TREATABILITY TESTING WORK PLAN

1. Introduction
PT Syngenta Indonesia is not a new player in the world of Indonesian agribusiness. The company
which is headquartered in Switzerland is in the business of seeds, fertilizers, pesticides and other plant
protective materials. Both vegetable and food crops and plantations. In Indonesia, Syngenta is based in
Jakarta and oversees three commercial areas including Java, Sumatra and eastern Indonesia. 80 to 85
percent of the products are intended for the local market, while the rest are exported to several countries
such as the Philippines, Thailand and other countries. Until now, Syngenta Indonesia has had no less
than 700 employees who have plant protection plants in Gunung Putri, Bogor, which was established in
1981. The factory with an area of 12 thousand m2 above 32 thousand m2 of land located not far from
East Jakarta is a site formulation, filling and packaging (FF & P) for plant protection products. Its total
production capacity can reach 58 million liters per year. Its main production is herbicide, gramoxone,
which is 86 percent followed by insecticides and fungicides.

2. Purpose and Objectives


Conducting wastewater treatment studies using chemical and physical systems to reduce the parameters
of BOD, COD, TSS, C7H8, C6H6, Cu, CN, NO3, pH, Phenol and Paraquat.
The target is to determine the type and dose of chemicals that are efficient and can determine the effective
ETP design

3. Scope of Work
The scope of work planned is:
- PT. LTE conducts sampling, jartest, filtration, study and analysis of the "ETP system".
- PT. LTE conducts study and analysis, to determine the related equipment and instruments needed.
- PT. LTE creates and submits an ETP proposal system according to the above points both technically
and commercially.
- In the proposal, the details of the technical specifications of the related equipment will be displayed.
- The jartest laboratory was conducted at the PT workshop. ETI Cikupa area Tangerang Banten.
- For the purposes of data 11 Quality parameters in the jartest process, using laboratory equipment and
an internal test kit PT. LTE
- The jartest process that meets the quality standards, then the raw water and effluent water will be sent
to the ALS Laboratory.
- PT. LTE will prepare facilities and infrastructure for this study.
- The maximum duration of study time is 3 weeks.
4. Job Implementation
JOB IMPLEMENTATION SCHEDULE is compiled and adjusted to 3 (three) activities that cannot be
separated, namely Preparation Work, jar test Simulation Work and Reporting Work within the period of
completion of the overall work.
Preparatory work, is a stage where all legal aspects and administration must be fulfilled which include
administrative preparation, field mastery work and mastery of technical conditions / existing Design and
non-technical preparation as well as project management consolidation meetings.
Jartest Simulation Work, is a stage where Sampling, Jartest, Filtration, Analysis & Planning Activities.
Reporting Jobs, is a stage where Field Activities and Planning take place with Back Up by Reporting
Activities. Management Reporting starts to be implemented until it reaches the completion stage. In this
stage the actual planning activities take place, starting with technical preparation, mobilization activities,
monitoring and monitoring, product control, coordination and input on field work and administration /
reporting stages, recording at each activity in the framework of making implementation and monitoring
documents as analytical material or as a file archive and has a Legal Aspect.
Job Plot Scale Testing is a stage that is done after the final report outside the 3 weeks period.

5. Working Method
The description of the work methods to be carried out in this activity are as follows:
1. Preparation
Preliminary work consisting of:
- Prepare the field office and its facilities in accordance with BOQ in the contract. In the event of
obstacles in this preparation, work must be carried out in accordance with the job description and
schedule.
- Mobilize the personnel who will be involved along with the job description, according to the
Organizational Structure.
- Prepare a work plan with targets to be achieved.
2. Primary data collection
- Data on measurement of ETP land plans in general.
3. Simulation of jar tests
Jar test simulation work consisting of:
- Taking 5 liters of raw water (sampling), as a simulation material.
- Test 9 parameters for raw water variations with the internal Lab.
- Jartest with varying doses of chemicals to determine the optimal dose
- Test 9 parameters for variations in treated water with the internal Lab.
- Lab test in ALS for 11 parameters in selected treated water, as the final result
4. Compiling and processing data
5. Reporting Jobs
The reporting work consists of:
- Collection of test documents and Lab analysis. ALS
- Making Description ETP Process
- Making PFD and P & ID
- Making ETP Layout
- Making Technical Specifications of ETP Equipment
- Making ETP Equipment Work System
- Making CAPEX & OPEX
6. Work Scale Testing is done after the two-week finel report.

6. Work Equipment
The internal laboratory equipment to be used in this activity are as follows:
1. BOD parameters
Equipment : Waterproff Dissolved Oxygen Mater
Made : Hanna Instrument
Type : HI-98193
Key Feature : Build-in calculation with determination of BOD.
2. Parameters of COD, TSS, Cu, CN, NO3 & pH
Equipment : Handheld Colorimeter
Artificial : Hach
Type : DR 900
Key Feature : A single hand-held instrument provides access to 90 of the most
common parameter.
3. Phenol parameters
Equipment : Phenols Test Kit
Made : Hanna Instrument
Type : HI-3864
Range : 0 - 5.0 mg / l.
5. 5 liter semple container
6. Buckets
7. Dipper
8. Jartest Equipment
9. Glass beaker 500 ml
10. Acid Solution
11. Base Solution
12. Coagulant Solution
13. Bleaching Earth Solution
14. Polymer solution
15. Kuriflock solution
16. Solution of FeCl3
17. Solution of SMBS
18. Solution ACH
19. Solution Alum
20. Filter Paper
21. Sand Filter Equipment
22. Active Carbon Filter Equipment
23. Zeolite Filter Equipment
24. Pipette