You are on page 1of 24
Rajasthan Rajya Vidy (Project, Plannin ut Prasaran Nigam Ltd. 1g & Monitoring Wing) PROJECT ESTIMATES TO INTER-CONNECT RVPN’S 765 / 400 KV ANTA GSS WITH PGCIL’S 400/220 KV KOTA GSS ~ rere err www ew ‘ Swwvvvvver~ ~~. - eee el elk Pha) 2 PROJECT ESTIMATES TO INTER-CONNECT RVPN'S 765/400 kV ANTA GSS TO PGCIL’s 400/220 kV KOTA GSs SESS SCIL'S 400/220 kV KOTA GSS Introduction This issue was also discussed i held on 4” January. 2011 at New Delhi between Anta and Kota would facilitate Power transfer during maintenance/shut mine 19° meeting of Northern Regional Power Committee (Appendix-2) wherein it was discussed that 400KV S1G lng interconnection between two corridors which would enable down! power outage of the units/ines as well as result in Proposal in the 133" BoD meeting of RVPN held on 30-5-2007, the following evacuation system had been approved for Chhabra TPS Stage | Phase | (2x20 Mw) 1305 kms 400 kV S/C Chhabra TPS-Hindaun line with 1x 315 MVA, 400/220 kV GSS at Hindaun (20 km 400 KV DIC line exist at Chhabra TPS ena) 2 303 kms 400 kV SIC line Chhabra TPS — Bhilwara line with 1x315 MVA, 400/220 kv GSS at Bhilwara (130 kms 400 kV DIC line fom Chhabra TPS to a and one circuit is extended upto Bhilwara) 3 220 kV SIC Chhabra TPS- Jhalawar line 4, 220 kV SIC Chhabra TPS location at Dahra SSSCSCSSCSSKOVDVVBVTOBPUTZET eT ewe_ -- ee PEBECEEEELEULEELE RCE TEC SITs oe ee EE EEE EEG tFConnection of RVPN's T6S/40OKV Anta GS with POCIL's ' 4o0r220hv Kota ass. ‘A _Detaa of Tanemiesion system covered under te scheme Olga ttctane anny 0 cme Ts pee ace ony wed] 9 fess ‘ Prnenet to [ear ein em Tenn tos ss wrociswnczowvesecsss | ag (2, ony oar Capen a Teton 65 wane t TOTAL PROVEETEOET Ta] 8. WCCateulaton of the scheme. ee ae Sa] oe] See a a me Commngaone | somauna | foes | eve sinoe sn se tat a yar en | an a Bier Tatar as a ae | ae Tk | ae se} Teer ise aro rants — TOTAL PROJECT cosT WcLUOING LO.c=Re ames foes, (Say Rex sy roves) werree vperrervvvvevvvwvevewe Aypendt x. 4 —___ Page 1 of 23 Government of India Central Electricity Authority ‘System Planning & Project Appraisal Division ‘Sewa Bhawan R K Puram, New Delhi -110066 No.1/9/10-SP&PA/ Dated: 20.01.2011 ~As per List enclosed- Sub: Minutes of the 29% meeting of the Standing Committee on ‘Transmission System Planning of Northern Region and Long Term Aeceae meeting held on 29” December, 2010 at POWERGRID, Gurgaon, ‘This is for your kind information and further necessary action at your end please. Yours faithfully (B. K. Sharma) Director (SP&PA) Page-12 of 23 Gane tn accordance with above even Inter-State Generating Stations owned by the Central Government need to apply for Connectivity/Long Term Access as applicable, POWERGRID daycuaitt they had already requested SIVNL vide letters dated 28/04/2010, 30/08/2016 & $2/1222010 for applying connectivity and Long Term Access, however the applications wag yet to be received However, POWERGRID indicated following tentative system after the preliminary system studies: Associated transmission for Luhri generation: ¢ LILO of Rampur-Nallagath 400KV line at Lubri + Luhri-Mohali 400kV Die (Triple Conductor) System Strengthening: ‘+ Mohali-Malerkotla 400kv Die * LILO of one circuit of Nallagarh - Patiala line at Mohali 400kV Die * Establishment of 2x315 MVA 400/220kV GIS substation at Mohali ‘Members decided that SJVNL should first apply for connectivity and LTA to the POWERGRID (CTU) and thereafter the transmission system for the project would he taken up for consideration of the committee. 