This document outlines a data collection scheme for taxiways and an apron at an airport. It details the lane positions and number of data collection points for three taxiways of varying sizes: Taxiway M1 with 19 points, Taxiway M with 29 points, and Taxiway E with 39 points. It also specifies that data collection points for the apron section will be taken at the center and joints of the rigid pavement slabs based on site conditions. Finally, it states that surveys will start with a load of 130kN and gradually increase up to 240kN.
This document outlines a data collection scheme for taxiways and an apron at an airport. It details the lane positions and number of data collection points for three taxiways of varying sizes: Taxiway M1 with 19 points, Taxiway M with 29 points, and Taxiway E with 39 points. It also specifies that data collection points for the apron section will be taken at the center and joints of the rigid pavement slabs based on site conditions. Finally, it states that surveys will start with a load of 130kN and gradually increase up to 240kN.
This document outlines a data collection scheme for taxiways and an apron at an airport. It details the lane positions and number of data collection points for three taxiways of varying sizes: Taxiway M1 with 19 points, Taxiway M with 29 points, and Taxiway E with 39 points. It also specifies that data collection points for the apron section will be taken at the center and joints of the rigid pavement slabs based on site conditions. Finally, it states that surveys will start with a load of 130kN and gradually increase up to 240kN.
Lane Position Spacing (Mt.) No. of points L9 100 2 L3 50 5 CL 50 5 R3 50 5 R9 100 2 Total 19 (CL = Center Line, L3 = 3mt from CL left side, R3 = 3mt from CL right side) 2. Taxiway M: 230M x 40M (Flexible Pavement) Lane Position Spacing (Mt.) No. of points L18 100 2 L9 50 5 L3 50 5 CL 50 5 R3 50 5 R9 50 5 R18 100 2 Total 29 3. Taxiway E: 250M x 70M (Flexible Pavement) Lane Position Spacing (Mt.) No. of points L27 50 2 L18 50 5 L9 50 5 L3 50 5 CL 50 5 R3 50 5 R9 50 5 R18 100 5 R18 100 2 Total 39 4. For Apron section (190M X 80M) Rigid Pavement, points shall be taken at Center & Joints of slab as per site condition. 5. Survey start with Load of 130 KN and then gradually increase up to 240 KN.