Opening Dates:
October 2003:
Frederiksberg – Vanløse
9
Cityringen - Current Status
– Contract Award January 2011
4 EPB Machines
2 in Limestone
Tunnel Alignment
en
vn
ark
sh a
r b ro
vsp
o rv s
ort
N y t nge n
ia n
a ge
rrep
gra
um
r is t
Level, metre Level, metre
Ko
Le r
Am
Nø
Ch
F or
+ 10 + 10
Quaternary 0
0
- 10 Limestone - 10
- 20 - 20
- 30 - 30
- 40 - 40
- 50 - 50
0 1 2 3 4 5 6 7 Kilometre
Shallow tunnelling under Magasin
FEM model: 3D Geometrical model
Tunnels deep alignment - bottom view
FEM model: 3D Geometrical model
Foundation plan
Grouting Model
Status
• Casting of 3950m3 for the bottom slab in Week 43
• Ongoing traffic relocation Phase 3A, road in front of D´Angleterre expected to be open to traffic on 1st
November 2015
• In the shaft at Lille Kongensgade, ongoing drilling and TAM installation. At McDonald´s basement,
ongoing jet grouting activities.
Status
• Intermediate slab cast the end August
• Preparation of inner lining wall level -12.9 commenced
• Cradle TBM1 cast
• False tunnel TBM1 ready to be cast
• TBM1 assembly completed
Status
• All 3 levels of struts installed.
• Excavation to level -7,4m, underside of technical slab
• Cleaning of reservation boxes
• Groundwater Control system is installed
Harbour Line
Rødovre
Malmø
Frederikssundsvej
Ring 3 Stage 2
Ring 2½
Ny Ellebjerg – Ring 3
Collective coverage
with DSB (commuter
train) lines
Fehmarnbelt Fixed Link
Immersed Tunnel
19 km between Rødbyhavn and Puttgarden
KSA 46
04 November 2015
Trans European Network - TEN
KSA 47
04 November 2015
The longest immersed tunnel in the world
KSA 48
04 November 2015
Tunnel portal on Fehmarn,
KSA 49
Germany 04 November 2015
Tunnel portal on Lolland,
Denmark
KSA 50
04 November 2015
How shall it look?
Beaches, lagoon
and channel Wetland lagoon
KSA 51
04 November 2015
9 sections make one standard element
KSA 52
04 November 2015
KSA 53
04 November 2015
KSA
04 November 2015
KSA 57
04 November 2015
Industrialised tunnel elements
1995 Øresund 2004 Busan Geoje 2009 Hongkong - Zhuhai
KSA 58
04 November 2015
Fourth generation - industrialised tunnel elements
KSA 59
04 November 2015
Cross-section of the tunnel
KSA 60
04 November 2015
Standard and special elements
KSA 61
04 November 2015
Special Element
• 10 special elements
• O&M access
• Access to installation rooms
and the different tubes
KSA 62
04 November 2015
Standard and special element
KSA 63
04 November 2015
Tender proces, Civil Works Contracts
KSA 64
04 November 2015
The environment and the plan approval process
KSA 65
04 November 2015
Danish approval procedure: Construction Act
KSA 66
04 November 2015
Stage 3, Final Adjusted Priced Bid under review
KSA 67
04 November 2015
The companies in the joint ventures
KSA 68
04 November 2015
Stage 1, Submitted for E&M and Power supply
KSA 69
04 November 2015
Years of preparation - parallel processes to
complete before construction begins
√
Clarity of the German Plan
Approval
Construction start
?
Civil Works Contracts
Valid bids until May 2016
KSA 70
04 November 2015
The access roads are ready - - -
KSA 71
04 November 2015
KSA 72
04 November 2015
Drainage around the site – new pumping station
KSA 73
04 November 2015
Removal of wind turbines
KSA 74
04 November 2015
Danish Tunnel Society