Dewanshu Srivastava

Planning, Scheduling & Cost Engineer


Planner Estimator Cost Quantity Survey
For more details, check my online resume : www.doyoubuzz.com/dewanshu-srivastava

EXPERIENCE SKILLS
Planning Engineer (MECP Flyover & Software
Underpass Project)  MS O ce     
Hindustan Construction Company Since October 2017  MS Project (2013)     
 Budget FTY 18-19 (EVA)  Primavera P6 R8.4     
Infos  Scheduling monthly programme (Flyover & underpass) and  Autocad 
monitoring the same on daily basis.
 25 years old  Macintosh     
 India  Preparation of work progress records & nancial reports.
 STAAD PRO (V8i)     
 Preparation of Master schedule (L1) then day wise activity
breakup accordingly. (upto L4) Level.
 SAP     
Contact
 Monitoring the works & cost as per the budget, shortfall analysis
 dewanshu.srivastava@hotm
ail.com
(cost variance) if any deviation found. (communication to HO) Communication
 Preparation of detailed Progress plan Including Schedule & Cost.  Hindi     
 +91-7752959555
 Identi cation of related to cost risk & its mitigation.  English     
 Tanu0073
 Comparison of scope , quantities Vs actual executed.  Punjabi     
 510 , Uphaar Expandable
 Daily, weekly & monthly reports preparation  Urdu     
Eldeco Colony udyaan II
226025 Lucknow, India  Assistance to Site team & Manager Projects.
Road works on yover , Over deck slab & Underpass

Road works Sub base, base, DBM , BM works


INTERESTS
About Me 
Spiritual
“As an ambitious and hard-
Meditation
Planning Engineer (DMRC CC34) (UG)

working individual, I am often
recognized for my commitment Hindustaan Construction Company Delhi India
and ability by highly respected February 2016 to October 2017 Full-time Sports
companies. I handle multiple
 Preparation of Budget.(FTY 17-18)  Chess
tasks on a daily basis
competently, working well  Preparation of schedules (L4) and Monitoring them like Entry  Gym
under the pressure. Frequent Exits Structure and all Finishing Works.  Horse Riding
acknowledgment of my  Planned Vs Actual Analysis, and monitoring the di erence
contribution from senior between them in cost as well as in time.
management illustrates my  Preparation of various reports like Daily, Weekly and Monthly
potential value to your Financial and Progress Reports.
company. I would welcome the  Preparation and approval of Method Statement for various
opportunity to discuss my activities of the Project.
suitability in more detail.”
 Identi cation of risk and its mitigation.
 Preparation of Presentations for Management review.
 Preparation of Major Material Reconciliation for the Project on
Monthly Basis
 Quantity estimation of structural steel,Excavation, Concrete,
Reinforcement,Shuttering, Finishing Items (Granite, False Ceiling,
Cladding etc) for all the entry exits and Box Pushing.
 Calculated all subcontractor Direct and indirect project costs.
 Interface Coordination :- Interfacing between Site - Client -
System contractor - Finishing Agencies and succeeding
contractor (ITD DMRC CC-32)
 Interfacing with Subcon regarding design and Inspection of PEB
Structure, and further interfacing with system contractor during
erection.
 Interfacing regarding box pushing with Subcon - Client - Site and
Utility Agencies.
 Preparation of bills of System contractor ie Crane Hire, Electricity
Etc.
 Preparation of Bills of Sub Contractor & System Contractor.
 Preparing Monthly Targets, Major Material Requirements for all
the sites, Action Plans to Achieve the targets and Shortfall
analysis.
 Road Works (Restoration).

Resume created on
1/2
Site Engineer / Billing / Planning
S A Construction Lucknow India
July 2014 to January 2016 Full-time
 Preparation of Monthly bills of Sub Contractor.
 Calculation of material quantity ie R/F , Shuttering & Str. Steel.
 Client And Contractor Billing
 Preparation of Major Material Reconciliation for the Project on
Monthly Basis
 Planning of material as per resources.
 Interface Coordination :- Interfacing between Site - Client -
System contractor - Finishing Agencies.
 Submission of MPR & Site Photographs to client as per
contractual requirement.
 Preparation of various reports like Daily, Weekly and Monthly
Financial and Progress Reports.

Trainee Engineer (Aawas Vikas)


(Residential)
Larsen and Toubro Lucknow India
June 2013 to July 2013 Internship
 Cal. of Shuttering material.
 Site Inspection

Trainee Engineer (DLF


Greens,Motinagar) (Residential)
Larsen & Toubro Delhi India June 2012 to July 2012
Internship
 Preparation of BBS & Cal. of steel quantity.
 Checking of Reinforcement as per drawing.

EDUCATION
Project Management
NICMAR 2016
Executive course

Project Management
Contract Management
Primavera
MSP

B.Tech
Lovely Professional University 2010 to 2014
B.tech In Civil Engineering

Resume created on