Professional Documents
Culture Documents
Institut Kemahiran Tinggi Belia Negara Kertas Kerja: Kementerian Belia Dan Sukan Malaysia
Institut Kemahiran Tinggi Belia Negara Kertas Kerja: Kementerian Belia Dan Sukan Malaysia
KERTAS KERJA
TAHAP LEVEL 4
------------------------------------------------------------------------------------------------------------------------------------------------
Modul 06 - Kertas Kerja Cawangan Pembangunan Kurikulum 2014 (Edisi 6)
DAM 4623 TP-300-4/M06/KK(1/4) Helaian 2 Daripada 4
PENGENALAN :
Anda sebagai ketua sebuah pusat servis kereta di tempat anda. Terdapat tujuh (7) tugas
dalam pengurusan pusat servis iaitu :
Anda diminta menyediakan carta alir prosedur pengurusan dan penyelenggaraan kenderaan
mengikut tugas-tugas seperti di atas.
Not Available
1. Organization chart
2. Flammable items (thinner, petrol treatment, etc.)
3. Toxic materials (brake fluid, battery acid, etc.)
4. Source stock inventory record
5. Company’s Standard Operating Procedure
6. Parts catalogue (parts list, price list, parts drawing, etc.)
7. Spare parts inventory records
8. Product range (model, variant, year of make, etc.)
9. Organisation Chart 6) Company’s
10. Categories of tools and equipment
11. Company inventory system record
12. List of supplier of tools and equipment
------------------------------------------------------------------------------------------------------------------------------------------------
Modul 06 - Kertas Kerja Cawangan Pembangunan Kurikulum 2014 (Edisi 6)
DAM 4623 TP-300-4/M06/KK(1/4) Helaian 3 Daripada 4
DETAIL
WORK STEPS
3 Prepare workflow
3.1 Determine workflow requirement (process records, checklist,
process requirement
procedure, workstation, etc.)
3.2 Interpret work schedule (time, flat rate, etc.)
3.3 Determine nature of work (major, minor, diagnosis, etc.)
3.4 Determine workshop facilities and equipment (lifter, air tools,
etc.)
3.5 Interpret manufacturer specification and information (workshop
manual, equipment, tools, parts catalogue, etc.)
3.5 Determine responsible personnel/parties involved
3.6 Comply to company’s Standard Operating Procedure(SOP)
------------------------------------------------------------------------------------------------------------------------------------------------
Modul 06 - Kertas Kerja Cawangan Pembangunan Kurikulum 2014 (Edisi 6)
DAM 4623 TP-300-4/M06/KK(1/4) Helaian 4 Daripada 4
CHECKLIST
B. WORK PROCESS
2 Checklist
3 Analyse data
C. TIME
1 Within given time
D. ATTITUDE
1 Discipline
2 Commitment
3 Responsibility
E. SAFETY
1 Personal
2 Tools
3 Environment
CHECK LIST
Date Date
------------------------------------------------------------------------------------------------------------------------------------------------
Modul 06 - Kertas Kerja Cawangan Pembangunan Kurikulum 2014 (Edisi 6)