structural Issues
The MCS (Microgeneration Certification Scheme) says that if we are in any doubt as to the structural
suitability of the building, then a structural engineer should be consulted. We will assess the suitability and
will only install it if we feel the structure is suitable. If we are in any doubt, we will liaise with you and consult
a suitably qualified person. Depending on the circumstances, this will either be our or your expense. If such a
matter should arrive, we will make our position on the same clear to you in writing.

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Data Protection
We will keep information about individuals in accordance with data protection legislation. We will not pass
information to any third party without your permission.

Warranties
● The equipment may be covered separately by manufacturer warranties, but you should contact us in
the first instance if anything appears to be wrong.
● Should we cause any damage, either to installed equipment or to your property, we will rectify such
damage free of charge
● We provide a workmanship warranty for two years from the date of installation. This workmanship
warranty will be transferable to the new legal owner of the property if it is sold during the warranty
period.

Insurance
It is recommended that you inform your property insurers about the proposed installation to check if it will
increase your building's insurance premium.

Commissioning the system


● The Solar PV system will be commissioned according to MCS installation standards to ensure that the
system is safe, has been installed in accordance with documented procedures and manufacturer's
requirements and is operating correctly in accordance with the system design.
● Following the testing and commissioning of the system, a detailed operating manual will be provided
to you within 7 days.

After Sales Support and Maintenance


● If, following installation, the system does not appear to be operating correctly, please refer to the
operating instructions. We will hand over the solar plant in safe and operating condition.
● If you are still in doubt as to any aspect of the system's operation, please contact us. We will resolve
the same depending on the issue.
● We can, should you require , provide servicing and maintenance contracts at additional cost.

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Dispute Resolution
In the event of an unresolvable issue, You can refer Your case to Our nominated alternative
dispute resolution provider through HIES, and the Dispute Resolution Ombudsman, HIES Can
be contacted at:
T: 0344 324 5242
E: info@hiesscheme.org.uk
www.hiesscheme.org.uk
Centurion House, Leyland Business Park, Centurion Way, Leyland, PR25 3GR

This Contract is subject to the applicable laws of England, Wales, Scotland and Northern
Ireland and save that the parties agree that, in the event of a dispute, We will exclusively
attempt to resolve the dispute through HIES’s alternative dispute resolution services, the
courts of England and Wales shall have exclusive jurisdiction to hear any dispute arising from
this Contract.

Using Your Personal Information


We will use the personal information You provide to Us in accordance with the Data
Protection Act 2018 ,General Data Protection Regulations and more specifically to:
● Supply the Goods and Services to You
● Process any payments that You make for the Goods and Services, including if necessary conducting
credit reference check;
● Register Your installation with any relevant bodies, including Your deposit protection and insurance
backed guarantee and any competent persons scheme;
● Address any concerns or complaints that You have about the Goods and Services, including liaison
with HIES and QA Scheme Support Services Limited or The Dispute Resolution Ombudsman where
the law requires Us to share.

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ
Confirmation of the Order:

By signing this Order Form,


● We confirm to give you the consent to install the proposed solar plant as per the details given
above.
● We also confirm having received Planning Permission or a Building Warrant for the proposed
installation or ascertained that these are not required. Arin Power cannot be held responsible for
any installations where Planning Permission or a Building Warrant was required but not obtained.

Address for communication

Arin Power Limited

For Customer For Arin Power Limited

Name: Name:

07503074000 Arin Power Limited


info@arinpower.com 71-75 Shelton Street, Covent Garden
www.arinpower.com London WC2H 9JQ