14. Transmission system for Singrauli-III TPS (500 MW) Director (SP&PA), CEA informed that NTPC was implementing Singrauli STPP Stage-IIT (500 MW) in UP with Northern region beneficiaries.The project is likely to be commissioned in 2013-14. It was informed that the present available system would not be adequate to evacuate power from this project. He further informed that studies were Gaitied out by POWERGRID & CEA and after analysing the same, following {transmission scheme was proposed for ewacuation of power from Singrauli-TIT TPS: > Singrauli-Allahabad 400kV S/e > Allahabad-Kanpur 400KV Die POWERGRID further mentioned that in existing Singrauli—Allahabad line, about 50 {i section is Sle strung on Dic towers and in view of severe ROW constraint at Singraul, the proposed SingrauliAllahabad 400kV S/e would be strung on the above Die towers wo eYer Possible. Balance portion would be developed as S/e line. Allahabad - Kanpur 400 KV Die line would be required for transfer of power beyond Allahabad. POWERGRID also stated that NTPC had applied for connectivity, however it was advised that NTPC might apply for LTA, before the above works could be taken up for implementation Members agreed for the above, IS Anta-Kota 400KV Line -Agenda by RVPN RRVPNL (Rajasthan) had proposed following system for connection of ISTS and their system: > Anta(RRVPNL)-Kota(PG) 400kV Sie line Page 13 of 23 Director (RRVPN) stated that large state thermal ‘generation projects viz. Chhabra and Kalisindh were coming at Antal Dahra Sis and in_view of this it would be_ fent to intet XV-Kota S/s (PG) for enhancing the no. 400KV line bs ‘Strengthening sche Members agreed for the above proposal. 16. Srinagar-Tebri Pooling Station 400 kV Dye (Quad) Line Irene GRID stated that for system reliability and stability there was a need of inter Srincgermanconnection, They proposed a 400K Die Line fav trey Pooling Station to Mg at {OOKV substation. Ditecor (RRVPNL) suggesed marie ROW constraints in BIIY Aen, the proposed 400 KV line might be commenced ain Quad conductor. The same was agreed by members, a POWERGRID further stated that PTCUL might inform the implementation schedule for Stinagar S/s and other associated lines within thee Scope. POWERGRID also stated that Members agreed for the above proposal 17. Bus reactor at Rihand POWERGRID stated that it was agreed to provide Ix125 MVAR bus reactor at Ritsnd in the 28" standing committee mecting held on 33 02.10. Subsequently NTPC indicated that presently 80 MVAR bus reactors were being procured by them under Rihand Ill and Vindhyachal-TV projects. In view of this Nive requested to examine the Possibility of installing 180 MVAR bus reactor for eave or Procurement through the wr Ph PPendiy -2. eR arene, assent, QGP ‘rex: 26865206 AIT aCaTT D Chek) arr ft Page fa 16%, afte she fe ar, neanftar aera, we Rett 110016 Government of india 2 4 JAN 201 Northern Regional Power Committee AN 18-A, Shaheed Jeet Singh Marg. Katwaria Sarai, New Delhi-110016 Prragecr beh rsref, er. (aT, y49-8. Phar 14/ Rete: 19a, 2011 gow Dayee- No.NRPC/SE(CISRPC/ 11/3 87-2623 Dated: 19 January, 2011 oa Pe: a * Noe lo, : kes rth doe Reg aR ae eh Beat Gea) TRIER Mie ge are 9 Sodettiand (ear et agar) anh ~ [azmbers of Norther Regional Power Committee a fh (As per list attached) LN Rew: ore ate Reger ae 19° (Rita tow ar arta | Sublect: Minutes of 19th (Special) meeting of Northern Regional Power Committee 7 (2 The 19" (Special) meeting of Northem Regional Power Committee was held on 04" January, 2011 at Hotel Sangti-La's-Eros, New Delhi. a COPY of the summary record of discussions of the SN meeting is enclosed herewith for favour of inf formation and necessary action, aioe: what weit, Endl: As above Yours fathfuty, ivlm Saft 2 Z 1a] oi]201 oP RVBNL JAIPUR poo ar (stator pare arrar <& R.NO. ill Q\. e on w A i: Aggarwal EN EXDELEROL AION) “ eh) “AN Member Sectetany “SRACCTSTHASTE( sow hn SE (PRP) AAC PSs) ros at PL puke’ C2 clea algo lh net aN NORTHERN REGIONAL: POWER COMMITTEE SUMMARY RECORD OF DISCUSSIONS OF 19" SPECIAL MEETING OF NORTHERN REGIONAL POWER COMMITTEE List of participants is enclosed at Annexure. Shri AK. Aggarwal, Member Secretary, NRPC, welcomed NRPC Members & other Participants. He informed that Shri Anurag Agarwal, CMD Punjab State Transmiseen Comp. Ltd, and Chairman, NRPC could not attend the meeting due to prior commitments and had asked to proceed with the meeting. He proposed the name of Member (G08D), CEA to chair the meeting. With the consent of the house, he fequested Shri S.M.Dhiman, Member (GO&D), CEA to chair the NRPC meeting. He further proposed the name of Shri Y K Raizada (Director) RVPN, as Chairman, TCC which was also agreed by the Members. Executive Director, POWERGRID (NR!) welcomed participants of the 19! special meeting of NRPC and thanked them for attending the meeting, despite severe winter conditions and problems in traveling due to roadiair traffic disruptions. Director, RVPN welcomed the participants and stated that this special NRPC meeting Yas called for concurrenc’ of the NRPC to the transmission proposal agreed in the Standing Committee meeting of transmission Planning in Northern Region before the timeline of Tariff based competitive bidding. He mentioned that many transmission schemes had been proposed in the agenda , which need to be approved. He further Stated that the although the trunk transmission system would remain same, the transmission system should be flexible enough to take care of subsequent requirement of any change or fine tuning in the system’at future date. Member (GO&D), CEA welcomed the partciparits to the 19" (special) NRPC meeting and wished them a very happy & prosperous new year 2011. He stated that the Power demand in Northem Region has been growing at faster rate resulting in continued shortage condition. He further stated that a number of IPP's, are coming up in the Eastern Region (Orissa, Jharkhand ete.) and in Southem/estem Region with target beneficiaries’ in Northern Region. For transfer of power from Regions having high concentration of new generating capacity to the other regions, high capacity corridors have been planned. He stated that as a part of the ongoing process for planning for ‘rangmission system for evacuation of power from additional generating capacity, a humber of schemes have been identified for NR beneficiaries as also for System strengthening and discussed in the last Standing Committee meeting held in December 2010 which have been incorporated in the agenda for consideration. He stated that in the expansion of the transmission system, the provisions