Health Care Risk Assessment
NFPA 99
RISK ASSESSMENTS
4
BIGGEST IMPACT:
• NEW HOSPITALS
IF 2012 LSC GETS ADOPTED:
5
IF 2012 LSC GETS ADOPTED:
MAY APPLY TO
ALL
HOSPITALS
&
NURSING
HOMES
6
TOTALLY RE-WRITTEN
Requirements
Change From:
Occupancy-Based
to
Risk-Based
7
TOTALLY RE-WRITTEN
Requirements
Change From:
8
TOTALLY RE-WRITTEN
Requirements
Change From:
Occupancy-Based
to
Risk-Based “You DO IT if the
space is health care,
regardless IF there is
a need”
9
TOTALLY RE-WRITTEN
In other words:
10
REORGANIZED CHAPTERS
11
Re-Organized Chapters
1999 2012
3 – Electrical Sys 4 – Risk Assessment
4 – Gas & Vacuum 5 – Gas & Vacuum
5 – Envir 6 – Electrical Sys
6 – Materials 7 – Info Technology
7 – Elec Equipment 8 – Plumbing
8 – Gas Equipment 9 – HVAC
9 – Mfr Requirements 10 – Elec Equipment
10 – Laboratories 11 – Gas Equipment
11 – Emergency Prep 12 – Emergency Mgmt
12 – Hospital 13 – Security Mgmt
13 – Other Health 14 – Hyperbaric
16 – Nursing Home 15 – Features of Fire Prot
17 – Limited Care
18 – Home Care
19 - Hyperbaric 12
1999
9 Gone 2012
3 – Electrical Sys 4 – Risk Assessment
4 – Gas & Vacuum 5 – Gas & Vacuum
5 – Envir 6 – Electrical Sys
6 – Materials 7 – Info Technology
7 – Elec Equipment 8 – Plumbing
8 – Gas Equipment 9 – HVAC
9 – Mfr Requirements 10 – Elec Equipment
10 – Laboratories 11 – Gas Equipment
11 – Emergency Prep 12 – Emergency Mgmt
12 – Hospital 13 – Security Mgmt
13 – Other Health 14 – Hyperbaric
16 – Nursing Home 15 – Features of Fire Prot
17 – Limited Care
18 – Home Care
19 - Hyperbaric 13
1999
6 New 2012
3 – Electrical Sys 4 – Risk Assessment
4 – Gas & Vacuum 5 – Gas & Vacuum
5 – Envir 6 – Electrical Sys
6 – Materials 7 – Info Technology
7 – Elec Equipment 8 – Plumbing
8 – Gas Equipment 9 – HVAC
9 – Mfr Requirements 10 – Elec Equipment
10 – Laboratories 11 – Gas Equipment
11 – Emergency Prep 12 – Emergency Mgmt
12 – Hospital 13 – Security Mgmt
13 – Other Health 14 – Hyperbaric
16 – Nursing Home 15 – Features of Fire Prot
17 – Limited Care
18 – Home Care
19 - Hyperbaric 14
1999
6 Re - Arranged 2012
3 – Electrical Sys 4 – Risk Assessment
4 – Gas & Vacuum 5 – Gas & Vacuum
5 – Envir 6 – Electrical Sys
6 – Materials 7 – Info Technology
7 – Elec Equipment 8 – Plumbing
8 – Gas Equipment 9 – HVAC
9 – Mfr Requirements 10 – Elec Equipment
10 – Laboratories 11 – Gas Equipment
11 – Emergency Prep 12 – Emergency Mgmt
12 – Hospital 13 – Security Mgmt
13 – Other Health 14 – Hyperbaric
16 – Nursing Home 15 – Features of Fire Prot
17 – Limited Care
18 – Home Care
19 - Hyperbaric 15
HIGHLY RECOMMENED
Buy the Handbook
Explanations of the
many changes
• Expert insights
• Descriptive photos
• Helpful tables & charts
17
BOOK
• Easy to flip to referenced sections
• Can copy & show others
PDF
• Easy to search for topics
Chapter 4
Risk
Assessment
19
RISK ASSESSMENT
21
4.1 – Building Systems Categories
1
High Patient
Impact
2
Consider equipment
Minor Patient operation
Impact
NOT
3
Slight Patient
Intervention by
Impact people
4
No Patient
Impact
22
4.1 – Building Systems Categories
Consider equipment operation
NOT intervention by people
SEVARITY OF FAILURE
• Harm to Patients
• Harm to Staff & Visitors
RELIABILITY
• Importance of redundancy
• Probability of system failure
• Levels of sedation
• Complexity of treatment
23
4.1 – Building Systems Categories
Consider worst-outcome scenario
of a failure impact
Major/ No
Death Minor Discomfort Harm
1 2
Failure may cause Failure limited to
death or serious injury minor injuries
3 4
Failure may cause No impact on patients
discomfort or caregivers
25
4.1 – Building Systems Categories
Evaluate potential for failure,
Based on system reliability
1 2
System must always
High Reliability
work (life support)
Expected
3 4
Normal No Impact on
Reliability Needed Patient Care
26
Category 1
Failure likely to cause major injury/death
Major injury
1 • Any amputation
Available at all times • Loss of sight, or injury to eye
for life-support
systems
• Unconsciousness that requires
resuscitation, medical
System must always
treatment, or hospital admit
work (life support) • Acute illness from biological
agents
27
Category 1
Failure likely to cause major injury/death
Examples of Failures
1 In this category
Available at all times
for life-support
systems
• Emergency power to OR's
