BETON COR CAMP 1Pc : 2Ps : 3Kr BETON COR CAMP 1Pc : 3Ps : 5Kr
16.20 201.60 24.30 33.33 18.00 15.60 130.80 26.10 41.67 18.00
5.44 67.74 8.16 24.89 7.56 5.24 43.95 8.77 31.11 7.56
8.03 99.95 12.05 41.32 11.16 7.73 64.85 12.94 51.64 11.16
4.81 59.81 7.21 9.89 5.34 4.63 38.80 7.74 12.36 5.34
2.57 31.92 3.85 5.56 2.85 2.47 20.71 4.13 6.94 2.85
1.63 20.30 2.45 8.39 2.27 1.57 13.17 2.63 10.49 2.27
2.25 28.01 3.38 10.29 3.13 2.17 18.18 3.63 12.87 3.13
5.98 74.37 8.96 27.32 8.30 5.75 48.25 9.63 34.16 8.30
1.05 13.09 1.58 4.81 2.34 1.01 8.50 1.70 6.01 2.34
2.17 26.95 3.25 9.90 3.01 2.09 17.49 3.49 12.38 3.01
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
50.12 623.74 75.18 175.70 63.94 48.27 404.69 80.75 219.63 63.94
SURVEY HARGA
1900000 316,667
PERHITUNGAN VOLUME/KUANTITAS PEKERJAAN
NAMA PEKERJAAN : DRAINASE JALAN LINGKUNGAN RT. 05 RW. 05
VOLUME : (atas 0,5 m/bwh 0,4 m) x 0,6 m x 22 m 2 0
JENIS PEKERJAAN : PEMBUAT
LOKASI
Volume /
Lebar Lebar Lebar Luas
No. Uraian Pekerjaan Sat Tinggi Panjang Luas luar Jumlah Kuantitas
Atas Bawah Tembok Dalam
(m) (m) (m) (m) (m) ( m2 ) ( m2 ) (bh)
DRAINASE PASANG BATU
2 Pekerjaan Pasangan Batu m3 0.5 0.4 0.15 0.6 22 0.8625 0.27 1 13.035
4 Pekerjaan Pengangkutan Material m3 0.5 0.4 0.15 0.6 22 0.8625 0.27 1 13.035
REBAT BETON K-300
PERKERASAN ATAS
PERKERASAN BAWAH
15 30
50 250 50
NAMA PEKERJAAN : DRAINASE JALAN LINGKUNGAN RT. 05 RW. 05
VOLUME : (atas 0,5 m/bwh 0,4 m) x 0,6 m x 22 m
JENIS PEKERJAAN : PEMBUATAN BARU
LOKASI 0
RABAT BETON
JUMLAH
6=(3x5)
75,000.00 14.472
3,250.00 2.8944
2,400.00
450.00
315.00
10,000.00
12,000.00
1,300.00
650.00 0.57888
0.024
337,500.00 #REF! 13.20888888889
220,050.00 #REF! 15.85066666667
185,250.00 36.01271466667
150,000.00 19.59091677867
90,000.00 9.854231139669
9,750.00 4.044669171277
9,750.00 0.323573533702
1,002,300.00 0.012942941348
7,020.00
9,262.50
30,000.00
18,000.00
1,950.00
1,950.00
-
- 3
- 2
- 5
- 4
- 0
RENCANA ANGGARAN BIAYA
NAMA PEKERJAAN : DRAINASE JALAN LINGKUNGAN RT. 05 RW. 05
VOLUME : (atas 0,5 m/bwh 0,4 m) x 0,6 m x 22 m
JENIS PEKERJAAN : PEMBUATAN BARU
LOKASI 0
Subtotal (3)
6 Alat
3 Skop 3 bh 135,000
3 Cangkul 3 bh 135,000
6 Ember 6 bh 13,500
6 Pengki 6 bh 16,875
5 Benang 5 roll 9,000
Sub Total (10)
7 Administrasi
Papan nama proyek 1.000 bh 100,000
Prasasti marmer 1.000 bh 200,000
Sub Total (11)
8 TPK
1 Ketua 1.000 hok 150,000
2 Sekretaris 1.000 hok 125,000
3 Anggota 6.000 hok 100,000
Sub Total (12)
Cat : Volume per satu satuan pekerjaan atau koefisien diambil dari koefisien Analisa harga satuan sni 2016
Cikembar, Januari 2019
Dibuat oleh :
TPK
DESA CIKEMBAR
(……………………………)
Jumlah Harga (Rp)
18,705,092
1,423,125
61,669
1,484,794
105,600
19,800
13,860
440,000
528,000
57,200
28,600
1,193,060
4,399,313
2,868,352
2,414,734
1,955,250
1,173,150
127,091
127,091
13,064,981
77,220
101,888
330,000
198,000
21,450
21,450
750,008
405,000
405,000
81,000
101,250
45,000
1,037,250
100,000
200,000
300,000
150,000
125,000
600,000
875,000
Januari 2019
…………………)
PERHITUNGAN KEBUTUHAN DAN BIAYA
TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI
( PER ITEM PEKERJAAN)
NAMA PEKERJAAN : DRAINASE JALAN LINGKUNGAN RT. 05 RW. 05
VOLUME : (atas 0,5 m/bwh 0,4 m) x 0,6 m x 22 m
JENIS PEKERJAAN : PEMBUATAN BARU
LOKASI -
57,000.00
27,000.00
21,000.00
965,000.00
220,000.00
114,000.00
46,000.00
11,000.00
12,000.00
6,000.00
200,000.00
100,000.00
200,000.00
230,000.00
250,000.00
200,000.00
200,000.00
200,000.00
200,000.00
403,000.00
142,710.00
113,050.00
275,000.00
1,000.00
25,000.00
17,000.00
965,000.00
220,000.00
60,000.00
25,000.00
15,000.00
15,000.00
10,000.00
2,000.00
63,000.00
13,300.00
145,000.00
120,000.00
57,000.00
40,000.00
30,000.00
40,000.00
50,000.00
60,000.00
60,000.00
85,000.00
110,000.00
140,000.00
654,700.00
1,098,700.00
1,698,900.00
2,395,400.00
307,300.00
540,500.00
890,300.00
1,429,800.00
13,500.00
54,232.00
50,820.00
37,510.00
35,090.00
30,000.00
22,000.00
99,770.00
78,650.00
49,500.00
38,500.00
11,000.00
10,450.00
18,500.00
20,000.00
42,350.00
10,650.00
19,665.00
33,270.00
46,970.00
4,400.00
20,250.00
49,500.00
49,500.00
2,407,800.00
1,801,800.00
1,995,600.00
21,700.00
27,000.00
1,600,000.00
22,500.00
121,000.00
76,000.00
135,000.00
75,000.00
18,500.00
41,800.00
36,800.00
16,000.00
17,000.00
17,000.00
19,000.00
100,000.00
120,000.00
130,000.00
120,000.00
130,000.00
120,000.00
130,000.00
120,000.00
130,000.00
120,000.00
130,000.00
100,000.00
130,000.00
120,000.00
130,000.00
96,000.00
78,200.00
96,000.00
88,620.00
70,780.00
81,494.88
72,400.00
100,000.00
100,000.00
61,550.00
130,000.00
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
96,311.00
100,000.00
135,278.00
210,540.00
172,380.00
212,470.00
195,120.00
181,570.00
155,050.00
142,710.00
113,050.00
113,030.00