 Measurement of physically construction works.
 Measurement form road building drawings, steel structure drawings, ground work and civil works.
 Cost plans/analyses, interim valuation and payment certificates, tender documents and tender analysis,
bills of quantities and claims.
 Financial reports / Fund monitoring reports and client’s cash flow.
 Monitoring of cost (cost control) to achieve cost target.
 Assessing effect of design changes on costs, ensuring clear processes and procedures are in place to ensure
costs are passed on properly in line with contracts.
 Ensuring that all payments are in line with agreed contracts.
 Financial audits of a range of projects.
 Project, fund monitoring and financial reports.
 Prepare Cost and Value Reconciliation, cost control, modelling and budget, feeding back value to
construction team on site.
 Negotiate target prices with supply chain and framework contractor.
 Co-ordination with client, contractor, landlord, and consultant.

PROFESSIONAL EXPERIENCE AS QUANTITY SURVEYOR


SBR GROUP (KHALIF SULTAN GENERAL CONTRACTING EST) (UAE AL AIN)

Apr 2014 to till Date

Projects
 Maintenance Rehablitation and Asset Management for the Main Roads Al Ain Region
 Maintenance and Installation of Guard Rails and Traffic Signs in Al Ain Region.
 Road Marking Al Ain Region.
 Crack Sealent Al Ain Region.

Client : Al Ain Municipility


: Department of Transport (DOT)

Consultant : Hyder Consultant Associates


: Engineering Consultant Associates Limited

Contractor : SBR Group (Khalaf Sultan General contracting Est)


Quantity Surveyor
During the job my responsibilities are as under;
 Prepares monthly invoices to Consultant with attached inspection certificate and relevant supporting
documents for review by the Project Manager and submission to Consultant, follows up progress
payments with the Consultant / Client.
 Preparation of inspection request for approval.
 Manage and update records of site instructions and work orders.
 Preparation of financial status of the project.
 Preparation of daily and monthly work reports for performance based work.
 Measuring of work completed from drawings and schedules.
 Preparation of price inquiry.
 Preparation and submission of interim payment certificate.
 Preparation and submission of final payment certificate.
 Estimating the quantities of proposed work of Traffic Signs, Guard rails, Rope Rails, Sand Fence, Animal
Grid, Chain Link Fence from drawings.
 Maintains project progress report on weekly & monthly basis.
 Preparing of cost estimates and new rates.
 Preparation of sub contractors documents and payment final account.
 BOQ recapitulation.
 Making monthly running bills of subcontractors.
 Preparation of bar bending schedule including verification from consultant.
 Prepare bills of various quantities on a monthly basis.
 Measuring of work completed on site but not specified in drawings.
 Undertaking costs analysis for repair and maintenance project work.
 Liaison with Client and Consultant Quantity Surveyor as necessary.
 Preparation of Material Requirement Plans.

NATIONAL FOUNDATION FOR RESOURCE DEVELOPEMENT AUG 2011 – Apr 2014

Completed Projects
 Display Center (Basement + 7) 265.20 Million
 NPSC/RDI Complex (Ground + 3) 128.26 Million
 NPSC Hostel (Basement + 6) 103.65 Million
 Small Buildings & Sheds 127.89 Million
 External Services 107.83 Million

Preparation of Final BOQ and Final Payments for the Projects


 Commercial Building Ask VII (Ground + 2) 28.70 Million
 Commercial Building Ask VII (Ground + 6) 139.22 Million
 NFRD Complex Additiona Alteration and Extention 48.95 Million

Client : GHQ (General Headquarters)


Consultant : MES (Millitry Engineering Services)
Contractor : NFRD (National Foundation of Resourse Development )
Quantity Surveyor
During the job my responsibilities were as under;
 Layout of Building as per Drawing.
 To check Execution of works according to Design, Drawing & Technical specification with latest ACI
Earthquake Zone modification structures.
 Preparation of IPC according to new accounting and Billing system.
 Preparation of Bar bending schedule.
 To check and Verify the Sub Contractor’s Bills.
 Co-ordination with consultant and client.
 Preparation of Material Requirement Plans.
 Preparation of BOQ,S.
 Preparation of Contracts.
 Rate Analysis.
 Daily Co-Ordination with Project Manger regarding project.
 Quality control etc.

HARO CONSTRUCTION SERVICES (PVT) LTD AUG 2010 – 2011


SUB ENGINEER/ASST QUANTITY SURVEYOR
During the job my responsibilities were as under;
 Execution of civil works as per drawings and specifications.
 Preparation of Bills.
 Bar-Bending schedule.
 Progress Reports (Daily, Weekly and Monthly)
 Verification of Sub-Contractor’s Bill
 Preparation of Material Requirement Plans.
 Verify Contractor’s Bill.
 Co-ordination with Site Engineer regarding work.

PERSONAL INFORMATION
Father’s Name Malik Muhammad Riaz
NIC # 37405-7586396-9
Passport # AW1603962
Religion/Citizenship Islam/Pakistani
Date of Birth 19/08/1990
EDUCATION
DAE (Civil Technology) Swedish Institute of Technology
FA (Sample) BISE, Rawalpindi
Matric (Science) BISE, Rawalpindi

PROFESSIONAL DEVELOPMENT
AutoCAD (2D)
MS Office (Computer Basic Course)

KEY STRENGTH
 Quality of motivating others, Team work, dedicated hard working, sincere, Honest, with good
communicating skill possessing great amount of patience with positive thinking, believing in doing
best to achieve best in life & ability to deliver the good with punctuality.

You might also like