You are on page 1of 1

0 1 2 3 4 5 6 7 8 9

L1

L2
L3

-F
6A
-X1 4
2A 5B 2A 5B
-S1 -S3
on/off on/off
switch 1A 4B switch 1A 4B
vacuum
1 3 5 pump
-K1 -X1 5
1.3 2 4 6

1 1 1 3 5
water shortage protection
-S2
2 4 -Q1 I >I >I >
0-4A 2 4 6
-X1 L1 L2 L3 N PE 1 2 3 6 10 -X1 0

1 1 13 1 3 5
-S4 P -S5 temperature -K2
2 4 regulation 1.6 14 2 4 6
U V W U V W pressure control
steam generator
-E1 PE -E2 PE
-X1 7 8 11 12 13 14

sterilizing timer
-A1
heating element I heating element II

-X1 9 U V W PE

1 M
A1 X1 X1 X1 A1 A1 PE -M1 3
power of heating elements PE
-K1 -H1 -A1 M -H2 -E3 -H3 red -K2 -Y1
A2 yellow X2 ^weiß X2 micro 2 water X2 vacuum A2 cold water A2 vacuum pump
40/60 = 2 x 4500 W steri- heating shortage pump vacuum pump
heating timerlization element
50/70 = 2 x 6000 W 500 W
50/80 = 2 x 6000 W 1.1 1 2 1.8 1 2
1.1 3 4
1.8 3 4
1.1 5 6 1.8 5 6
1.7 13 14

KSG 40/60-2 50/70-2 50/80-2 Schaltplan/wiring diagramm


Doppelwandige Ausführung, elektrisch beheizt mit Zeitschaltuhr, mit Vakuumpumpe Plan-Nr.01E040602EUV001
double walled execution, electrically heated with timer, with vacuum pump
Revision/revision 2.0 Datum/date 29.10.02 Bearbeiter/person in charge Knechtskern Blatt/page 1 von/of 1 Blättern/pages
Änderungen vorbehalten/modifications reserved

You might also like