Professional Documents
Culture Documents
S2 100 #10 @ 110 C/C --- #10 @ 110 C/C --- #10 @ 110 C/C #10 @ 110 C/C #10 @ 110 C/C #10 @ 110 C/C #10 @ 110 C/C TWO WAY
2-#16 2-#16
2-#16
2B - 1
200MM 2-#16 2-#16 1 @ 50MM, 6 @ 100MM, UNIVERSITY
400
10MMø
400
400
SUBJECT:
2-#16 2-#16
200MM 2-#16 1 @ 50MM, 6 @ 100MM, 200 200
2B - 2
300
300
10MMø
300
X 300MM 2-#16
4 @ 150MM, REST @ 200MM O.C.
2-#16 2-#16 2400
600 600 CE 2L
STIRRUPS
BEAM BEAM
AT LEFT SUPPORT AT MIDSPAN AT RIGHT SUPPORT #10@110 C/C #10@110 C/C
DESIGNATION SIZE DIAM.ø SPACING (mm) PROJECT TITLE:
#10@110 C/C #10@110 C/C
200 200 200
300
300
X 300MM
2-#16 2-#16 2-#16 #10@110 C/C RESIDENTIAL
L R
#10@110 C/C
BUILDING
D E
C D E
ENGR.REY ALBERT
200 200
2725
350
2525
350
2575
350 CABOTAJE
635 635 645 645
2-#16 2-#16 SHEET CONTENT:
2-#16 2-#16 2-#16
2-#16
2-#16 0.3
23-2L-#10
10-2L-#10 8-2L-#10 10-2L-#10 10-2L-#10 8-2L-#10 10-2L-#10 1.41 1.43 1.43 1.43 1.43 1.43 1.43
@125 C/C
@95 C/C @115 C/C @95 C/C @95 C/C @115 C/C @95 C/C
B19 B22 DRAWING NO:
BEAM-1DETAIL
BEAM-2 DETAIL TRUSS DETAILS S 4
SHEET NO: