You are on page 1of 3

10/24/2018 RA » Risk Assessment

Risk Assessment - GEHC, Canada S/S

The risk score for this task indicates that the simplified RA format is sufficient.

RA

RA Title/Number: Author: RA Owner: EHS Approver: Building: Status:

Construction Site Safety Approved Active


RA ID#: 318
Revision Date:23-Mar-2018

Occupation: Workstation: Component: Dept./Sub-Dept.: Team Members:

Contractor , Field Service Representative Risk Rating: Medium Project Manager - Installations /

 Questions/Comments?  Email!

RA Task Assessment 

Description: Visual Aids: Risk


Score: 

This SRA is to be reviewed in conjunction with the GEHC site specific Safety Plan (SSP). This SRA is to provide an overview of site emergency response procedures and any potential fire, explosion,
health, or safety hazards of the operation and protective measures planned for a site.

All employees, subcontractors and visitors entering a construction site will be required to read and verify compliance with the provisions of the CHASP. In addition, employees, subcontractors and
visitors will be expected to comply with relevant regulatory requirements such as training and personal protective equipment (PPE).

Potential Hazards: Potential Engineering and Admin Defenses: PPE


Consequences: Defenses:

Hazardous Waste Generation; Potential Chemical Release to Air; Potential Chemical Release to Water; Potential Chemical Release to Land; Storage of Chemical Materials; Fire Slips/Trips Position/Distance; Procedures/Processes; Signs & None
potential of combustible materials; Fire / explosion Potential of flammable; liquids/solids; Overhead obstructions; Hazards leading to eye injury; Working at height / using ladders Bodily Injury Warnings; Training/Awareness
scaffolds; Working in/around energized electrical equipment; Food hygiene hazards; Working with hazardous chemicals; Working in high noise levels; Fumes, gases, or vapor Fire
exposures; Dangers from reversing / moving vehicles; Sharp edges on equipment or tools; Slipping and tripping; Objects falling onto personnel

Requirements 

General Safety Requirements: Equipment/Chemicals: Training Requirements:

e
Safety Shoes/boots (CSA Standard Z195-M92, Grade 1 (green patch) Construction site safety meetings should be held at least on a weekly basis and
documented. Tool box safety talks will be held daily to review hazards and controls of
Safety Glasses (ANSI Z87 + high impact and CSA Z94.3 compliant) the day's tasks.

Presription Safety Glasses (CSA approved Industrial Safety Lens,

Z87 or Z94.3 frames)

Hard hat, CSA Z94.1-05, Class E; and/or ANSI Z89.1.2009, Class E

Safety gloves (if site required)

High-visibility clothing, such a reflective vest (if site required).


pl
am
References 

 SDS References  Industrial Hygiene References


Manage Manage

No SDSs currently referenced No IH Assessments are referenced


for this Risk Assessment. for this RA Print Risk Assessme

 Safety Matrix Task


References
Manage
Ex

No Safety Matrix Tasks are referenced


for this Risk Assessment

Supplementary Information 

Required Work Permits: Emergency Procedures:

Construction site notifications and permits will be established based on regulatory requirements for the site/jurisdiction. Emergency Response will be dependent on the site and included in the site specific Safety Plan (SSP). Ensure awareness of the
emergency contact/notificaiton system; map of evacuation routes from the site and route to nearest medical facilities.

Generally:

Pre-Emergency Planning

-During the site briefings, all employees will be trained in and reminded of provisions of the emergency response plan,
communication systems, and evacuation routes.

Evacuation Routes/Procedures

-In the event of an emergency, which necessitates an evacuation of the site, the following alarm procedures will be implemented:

1 -Evacuate and gather personnel at a predetermined assembly area (relocate if necessary)

2 - Call 9-1-1 or the appropriate emergency contact for assistance.

3 - Perform head count to verify all personnel are present.

4 - Notify Regional Safety Coordinator/Project Manager.

Pre-use Inspections: Emission Control Bypass:

N/A N/A

Preventative Maintenance: Pre-Activity Coordination for Task Teams:

N/A When this task involves two or more individuals working as a team, this team shall perform a last minute mini review of the risk
assessment and conduct pre-activity coordination ('Take 2') before starting the activity.

Step-by-Step Detail 

Basic Job Critical Description Potential Hazards Potential Consequences Engineering and Admin Defenses PPE I&I Case Log
Step ID Step? Defenses ID(s)

1 No Preparation / Pre- Improper training; All persons working on a project shall read and sign the Health & Safety Plan prior to None None
planning Improper planning/preparation entering or working on the site.

E f h / ifi i f i
https://ge.gensuite.com/geh/ehs/safety/jsaprint_assessment.cfm?orgname=GEHC&Loc=Canada+S%2FS&JSAID=318&print=yes&auto=yes 1/3
10/24/2018 RA » Risk Assessment
Ensure awareness of the emergency contact/notificaiton system; map of evacuation routes
Basic Job Critical Description Potential Hazards Potential Consequences Engineering
from the site and
and Admin Defenses
routes to nearest medical facilities. PPE I&I Case Log
Step ID Step? Defenses ID(s)

Baseline Risk Score & Post Prevention Risk Score Visual Aids

Baseline Risk Score: 4 Post Prevention Risk Score: 1


Likelihood of Consequence: 2 Likelihood of Consequence: 1
Severity of Consequence: 2 Severity of Consequence: 1

Basic Job Critical Description Potential Hazards Potential Consequences Engineering and Admin Defenses PPE I&I Case Log
Step ID Step? Defenses ID(s)

2 No Personal Protective Overhead obstructions; Hazards Prior to entering the site, don the required PPE. Only equipment complying with CSA or ANSI None None
Equipment leading to eye injury; Working in high Standards shall be used.
noise levels; Sharp edges on
equipment or tools; Slipping and
tripping; Objects falling onto
personnel Personal protective clothing and equipment, where required, shall be worn by all employees.
Employees will properly care for and be responsible for all personal protective equipment.