• Medical gas system in ICU
System must always • Ventilator-assisted procedure
work (life support) in a MOB
• Cardiac cauterization imaging
equipment
28
Category 2
Failure likely to cause minor injury
Minor injury
2 • Not serious
Failure limited to • Not involving risk to life
minor injuries
High Reliability
Expected
29
Category 2
Failure likely to cause minor injury
Examples of Failures
2 In this category
Failure limited to
minor injuries • Task or procedural lighting in
patient rooms
High Reliability • Potable water in the patient
Expected care areas
30
Category 3
Failure not likely to cause injury, but may
cause discomfort
Examples of Failures
3 In this category
Failure may cause
discomfort • Heating system in southern US
• Humidity control in non-
operating areas
Normal Reliability • Dental drill
Needed
• Motorized bed adjustments
• Cooling tower makeup water in
nw US
31
Category 4
Failure would have no impact on
patient care
Examples of Failures
3 In this category
Failure may cause
discomfort • Gray water lawn sprinkling
• Seasonal lighting systems
• Public address system
Normal Reliability • Pneumatic tube systems
Needed
• Vacuum systems in a research
area
32
RISK ASSESSMENT
Must follow & document
according to a DEFINED
risk assessment procedure
Examples:
33
ISO 31010 - RISK ASSESSMENT
Risk assessment is part of the core elements of risk management
34
ISO 31010 - RISK ASSESSMENT
There are 31 risk assessment techniques in Annex B of ISO/IEC 31010
Amazon
• Brainstorming • Cause & effect analysis
$298
• Full & semi-structured interviews • Layer protection analysis
192 pages
• Dephi method • Decision tree
softcover
• Checklist • Human reliability analysis
• Preliminary hazard analysis • Bow tie analysis
• Hazard & operability study • Reliability centered maintenance
• Hazard analysis & critical cont pts • Sneek circuit analysis
• Toxicity assessment • Markov analysis
• Structured “What-If” technique • Monte Carlo simulation
• Scenario analysis • Bayesian statistics & Bayes nets
• Business impact analysis • FN curves
• Root cause analysis • Risk index
• Failure mode & effects analysis • Consequence/probability matrix
• Fault tree analysis • Cost/benefit analysis
• Event tree analysis • Multi-criterial decision analysis
• Cause & consequence analysis
35
ISO 31010 - RISK ASSESSMENT
There are 31 risk assessment techniques in Annex B of ISO/IEC 31010
Amazon
• Brainstorming • Cause & effect analysis
$298
• Full & semi-structured interviews • Layer protection analysis
192 pages
• Dephi method • Decision tree
softcover
• Checklist • Human reliability analysis
• Preliminary hazard analysis • Bow tie analysis
• Hazard & operability study • Reliability centered maintenance
• Hazard analysis & critical cont pts • Sneek circuit analysis
• Toxicity assessment • Markov analysis
• Structured “What-If” technique • Monte Carlo simulation
• Scenario analysis • Bayesian statistics & Bayes nets
• Business impact analysis • FN curves
• Root cause analysis • Risk index
• Failure mode & effects analysis • Consequence/probability matrix
• Fault tree analysis • Cost/benefit analysis
• Event tree analysis • Multi-criterial decision analysis
• Cause & consequence analysis
36
NFPA 551- FIRE RISK ASSESSMENT
$45 at NFPA
30 pages
softcover
37
SEMI S10-0307E -RISK ASSESSMENT
SUPERSEDED BY SEMI S10-0215
SEMI:
Semi-Conductor Equipment & Materials International
38
ASHE- RISK ASSESSMENT
INSTRUCTIONS
&
3 WORKSHEETS
Free download of
Excel Spreadsheet to
ASHE members
39
ASHE- RISK ASSESSMENT
40
ASHE- RISK ASSESSMENT
41
ASHE- RISK ASSESSMENT
42
ASHE- RISK ASSESSMENT
43
ASHE- HAZARD
VULNERABILITY ANALYSIS
44
ASHE- RISK ASSESSMENT
Article from:
“Inside ASHE”
Summer 2015 issue
ASHE Conference
presentation by
George Mills, TJC
45
ASHE- RISK ASSESSMENT
46
ASHE- RISK ASSESSMENT
48
ASHE- RISK ASSESSMENT
49
ASHE- RISK ASSESSMENT
2. Methodically list every room
50
ASHE- RISK ASSESSMENT
51
ASHE- RISK ASSESSMENT
52
ASHE- RISK ASSESSMENT
53
LLSC- RISK ASSESSMENT
ROOMS
54
LLSC- RISK ASSESSMENT
55
LLSC- RISK ASSESSMENT
56
NFPA 99 - RISK ASSESSMENT
Develop a uniform Risk Assessment process
• Quality Improvement
• Infection Prevention
• Environment of Care
57
ASHE- RISK ASSESSMENT
WHAT do you do
with this
jumble of numbers?