to ensure the stabilty and the reliability of the grid need to be given due consideration. He appreciated the action taken by the utilities of the Northem Region like cleaning of insulators and the replacement of 1 NRPG concurred to the proposal, 3.0 Transmission system associated with Meja TPS Executive Director /POWERGRID, explained that NTPC had been developing a 1320 MW power plant as a JV project with UPRVPNL cp Meja in UP. From Meja TPS, UP had share of about 900 MW and balance of about 400 MW power for other Kerariuents. For evacuation of power from the generation Projects like Meja, Bara, Karchanna etc., UPPTCL were developing an integrated transmission network. In order to integrate the system being developed by the State with ISTS and for transfer of power from Meja to other constituents following transmission system was agreed during the 29” Standing Committee Meeting: > Meja-Allahabad (POWERGRID) - 400 kV Dic Beyond Allahabad, available capacity in Proposed Allahabad-Kanpur line would be ulilized for transfer of power to the constituents, Rewd Road to Allahabad (PG) planned as a part of integrated network of UP. Chief pugineer, CEA stated that in view of the Meja-Allatane, 400 kV Dic line, “Rewa Road - Allahabad (PG) 400 kV Dic line shall net be required. NRPC concurred to the proposal. 4.0 Transmission system for Rajastan Atomic Power project (RAPP) -788 (2x700 Scheduled for commissioning by Jun-2016 and Dec-2016. Following Transmission system for RAPP-7&8 was proposed: > RAPP ~ Jaipur (South) 400 kV D/c line of which one circuit to be LILOed at Kota > RAPP — Shujalpur (WR) 400 kV D/C Penffes 4! The Board of Di 1 joard of Directors of RVPN, in its 167% aa Sa pet rate erg ne sycies ae ese ‘TPS and Kalisindh TPS where 2x765 kV Super Critical TPS ’ Super Critical TPS and Kalisindh TPS to 765/400 kV pooling Also, the Board of Directors of RVP, init 169! m 25% ‘August 2008, hae. accorded administrative and frm approval for evacuation syatem of Suratgarh and Banswara fnamission eyetem env atau Supe Cita TRS Includes 400 KV G8S Jmurpune with 400 KV /C line on Quad Moose from Suratgarh Super Critical TPS and extending the 400 kV D/C line on Twin Moose from pro; 3 kV GSS Jhunjhunu up to Jaipur (North). ean | ; 3.| | Se(tecmajmer was Instmcted to search for the sulabe i 0 Hactare) for construction of 400 kV GSS around unjhunu with adequate ROW fer emidnating/ terminating 400, kV {as well as 220 kV transmission lines, He replied that there is no j such land around Jhunjhunu. In the meanwhile, representations from the President Block Congress Committee, Khetri (DisttJhunjhunu) and the Pradhan’ Panchayat Samiti, Khetri {Distt Jhunjhunu) have been made to the Hon’able Energy Minister, Govt, Of Rajasthan requesting to construct a 192 kV GSS in the Siva of Gram Panchayat, Babai. It has also been indicated in the Sepresentations that a piece of Govt. Land, measuring about 32 Hicare, is available along the Khetri-Neemkathana road in Uiieedarura, Gram Panchayat Babal, Tehsil Khetri vi Setandnunu where two numbers of 220kV and one number is) mansmission line are just passing. It has further been sexed that construction of 400kV GSS at this land, being at the State Met hunjhunu and Sikar District, would benefit both the i cereetts, So, the site indicated in the representations was visited and, as stated, it has been found to be most suitable