Professional Documents
Culture Documents
Ahs HSR Ver KP
Ahs HSR Ver KP
HARGA
KODE URAIAN KOEF. SAT.
( Rp ) SAT. ( Rp )
2 3 4 5 6
STR- 177 1 Nos Pekerjaan Bored Pile
Bahan :
- Besi D22 1.0000 kg 11,500.00 11,500.00
- Besi 10 kg
- Kawat Bendrat 0.0150 kg 23,400.00 351.00
- Besi Las-lasan ls -
- Pipa Sonic 2'' pcs -
- Beton C40 T1 Underwater 1.0000 m3 860,000.00 860,000.00
Tenaga :
- Pekerja 0.0070 Oh -
- Tukang besi 0.0070 Oh -
- Kepala tukang 0.0007 Oh -
- Mandor 0.0004 Oh -
- Operator Alat Berat
Sewa Alat
- Mobile Crane
- Drilling Machine
- Excavator
Bahan
- Beton C40
- Besi D13
- Besi D16
- Besi D25
- Besi D29
- Kawat Bendrat
- Besi Las-lasan
- Bekisting Besi
Tenaga :
- Pekerja
- Tukang besi
- Tukang Bobok Boredpile
- Kepala tukang
- Mandor
- Operator Alat Berat
Sewa Alat
- Concrete Pump
- Mobile Crane
- Excavator
- Vibrator
STR- 177 1 Nos Pekerjaan Pier
Bahan
- Beton C45
- Besi D13
- Besi D16
- Besi D25
- Besi D29
- Kawat Bendrat
- Besi Las-lasan
- Bekisting Besi
Tenaga :
- Pekerja
- Tukang besi
- Tukang Bobok Boredpile
- Kepala tukang
- Mandor
- Operator Alat Berat
Sewa Alat
- Concrete Pump
- Mobile Crane
- Excavator
KEUNTUN
JML.
GAN &
JML. HARGA TOTAL JML. TOTAL
OVER
HARGA
HEAD
( Rp ) ( Rp ) 10.00% HARGA ( Rp )
7 8 9 8
### 1,088.51 11,973.60
1,135.09