You are on page 1of 1

Testing & Commissioning Report

PROJECT NAME
CONSULTANT Saudi Diyar Consultants
CONTRACTOR
BUILDING / LOCATION DATE :

Domestic Water Pumps - Tag # , Tag # , Tag # and Tag #


Description Pump-1 Pump-2 Pump-3 Pump-4

Pump type
Manufacturer
Serial No.
Flow gpm(l/s)
Head ft of water(m)
HP / Kw
Power supply, V-Ph-Hz
Actual voltage
Rated amps on label
Actual running amps

Pump test zero flow


Description Pump-1 Pump-2 Pump-3 Pump-4
Discharge Pressure bar bar bar bar

Pressure switch settings


Description PS-1 PS-2 PS-3 PS-4
Cut-in pressure bar bar bar bar
Cut-out pressure bar bar bar bar

Safety & Protection tests


Float switch installation Yes / No
Dry run protection Buzzer alarm sound Yes / No
Visual alarm / Lamp indication Yes / No
Thermal Over Load Protection Yes / No Phase failure protection Yes / No

Pressure Tank
Tank Size : …………… Tank Pre-charged Pressure : ……………

Sequence of Operation of Pumps


First start Pump # starts & then Pump # & then Pump #
Second start Pump # starts & then Pump # & then Pump #
Third start Pump # starts & then Pump # & then Pump #
Sequence repeats cycle Yes / No

Contractor's Representative Consultant's Representative

Name & Sign: Name & Sign:

Date: Date:

You might also like