Professional Documents
Culture Documents
Esco Solar Eletric Project-Mgt
Esco Solar Eletric Project-Mgt
DKKD: NV 2.3, Khu Đô Thị Viglacera, P. Tây Mỗ, Q. Nam Từ Liêm, Hà Nôi
Web: www,mgt.com.vn Hotline: 0963.12.896
TARGET
TRULLY INVESTMENT
1. PURPOSE:
INSTALL FREE SOLAR ELECTRIC SYSTEMS FOR FACTORY (OR OFFICE) THEN
SELLING ELECTRICCITY WITH 5% DISCOUNT COMPARE EVN PRICE
AFTER 11 YEARS, WHOLE SYSTEMS HANDOVER TO THE FACTORY – THE
SYSTEMS LIFETIME 25 YEARS
2. CONDITION
AVAIABLE AREA TO INSTALL SOLAR PANEL FROM 5000 m2 UP LOCATED
SOUTHERN VIET NAM (WITH OFFICE FROM 2000 m2)
NOTICED 3 MONTHS BEFORE MOVING FACTORY BY BANK GUARANTEE TO
PAY 3 MONTHS ELECTRICITY
3. BENEFIT
REDUCE 5%-10% ELECTRICITY BILL
REDUCE COOLING COST
USING GREEN POWER TO APPLY LEED GOLD STANDARD
TRUYLLY INVESTMENT