58
Now let’s
Apply the Risk Categories
To the NFPA 99 Chapters
1 2
High Patient Impact Minor Patient Impact
3 4
Slight Patient Impact No Patient Impact
59
Applying the Risk Categories
60
NFPA 99 – CHAPTER 5
GAS & VACUUM SYSTEMS
Organized by Risk
Category requirements
62
NFPA 99 – CHAPTER 5
GAS & VACUUM SYSTEMS
2012 1999
1
Level 1
High Patient
Hospital
New
Impact Risk Categories
Level 2
are similar to
2
Minor Patient Hospital the former
Impact ASC Level 1
Level 2
3 Level 3
Level 3
Slight Patient
Dental
Impact
4
No Patient
Impact
63
NFPA 99 – CHAPTER 5
GAS & VACUUM SYSTEMS
2012 1999
1
High Patient
Level 1 Under the 1999
Hospital
Impact edition
hospitals had
2 Level 2
Hospital
to follow this
Minor Patient
Impact ASC
3
Level 3 Under the 2012
Slight Patient
Impact
Dental edition HEALTH
CARE FACILITIES
4 can do any of these
No Patient (depending on the
Impact patient risk)
64
NFPA 99 – CHAPTER 5
GAS & VACUUM SYSTEMS
5.X.14 - MAINTENANCE
1
High Patient 7.3
Impact
2
75% of the Chapter
Minor Patient
Impact
7.4 deals with Risk
Category 1
3
Slight Patient 7.5
Impact
4
No Patient NA
Impact
69
NFPA 99 – CHAPTER 7
INFO TECHNOLOGY SYSTEMS
7.3.1 – Infrastructure
• Building Entrance
1
High Patient • Data Center
Impact • Telecom Equip Rm
• Power Requirements
• Pathways
7.3.2 – Systems 7.3.3 – Nurse Call
No requirements • Patient Call
(reserved for future • Emergency Call
code development)
• Staff Assist Call
• Emergency Resuscitation
• (many other sys reserved for
future code development)
70
NFPA 99 – CHAPTER 8
PLUMBING SYSTEMS
NEW Chapter
(very short)
• Potable Water
• Nonpotable Water
• Special Use Water
• Grease Interceptors
• Black Waste Water
• Gray Waste Water • Non-med Compressed Air
• Clear Waste Water • Water Conditioning
• Fuel • Water Heating
(not retroactive) 71
NFPA 99 – CHAPTER 8
PLUMBING SYSTEMS
1
High Patient
Impact 8.2 For each plumbing component
system, the facility must designate risk
2
Minor Patient category for each building space.
Impact
8.2.1 The risk category of each
3 plumbing system shall be
Slight Patient
Impact
independent of the category applied to
other systems that serve the same
4 space.
No Patient
Impact
72
NFPA 99 – CHAPTER 8 Sample
PLUMBING SYSTEMS Table
73
NFPA 99 – CHAPTER 9
HVAC SYSTEMS
NEW Chapter (short)
• Heating
• Cooling
• Ventilation
• Process
(not retroactive)
74
NFPA 99 – CHAPTER 9
HVAC SYSTEMS
1
High Patient
Impact 9.2 For each HVAC component
system, the facility must designate risk
2
Minor Patient category for each building space.
Impact
9.2.1 The risk category of each HVAC
3 system shall be independent of the
Slight Patient
Impact
category applied to other systems that
serve the same space.
4
No Patient
Impact
75
Sample
Table
SYSTEMS
NFPA 99
CH 9
HVAC
76
NFPA 99 – CHAPTER 9
HVAC SYSTEMS
ADOPTED BY REFERENCE
77
NFPA 99 – CHAPTER 10
ELECTRICAL EQUIPMENT
Not organized by Risk Categories
Similar to 1999 standard
Primarily on TESTING
• Patient-Care related equip
• Non-Patient equipment
• Laboratory equipment
(retroactive)
78
NFPA 99 – CHAPTER 11
GAS EQUIPMENT
Not organized by Risk Categories
Similar to 1999 standard
• Cylinder Requirements
• Cylinder Storage
• Gas Equipment Testing
• Transfilling & Liquid Oxygen
• Testing Requirements
(retroactive)
79
NFPA 99
RISK ASSESSMENTS
ARE YOU
READY ?
(Get started now)
80
“Lunch & Learn”
2015 Webinar Series NFPA 99
RISK ASSESSMENTS