At a minimum the following PPE will be mandatory for all construction sites:

1) Safety Shoes/boots - CSA Standard Z195-M92, Grade 1 (green patch).

2) Safety Glasses (ANSI Z87 + high impact and CSA Z94.3 compliant) or Prescription Safety
Glasses (CSA approved Industrial Safety Lens, Z87 or Z94.3 frames)

3) Hard hat, CSA Z94.1-05, Class E; and/or ANSI Z89.1.2009, Class E

Depending on the site requirements there may be additional PPE required, such as:

-Safety gloves

-High-visibility clothing, such a reflective vest (if site required)

-hearing protection (ear plugs or muffs)

-repiratory protection

Baseline Risk Score & Post Prevention Risk Score Visual Aids

e
Baseline Risk Score: 4 Post Prevention Risk Score: 1
Likelihood of Consequence: 2 Likelihood of Consequence: 1
Severity of Consequence: 2 Severity of Consequence: 1

Basic Job Critical Description Potential Hazards Potential Consequences Engineering and Admin Defenses PPE I&I Case Log
Step ID

3
Step?

No General Safe Work


Practices
Damage to electrical equipment;
Potential Chemical Release to Air;

Potential Chemical Release to Water;

Potential Chemical Release to Land;


pl -Employees should remove themselves from any room or service event while a contractor is
performing service work, unless absolutely necessary.

-Scan the area for obvious problems. Take the time and look around to make sure everything
is in order.
Defenses

None
ID(s)

None
am
-Recognize Customer Site Sign Nomenclature and understand the nomenclature the facility
Fire potential of combustible has incorporated.
materials;
-No smoking, eating, chewing gum, drinking or any activities which involve hand to
Fire / explosion Potential of mouth/face contact at the construction site, except at designated areas.
flammable;
-Daily safety meeting will be held at the start of each site operation to discuss current site
liquids/solids; conditions, field tasks being performed, plan modifications, and work concerns.

Overhead obstructions; - Excavation activities requiring the use of heavy construction equipment must be performed Print Risk Assessme
while in compliance with the applicable safety regulations.
Improper training;
- Aerial obstructions such as power lines and tree branches will be verified prior to
Hazards leading to eye injury; movement of large equipment. A 20-foot horizontal clearance must be maintained between
all aerial obstructions.
Working at height / using ladders
Ex

scaffolds; - Locations of subsurface utilities shall be verified prior to any drilling or excavation activities.

Food hygiene hazards; - No project personnel may be allowed on-site without the prior knowledge and consent of
the designated site safety officer or contractor site supervisor.
Working in high noise levels;
- Hand tools should be inspected to determine if they are in proper working order and
Dangers from reversing / moving condition before use at the site.
vehicles;
- A GFCI should be in place during operation of electrical equipment in wet or damp areas.
Incorrect installation of equipment;
- Scaffolds should have standard guardrails in place when greater than 10 feet in height,
Use of sharp equipment hand tools; proper planking and a safe access means.

Sharp edges on equipment or tools;


-Ladders should be inspected to verify they are in good condition. Refer to SRA #17 Ladder
Incorrect use of hand tools; Use for ladder inspection requirements.

Defective tool/equipment/material;

Slipping and tripping;

Objects falling onto personnel

Baseline Risk Score & Post Prevention Risk Score Visual Aids

Baseline Risk Score: 6 Post Prevention Risk Score: 2


Likelihood of Consequence: 2 Likelihood of Consequence: 1
Severity of Consequence: 3 Severity of Consequence: 2

Basic Job Critical Description Potential Hazards Potential Consequences Engineering and Admin Defenses PPE I&I Case Log
Step ID Step? Defenses ID(s)

4 No Accident/Injury Improper training/reporting - If an accident occurs, the primary objective is to be sure that the employee receives proper None None
Reporting medical attention, from first aid to hospital emergency care as needed. The first report of
injury and appropriate paperwork should be completed and forwarded to the insurance
company.

- An accident investigation should be completed as soon as possible to identify accident


causes and prevention measures.

- The GEHC Project Manager should be notified if the accident is lost time or potential lost
time.

Baseline Risk Score & Post Prevention Risk Score Visual Aids

Baseline Risk Score: 4 Post Prevention Risk Score: 1


Likelihood of Consequence: 2 Likelihood of Consequence: 1
S it f C 2 S it f C 1
https://ge.gensuite.com/geh/ehs/safety/jsaprint_assessment.cfm?orgname=GEHC&Loc=Canada+S%2FS&JSAID=318&print=yes&auto=yes 2/3
10/24/2018 RA » Risk Assessment
Severity of Consequence: 2 Severity of Consequence: 1

Sign-Off 

____________________
______________________________
________________________________________ Date
Printed Name
Signature

e
pl
am
Print Risk Assessme
Ex

https://ge.gensuite.com/geh/ehs/safety/jsaprint_assessment.cfm?orgname=GEHC&Loc=Canada+S%2FS&JSAID=318&print=yes&auto=yes 3/3

You might also like