• RasGas acts as the operating company for and on behalf of the owners
of the LNG projects RL, RL (II), RL 3, AKG Projects and Barzan Gas
Company Limited (Project Owners)
• Major Shareholders:
• ExxonMobil: 30%
17th INTERNATIONAL
PROJECT BACKGROUND CONFERENCE
AND& OBJECTIVE
EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
Background:
• Train 3 is designed for rich LNG and Trains 4/5 are designed for rich
and lean LNG production of 4.71 MMTPA
• Due to seasonality impact, LNG production reduces during summer
by ~5%
Project Objective:
<Title
To remove the seasonality of of
<Title
impact Presentation>
Presentation>
By:
By:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
The project consisted of three main aspects:
<Date>
<Date>
1. Revision of process conditions
2. Design for more gas turbine power LP/MP-MR string
• Gas turbine power reduced due to ambient air temperature
and hot air recirculation
3. Design a restaged propane compressor
LNG
17th PRODUCTION SEASONALITY
INTERNATIONAL CONFERENCE & EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
<Title of of
<Title Presentation>
Presentation>
By:
By:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
<Date>
<Date>
17th INTERNATIONAL
PROJECT TEAMCONFERENCE
ORGANISATION
& EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
Project Team:
• RasGas (Company)
• Elliott Group (Compressor OEM)
• General Electric (GT OEM) and
• APCI (Refrigeration Licensor)
• <Title
Chiyoda Corporation (EPC of of
<Title Presentation>
Contractor) Presentation>
By:
By:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
Project Management: <Date>
<Date>
• RasGas Venture Planning department
acts as focal point for RasGas
• Chiyoda Corporation acts as focal point
for various vendors
PR-MR LIQUIFACTION
17th INTERNATIONAL PROCESS
CONFERENCE & EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
Re-stage compressor
FCW
Feed Gas
FCW
Inlet Chilling
<Title of of
<Title Presentation>
Presentation>
FCW MR
Main Cryogenic
Heat Exchanger
LNG
By:
By:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
<Date>
<Date>
Frame 7 GT/MR MR/1 MR/2 Helper Motor (12 MW)
(75~85 MW)
17th INTERNATIONAL
STUDY FOCUS AREAS
CONFERENCE & EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
<Title of of
<Title Presentation>
Presentation>
By:
By:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
<Date>
<Date>
th
17 INTERNATIONAL CONFERENCE & EXHIBITION
COOLING WATER CAPACITY EVALUATION
ON LIQUEFIED NATURAL GAS (LNG 17)
Exchanger
SW/FCW
• SW & FCW system has capacity
to handle the additional heat<Title of of
<Title Presentation>
Presentation>
By:
load to remove seasonalityBy:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
FCW Out
impact <Date>
<Date>
SW Out
FCW Pump
Summer -
79.55 Maximum LNG with 960
max 84.67 80.26 4.40 960 78.34
3636 rpm USRT Chiller
(August)
<Title of of
<Title Presentation>
Presentation>
85.50
88.16 88.94
Winter
By:0<Author
By: None
<Author 64.8
Name>,
Name>, Current Winter LNG rate
<Organization>
<Organization>
3534 rpm
Winter-
<Date>
<Date> 81.18 LNG production limited by
88.26 82.49 5.77 960 74.26 7% stonewall margin on
max (May) 3616 rpm Propane Compressor
Train 4 Re-rating Cases 1, 2 and 3 with modified propane compressor and inlet air cooling on LP/MP-MR turbine
LNG TRAIN MAJOR COMPRESSION STRINGS
PR/HP-MR
String
88M8-5 56MB5
DLN1, 79 MW Site Rated PR Compressor HP/MR Compressor Helper Motor, 12 MW Rated
LP/MP-MR
String
88M4 60M4
DLN1, 79 MW Site Rated LP/MR Compressor MP/MR Compressor Helper Motor, 12 MW Rated
NGL String
(Train 4 & 5)
DLN1, 27 MW Site Rated RGC Compressor Gear Box Helper Motor, 9.7 MW Rated
LP/MP-MR STRING POWER AUGMENTATION
pulse filter
cooler coils
silencer
trash screen
PROPANE COMPRESSOR LAYOUT AND DESIGN
Restaging:
Authors would like to acknowledge the following for supporting this paper:
• RasGas Management & Technical Teams
• Chiyoda Corporation
• General Electric
<Title of of
<Title Presentation>
Presentation>
By:
By:<Author
<AuthorName>,
Name>,<Organization>
<Organization>
<Date>
<Date>
LP/MP-MR STRING POWER AUGMENTATION
Redesigned Components:
Stage 2 - diaphragm and return channel
Stage 3 - diaphragm, return channel, side load wall and impeller
Stage 4 - diaphragm, return channel, side load wall, 2 impellers and volute wall
Discharge volute
Balance piston