INDIRECT COST %
TOTAL INDIRECT
ESTIMATED DIRECT FOR OCM & PROFIT COST % FOR OCM &
COST OCM PROFIT PROFIT
(% OF EDC)(% OF EDC)
Up to P5 million 15 10 25
Above P5M - P50M 12 8 20
Above P50M - P150M 10 8 18
Above P150M 8 8 16
* VAT component shall be 5% of the sum of the EDC, OCM & Profit.
* Mobilization/Demobilization shall not be subjected to OCM &
Profit and in no case shall it exceed 1% of the EDC of the Civil Work Items.
* Non-civil work items shall not be subjected to OCM mark-up.
* Rental rates of equipment shall be based on the pevailing
"Associated Construction Equipment Lessors, Inc. (ACEL), presently it is
the 2014 ACEL Rates.
* Cost for Permits, Clearances and other government taxes (MMDA Permit,
LGU Permits, BFP Clearance, etc) shall be included in the cost under
Part B-Other general Requirements of the POW & Estimate/ABC.
INDIRECT COST %
ESTIMATED DIRECT FOR OCM & PROFIT TOTAL INDIRECT
COST % FOR OCM &
COST OCM PROFIT PROFIT
(% OF EDC)(% OF EDC)
Up to P5 million 12 10 22
Above P5M - P50M 9 8 17
Above P50M - P150M 7 8 15
Above P150M 6 8 14
* VAT component shall be 5% of the sum of the EDC, OCM, & Profit.
INDIRECT COST %
ESTIMATED DIRECT FOR OCM & PROFIT TOTAL INDIRECT
COST % FOR OCM &
COST OCM PROFIT PROFIT
(% OF EDC)(% OF EDC)
Up to P5 million 12 10 22
Above P5M - P50M 9 8 17
Above P50M - P150M 7 8 15
Above P150M 6 8 14
Galvanised Iron Pipe Conversion BS 1387 and EN 10255 Thickn
BS 1387 and EN 10255 Thickness Light
Outside Thickness Mass Nominal Bore
Nominal Bore Medium
Light Light Light
Heavy in mm
in mm mm mm mm kg/m 1/4 8
1/4 8 13.6 13.9 1.8 0.515 3/8 10
3/8 10 17.1 17.4 1.8 0.67 1/2 15
1/2 15 21.4 21.7 2 0.947 3/4 20
3/4 20 26.9 27.2 2.3 1.38 1 25
1 25 33.8 34.2 2.6 1.98 1.25 32
1.25 32 42.5 42.9 2.6 2.54 1.5 40
1.5 40 48.4 48.8 2.9 3.23 2 50
2 50 60.2 60.8 2.9 4.08 2.5 65
2.5 65 76 76.6 3.2 5.71 3 80
3 80 88.7 89.5 3.2 6.72 4 100
4 100 113.9 114.9 3.2 9.75 5 125
5 125 140.6 6 150
6 150 165.1