Professional Documents
Culture Documents
QUALITY MANAGEMENT
BAR BENDINGBaharagora-Singha
SCHEDULE
PROJECT NAME Four Lanning of Bar-Bilara-Jodhpur Road Project (NH-112)
CLIENT National Highway Authority Of India
INDEPENDENT CONSULTANT LEA Associates South Asia Pvt Ltd
MEDIAN
Structure No FROM 74+720 TO 74+970 Date
Structure Type MEDIAN DRAIN Part of Structure
1 1225/1406 1425/1606 2 10
710
TRANSVERSE REINFORCEMENT
2
470 710 470 4 10
3 3 8
12000
4 1 8
12000
EPC Representetive
Transportation Infra IC
Baharagora-Singhara
ENDING SCHEDULE Road Project (NH-6)
-112)
537.028 2614.403
TOTAL 3.15143109
AE Representetive
MEDIAN DRAIN LEVEL SHEET 74+720 TO 74+970
SR NO CHAINAGE FRL INVERT LEVEL KERB TOP LVL PCC TOP LVL DEPTH OF DRAIN
238.118 1.087
238.088 1.076
238.057
238.027
237.996 1.158
237.966
237.935
237.905
237.874 1.189
237.844
237.813
237.783
237.752 1.199
237.708
237.663
237.618
237.573 1.204
237.528
237.483
237.438
237.393 1.167
237.348
237.303
237.258
237.213
237.168 1.103