^(2/3) 〖 𝑠〗 ^(1/2)A V = Calculated Discharge (Q) = 95.419 cumec Now average of the discharge = 95.419 cumec This discharge has to be enhanced by 30% as per Cl. 703.1.1 , P-9 of IRC:78-2014 So, enhanced design discharge = 124.045 cumec Calculation of waterway and scour depth : Design discharge , worked out = 143.48 cumec Vertical clearance required = 0.90 m
Linear waterway , as per cl.106.5 page 13 of IRC : 5 - 2015, required , as follows;
WCÖQ ….( ii )
Where ,W=Effective regime width
Q= The design maxm discharge C= A constant equals to , 4.80 143.50043
Now , W= 57.50 metre
Allowing a contraction of 15% , Waterway to be provided (m) = 48.88 Gross waterway provided (Abutment to Abutment)= 49.13 metre Obstruction for Pier = nos of Pier x Pier width= 4m However , provided water way(effective linear) , L = 45.13 metre Using , Mole Worth formula ℎ=[𝑉^2/(17⋅88)+0.015]×[(𝐴/𝑎)^2−1]
h = afflux (in meters)
V = average velocity of the water in the river prior to constriction (in m/sec) A = unobstructed sectional area of the river at proposed site (in sq. m) a = constricted area of the river at proposed site (in sq. m) Now velocity of flow = V= 1.00 m/sec at bridge site Un-obstructed, area = A= 123.15 m2 Obstructed , area (sq m) a= 113.13 m2 Afflux, h = 0.0131 m
Average HFL is 5.400 Metre
Discharge calculated considering average HFL, vertical clearance provided above HFL. However, Vertical clearance required 0.905 metre Soffit level of bridge should not go below 6.305 Metre Soffit level shall be kept at R.L = 6.305 Metre Assuming total depth of superstructure structure : 0.700 metre at mid span , Average thk of wearing course = 0.110 metre Top level of deck/road formation level : 7.115 Metre Calculation of scour depth: As per cl. 110.1.3, page no 18 of IRC: 5 - 1998 , Where , dsm = Mean depth of scour below the highest flood level Db= The discharge in cumecs per metre width Ksf = Silt factor Db= 3.18 cumec/metre Ksf = 0.75 Now , dsm= 3.19 metre , Department of Construction Engineering, Jadavpur University Page 4 of 5
Bridge over Jagannath Khal at Behari Calculation of waterway
Non seismic scour :
from H F L as per cl.703.3.1.1 page 11 of IRC : 78 - Maxm.scour depth near pier(meter): 6.38 2014 Level of scour (R L) : -0.98 Metre Bottom level of foundation for pier should at least go beyond a R.L of -1.00 Metre
Maxm scour depth near abutment (m): 4.05
Level of scour (R L) : 1.35 Metre
Bottom level of foundation for abutment should go beyond a R.L of 1.35 Metre Seismic Scour : Ref cl.703.3.1.2 , IRC;78 - 2000 ; from H F L as per cl.703.3.1.2 page 11 of IRC : 78 - Maxm.scour depth near pier(meter): 5.74 2014 Level of scour (R L) : -0.34 Metre Bottom level of foundation for pier should at least go beyond a R.L of -0.40 metre
Maxm.scour depth near abutment (m): 3.65
Level of scour (R L) : 1.75 Metre
Bottom level of foundation for abut should at least go beyond a R.L of 1.75 Metre