Total discharege (Q) = 543.000 cumecs n = 0.025 S = 0.0025 Assumed water level = 239.051 m Max. depth = 1.646 m Area (A) = 219.509 m2 Wetted perimeter (P) = 159.646 m R2/3 = (A/P)2/3 = 1.237 S1/2 = 0.05001 Velocity (V) = 2.474 m/sec Discharge (Q) = 542.999 cumecs Loss of head (hl) = V2/2g = 0.312 TEL = 239.362 m
Application of Bundled Bamboo Split As Structural Elements in Pearl Beach Lounge, Gili Trawangan " Resilient Building Design and Material For Future " 2