and aeeromical (due almost negligible length of 220kV interconnections) for construction of 400kV GSS and also construction of 132kV GSS er reettame land. It will also obviate the 220kV proposed ‘bgtadation of Neemkathana GSS as well as would also meet Tea of Railways for creation of 220 kV GSS by them at Maonda/ Neemkathana for proposed freight corridor, 4 ‘A suitable land, near Vill. Phagi (measuring about 478 Bigha), has been identified for construction of 765/400 kV GSS around i Jaipur (under composite evacuation system of Chhabra Super Critical TPS and Kalisindh TPS). The technical suitability for termination of 765 kV and 400.KV inter connections from this land has been examined and it'i'fotind that it would be the most tuitable location for termination of all the EHV lines and also there would no. problem in .4eanspaxtation of heavy equipment/ i Consignments to the site, The field officers have already been Gdvised to get this land allotted from the GOR at the earliest ‘The existing site for 400,4¥ switching station at Dahra was examined for its suitabilige std adequacy in construction of $65] 400kY pooling sub-aigtson at Dahra. It was observed that the aad ie inadequate for construction of 765/400KY pooling sub- vento and is in low lying area comprised of undulations. Moreover, N APPENDIX~ GENERATION SCHEDULE FOR THE CONDITION CORRESPONDING TO 2011-12 Gpap FLOM ANALYSIS ConVERGED, ITERATIONS P 8.9. 7 Se mr eae cobenncr (eM aceroice isa SOMTINGRICY Wwe © Basecase "RATING CONSIDERED © NoWaAL Pont Meee Omer Actual-pu Angie (deg) Pyen hs) Open VAR) GalaibWAR) (eax (van) Sseswoe $$} 1-000” G-siea “asoceos Sy a1 Tae 800 250.000 fo "mses $$} 10000 aloean Soocens gg 8 200 00-000 & ros £ $2 Loo titers iSpcggs “88222 “240 200 100.000 @ rns $f Hoe izvonea doecans PRES 750 00 80.000 So ima o£ $2 20000 dsenee davies $268 238 82 40.900 Roms $$ 2 Nooo ATI Nios PEF sassaee 0000 to mor; $$ 2 ioe in.beze itocons $434 “30.000 40.000 Somons ff 2 Mevoo azisays iocans 2832 “30.000 18.000 2 mmm ff} 290002 Ses Aoocone — S12BF 72-000 36.000 2 anes $Y 2000 “2'9esa “econ, USES a8. 00 24.000, ss "more 2 $f ho000S3eaeGeloog 3527 124° 000 50.000 a "mse $$ ooo 7.eean aoscone 2 22S “30.000 30.000, ose ft dom loses “tacone “$5908 Hs 200 40.000, “mine 5 $2 Lovo 50098 gacgee 12-204 538/000 0900 soMmmie of 2 Neues 203585 asalsoe ang 882 29-290 200/090 S "man $2 2 Hoe “Glo0e saacaze “220-882 -300:000 300.000, So curse $$} Moma ASK8e SSorda0“TREGBZ “280-000 30.000, by sores «2 $2 Loson Lt"foen atzcane $9780 40.000 40.000 a oma $f ome TENG Hecene E522 “30.000 48.009, 3 $f fesse 3.773, aaeiooo delta “gered 48-900 5 $f Bee 3:37 doo.000 balan 120.002 40-000 $ 2 foo aeistse sto.n00 — tesane -aaasgte t0.008 Rie 1 treate (= [ilshza «zeaiooe, eiaiyea mrsnieeel caeeeiete kt esses Baers 724,000) sesape | casigees aarene S$} Beg evexe, 2ailo00 —sisag “ygigt? 129-000 $f Lege 20-0831 080.000 adeiaey 700008 39-000 ff 2 Bases “zszee “'o.000 —“75iggq "200.00 00000 ee > ff Rae zine “aloes Siog9 8908s: 008 3 ff Bee sss3923 oleco aay e0® 8000 2 ff bee sais77 lose Bonn «8007 8.000 2 2} BME apace clone a'gnp get «8:000 PP Oe BME of000 Site 8008 ann Munber of generators: 40 Summary of resuies BOTAL REAL POWER GuemnatroN —; 9207.224 400 TOTAL REAL POWER TRIECT. sve 1, 0.000 ta TOTAL REACT. PowER GENERATION; 259/996 Man GEnenarzow pe 1000 TOTAL SUT REACTOR INJECTION + =,000 sa ‘TOTAL SuUNT REACTOR IngRCTION | -3430/990 MM TOTAL sumer caPAcrT.z¥TECTION ; 9.000 sa ‘TOTAL SWUNT CAPACIT. INJECTION ; 17501529 Man TOTAL suusT FACTS. raJECrroN 0.000 sag TOTAL SHLMT PACTS -DRAWAL 2.000 van TOTAL REAL POKER LOAD 8927.69 9m FOTAL REAL POWER onaWAL «veg; “973-903 St TOTAL REACTIVE: FoWER TAD 4279188) aR Lond pt 9.303 TOTAL COMPENSATION AT LoADS 2000 mwas TOTAL wvoc REACTIVE Powen 9.000 MuaR Pancevmase Ron™ LOSE (ACHDC) : 279.se4156 we (279.584186+ 0.000000) PERCEYTAGE REAL Loss (assoc) alas aaaaaraeee COST ESTIMATE DETAILS OF INTERCONNECTION OF RVPN'S 765/400kV ANTA GSS WITH PGCIL'S 400/220kV KOTA GSS RSIBOOKV ANTA GSS WITH PGCIL'S 400/220kV KOTA GSS. 1.1 PRELIMINARY EXPENSES No provision is required under this head as the same is included in the per kM transmission line cost 4.2 LAND No provision is required under this head since the crop compensation etc. are inclusive in the per kM line cost 1.3. PLCC & TELEPHONES No provision is required under this head since PLCC system cost has been covered in the Sub-Station equipments in this project estimate report. 4.4. OFFICE EQUIPMENTS No provision is required under this head 1.5 SOCIAL INFTRASTRUCTURE & COMMUNITY SERVICES A ‘otal provision of Rs. 8.00 lacs has been made under the head “Social infrastructure & Community Services" to meet out the expenses towards arrangements of igmPorary sheds, lat-bath, drinking water, any first aid medical facility etc. for faboutlworkers involved in construction of substation and line during construction stage as per following SiNo!| eu _ Particulars _ | “Amount (Rs. in lacs.) =a L i [z 2 nos. 400KV lines associated with the| 8.0 Substation (4 Nos. x 2.0 lacs) 80 | 4.6 CIVIL WORKS No provision is required made under this head. ‘Projectriport between T8SKY Anta and 400KY Ko ess SUUUCUCUWTCTTTESC SCTE SSF eevceeeeverwrw~~-~-- 1.7 GRID SUB-STATION EQUIPMENTS A provision of Rs. 1650.19 lacs has been made under this head to cover the cost of equipments required for 2 nos. 400kV extension bays at 765/400kV GSS Anta. The details of the equipments to be provided at 765/400kV Anta GSS is given at Appendix-A1 and their cost estimates is given at Appendix-A : (S.No. = ___Name of Substation _ = z NOs. 400kV extension bays at 765/400kV GSS Anta 1.8 TRANSMISSION LINE ‘Amount in lacs. __1650.19 Totall 1650.19 | A total provision of Rs. 2510.00 lacs has been made under this head to cover the Gost of 400kV S/C and D/C Transmission lines of the scheme with ACSR Moose Conductor as per the following details = Dahra section at 765/400 kV Anta GSS. { s. Section of Line, Route length] Rate per] Amount _No. . i | _inkM | kM in lacs. | 1 LILO of 2nd circuit of 400 KV DIC Chhabra TPS- | 80 80 | | 1 DIC 2 [400 kV SIC line from 765/400 kV Anta GSS to 45 SIC 54 2430 | PGCIL's 400/220 kV Kola GSS # ! i a es Totall ic [2510 ince 430 kms 400 KV DIC line from Chhabra TPS to a location at Dahra has already been constructed hence extention of 2nd circuit of 400 kV D/C Chhabra TPS-Dahra section upto POCIL's 400/220 kV Kota GSS by constructing a new 45 kM 400 KV SIC line between Dahra & Kota(PG) would be required, The “above per km. estimates of 400kV D/C & 400KV SIC lines are as per Appendix-B. 1.9 VEHICLE No provision is required made under this head. Estimate of Substation Equipments at 765/400kV GSS Anta (Refer Single Line Diagram at Appendix-A4) Append i , , GEMGIEC] , ‘Sho. [Particulars