Professional Documents
Culture Documents
Conceptual Test: (TK 100 Par Value)
Conceptual Test: (TK 100 Par Value)
Required:
a) Calculate the goodwill on the investment in Mim Limited as at 1 January 2012 in compliance
with BFRS-3.
b) Calculate the goodwill on the investment in Zeem Ltd as at 1 January 2012 in compliance
with BAS-27.