No : FM 00-ENG-017

PLAN WEEKLY PRODUCTION PERFORMANCE GRAPHIC Tgl Terbit : 08-04-11

April-18 Revisi : 00
Job Site : Janahjari Halaman : 4 dari 16

OVERBURDEN REMOVAL
100.000 500.000
80.000 400.000
PLAN (bcm)
60.000 300.000
ACTUAL (bcm)
40.000 200.000
PLAN CUMM.
20.000 100.000 ACTUAL CUMM.
- -
Week 14 Week 15 Week 16 Week 17 Week 18

Description Week 14 Week 15 Week 16 Week 17 Week 18


PLAN (bcm) 94.925 94.925 94.925 94.925 14.850
PLAN CUMM. 94.925 189.850 284.774 379.699 394.549
ACTUAL (bcm) - - - -
ACTUAL CUMM. - - - -

OB AND COAL PRODUCTIONS

120.000 100,00%
90,00%
100.000
80,00%
PLAN OB (Bcm)
70,00%
80.000
ACTUAL OB (Bcm)
60,00%
60.000 50,00% PLAN COAL (Ton)

40,00% ACTUAL COAL (Ton)


40.000 ACH (%)
30,00%
20,00% ACH (%)
20.000
10,00%
- 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Week 14 Week 15 Week 16 Week 17 Week 18

Description Week 14 Week 15 Week 16 Week 17 Week 18


PLAN OB (Bcm) 102.350 94.925 94.925 94.925 14.850
ACTUAL OB (Bcm)
ACH (%) 0,00% 0,00% 0,00% 0,00% 0,00%
PLAN COAL (Ton) 22.744 21.094 21.094 21.094 3.300
ACTUAL COAL (Ton)
ACH (%) 0,00% 0,00% 0,00% 0,00% 0,00%