Qy. Unit Rate] ‘Amount| 1 [az0KV GVTS (i-phase) 5 Nos. 6.54 39.24] , [27 UA for 400% System Ciphasey 6 Nos. 3.35 23.76] i 2 2 Roto operated oats WI GER: in ra To2al wal 9 |e RRR, Nor epraad ears wi doa EBT 5 = Ta a T_[sa0kv 3 pole Creal Greater S-phase z Ns ss] Toa , 1220KV. 3 pole Circuit Breaker (S-phase) Tor controling & [Shunt Reactor alongwith microprocessor based point | 0 Nos. 70.38] 0 , lot wave controller 1220 KV CT's (-phasa) | Wes, aaa Tas] ’ [420 KV Bus Post Insulators alongwith connectors 21 Nos, 0.47] 9.87] . [S20 KV Wave Traps ({-phase) 3 Nos. 6.14 EERE 400kV Bus-bar Protection scheme for the 1 1 complete systom (Augmentation) “as | *| . TT [400kV Contol and relay panel: i) For vansformer a os EEE a ® il) For Line feeder with Auto Reclose scheme 2 Nos, 32.8] 5.66) ii) For Breaker 2 Nos. 9.34 38.65] ® iv) For Reactor 0 Nos. 22.29] ol 7_Marshiing Kiosks (VK) Tor 200K system 2 Nos. 437 S74 . ISCADA system : Automation/SCADA solution with ° lassociated accessories & equipments consisting of I8CU's, Communication interfaces, Networking *9 Jelemenis, Computer Systems, SCADA sefware, Data | us 59} cot ° acauisiion elomenis, Sensors, Cubicles, GPS etc. lAugmentation] ° 1 [Power and contcl cable i ws 759 750] é 15, ating esupments ining Ear Wat, around wie) a a 5 15_[Sub-Siation Slee! Stuctures i ws 7 7 » [Bus bar material, camps & Discinsuatore molding 17 |aluminium tube, associated clamps, conductor for 1 us 100] 109] *° Bus-bars of 400KV system zi TE [Firefighting system iz ts a a fe [is Tarcondiions & ventfaton + Ls 70 79 20 [lighting system 1 ts 70 109 fe arc Sistem z ts 79] 50) 22_JOLTE Communication System t us: 35 35] - Toia"A'| ——T183.5700] 23_| Cost of Cl Works @TO% on 118.36) Tour 7301.93 © boheme establishment incluging leave persion, CPF ac 2. |aer came ec 97.64] eo (i ast anaaecounis came TH F502 [Losses on stock @0.25 % 3.25 ee le ios o3% 39.05] [labour Charges @5% 85.10] eo Fr Mansporation Charges @ 5% 85.10) vii_[Contingencies @ 3% = 39.06] fee [Lill Trois & plans, vehicles spacer TaP ac ie 43.02 ix [Maintenance during construction @ 1% 13.02 oe Tota 7650.19 Lod me | PPPENSS x AL. Pay/a-nt/asiti/eaut on “oa (mavEyany Gv $59 009/508 sou Rviovid ANT FIONIS nmavsrid ana Appendix-8 ESTIMATE OF 400kV TRANSMISSION LINES i S.No, tom Qty. Rate in Amount in Rs. lacs. Rs.lacs 1__|400 KV (D/C) TWIN MOOSE TRANSMISSION LINE 1 [400 kV O/C (twin Configuration Per Phase) Tower] tT w a7 Package including Insulators, Tower Structures, Jaccessories and Earth Wire (OPGW), Hardware| Fitings for Conductor and Earthwire, Earthing, Spacers, Vibration Dampers etc. including survey, civil works, lerection, stringing. (Per Km) 2 [400 KV DIC Conductor Package (ACSR Moose) for] 7 cy 3 Twin Conductor Per Phase (Per Km) OTALS __|400 kV (S/C) TWIN MOOSE TRANSMISSION LINE 1 [400 kV SIC (twin Configuration Per Phase) Tower] 1 % co [Package including Tower Structures, accessories and| Earth Wire (OPGW), Hardware Fitings for Conductor Jand Earthwire, Earthing, Spacers, Vibration Oampers| etc. including survey, civil works, erection, stringing (Per Km) |400 kV SIC Conductor Package (ACER Noose) for] 1 5 5 Twin Conductor Per Phase (Per Km) | 3 [400 kV SIC Insulator Package (160 KN & 120 KN Oise] 7 3 3 Insulators) for Twin Conductor Per Phase (Per Km) 0 [TOTAL STEEECE CTT EEREKR TES TCE E TCC EC KK OOo we © ©-©-c,c~,

You might also like