You are on page 1of 1

Data Collection Scheme for Taxiway/Apron

1. Taxiway M1: 230M X 23 M (Flexible Pavement)


Lane Position Spacing (Mt.) No. of points
L9 100 2
L3 50 5
CL 50 5
R3 50 5
R9 100 2
Total 19
(CL = Center Line, L3 = 3mt from CL left side, R3 = 3mt from CL right side)
2. Taxiway M: 230M x 40M (Flexible Pavement)
Lane Position Spacing (Mt.) No. of points
L18 100 2
L9 50 5
L3 50 5
CL 50 5
R3 50 5
R9 50 5
R18 100 2
Total 29
3. Taxiway E: 250M x 70M (Flexible Pavement)
Lane Position Spacing (Mt.) No. of points
L27 50 2
L18 50 5
L9 50 5
L3 50 5
CL 50 5
R3 50 5
R9 50 5
R18 100 5
R18 100 2
Total 39
4. For Apron section (190M X 80M) Rigid Pavement, points shall be taken at
Center & Joints of slab as per site condition.
5. Survey start with Load of 130 KN and then gradually increase up to 240
KN.